Loading...
HomeMy WebLinkAboutVan Winkle Football Stadium Staff Report 03.06.19 R 4 Z E MAN MT Staff Report Planning Van Winkle Football Stadium Friday, September 7,2018 Project Name: Van Winkle Football Stadium Application: 18192 Type: ISite Plan-Phase 1 Summary: New±3,200-seat multi-purpose stadium with sports lighting north of the existing van winkle stadium with ±9,400 support buildings consisting of training,first aid, equipment storage,team rooms, and toilet facilities for fans, players, coaches, and officials. Area affected also includes two softball fields, corresponding pathways, a multi-purpose turf field,fencing, ruth thibeault way parent drop off traffic development, mini round about at 15th intersection, corresponding lighting and demolition of existing south bleachers at van winkle stadium. Zoning: PLI Growth Policy: Public Institutions Size: 2,845,426 Square Feet 65.32 Acres Overlay District: NA Project Address: 205 N. 11th Ave., Bozeman, MT 59715 Legal Description: S12, T02 S, R05 E, ACRES 27.08, HIGH SCHOOL SITE TRACT IN NW4 Owner: Bozeman School District#7; Attn:Todd Swinehart, Director of Facilities PO Box 520, 406-522-6009 Bozeman, MT 59771 todd.swinehart@bsd7.org Applicant: NE45 Architecture Attn: Jeff Lusin 1216 W. Lincoln St. 406-577-2345 Bozeman, Montana 59715 jlusin@ne45arch.com Representative: NE45 Architecture Attn:Jeff Lusin 1216 W. Lincoln Street 406-577-2345 Bozeman, Montana 59715 jlusin@ne45arch.com Staff: Planner: Johnson Engineer: Kohtz Noticing: Public Comment Period: Site Posted: Adjacent Owners Mailed: 8/3/2018 8/20/2018 8/3/2018 8/3/2018 Advisory Boards: Board: Date: Recommendation: Recommendation Approval with conditions Decision Authority Director of Community Development Date 9/7/2018 Full application and file of record: Community Development Department, 20 E. Olive St., Bozeman, MT 59715 Page 1 of 10 B O Z E MAN MT Staff Report planning Van Winkle Football Stadium Friday, September 7, 2018 NEI�SON'1'IL:�ILER•(UIIRT �tPlc III �t CERRA • �iAE S7•� _ RSTON RD >r�is• . Own f .wn r ���tl��� i ■Y� � � � _ \1 '� 1 I I 1 It h \l �\ I �NINIF SI i .. r _ r „° MAIN ST -- 1 ILI -2W y . Legend �� 1 s A Z'^� �.•�-T_-' . 9 1 i) 'r',f, v, Plannin Projects R-0 r' Parcels i_— Roark ( ter 1 TR1� L. 4 — Alleys Il 'x„' :,`>� _ _ '► v v. l _ City Limits - Zoning Districts r1 ' .! TI­m,r,x..,9�,aeladh,•ll,e Van Winkle Football Stadium ni—,,;ns niws1on Site Plan '~�•�°`'"'°'� Application 18192 Submitted 04/30/2018 B O Z E M A N MT 1—h-439 reel A Piannina Page 2 of 10 B O Z E MAN MT Staff Report Planning Van Winkle Football Stadium Friday, September 7,2018 FINDINGS OF FACT AND APPEAL PROVISIONS CERTIFICATE A. PURSUANT to Chapter 38,Article 2,Bozeman Municipal Code(BMC),and other applicable sections of Ch.38, BMC,public notice was given,opportunity to submit comment was provided to affected parties,and a review of the preliminary site plan described in this report was conducted. The applicant proposed to the City a Site Plan to allow a proposed multi-use stadium,modifications to the old Van Winkle Stadium along with related site improvements, parking and circulation on a 65.322 acres site.The purposes of the Site Plan review was to consider all relevant evidence relating to public health,safety,welfare,and the other purposes of Ch.38,BMC;to evaluate the proposal against the criteria of Sec.38.230.100 BMC,and the standards of Ch.38, BMC;and to determine whether the plan should be approved, conditionally approved,or denied. B. It appeared to the Director that all parties and the public wishing to examine the proposed site plan and offer comment were provided the opportunity to do so.After receiving the recommendation of the relevant advisory bodies established by Ch.38,Art.33,BMC,and considering all matters of record presented with the application and during the public comment period defined by Ch.38, BMC,the Director has found that the proposed site plan would comply with the requirements of the BMC if certain conditions were imposed.Therefore,being fully advised of all matters having come before him/her regarding this application,the Director makes the following decision. C. The Site Plan has been found to meet the criteria of Ch.38,BMC,and is therefore approved,subject to the conditions listed in this report and the correction of any elements Not in conformance with the standards of the Title.The evidence contained in the submittal materials, advisory body review, public testimony,and this report,justifies the conditions imposed on this development to ensure that the site plan and subsequent construction comply with all applicable regulations,and all applicable criteria of Ch.38,BMC. Martin Matsen, Director of Community Development,approved with conditions this Site Plan for and on behalf of the City of Bozeman as authorized by Sec.38.200.010 BMC.The approval of this Site Plan shall be effective for twelve(12)months from the date of Plan approval.At the end of this period the Director may,at the request of the developer,extend the approval in accordance with Ch.38 Art.19,BMC. D. This Director of Community Development's project decision may be appealed by filing a documented appeal with and paying an appeal fee to the Clerk of the Commission for the City of Bozeman within 10 working days after the date of approval as evidenced by the Director's signature,following the procedures of Sec.38.250.030,BMC Director of Community Developme Martin Ma n, Al Friday, September 7, 2018 CONDITIONS OF APPROVAL 1.0 The applicant is advised that unmet code provisions,or code provisions that are Not specifically listed as conditions of approval,does Not,in any way,create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. 