Loading...
HomeMy WebLinkAbout12 Encompass Narrative (1of2) 5-6-20 encompass design inc 1535 liberty lane suite 110b missoula mt 59808 O: 406.540.4437 1 MEMO TIMBER RIDGE APARTMENTS PROJECT NO.: 19.136 RE: CONCEPT REVIEW CITY OF BOZEMAN DATE OF ISSUANCE: 1/8/2020 AFFORDABLE SENIOR HOUSING The Timber Ridge Project is a Low Income Senior Housing Tax Credit project that was awarded tax credits from the Montana Board of Housing. Timber Ridge will house 30 seniors in one building that is 3 stories in height with an elevator. It is set to complete the affordable housing lots created in the West Winds subdivision. The 30 units are comprised of the following unit mix:  20 one bedroom/one bathroom units  10 two bedroom/one bathroom units The project provides senior amenities to ensure a comfortable, communal place to live. It boasts an on site property manager, community room with a kitchenette, an outdoor community space, computer area, a Fitness Room, a Library space, as well as an outdoor garden area. The project will incorporate energy features to meet and exceed International Energy Code compliance. Specifically the following: Green Initiatives: • Energy Star Appliances to include refrigerator, washer, dishwasher, range hood, bathroom exhaust fans • Low/No VOC paint/adhesive • Formaldehyde free/full sealed countertop • Water efficient landscaping • Water flow saving device – Showerheads=1.5GPM, Kitchen Faucets=1.5GPM, Lav faucets=1.0 GPM • Smoke free policy • The items listed below are either code and are therefore required or will be required in the QAP • Insulation and Windows meeting State Adopted IECC standards – minimum (Rehab and New Construction) • LED lighting All Exterior (all for New Const, where replaced for Rehab) All Interior lighting shall have CFL or LED bulbs • Multi Family Project - Blower Door testing and Certification of 20% of the total units for projects with a total unit count of 9 or more. The Developer or Builder must notify MBOH at least one week in advance of the date and time that tests will be performed and MBOH staff must be permitted to attend and observe such testing. Proof of such testing must be submitted to MBOH to qualify for issuance of Form 8609(s), demonstrating at least meeting the State Adopted IECC level of ACH at the time the project is awarded. • Min Code requirement or as labeled below: (all for New Const, where replaced for Rehab) Toilets = 1.6 GPF min (3 inch flapper is recommended) Range/bathroom fans vented to exterior (New Const only) encompass design inc 1535 liberty lane suite 110b missoula mt 59808 O: 406.540.4437 2 Carbon Monoxide Detectors in all units that provide Gas Fired appliances or equipment within the unit (New Const and Rehab) Flooring (All for New Const, where replaced for Rehab) Carpet – 26 oz min Hard Surface – 12 mil min Cabinets (All for New Const, where replaced for Rehab) Must have “No” added urea Formaldehyde Must comply with AWI Architectural Woodwork Quality standards Must contain cabinet fronts made from solid wood. Front stiles pocket-drilled and assembled with screws for rugged durability. Side and back panels are made from 3/8" vinyl covered particleboard min. For wood surfaces that are to be coated or laminated with vinyl or water-resistant coating, the coating or laminate should be applied as soon as practicable, to reduce formaldehyde emissions. Senior housing projects typically see 1 vehicle per dwelling unit. We have provided 44 off street parking spaces in this development. The site is laid out to provide southern exposure to the garden space and the community room. Meant create an interesting facade with fenestration along Tschache Lane. We placed the Senior housing building to compliment the adjacent family affordable housing project layout to create a cohesive group of building, open space and parking and driveway traffic. The project will submit for permit once all of our City of Bozeman review processes are completed. We intend that to be late Spring 2020 and begin construction as soon as we obtain a permit in 2020. We believe the project will take 10 months to construct. We appreciate the review, please contact our team with any questions or comments. Sincerely. Jenn Clary, Principal Architect encompass design inc