Loading...
HomeMy WebLinkAbout13--DEM Checklist 10-12-2020 1 | P a g e 204 S. 3rd. Residences – DEM Checklist 1. Project Narrative is included in submittal. Please see 03--Project Narrative 10-12-2020. 2. Historical information is included in submittal. Please see Montana Historical Architectural Inventory Card 10-12-2020. 3. Existing Images included in submittal. Please see 08--Existing Images 10-12-2020. 4. Please see sheet A1.1 in Plan Set. 5. Please see sheets D1.1, D2.1, D2.2, D4.1, D6.1 and D6.2 in the Plan Set. 6. Please reference Demo sheets. All demolition will happen on noncontributing facades and will only be to tie in the addition. No nonconforming structure demolition planned. 7. Noticing certificate N1 and materials included in submittal. Please see 14--Property Owner List 10-12-2020. 8. Only selective demolition planned that will not alter the historic presence to the streetscape.