2.0 To meet minimum parking requirements the transit reduction must be satisfied,by upgrading the two Streamline transit stops located at Beall and 15th and at Main Street.A transit stop is eligible when it has publicly available cover from weather approved by the transit provider to be equivalent to a transit shelter,and service is provided on not less than an hourly schedule a minimum of five days per week. (38.25.040- A.2.C.3. 10%Parking Reduction for Transit Availability) CODE PROVISIONS 1.0 Per Section 38.100.080&38.200.110,the proposed project shall be completed as approved and conditioned in the Site Plan application. Any modifications to the submitted and approved application materials shall invalidate the project's legitimacy,unless the applicant submits the proposed modifications for review and approval by the Department of Community Development prior to undertaking said modifications. The only exception to this law is repair. Page 3 of 10 B O Z E MAN MT Staff Report Planning Van Winkle Football Stadium Friday, September 7, 2018 SITE PLAN AGENCY EXEMPTIONS Montana law(M.C.A.Section 76-2-402)addresses the relationship of municipal zoning regulations to a school district's use of land. The law requires a public hearing whenever land is to be used contrary to zoning regulations. The statute expressly provides that a municipality"shall have no power to deny the proposed use but shall act only to allow a public forum for comment on the proposed use." The requirement for a public hearing before the City Commission on such exemptions was specifically included in the 2012 Interlocal Agreement executed between the School District and the City. In this regard,the School District is claiming exemptions to the Bozeman Municipal Code provisions,with provided rationale as follows: 1.0 Sec.38.550.0501 B.Additional Screening Requirements-This requirement creates screening that we(the Bozeman School District 7) feel like would decrease visibility on the property. The intent is to provide a higher level of safety for students. In addition,because the location of the new parking lot is in the middle of campus,there will be very limited visibility of the parking lot. 2.0 Sec.38.550.0501 C.Parking Lot Landscaping Requires that parking lots with more than 15 spaces shall have a minimum of 20 sf of landscape area within the parking lot for each off-street parking space in a lot. It remains the Bozeman School District's policy to provide uninterrupted paved areas within all school parking lots. The intent is to provide better visual access and a higher level of safety for the students within the parking lots. In addition,because the location of the new parking lot is in the middle of campus,there will be very limited visibility of the lot from the surrounding city streets. 3.0 Sec.38.520.0501 D.Vehicular Circulation and Parking Requires that street trees and sidewalks are provided per standard roadway design for internal roadways as well as city streets. Due to existing site features such as site fences and drainage conveyance,street trees and sidewalks cannot easily be installed to city standards. Pedestrian circulation and landscaping are still implemented in the design including existing trees and new trees planted along the roadway to the south and north of Ruth Thibeault Way,but will not specifically adhere to city design standards. 4.0 Sec.38.510.0301 C and 38.510.0301 G Block Frontage Designations-The block frontages for this site are"other"and"mixed". The mixed block frontage requires no more than 50%of site frontage shall be parking of which is in conflict with the 100%of the existing street frontage as an existing 15th street parking lot that will be used for the parking count calculations and traffic/safety vehicle functions out of the stadium onto 15th street. These block frontages also require building placement to be at the sidewalk edge which is also in conflict with the placement of the existing parking lot. The stadium buildings,at 245'away from the street will also not comply with the requirement for fagade transparency and instead will be screened properly per plank wall treatment requirements. 