Loading...
HomeMy WebLinkAboutPart 2 SWPPP 02-04-20 FLANER6 MILE ROAD Q D C TRASH RECEPTACLE - AND SANITARY WASTE FACILITY STRAW WATTLES FOR o L PERIMETER PROTECTION i � n *DESIGNATED CONSTRUCTION ENTRANCE ,I *, -- - - -- O o g..55RYWAY Ao l I WAY III\ P X 4 u *STREET SWEEPING TO OCCUR ON a o � A WEEKLY BASIS o _ CLEAR AND STRIP n £V CLEAR AND STRIP , IMPROVED AREAS ° IMPROVED AREAS i 17 LIMITS OF DISTURBANCE; N r ti i i _J .— �����,, INLET PROTECTION �DRo e B W a"W 8"W B SSi O - O la Q o� C '% ° LL NOTES: PHASE I: CLEARING AND STRIPPINGEROSION CONTROL LEGEND i 1. CONTRACTOR SHALL MAKE ALL NECESSARY EFFORTS TO PREVENT STRAW WATTLES 3 SEDIMENT FROM LEAVING THE SITE. 1. INSTALL EROSION CONTROL MEASURES AS NOTED ON j THIS SITE PLAN PRIOR TO PERFORMING ANY WORK. _VB_ VEGETATIVE BUFFER 2. EROSION CONTROL MEASURES SHALL REMAIN IN-PLACE UNTIL VEGETATION 2. INSTALL SANITARY FACILITY FOR WORKERS. HAS ESTABLISHED AND THERE IS NO RISK OF SEDIMENT RUN-OFF. LIMITS OF DISTURBANCE T3 3. STRIP TOPSOIL AND ORGANICS IN AREAS WHERE 3. THIS EROSION CONTROL PLAN SHALL BE USED IN CONJUNCTION WITH THE PARKING LOTS, BUILDINGS, AND UTILITIES WILL BE GRAVEL CONSTRUCTION ENTRANCE STORM WATER POLLUTION PREVENTION PLAN FORM (SWPPP). PLACED. _— 00 4. GENERAL CONTRACTOR IS RESPONSIBLE FOR ASSURING EROSION CONTROL 4. CONSTRUCTION TRAFFIC TO ENTER FROM WEST CURB INLET PROTECTION MEASURES ARE IN CONFORMANCE WITH THE SWPPP. CLEAR COMMUNICATION BOUNDARY OF PROJECT SITE USING FLANDERS MILL In BETWEEN THE CONTRACTOR AND SWPPP ADMINISTRATOR IS CRUCIAL FOR AND HARVEST PARKWAY. STREET SWEEPING SHOULD *1 MATERIAL STORAGE AND STOCKPILE SCALD � MAINTAINING COMPLIANCE WITH THE GENERAL PERMIT FOR STORMWATER BE COMPLETED ON ALL STREETS IMPACTED BY CONSTRUCTION. DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY. UNANNOUNCED *2 CONCRETE WASHOUT 0 75' 150 300' VISITS BY THE AUTHORITY MAY OCCUR. o R WATER FLOW DIRECTION Q 5. DO NOT ALLOW DISTURBANCE OUTSIDE OF THE LIMITS OF DISTURBANCE. 1 inch= 150 FEET j 6. SOIL STOCKPILE MUST BE TEMPORARILY STABILIZED IF INACTIVE FOR 14 c5 DAYS. COVERING OR SURFACE ROUGHENING IS APPROPRIATE. ]SLANDERS MILL FIGURE A 7. CONTRACTOR TO MAINTAIN GOOD HOUSEKEEPING PRACTICES INCLUDING T� 1t��I�1��C SWPPP t� MADISON ENGINEERING DRAWN BY: DAD WORKER WASTE PICK UP. APARTMENTS JL A�vJ1ENTS S �Y�Y JC JC JC 895 TECHNOLOGY BLVD.ST1E 203,BOZEMAN,MT 59918 BOZEMAN MT PHONE(406)586-02621FAX(406)586-7355 DATE: 01/08/20 8. SPILL KIT TO BE KEPT ON SITE IN JOB/STORAGE TRAILER. 