Loading...
HomeMy WebLinkAboutEZA -N7Rehab-application and packet e North 7th Urban Renewal District Redevelopment Incentive Program Property Information Property Address: _______________________________________________________________________ Property Owner: ________________________________________________________________________ Legal Description: _______________________________________________________________________ Property Geo-Code: ____________________________________________________________________ County Tax ID #: _______________________________________________________________________ Log on to http://webapps.gallatin.mt.gov/mappers/ to obtain Geo-codes and Tax ID#s Applicants Legal Name and Contact Information Name: _______________________________________________________________________________ Company or LLC entity: __________________________________________________________________ Address: ______________________________________________________________________________ City/State/zip: __________________________________________________________________________ Phone: ________________________________________________________________________________ Email: _________________________________________________________________________________ Additional Information 1. Project Description Tell us about the type and scale of the development. Tell us why you want to redevelop a property along N. 7th Avenue and how your project reduces the blighted condition of the property (not to exceed 1 typed page). 2. Technical Assistance If applying for a Technical Assistance Grant, please provide the accreditations and building design/site development experience of the professional assisting the property owner. 3. Site Plan & Renderings and Elevations These should be the same plans submitted for Site/Sketch Plan review to the Planning Department. Please provide enough copies for each Board Member (11x17 versions are acceptable) 4. Total Project Cost Estimates Please include the total project cost estimate, with supporting independent bid documents. Two cost estimates are required for all eligible activities for which the applicant seeks funding. Use N7Rehab Cost Estimate work sheet(s). Estimates may be provided in your application, but bid contracts are required prior to finalizing the development agreement. 5. IMPORTANT Applications must be received at least 15 days prior to the next NSURB board meeting and in conjunction with an Application to the City Planning Department. This is to allow adequate time to place the item on the NSURB meeting agenda and for a thorough staff review of the application for presentation to the North 7th Urban Renewal Board. Approval for N7Rehab funding does not guarantee approval from other City Departments. Failure to receive approvals from applicable City Departments before beginning construction will result in the revocation of project funding award under this program. Submit 10 copies of application and attachments to: North Seventh Urban Renewal Board 20 E. Olive St., PO Box 1230, Bozeman, MT 59771 For what type of project(s) are you requesting N7Rehab grant funding Technical Assistance Façade/Site Improvements Demolition Streetscape Enhance E-Z Auto Sales Building Technical Assistance Grant Applicaon May 2016 North Seventh Urban Renewal District | Redevelopment Incen ve Program 1) Project Descripon The exis ng building and site located at 23 North Seventh Avenue is an ideal candidate for the North Seventh Urban Renewal District Redevelopment Incen ve Programs. The subject property is located within the North Seventh Tax Increment District and would be consistent with the Design and Connec vity Plan (DCP), the Design Objec ves Plan, the Bozeman Community Plan and the Unified Development Code. The property is presently used as E-Z Auto Sales (retail). In 2000, Bill and Jeannine Albee purchased the property and started their company. The building was used another car dealer prior, Credit Cars, and before that the building was a gas sta on. The Albees would like to explore the redevelopment of their property, through the demoli on of the exis ng building and the design/construc on of a new mixed-use building. The new mixed-use building would be consistent with the newly adopted B-2M (Community Business District—Mixed) and would include main level restaurant and retail space, along with offices and residen al above on subsequent levels above grade. This Technical Assistance Grant would specifically explore the following: · Parking and Site Analysis · Building Code Research · Unified Development Ordinance Analysis · Municipal Review Processes Analysis · Conceptual Site and Building Design Analysis · Engineering Assessments, if needed · Preliminary Cost Es mates · Explora on of Development Scenarios & Conceptual Designs · Conceptual Tenant Configura ons · Scenario Planning The owner requests the full amount ($7,200) be applied to this project. The owner is also interested in exploring addi onal future funding for façade/site improvements and streetscape improvements. 