Loading...
HomeMy WebLinkAboutA000-MSP COVER - 04 09 2019BA X T E R L A N E G A L L A T I N G R E E N B L V D D A V I S L A N E KI M B E R W I C K E S T F E R G U S O N A V E CA T T A I L S T PR O J E C T L O C A T I O N BOZEMAN MUNICIPAL CODE REVIEW NEIGHBORHOOD CONSERVATION OVERLAY DISTRICT = NO ZONING: B -2 -Community Business District BLOCK FRONTAGE: MIXED PERMITTED USES: P -Convenience uses (38.360.100)*P –Retail P -General service establishment*P3 –Offices*Conditional uses:C -Apartment buildings*3 C -Ground floor residential LOT AREA: 63,089 sf / 1.4483 acres MAX BUILDING HEIGHT: Roof pitch < 3:12 = 38'PROPOSED HEIGHT: 38'MAXIMUM LOT COVERAGE: %100 Building setbacks:FRONT SETBACK = per block frontage standards SIDE SET BACK = 5'REAR SET BACK = 10'Parking setbacks:Front setback = per block frontage standards Rear setback = 10'Side setback = 8'38.380 BMC (AFFORDABLE HOUSING) All units in this project are condominiums, therefore this proj ect is exempt from the requirements of affordable housing OPEN SPACE CALCULATIONS OPEN SPACE CALCULATIONS:Usable residential open space Space required per unit:studio and 1 bedroom = 100 s.f. per unit 2 bedroom = 150 s.f. per unit # 1 BDRM = 5 UNITS = 500 SF REQ # 2 BDRM = 26 = 3,900 SF REQ TOTAL S.F. OF OPEN SPACE REQUIRED = 4,400 OPEN SPACE PROVIDED PRIVATE PATIOS (8) = 8 X 14' X 6' = 672 SF PRIVATE PATIOS (9) = 9 X 12' X 6' = 648 SF PRIVATE PATIOS (4) = 8 X 14' X 7' = 392 SF SHARED OPEN SPACE = 4,917 SF TOTAL OPEN SPACE PROVIDED = 6,629 SF Usable commercial open space space required = >2% of building envelope commercial area = 17,000 sf 17,000 sf x .02 = 340 sf of commercial open space req. PA R K I N G C A L C U L A T I O N S Ta b l e 3 8 . 5 4 0 . 0 5 0 -1 Pa r k i n g s p a c e s r e q u i r e d p e r d w e l l i n g Ef f i c i e n c y u n i t = 1 . 2 5 On e -be d r o o m = 1 . 5 Tw o -be d r o o m = 2 Th r e e -be d r o o m = 3 Ta b l e 3 8 . 5 4 0 . 0 5 0 -3 Co m m e r c i a l p a r k i n g r e q u i r e m e n t s He a l t h a n d e x e r c i s e e s t a b l i s h m e n t = 1 s p a c e p e r 2 0 0 s q u a r e f e e t of floor ar e a ; p l u s 3 s p a c e s p e r c o u r t Of f i c e s ( e x c e p t m e d i c a l a n d d e n t a l ) = 1 s p a c e p e r 2 5 0 s q u a r e f e et of floor ar e a Re t a i l s t o r e a n d s e r v i c e e s t a b l i s h m e n t s = 1 s p a c e p e r 3 0 0 s q u a r e feet of fl o o r a r e a Co m m e r c i a l C a l c u l a t i o n s 8 c o m m e r c i a l s p a c e s i n b u i l d i n g A f i r s t f l o o r : s. f . P e r u n i t = 4 2 0 nu m b e r o f u n i t s = 8 8x 4 2 0 = 3 , 3 6 0 s . f . 3, 3 6 0 s . f . X . 8 5 ( r e d u c t i o n p e r B M C ) = 2 , 8 5 6 s . f . 2, 8 5 6 s . f . / 2 5 0 ( s . f . o f o f f i c e p e r s t a l l ) = 1 1 . 4 2 4 s t a l l s Re s i d e n t i a l C a l c u l a t i o n s # o f e f f i c i e n c y u n i t s = 0 # o f 2 b e d r o o m u n i t s = 2 6 # o f 1 b e d r o o m u n i t s = 5 26 x 2 = 5 2 s t a l l s 5 x 1 . 5 = 7 . 5 s t a l l s 0 x 1 . 2 5 = 0 s t a l l s To t a l r e s i d e n t i a l s t a l l s = 5 9 . 5 To t a l s t a l l s r e q u i r e d = 7 0 . 9 2 4 ( r o u n d t o 7 0 ) Pa r k i n g s t a l l s p r o v i d e d Ga r a g e s t a l l s = 2 3 St r e e t s t a l l s = 4 Pa r k i n g l o t s t a l l s = 4 3 To t a l s t a l l s s u p p l i e d = 7 0 PA R K L A N D S U M M A R Y PA R K L A N D D E D I C A T I O N : No a d d i t i o n a l c a s h -in -li e u o f p a r k l a n d i s r e q u i r e d . T h e 1 . 4 4 a c r e l o t x 1 2 un i t s ( t h e m a x c a p f o r p a r k l a n d t h i s z o n i n g d i s t r i c t ) = 1 7 d w e l li n g u n i t s wh i c h e q u a l s t h e p r e v i o u s l y d e d i c a t e d a m o u n t p e r P l a t J -14 4 f o r B a x t e r Me a d o w s S u b d i v i s i o n , P h a s e 6 . S e e s e c t i o n 3 8 . 4 2 0 . 