9 PROJECT# 19-116 C — e _ _C C j FLANER6 MILE ROAD Q D C _- ��h�e m nn o n � 3v v o TRASH RECEPTACLE —m �� - 00 -- AND SANITARY WASTE FACILITY a �e � 0 STRAW WATTLES FOR o � X PERIMETER PROTECTION X o - *DESIGNATED CONSTRUCTION X V� ENTRANCE 8,SRYLIN WAY Q \ \ *STREET SWEEPING TO OCCUR ON X D Q I D i' Z A WEEKLY BASIS /5 \ a LIMITS OF DISTURBANCEZE sM—1 9� N d' w sro r — \j cn BW i "f� aW" esS INLET PROTECTION (TYP.) � w�BW BW 8"W 8"SS 8"SS 8"SS e"SS -- / NOTES: PHASE II:UTILITY'INSTALLATION EROSION CONTROL LEGEND j 1. CONTRACTOR SHALL MAKE ALL NECESSARY EFFORTS TO PREVENT 1. INSTALL EROSION CONTROL MEASURES AS NOTED STRAW WATTLES SEDIMENT FROM LEAVING THE SITE. ON THIS SITE PLAN PRIOR TO PERFORMING ANY / WORK. —VB— VEGETATIVE BUFFER 2. EROSION CONTROL MEASURES SHALL REMAIN IN-PLACE UNTIL VEGETATION HAS ESTABLISHED AND THERE IS NO RISK OF SEDIMENT RUN-OFF. 2. INSTALL UNDERGROUND UTILITIES: SEWER, WATER, LIMITS OF DISTURBANCE STORM, AND UTILITY CONDUIT. 3. THIS EROSION CONTROL PLAN SHALL BE USED IN CONJUNCTION WITH THE GRAVEL CONSTRUCTION ENTRANCE `L STORM WATER POLLUTION PREVENTION PLAN FORM (SWPPP). 3. CONSTRUCTION TRAFFIC TO ENTER FROM WEST BOUNDARY OF PROJECT SITE USING FLANDERS MILL `� 4. GENERAL CONTRACTOR IS RESPONSIBLE FOR ASSURING EROSION CONTROL AND HARVEST PARKWAY. STREET SWEEPING SHOULD CURB INLET PROTECTION j MEASURES ARE IN CONFORMANCE WITH THE SWPPP. CLEAR COMMUNICATION BE COMPLETED ON ALL STREETS IMPACTED BY In BETWEEN THE CONTRACTOR AND SWPPP ADMINISTRATOR IS CRUCIAL FOR CONSTRUCTION. MATERIALS STORAGE AND STOCKPILE SCALD � MAINTAINING COMPLIANCE WITH THE GENERAL PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY. UNANNOUNCED *2 CONCRETE WASHOUT 0 75' 150 300' VISITS BY THE AUTHORITY MAY OCCUR. o R WATER FLOW DIRECTION Q 5. DO NOT ALLOW DISTURBANCE OUTSIDE OF THE LIMITS OF DISTURBANCE. 1 inch= 150 FEET j 6. SOIL STOCKPILE MUST BE TEMPORARILY STABILIZED IF INACTIVE FOR 14 c5 DAYS. COVERING OR SURFACE ROUGHENING IS APPROPRIATE. ]SLANDERS MILL FIGURE A 7. CONTRACTOR TO MAINTAIN GOOD HOUSEKEEPING PRACTICES INCLUDING T� 1t��I�1��C SWPPP t� MADISON ENGINEERING DRAWN BY: DAD WORKER WASTE PICK UP. APARTMENTS JL A�vJ1ENTS S �Y�Y JC JC JC 895 TECHNOLOGY BLVD.ST1E 203,BOZEMAN,MT 59918 BOZEMAN MT PHONE(406)586-02621FAX(406)586-7355 DATE: 01/08/20 8. SPILL KIT TO BE KEPT ON SITE IN JOB/STORAGE TRAILER. 