Loading...
HomeMy WebLinkAboutLS3.1_Planting Details_1-21-2020TH I S D R A W I N G I S T H E I N T E L L E C T U A L P R O P E R T Y O F I N - S I T E D E S I G N G R O U P . D O N O T C O P Y O R R E P R O D U C E I N A N Y W A Y W I T H O U T T H E E X P R E S S W R I T T E N P E R M I S S I O N O F I N - S I T E D E S I G N G R O U P . C O P Y R I G H T © 2 0 0 6 ar c h i t e c t s @ i n - s i t e d e s i g n g r o u p . c o m 17 N o r t h 4 7 0 W e s t A m e r i c a n F o r k , U t a h 8 4 0 0 3 80 1 . 7 5 6 . 5 0 4 3 w w w . i n - s i t e d e s i g n g r o u p . c o m 4- 1 4 - 2 0 2 0 T Co r y B . Wh i t i n g # 1 0 6 2 9 CETIHCRA EPACSDN A L D E S N E C I L CI T Y S U B M I T T A L 45 5 5 F A L L O N S T . B O Z E M A N , M T 5 9 7 1 5 PH A S E B IC O N A T F E R G U S O N F A R M DE T A I L S PL A N T I N G LS3.1 19-143 1-21-2020 CBW JES PLACE ROOTBALL ON UNDISTURBED SOIL. NOTES: 1.SCARIFY SIDES OF PLANTER PIT PRIOR TO PLANTING TREE SO AS TO AVOID ANY GLAZING OR HARDENED AREAS THAT WILL BE DIFFICULT FOR ROOTS TO GROW THROUGH. 2.AMENDED SOIL PER SPEC'S TO BE USED IN ALL PLANTER PITS. 3.REMOVE ALL ROCKS LARGER THAN 12"FROM PLANTER PIT AND HAUL ROCK OFF SITE IN LEGAL MANNER. 4.TREES SHALL BE PLANTED SO THAT SOIL HAS SUFFICIENT DRAINAGE. 5.CONTRACTOR SHALL PERFORM PLANTER PIT DRAINAGE TEST PER SPECS. 6.EXCAVATE PLANTER PITS PER SPECS. 7.ROCK OR WOOD MULCH SHALL NOT TOUCH ANY PART OF THE TRUNK OF THE TREE, TYP. 8.ROOT FLARE OF TREE SHOULD BE PLACED 1" ABOVE EXISTING GRADE PER EACH 1" OF TREE CALIPER TO A MAXIMUM OF 2". ROCK MULCH OR WOOD MULCH PER PLANS. INSTALL FILTER FABRIC ONLY UNDER ROCK MULCH. BACKFILL PER SOIL NOTES/SPECS. WATER BASIN (ONLY REQUIRED IF REQUESTED BY LANDSCAPE ARCHITECT). DECIDUOUS TREE PLANTING SCALE: NTS 2X ROOT BALL WIDTH FINISHED GRADE 1 6'-8' STAKE, TYP. 2"Ø LODGE POLE STAKE, TYP. STAKE TO BE 6'-8' TALL TYP. ALL STAKES SHALL BE DRIVEN OUTSIDE THE EDGE OF THE ROOT BALL. ARBOR TIE, TYP.STAKES SHALL BE INSTALLED AT 60° ANGLES AROUND TREE AS SHOWN PLAN VIEW NOTES: IF TREE STAKING IS REQUIRED, THE FOLLOWING IS RECOMMENDED: 1.ALLOW FOR SOME TRUNK MOVEMENT. ATTACH ARBOR TIE TO TREE AND STAKE. 2.REMOVE ALL WRAPPING MATERIAL FROM ROOTBALL PRIOR TO PLANTING. 3.INSTALL THREE STAKES PER TREE, SPACED EVENLY AROUND THE TRUNK 4.REMOVE ALL STAKING AS SOON AS THE TREE IS STABLE. 5.CONTRACTOR SHALL PROVIDE TREE STAKING AS PART OF THE BASE BID. 6.CONTRACTOR TO REMOVE NURSERY TREE STAKE FROM ROOTBALL AT TIME OF PLANTING (TYP.). ARBOR TIE NAILED TO STAKE. ARBOR TIE. FOLD ENDS OF ARBOR TIE BACK. SECURE TO STAKE WITH 1" GALVANIZED ROOFING NAIL OR USE A KNOT. DECIDUOUS TREE STAKING SCALE: NTS2 FINISHED GRADE. PLACE ROOTBALL ON UNDISTURBED SOIL. BACKFILL PER SOIL NOTES/SPECS. WATER BASIN (ONLY REQUIRED IF REQUESTED BY LANDSCAPE ARCHITECT). ROCK MULCH OR WOOD MULCH, PER PLANS. INSTALL FILTER FABRIC ONLY UNDER ROCK MULCH. NOTES: 1.SCARIFY SIDES OF PLANTER PIT PRIOR TO PLANTING TREE SO AS TO AVOID ANY GLAZING OR HARDENED AREAS THAT WILL BE DIFFICULT FOR ROOTS TO GROW THROUGH. 