Loading...
HomeMy WebLinkAbout10--Construction Timeline 10-12-2020 Construction Information and Timeline Contractor: R & R Taylor Construction Inc 1775 Love Ln, Bozeman, MT 59718 R&R Taylor is an established and reputable contractor in the Gallatin Valley that has successfully completed a multitude of historic projects. They are used to working in the Downtown Corridor and are experienced at minimizing construction impacts on neighbors. Below is a list of historic projects they have completed: • Montana Hall East End ADA Improvements – Montana State University o https://www.bozemandailychronicle.com/news/montana_state_university/iconic- montana-hall-finally-getting-an-elevator-to-meet-ada/article_1d1efa23-4694-56aa- 90ee-3bb0696188a2.html • Story Mansion – Renovation of the interior and exterior of Story Mansion o https://friendsofthestory.org/ • Bannack Hotel and out Buildings – Restored the Bannack Hotel to its original condition o http://bannack.org/about-us • Old Faithful Cabins – Fixed the exterior and restored the interior of all the cabins near the Old Faithful o https://www.yellowstonenationalparklodges.com/lodgings/cabin/old-faithful-lodge- cabins/ • Hamilton Hall Montana State University o https://www.montana.edu/calendar/locations.php?building=20&ref=map • Powder Horn Building Renovation o https://www.bozemandailychronicle.com/news/economy/schnee-s-and-powder-horn- to-merge-retail-spaces-in-story-block-building/article_85594fd4-489f-11e1-9909- 0019bb2963f4.html • Berg Law Firm Remodel – Currently Under Renovation fixing up the Exterior to the original look. o https://www.berglilly.com/ • Donaldson Hall – Havre MT o https://www.msun.edu/aboutmsun/history/donaldson.htm 2 of 2 Timeline: Construction will take approximately 8-14 months and will begin as soon as April 2021