9 PROJECT# 19-116 FLANDERS MILL ROAD TRASH RECEPTACLE Q AND SANITARY WASTE FACILITY STRAW WATTLES FOR X PERIMETER PROTECTION X / *DESIGNATED CONSTRUCTION RANCE I X � �,' r � ,— '—� `X;O RYIJN SUN ENT *1 M sss WAY *STREET SWEEPING TO OCCUR ON X ° 2 I i � A WEEKLY BASIS Al — M M -- I S S 1 � II K I ZE —X X ❑ J 0. LIMITS OF 1 r 1 DISTURBANCE ® 04 3 ZE N u n 1 e _ g'W �: y INLET PROTECTION > W wio 'ss�� (TYP.) -ss � 8 W e"W 8'•W B'S5 8"SS 8"SS "'ss Wss LL NOTES: PHASE III:ASPHALT, CURBING&SIDEWALK EROSION CONTROL LEGEND 1. CONTRACTOR SHALL MAKE ALL NECESSARY EFFORTS TO PREVENT 1. INSTALL EROSION CONTROL MEASURES AS NOTED � STRAW WATTLES j SEDIMENT FROM LEAVING THE SITE. ON THIS SITE PLAN PRIOR TO PERFORMING ANY —VB— VEGETATIVE BUFFER 2. EROSION CONTROL MEASURES SHALL REMAIN IN—PLACE UNTIL VEGETATION WORK. HAS ESTABLISHED AND THERE IS NO RISK OF SEDIMENT RUN—OFF. LIMITS OF DISTURBANCE 2. INSTALL CURB, GUTTER, AND SIDEWALKS. -a 3. THIS EROSION CONTROL PLAN SHALL BE USED IN CONJUNCTION WITH THE GRAVEL CONSTRUCTION ENTRANCE 3. INSTALL ASPHALT PAVEMENT. _ STORM WATER POLLUTION PREVENTION PLAN FORM (SWPPP). m �— 00 4. GENERAL CONTRACTOR IS RESPONSIBLE FOR ASSURING EROSION CONTROL CURB INLET PROTECTION �� N MEASURES ARE IN CONFORMANCE WITH THE SWPPP. CLEAR COMMUNICATION r MATERIALS STORAGE AND STOCKPILE SCALE THE CONTRACTOR AND SWPPP ADMINISTRATOR IS CRUCIAL FOR *� MAINTAINING COMPLIANCE WITH THE GENERAL PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY. UNANNOUNCED *2 CONCRETE WASHOUT AREA 0 75' 150 300' j VISITS BY THE AUTHORITY MAY OCCUR. o R WATER FLOW DIRECTION Q 5. DO NOT ALLOW DISTURBANCE OUTSIDE OF THE LIMITS OF DISTURBANCE. 1 inch= 150 FEET j 6. SOIL STOCKPILE MUST BE TEMPORARILY STABILIZED IF INACTIVE FOR 14 c5 DAYS. COVERING OR SURFACE ROUGHENING IS APPROPRIATE. ]SLANDERS MILL FIGURE A 7. CONTRACTOR TO MAINTAIN GOOD HOUSEKEEPING PRACTICES INCLUDING T� 1t��I�1��C SWPPP t� MADISON ENGINEERING DRAWN BY: DAD WORKER WASTE PICK UP. APARTMENTS JL A�vJ1ENTS S �Y�Y JC JC JC 895 TECHNOLOGY BLVD.ST1E 203,BOZEMAN,MT 59918 BOZEMAN MT PHONE(406)586-02621FAX(406)586-7355 DATE: 01/08/20 8. SPILL KIT TO BE KEPT ON SITE IN JOB/STORAGE TRAILER. 9 PROOCT# 19-116