5.0 Sec.38.540.060.B.1 Joint Use of Parking Facilities-This section requires that parking facilities provided by another building or use must be located within 1,000 feet of the entrance to the building or use which the application being made. Parking for all uses and facilities within the Existing Bozeman High School campus is provided on-site or on-street adjacent to school property,however,due to the size of the campus,some of these parking facilities are great than 1,000 feet away from entrances to buildings on campus. This exemption is applied only to walking distance between facilities and parking areas,total spaces required for all uses within the joint use analysis are provided on or immediately adjacent to school property and no required parking for any one facility or use is further than 1,600 feet from an entrance. 6.0 Sec.38.540.070.A.5 Off-site Parking The off-site parking for the school and stadium will not be complying with the following mandatory parking provisions:Per Sec.38.540.060.A.5 Off-site Parking—requires that parking facilities provided by another building or use must be located within 1,000 feet of the entrance to the building or use which the application is being made. Parking for all uses and facilities within the Existing Bozeman High School campus is provided on-site or on-street adjacent to the school property,however,due to the size of the campus,some of these parking facilities are greater than 1,000 feet away from entrances to the buildings on campus. This exemption is applied only to walking distance between facilities and parking areas,total spaces required for all uses are provided on or immediately adjacent to school property and no required parking for any one facility or use is further than 1,600 feet from an entrance. 7.0 Sec.38.520.040.C.4 Non-Motorized Circulation The parking for the school and stadium will be requesting an exemption from the following mandatory provisions: Per Sec.38.520.040.C.4 Non-Motorized Circulation and Design, Internal Circulation-requires that parking lots provide pedestrian paths through lots every four rows or a maximum of 200'. Page 4 of 10 B O Z E MAN MT Staff Report Planning Van Winkle Football Stadium Friday, September 7, 2018 ANALYSIS AND FINDINGS Analysis and resulting recommendations are based on the entirety of the application materials, municipal codes, standards, plans, Plan Review, Section 38.230.100, BMC In considering applications for plan approval under this title,the advisory boards and City Commission shall consider the following: 1.0 Conformance to and consistency with the City's adopted growth policy Meets Code? Growth Policy Land Use Public Institutions Yes Zoning PLI Yes Comments:The project site is zoned PLI,which is a permitted use as long as it is completely enclosed with a building.The property is within the City's municipal service area and otherwise complies with the goals and objectives of the growth policy. Staff did not identify any conflicts between the proposed use,the zoning, and the growth policy. 2.0 Conformance to this chapter,including the cessation of any current violations(38.200.160) Meets Code? Current Violations I None Yes Comments: The applicant is advised that unmet code provisions, or code provisions that are Not specifically listed as conditions of approval, does Not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. 3.0 Conformance with all other applicable laws,ordinances,and regulations(38.100.080) Meets Code? Conflicts None Yes Condominium ownership NA NA Comments: The City will evaluate the plans against the requirements of the International Building Code(IBC)during building permit review.The applicant must provide professional services for construction inspection and post-construction certifications from their project professionals that the project was constructed according to plan and specification. The applicant must prepare plans and specifications for any fire service line in accordance with the City's Fire Service Line Policy. The plans must be prepared by a Professional Engineer and be provided to and approved by the City Engineer prior to initiation of construction of the fire service or fire protection system. The applicant must also provide Professional Engineering services for construction inspection, post-construction certification and preparation of mylar record drawings. Fire service plans, and domestic services 4"or larger, must be a standalone submittal,separate from the site plan application. City of Bozeman applications for service must be completed by the applicant. 4.0 Relationship of site plan elements to conditions both on and off the property(38.230.100) Meets Code? Neighborhood Compatibility Yes Design and arrangement of plan to produce an efficient,functionally organized and cohesive Yes development Design and arrangement of plan in harmony with topography,water bodies,vegetation,contributing to Yes the overall aesthetics Conform with local historical or landmark designation requirements, including the Neighborhood NA Conservation Overlay District (NCOD) Relationship to other plans(subdivision/master site plan, PUD,etc.) Yes Page 5 of 10 10 7 E M N MT Staff Report Planning Van Winkle Football Stadium Friday, September 7,2018 Comments: The proposed development is compatible with the general pattern of development in the area. The site design provides appropriate parking and denotes proper circulation (site plan agency exemption, public hearing held on August 20, 2018). The landscaping and Non-vegetative landscape elements does not provide screening for the parking and circulation areas(site plan agency exemption, public hearing held on August 20,2018). The site plan addresses the Non-motorized transportation network through the provision of direct and efficient pedestrian connections to future public sidewalks and/or shared use pathways. 