2.AMENDED EXISTING SOIL PER SPEC'S TO BE USED IN ALL PLANTER PITS. 3.REMOVE ALL ROCKS LARGER THAN 12"FROM PLANTER PIT AND HAUL ROCK OFF SITE IN LEGAL MANNER. 4.TREES SHALL BE PLANTED SO THAT SOIL HAS SUFFICIENT DRAINAGE. 5.CONTRACTOR SHALL PERFORM PLANTER PIT DRAINAGE TEST PER SPECS. 6.EXCAVATE PLANTER PITS PER SPECS. 7.MULCH SHALL NOT TOUCH ANY PART OF THE TRUNK OF THE TREE, TYP. 8.ROOT FLARE OF TREE SHOULD BE PLACED 1" ABOVE EXISTING GRADE PER EACH 1" OF TREE CALIPER TO A MAXIMUM OF 2". EVERGREEN PLANTING SCALE: NTS 2X ROOT BALL WIDTH 3 PLACE ROOTBALL ON UNDISTURBED SOIL. PLACE TOP OF ROOTBALL FLUSH WITH FINISHED GRADE.WATER BASIN. USE WHEN NECESSARY PER LANDSCAPE ARCHITECTS REQUEST. ROCK OR MULCH PER PLANS. MULCH SHOULD NOT TOUCH ANY PART OF THE TRUNK OF THE SHRUB. FINISHED GRADE. BACKFILL PER SOIL NOTES AND SPECS. NOTES: 1.SCARIFY SIDES OF PLANTER PIT PRIOR TO PLANTING SHRUB/GRASS SO AS TO AVOID ANY GLAZING OR HARDENED AREAS THAT WILL BE DIFFICULT FOR ROOTS TO GROW THROUGH. 2.IMPORTED & AMENDED TOPSOIL PER SPEC'S TO BE USED IN ALL PLANTER PITS. 3.REMOVE ALL COMPACTED, CLAY OR ROCKY SOILS FROM PIT AND HAUL OFF SITE IN A LEGAL MANNER. 4.CONTRACTOR SHALL PERFORM PLANTER PIT DRAINAGE TEST PER SPECS. 5.EXCAVATE PLANTER PITS PER SPECS. SHRUB & ORNAMENTAL GRASS PLANTING SCALE: NTS4 EXISTING SOIL ROCK OR WOOD MULCH PER PLAN. MULCH SHOULD NOT TOUCH ANY PART OF THE PERENNIAL. NOTES: 1.SCARIFY SIDES OF PLANTER PIT PRIOR TO PLANTING PERENNIALS SO AS TO AVOID ANY GLAZING OR HARDENED AREAS THAT WILL BE DIFFICULT FOR ROOTS TO GROW THROUGH. 2.REMOVE ALL COMPACTED, CLAY OR ROCKY SOILS FROM PIT AND HAUL OFF SITE IN LEGAL MANNER. 3.CONTRACTOR SHALL PERFORM PLANTER PIT DRAINAGE TEST PER SPECS. 4.EXCAVATE PLANTER PITS PER SPECS. 12" DEPTH OF AMENDED SOIL PER SPECS. PERENNIAL PLANTING SCALE: NTS PLANT SPACING PER PLAN 6 FINISH GRADE WHERE BOULDER RETAINS GRADE. BOULDER. FINISH GRADE. BOULDER, TYP. FINISH GRADE. GROUP BOULDERS SO AS TO APPEAR NATURAL. CUT FABRIC SO THAT BOULDER CAN REST ON TOP OF FABRIC. DO NOT REMOVE FABRIC FROM UNDER THE BOULDERS. BOULDER PLACEMENT SCALE: NTS NOTES: 1.PLACE ALL BOULDERS SUCH THAT 1/4 OF THE TOTAL MASS OF EACH BOULDER IS BELOW FINISH GRADE. 2.LANDSCAPE ARCHITECT SHALL APPROVE ALL BOULDER LOCATION AND ORIENTATION ON SITE. 9 NOTES: IF TREE STAKING IS REQUIRED, THE FOLLOWING IS RECOMMENDED: 1.ALLOW FOR SOME TRUNK MOVEMENT. ATTACH ARBOR TIE TO TREE AND STAKE. 2.REMOVE ALL WRAPPING MATERIAL FROM ROOTBALL PRIOR TO PLANTING. 