0 2 0 . A . CI T Y O F B O Z E M A N A D O P T E D C O D E 20 1 2 I n t e r n a t i o n a l B u i l d i n g c o d e 20 1 2 I n t e r n a t i o n a l R e s i d e n t i a l B u i l d i n g C o d e 20 1 2 I n t e r n a t i o n a l E x i s t i n g B u i l d i n g C o d e 20 1 2 I n t e r n a t i o n a l M e c h a n i c a l C o d e 20 1 2 I n t e r n a t i o n a l F u e l G a s C o d e 20 1 2 E n e r g y C o n s e r v a t i o n C o d e 20 1 2 U n i f o r m P l u m b i n g C o d e 20 1 4 N a t i o n a l E l e c t r i c C o d e 20 0 9 I C C A 1 1 7 . 1 A c c e s s i b l e a n d U s a b l e B u i l d i n g s a n d F a c i l i t i e s AS O F 5 / 1 8 / 2 0 1 8 P E R - https://www.bozeman.net/government/building - in s p e c t i o n s / a d o p t e d -co d e s DE S I G N T E A M AR C H I T E C T - EN S I T I O D E S I G N 62 7 E . P E A C H S T . BO Z E M A N M T . 5 9 7 1 5 P. 4 0 6 8 3 8 6 8 5 3 CI V I L - C& H E N G I N E E R I N G 10 9 1 S T O N E R I D G E D R I V E BO Z E M A N , M T 5 9 7 1 8 P. 4 0 6 5 8 7 1 1 1 5 LA N D S C A P E - RE D B A R N M O N T A N A 30 8 4 T H O R P E R O A D BE L G R A D E , M T , 5 9 7 1 4 P. 4 0 6 9 2 4 8 0 3 8 C These drawings, notes, and specifications are copyrighted by Ensitio Design. They are for the owner's use solely with respect to this project and under direction of the above said architect. They are instruments of service of the above said architect and remain his property. Any use or transmission of these documents, without written permission of the above said architect is prohibited by law. OW N E R AR C H I T E C T NA M E : _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ DA T E : _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ST R U C T U R A L EN G I N E E R NA M E : _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ DA T E : _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ME C H A N I C A L EN G I N E E R NA M E : _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ DA T E : _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ EL E C T R I C A L EN G I N E E R NA M E : _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ DA T E : _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ CO N T R A C T O R I N F O R M A T I O N PL U M B I N G EN G I N E E R NA M E : _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ DA T E : _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ CIVIL ENGINEER NAME:_______________DATE:_______________LANDSCAPE ARCHITECT NAME:_______________DATE:_______________DESIGN TEAM 627 E. PEACH ST.BOZEMAN, MONTANA 59718 406-209-8330 ASHEET DATE PROJECT ISSUE DATE RE V I S I O N S C : \ U s e r s \ B o b H o p e \ D o c u m e n t s \ M C G O U G H - M S P - S P 1 - D R C C O M M E N T S S U B M I T T A L - R O U N D 2 _ E R I K D 2 H J 3 . r v t 4 / 1 2 / 2 0 1 9 1 1 : 4 3 : 0 5 A M 000-MSPCOVER 03/27/19 WE S T L A N D L O F T S M I X E D U S E BA X T E R M E A D O W S S U B P H 6 , S 3 4 , T 0 1 S , R 0 5 E , BL O C K 1 4 , L o t 5 , A C R E S 1 . 4 4 8 , P L A T J - 4 6 6 PL U S O P E N S P A C E & P P W ( 2 47 2 G A L L A T I N G R E E N B L V D ) 03 / 2 7 / 1 9 0 3 / 2 7 / 1 9 WESTLAND LOFTS MIXED USE 04/09/19 DA L L A S F I N A C I A L L L C PO B O X 1 2 0 0 9 BO Z E M A N , M T 59 7 1 9 AN D C O N D I T I O N A L U S E M A S T E R S I T E P L A N MC G O U G H C O N S T R U C T I O N , I N C . PO B O X 1 2 0 0 9 BO Z E M A N , M T 59 7 1 9 AND CONDITIONAL USE MASTER SITE PLAN SH E E T I N D E X - A R C H - M S P Sh e e t I s s u e D a t e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h e e t I s s u e D a t e C1 . 0 - M S P O V E R A L L M A S T E R S I T E P L A N & IN F O 04 / 0 3 / 1 9 C2 . 0 - M S P M A S T E R S I T E G R A D I N G & U T I L I T Y PL A N 04 / 0 3 / 1 9 C3 . 0 - M S P D E T A I L S 0 4 / 0 3 / 1 9 SH E E T I N D E X - L A N D S C A P E - M S P Sh e e t I s s u e D a t e L1 0 1 - M S P L A N D S C A P E P L A N 0 4 / 0 9 / 1 9 L1 0 2 - M S P P L A N T S C H E D U L E A N D N O T E S 0 4 / 0 9 / 1 9 1" = 8 0 0 ' VI C I N I T Y M A P . 1 PROJECT TOTAL UNIT COUNT:RESIDENTIAL UNITS = 31 COMMERCIAL UNITS = 8 TOTAL UNITS = 39 No . D e s c r i p t i o n D a t e