5.0 The impact of the proposal on the existing and anticipated traffic and parking conditions Meets Code? Street vision Yes Snow storage Yes Traffic Impact Study/LOS Not required ITransportation grid adequate to Yes Comments:The Engineering Division did Not require a Traffic Impact Study for Phase 1 of the master site plan. No additional mitigation was identified for this project. Parking Required On-site Off-site Total Yes Football Game 957 944 80 1024 Basketball Tournament 634 908 80 988 Average School Day 407 908 80 988 ADA Required 27 1113rovided (Total) 1 11 1 No* Reduction *See Below Bicycle Required_____T 42.7 lProvided (_Total) 1 50 _ Yes Comments: The parking calculations were provided using the Joint Use Analysis method (38.540.060). The distance of parking locations exceeds the 1,000 foot minimum as stated in the code,this distance was part of the site plan agency exemption (the public hearing was held on August 20,2018). To meet minimum parking requirements the transit reduction must be satisfied, by upgrading the two Streamline transit stops located at Beall and 15th and at Main Street.A transit stop is eligible when it has publicly available cover from weather approved by the transit provider to be equivalent to a transit shelter, and service is provided on not less than an hourly schedule a minimum of five days per week. *ADA parking is not currently meeting minimum standards. By IBC the total ADA count should be 29, only 11 are provided. Even though the design team submitted and signed an Acknowledgement of Access Requirements Under Federal and State Discrimination Laws Form. This acknowledges that the project was designed with full knowledge that the City of Bozeman will not review for compliance with, nor is responsible for enforcement of the Federal Americans with Disabilities Act of 1990, the Rehabilitation Act of 1973,the Fair Housing Amendments Act of 1988,Title 49, Chapter 2, commonly known as the Montana Human Rights Act, or other similar federal, state, or local laws,that mandate accessibility to commercial construction or multifamily housing.This may want to be addressed by your team at some point prior to completion as a matter of risk management for the School District. 6.0 Pedestrian and vehicular ingress and egress(38.230.100) Meets Code? Safe and easy movement Yes Pedestrian access location(s) Yes Site vision triangles Yes Fire lanes,curbs,signage and striping Yes !Vehicle access to site Yes Special Improvement Districts NA Waiver NA NA Page 6 of 10 B O Z E MAN MT Staff Report Planning Van Winkle Football Stadium Friday, September 7, 2018 Comments: Non-automotive transportation and circulation systems design features to enhance safety and as Adequate connection and integration of the pedestrian and vehicular transportation systems Yes Comments:The site plan provides pedestrian connection to the development from the sidewalk, but does not meet the code standard for pedestrian pathways within parking lots,which was a site plan agency exemption(public hearing was held on August 20, 2018). Dedication of right-of-way or easements necessary for streets and similar transportation facilities _F NA Comments:All right-of-way exists for this phase of the master plan. 7.0 Landscaping, including the enhancement of buildings,the appearance of vehicular use,open Meets Code? Submittal requirements for landscape plans(38.220.100) Yes Mandatory landscaping Yes Yard Yes Additional screening NA* Parking lot screening NA* Off-street loading spaces screening NA* Street frontage Yes Street median island NA Acceptable landscape materials Yes Protection of landscape areas Yes Irrigation: plan,water source, system type: Municipal water, high efficiency drip&spray Trees for residential adjacency NA NA Performance points 23 29 Yes City rights-of-way and parks Yes Tree plantings for boulevard ROW, drought-resistant seed Yes Public ROW boulevard strips Yes Irrigation and maintenance provisions for ROW Yes State ROW landscaping NA _ Additional None NA Fencing and walls Yes Comments: The applicant submitted a complete landscape and irrigation with the site plan application as required by Bozeman Municipal Code(BMC)and the plan complies with all applicable landscape standards,which take into consideration the site plan agency exemptions(public hearing held on August 20,2018). 