3.INSTALL THREE STAKES PER TREE, SPACED EVENLY AROUND THE TRUNK 4.REMOVE ALL STAKING AS SOON AS THE TREE IS STABLE 5. CONTRACTOR SHALL PROVIDE TREE STAKING AS PART OF THE BASE BID. EVERGREEN TREE STAKING SCALE: NTS 6'-8' STAKE, TYP. STAKES SHALL BE INSTALLED AT 60° ANGLES AROUND TREE AS SHOWN PLAN VIEW ARBOR TIE NAILED TO STAKE. ARBOR TIE. FOLD ENDS OF ARBOR TIE BACK. SECURE TO STAKE WITH 1" GALVANIZED ROOFING NAIL OR USE A KNOT. ALL STAKES SHALL BE DRIVEN OUTSIDE THE EDGE OF THE ROOT BALL. 2"Ø LODGE POLE STAKE, TYP. STAKE TO BE 6'-8' TALL TYP. ARBOR TIE, TYP. 11 12" MOWCURB SECTION 1 1/2" = 1'-0"SCALE: NOTES: 1.PROVIDE CONTROL JOINT IN MOWCURB AT 10' INTERVALS, PROVIDE EXPANSION JOINTS EVERY 30' ALONG MOWCURB AND WHERE CURB MEETS WALKWAYS, CURB AND GUTTER OR OTHER HARDSCAPE SURFACE. 2.INSTALL ELASTOMERIC SEALANT FOR ALL EXPANSION JOINTS COBBLE ROCK OR ORGANIC MULCH PER PLAN. 12" X 6" CONCRETE MOWCURB SMOOTH FINISH, PER PLANS. PROVIDE (2) #3 REBAR CONTINUOUS 3" IN FROM SIDES, CENTERED TOP TO BOTTOM. NEW TURF, SEE SPECS. AMENDED TOPSOIL PER SPECS (TYP.) 85% COMPACTED BASE UNDER CURBING. 7 FINISHED SURFACE OF ADJACENT CONCRETE SIDEWALK, CURB, OR OTHER HARDSCAPE ELEMENT PER PLAN. ROCK PER PLANS. SEE LEGEND ON PLANTING PLAN SHEETS FOR TYPES AND DEPTHS. LANDSCAPE WEED BARRIER FABRIC. UNDISTURBED SOIL WEED FABRIC NOTE: INSTALL 6" SOIL STAPLE IN WEED BARRIER FABRIC AT 5' O.C. TRIANGULAR SPACING. INSTALL 6" SOIL STAPLE AT 12" O.C. ALONG ALL WEED BARRIER FABRIC SEAMS. OVERLAP FABRIC MIN. OF 6" AT ALL SEAMS AS SHOWN BELOW. INSTALL SOIL STAPLE 6' O.C. ALONG EDGES & 2 AT EACH CORNER. FINISH GRADE PRIOR TO INSTALLING WEED BARRIER FABRIC AND ROCK. WEED BARRIER FABRIC. SOIL STAPLE AT 12" O.C. ALONG SEAM. ROCK MULCH AND WEED BARRIER FABRIC SCALE: NTS NOTES: 1.ROCK SHALL BE SCREENED & DOUBLE WASHED AND BE FREE OF DEBRIS PRIOR TO INSTALLATION. IF ROCK SUPPLIER DOES NOT HAVE A WASH PLANT, THE LANDSCAPE CONTRACTOR SHALL STILL BE RESPONSIBLE FOR DOUBLE WASHING ALL ROCK AND BOULDERS PRIOR TO INSTALLATION. 2.INSTALL ROCK AFTER INSTALLATION OF WEED BARRIER FABRIC AND PLANT MATERIAL. 3.CONTRACTOR TO ENSURE THAT TOP OF WEED BARRIER FABRIC IS FREE OF SOILS AND DEBRIS PRIOR TO PLACING ROCK. 4.BEFORE PLACING WEED BARRIER FABRIC AND ROCK, APPLY A PRE-EMERGENT HERBICIDE TO SOIL. AFTER PLACING WEED BARRIER, PLANTS AND ROCK, RAKE ROCK SMOOTH, WET ROCK TO ENTIRE DEPTH, ALLOW TO DRY, THEN APPLY A SECONDARY APPLICATION OF PRE-EMERGENT HERBICIDE TO TOP OF ROCK. 5.KEEP TOP OF ROCK 1" BELOW ADJACENT WALKS AND CURBS. 6.DO NOT ALLOW ROCK TO TOUCH THE TRUNK OF ANY PLANT. 7.SEE LANDSCAPE PLANS FOR ROCK TYPE AND DEPTH. FINISH GRADE OF ROCK TO BE 1" BELOW TOP OF ADJACENT CONCRETE SIDEWALK, CURB OR OTHER HARDSCAPE ELEMENT PER PLAN. 5 NOTES: 1.ENSURE FINISH GRADE IS 1" BELOW TOP OF CURB, WALK, OR EDGING. CONSULT WITH OWNER FOR PROPER DEPTH. 2.SEE SOD SPEC'S FOR ADDITIONAL INFORMATION ON SODDING AND SEEDING REQUIREMENTS 3.EDGING OF SOD TO BE SHOVEL CUT WHEN NOT NEXT TO CONCRETE SIDEWALK OR PATH. 4.TURF IS THE MOST HEALTHY AND WATER EFFICIENT WHEN MOWED AT A MIN. HEIGHT OF 212" - 3". CONCRETE CURB, SIDEWALK, PATH OR EDGING - SEE PLAN. SOD BASE OR ROOT AREA. AMENDED SOILS PER SPECS. CROSS RIP OR TILL SUBGRADE PER SPECS. AGGREGATE BASE. (NOT PAST OR UNDER EDGING). SUBGRADE COMPACTED TO 85%. SOD LAYING AND EDGE SCALE: NTS8