Loading...
HomeMy WebLinkAbout21207 Application Summary BOZ E M NMT Al Community Development PROJECT IMAGE a j i l� PROJECT INFORMATION VICINITY MAP Project Name: Lamme and 5th ADU Project Type(s): New car port/accessory structure and ADU Aim Street Address: 421 West Lamme Street E.1T.�_Ft.mlChutchV1x-IS Legal Description: Tracys 3rd addition,S12,T02 S,R05 E,Block D,Lot 21&W2 Lot20 Description of Project: Constructlon of anew carport/accessory structure on the north end of the lot •" Tre with a new ADU Located ab—Lot has an existing dwelling:no work is being done to the existing dwelling and on physkal con—Alon to the proposed new construction Current Zoning: Ra Gross Lot Area: 6,oso - Block Frontage(s): Lamme=42' 5th=144r I Existing Dwelling(no work to this snucture).I prapused new ground flour cwpart/acccessory stmdure with new ADU above Number of Buildings: — ' . 1 ( L Type and Number of Dwellings: IproposednewaccessorydwellingunitBuilding Si2e(s): Uses are one structure-on ground floor-carport end accessory structure=22'x36',Upper floor ADU 15'x 40' K-- Building Height(s).. 25r Err , Ut Number of Parking Spaces: 2 off street spaces provided for ADU t t Affordable Housing (Y/N): N Cash-in-lieu Parkland (Y/N): N Departure/Deviation Request (Y/N): N SPECIAL DISTRICTS Overlay District: Neighborhood Conservation None Urban Renewal District: Downtown North 7th Avenue Northeast North Park None i Development Review Application Page 1 of 3 Revision Date:June 2020 i PROPERTY OWNER Name: Graham Neale Full Address: 13160 Portnell Road,Bozeman,MT 59718 Email: grahamnealemt@gmail.com Phone: 406.223.6920 APPLICANT Name: Graham Neale Full Address: 13160 Portnell Road,Bozeman,MT 59718 Email: grahamnealemt@gmail.com Phone: 406.223.6920 REPRESENTATIVE Name: Living Places Architecture;Craig Miller Full Address: 321 East Main Street Suite 318,Bozeman,MT 59718 Email: craig@yourlivingplaces.coin Phone: 406,579.4783 CERTIFICATIONS AND SIGNATURES This application must be signed by both the applicant(s) and the property owner(s) (if different) for all application types before the submittal will be accepted.The only exception to this is an informal review application that may be signed by the applicant(s) only. As indicated by the signature(s) below,the applicant(s) and property owner(s) submit this application for review under the terms and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and any special conditions established by the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may be assessed for my project. Further, I agree to grant City personnel and other review agency representative's access to the subject site during the course of the review process (Section 38.200.050, BMC). I (We) hereby certify that the above information is true and correct to the best of my(our) knowledge. Certification of Completion and Compliance—I understand that conditions of approval may be applied to the application and that I will comply with any conditions of approval or make necessary corrections to the application materials in order to comply with municipal code provisions. Statement of Intent to Construct According to the Final Plan—I acknowledge that construction not in compliance with the approved final plan may result in delays of occupancy or costs to correct noncompliance. Applicant Signature: Printed Name: Owner Signature: `3affi t" Printed Name: S�tiy►�e, ����,wti �{��QQ Representative Signature: Printed Name: Craig Miller Development Review Application Page 2 of 3 --I Revision Date:June 2020 APPLICATION TYPE Check all that apply FORM FORM 1. Administrative Interpretation Appeal AIA [' 16. PUD Preliminary Plan PUDP 2. Administrative Project Decision Appeal APA [ 17. PUD Final Plan PUDFP 3. Annexation and Initial Zoning ANNX [ 18. Reasonable Accommodation RA 4. Commercial/Nonresidential COA CCOA [ 19. Site Plan SP 5. Comprehensive Sign Plan CSP [ 20. Special Use Permit SUP 6. Condominium Review CR 21. Special Temporary Use Permit STUP 7. Conditional Use Permit CUP 22. Subdivision Exemption SE 8. Extension to Approved Plan EXT [ 23. Subdivision Pre-Application PA 9. Growth Policy Amendment GPA [ 24. Subdivision Preliminary Plan PP 10. Informal Review INF [ 25. Subdivision Final Plat FP 11. Master Site Plan MSP [ 26. Wetland Review WR 12. Modification/Plan Amendment MOD E. 27. Zone Map Amendment ZMA 13. Neighborhood/Residential COA NCOA E 28. Zone Text Amendment ZTA 14. Pre-application Consultation None [' 29. Zoning/Subdivision Variance Z/SVAR 15. PUD Concept Plan PUDC [ 30. Zoning Deviation/Departure None [ 31. Other: REQUIRED FORMS Varies by project type APPLICATION FEE Varies by project type CONTACT US Alfred M. Stiff Professional Building phone 406-582-2260 20 East Olive Street fax 406-582-2263 Bozeman, MT 59715 planning@bozeman.net www.bozeman.net/planning Development Review Application Page 3 of 3 Revision Date:June 2020 -1 Community Development CVA Development Review Application COVID-19 Acknowledgment of Application Processing Delays On March 13, 2020, the President of the United States issued a Proclamation on Declaring a National Emergency Concerning the Novel Coronavirus Disease (COVID-19) Outbreak. On March 12, 2020, the Governor of the State of Montana issued Executive Order No. 2-2020 Declaring a State of Emergency to Exist Within the State of Montana Related to the Communicable Disease COVID-19. The City of Bozeman issued a COVID-19 emergency declaration on March 16, 2020. The City subsequently issued Order ED-05 setting forth public meeting protocols on March 31, 2020 and Order ED-06 closing City facilities to public entry, including the Stiff Professional Building, on March 23, 2020. Order ED-05 states in relevant parts, "In accordance with the Emergency Declaration, public meeting agendas will be limited to only essential matters. . . ," It describes notice requirements, the use of videoconferencing or telephonic technology to hold remote hearings, and providing the public an opportunity to participate remotely. A copy of Order ED- 05 is attached to this form. On March 27, 2020 the Attorney General of the State of Montana issued a letter of guidance to local governments recommending public meetings be held only for essential business, and those public meetings be held remotely. Provisions in the emergency declarations and City of Bozeman Orders may restrict or delay the ability of the City to complete the review and finally approve certain development review applications. Acknowledgment and signatures This acknowledgement must be signed by both the applicant(s) and the property owner(s) (if different) for all application types before the submittal will be accepted and processed. As indicated by the signature(s) below, the applicant(s) and property owner(s) submit this application for review under the terms and provisions of the Bozeman Municipal Code the City's COVID-19 Emergency Declaration and subsequent Orders issued by the City Manager. I acknowledge that the City may be delayed in the processing of my application and may not be able to complete the application review within standard time limits due to the constraints present under the emergency orders. I (We) hereby certify that the above information is true and correct to the best of my (our) knowledge. Certification of Acknowledgment— I understand that there may be delays in the processing of my application and that it may reach a point in processing where it may not proceed to final approval and that I will not hold the City responsible for any delays presented under the emergency order. Applicant Signature; �Z,L Printed Name: kle4Je- Owner Signature: 5cw►�� ��<�G :n+� �i�,� �� Page 1 of 2 q_g_Z0 Printed P Name: 5 o''ti'`'� �YcLGlttiYv� /v-ec Owner Signature -4ti �Vl'" �ii Printed II Name: If signing as a corporation or LLC, please provide the title and position of the individual signing on behalf of the corporation/LLC. Attach separate sheets for additional owner signatures. Page 2 of 2 4-8-20