8.0 Open space(38.420.020) Meets Code? Enhancement of natural environment NA Wildlife habitat or feeding area preservation NA Maintenance of public park or public open space access NA Recreational area design NA Open space NA Parkland Cash-in-lieu for maximum known density not to exceed 12 units/acre(ac.). NA Cash donation in-lieu INA NA Cash donation in-lieu INA NA Page 7 of 10 B O Z E M A N M T Staff Report Planning Van Winkle Football Stadium Friday, September 7,2018 Comments: 9.0 Building location and height(38.320) Meets Code? PLI Requirements (38.08.010-.080) Yes Lot coverage Allowed 100% Proposed: 0.3% Yes Lot Size Gross SF: 2,845,426 Gross Building SF: 9,483 Yes Height Allowed - Proposed: 34'-1" Yes Comments: 10.0 Setbacks(38.320.020.E) Meets Code? Zoning PLI Yes Setbacks 'Yards(feet) Structures Parking 1 Loading Front 0 NA NA Rear 0 NA NA Side 0 NA NA Alley NA NA NA Watercourse NA NA NA Block Frontage 10 ft min NA NA Comments: The proposal request does comply with all applicable setbacks.The subject development complies with applicable setbacks. New stadium exceeds the minimum front setbacks, as outlined in the Landscape block frontage standards.With type of use Staff supports the setback of the new stadium,further inset to the site and farther from the surrounding residential homes. 11.0 Lighting(38.570) Meets Code? Building-mounted lighting (cutoff and temperature) Yes Site lighting(supports,cutoff and temperature) Yes Minimum light trespass at property line Yes Comments: Site lighting does comply.The project employs LED technology,the City's recommended bulb type. 12.0 Provisions for utilities, including efficient public services and facilities(38.350.030,38.410.050, Meets Code? Municipal infrastructure requirements Yes Easements(utility rights-of-way etc.) Yes Water,sewer, and storm water Yes Other utilities(electric,natural gas,communications) Yes CIL of water Yes Comments: Municipal infrastructure serves the subject property.A four-inch fire service line will be constructed to the building for fire protection.The Engineering Division reviewed the utility layout from the public right-of-way and on-site and found compliance with the City's standards. Page 8 of 10 B O Z E M A N MT Staff Report Planning Van Winkle Football Stadium Friday, September 7, 2018 13.0 Site surface drainage(38.410.080) Meets Code? Drainage design Yes Stormwater maintenance plan (38.23.030.A) Yes Stormwater feature: landscaping amenity, native species,curvilinear, 75%live vegetation Yes Comments: The Engineering Division approved the drainage plan. Low Impact Development(LID) retention systems will capture much of the surface runoff from the parking areas and a common retention pond, designed as a landscape amenity, and will capture excess runoff from the site and buildings. 14.0 Loading and unloading areas(38.540.080) Meets Code? Loading and unloading NA First Berth (min. 70 feet length, 12 feet in width and 14 feet in height) NA Additional Berths(min.45 feet length) NA Comments: 15.0 Grading(38.410.080) Meets Code? Grading Yes On-site retention/detention Yes Comments: 16.0 Signage(38.560.010) Meets Code? Allowed (sq.ft)Ibuilding NA Proposed(sq.ft) Comments: Not submitted with this application. The City requires a sign permit for the on-premises signs that demonstrates compliance with PLI zoning standards prior to installation of any signage. Flashing, blinking,or animated signs, or LED or other electronic messaging signs are prohibited. 17.0 Screening (38.360.030 and 38.550.050) Meets Code? Mechanical equipment screening Yes Additional screening NA* Comments: *Trees and shrubs do NOT provide screening of the parking lot from public rights-of-way, site plan agency exemption was made for this standard (public hearing held on August 20, 2018). 18.0 Overlay district provisions(38.340.010) Meets Code? Neighborhood Conservation NA Overlay: INA lCommunity Plan Public Institutions Yes Comments: 19.0 Other related matters, including relevant comment from affected parties(38.220) Meets Code? Public Comment JYes Yes i Comments:A public notice period was executed as per Section 38.220.420. Details regarding the noticing requirements were conducted can be found on page 1 of this staff report document. There were 12 letters of public comment and 60 signatures on a collective neighborhood petition. Page 9 of 10 B 0 Z E M A N M T Staff Report Planning Van Winkle Football Stadium Friday, September 7,2018 20.0 If the development includes multiple lots that are interdependent for circulation or other means of Meets Code? addressing requirement of this title,whether the lots are either: Configured so that the sale of individual lots will Not alter the approved configuration or use of the property or cause the development to become Nonconforming OR Are the subject of reciprocal and perpetual easements or other agreements to which the City is a party so that the sale of individual lots will Not cause one or more elements of the development to become Nonconforming.(38.410.060) Required Easements T NA Shared access easement NA Number of lots served Comments: 21.0 Compliance with article 43 of chapter 38 of the Bozeman Municipal Code(38.380.010) Meets Code? Affordable Housing NA Comments:This requirement is Not applicable to the subject application. 22.0 Phasing of development(38.41.080) Meets Code? Phasing Yes Number of phases 2 Comments: The master site plan proposes 2 phases for this development, phase 1 is for the new stadium and phase 2 is for the improvements to Ruth Theobeault and the round-about at 15th and Beall. The DRC supports the proposed phasing. Page 10 of 10