2) Technical Assistance—Firm Experience The property owners would like to retain Intrinsik Architecture, Inc. to collaborate with on their poten al property redevelopment. Intrinsik Architecture, Inc. specializes in professional planning, architectural design and building. Over the past 13 years, Intrinsik has dis nguished itself as a very unique studio with an emphasis in projects that embody and preserve the spirit of clients, the project and the place. Intrinsik has completed over 20 Technical Assistance Grants for the Downtown Bozeman Partnership. Some of the more notable Technical Assistance Grants which lead to actual projects include the Downtown Community Co-Op, the Thrive building remodel and façade improvements, the Baxter Hotel Sign and most recently the Bozeman Taproom and Fill Sta on. While everyone on the Design team will contribute to this project, Rob Pertzborn will serve as the Project Principal and Peter Andrews will serve as the Project Manager. As a registered Montana architect and a prac cing planner, Rob Pertzborn bridges the gap between buildings and neighborhoods. Rob has worked in design and planning for the past 20 years and has a wide range of experience ranging from historic civic and commercial renova ons to land and municipal facili es planning to designing infill urban mixed use projects and residences. Rob specializes in big picture thinking and master planning to assure mely, quality and sustainable projects for the client, future residents and users, and the greater community. Rob is from Madison, Wisconsin and has lived in the Twin Ci es before seEling in Bozeman in 1989. Rob holds a Master of Architecture degree from Montana State University. Peter is a registered architect, LEED AP and Project Manager at Intrinsik. His unique journey to Architecture (beginning with a bachelor’s degree from Boston College, a volunteer year with the Jesuit Volunteer Corps, and a fellowship with Architecture for Humanity all the way to receiving his Master of Architecture from Montana State University) contributes to our eclec c and mul disciplinary approach to design. His experience includes a wide variety of projects including single household residen al projects, mul -family and commercial work. 3) Prospecve project would support the Design and Connecvity Plan (DCP), the Design Objecves Plan, the Bozeman Community Plan and the Unified Development Code. Site renova on and/or redevelopment would support the Design and Connec vity Plan (DCP), the Design Objec ves Plan, the Bozeman Community Plan and the Unified Development Code as follows: “Encourage the rehabilitaon and redevelopment of p arcels that are underulized... (Page 8 Design and Connecvity Plan). This building and site is a prime example of an underu lized and underdeveloped site which makes it a perfect candidate for a Technical Assistance Planning grant. “Encourage buildings of two more stories to increase density” (Page 8 Design and Connecvity Plan). The exis ng single level building would be replaced with a mul -story, mixed use building with poten al housing above, which would anchor the exis ng corner. “Provide Mixed Use Development” (Page 11 Design and Connecvity Plan) The proposed new mixed use building would provide commercial ac vi es and residen al uses which would contribute to making North 7th Avenue its own neighborhood. “The intent of the B-2M community business district—mixed is to funcon as a vibrant mixed-use district that accommodates substanal gro wth and enhances the character of the city.” (Midtown Zoning Text Amendments). With high-density housing and suppor ve commercial uses planned within a walkable area to serve the needs of the residents, this property and its proposed redevelopment are consistent with the intent and purpose of the newly created Zoning District. Addi onally, the poten al inclusion of offices, small scale retail and restaurants further the overall goals of the district and endeavor to create a sense of vitality and community. 4) An esmated meline indicang benchmarks for compleng technical evaluaon, beginning the project and compleng the project. DATE ITEM 5/20/16 Submit Grant Applica on 6/01/16 Projected Start Date 6/01/16 - 9/01/16 · Parking and Site Analysis · Building Code Research · Unified Development Ordinance Analysis · Municipal Review Processes Analysis · Conceptual Site and Building Design Analysis · Engineering Assessments · Preliminary Cost Es mates · Explora on of Development Scenarios & Conceptual Designs · Conceptual Tenant Configura ons · Scenario Planning 9/30/16 Es mated Comple on of Grant Funded Report 9/01/16 - 9/15/16 DraK Review and Revisions Note: Data and Informaon from the Grant Project St eps will be ulized in important decision making and forward progress prior to final submi!al. Site N Aerial Site Image Image Source: Bozeman GIS Dept. Site Map Photo 1 Photo 2 Site Photographs Photo 3 Photo 4