Loading...
HomeMy WebLinkAboutIntake Review Comment Narrative 02-11-20Flanders Mill Apartments Intake Review Comments Narrative  Include Jesse’s title and position on the A1 form Response: Jesse Chase’s Title and Position as Managing Member has been added to application.  Include the 50’ watercourse setback as shown on the plat Response: Per the approved variance the 50’ setback line shown on the Final Plat is not accurate. We also confirmed that with Ethan Cote from C&H. There is not “Wetland Setback” on the east side of the wet land, located west of the property. A copy of the approved variance is included in this submittal.  Please rotate the plans correctly in the electronic version Response: All sheets have been rotated to landscape view.  Include a Landscaping Plan Response: A Landscape Plan is included with the Site Plan package. Landscape Plans are not required for the Master Site Plan.  Include a Lighting Plan with fixture details included in the plan Response: A Lighting Plan with fixture details is included with the Site Plan package. Lighting Plans are not required for the Master Site Plan.  Provide trash enclosure details Response: The Trash Enclosure detail is shown on Sheets A0.2 & A0.3 and are included in both the Site Plan and Master Site Plan packages.  Provide transparency calculations on the elevations for the block frontages Response: Transparency calculation’s have been added to the building elevations. END OF NARRATIVE