Loading...
HomeMy WebLinkAbout43_E101D Site Plan_01.13.21AD A U N I T C C C C C C C C Y H D Y H D BL D G B MD P - 2 'H B ' MD P - 2 'H B ' CP 1 P1 P1 WP 1 WP 1 WP 1 WP 1 WP 1 WP 1 WP 1 WP 1 WP 1 P1 P1 CP 1 P1 P1 WP 1 WP 1 WP 1 WP 1 WP 1 WP 1 WP 1 WP 1 WP 1 1 1 1 1 1 1 2 3 4 5 6 3 7 4 5 6 HB - 7 BL D G B HB - 7 P1 1 ABCD ABCD 1 2 3 4 5 1 2 3 4 5 COPYRIGHT GGLO. ALL RIGHTS RESERVED.ORIGINAL SHEET SIZE IS 24"x36"SHEET NO. SHEET TITLE DCE STAFF: DCE STAFF: PROJECT NO.: OWNER APPROVAL: MARK DATE DESCRIPTION ISSUE INFORMATION REVISIONS PROJECT: OWNER: PROJECT ADDRESS: P L O T D A T E / T I M E : 1301 First Avenue, Suite 301 Seattle, WA 98101 http://www.gglo.com Phone:208.288.2181 Project:20GGLO01 1 / 1 3 / 2 0 2 1 1 2 : 2 1 : 4 2 P M REEDTS2019111.01COTTONWOOD SUBDIVISION 5500 S COTTONWOOD RD BOZEMAN, MT 59718 E -101D ELECTRICAL SITE PLAN PACKAGE 'D' THE COTTONWOOD PROJECT THE COTTONWOOD PROJECT, LLC SC A L E : 1 " = 2 0 ' - 0 " 1 EN L A R G E D E L E C T R I C A L S I T E P L A N P A C K A G E ' D ' SITE GENERAL NOTES A. CONTRACTOR SHALL CONTACT UNDERGROUND UTILITY LOCATING SERVICE PRIOR TO EXCAVATION FOR ELECTRICAL WORK. B. CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITH ALL OTHER SITE DISCIPLINES INCLUDING BUT NOT LIMITE D TO TRADES ASSOCIATED WITH WATER, SEWER, AND GAS INSTALLATIONS. C. ELECTRICAL CONTRACTOR SHALL COORDINATE UTILITY WORK REQUIRED BY SERVING UTILITY AND SHALL FORWARD SERVING UTILITY WORK INVOICE TO OWNER FOR PAYMENT BY OWNER. D. ROUTE ALL EXTERIOR LIGHTING (INCLUDING BUILDING MOUNTED LIGHTING SHOWN ON FLOOR PLANS) THROUGH A LIGHTING CONTROL PANEL. REFER TO DETAILS ON SHEET E-600. E. COORDINATE ALL EXTERIOR LIGHTING FIXTURE LOCATION S WITH ARCHITECTURAL PLANS PRIOR TO ROUGH-IN. F. UTILITY FAULT CURRENT INFORMATION WAS NOT AVAILABLE DURING DESIGN. AIC CALCULATIONS/RATINGS MUST BE VERIFIED. CONTRACTOR TO COORDINATE WITH UTILITY AND NOTIFY ENGINEER OF RECORD ONCE UTILITY FAULT CURRENT INFORMATION IS AVAILABLE. KEYED NOTES 1 REFER TO DETAIL 4, SHEET E-600 FOR POLE BASE DETAI L. TYPICAL OF ALL LIGHT POLE BASES. 2 NEW TRANSFORMER AND PAD BY SERVING UTILITY. COORDINATE WITH SERVING UTILITY AS REQUIRED FOR CONSTRUCTION SCHEDULE. 3 APPROXIMATE ROUTING/LOCATION OF SERVING UTILITY UNDERGROUND CONDUIT/CONNECTORS. SHOWN FOR REFERENCE ONLY. PRIMARY CONDUIT, CONDUCTORS, AND TERMINATIONS BY SERVING UTILITY. COORDINATE EXACT REQUIREMENTS AND APPROVALS WITH UTILITY PRIOR TO COMMENCING WORK. 4 APPROXIMATE LOCATION OF MAIN DISTRIBUTION PANEL 'MDP.' REFER TO BUILDING FLOORPLANS FOR EXACT LOCATIONS. 5 CHARTER COMMUNICATIONS TO PROVIDE CONDUIT AND ELECTRICAL CONTRACTOR TO INSTALL FOR PHONE/TV/DATA SERVICES. COORDINATE EXACT REQUIREMENTS WITH SERVICE PROVIDERS PRIOR TO COMMENCING WORK. 6 BUILDING COMMUNICATIONS PANEL. REFER TO DETAIL 6, SHEET E-600. 7 REFER TO DETAIL 5, SHEET E-600 FOR TYPICAL TRENCHI NG DETAIL. COORDINATE EXACT REQUIREMENTS AND APPROVALS WITH UTILITY PRIOR TO COMMENCING WORK. #NORTH A1 BC KEY PLAN A2 A3 D MARK DATE DESCRIPTION