HomeMy WebLinkAboutBTB - N7Rehab - TAG application and packet e
North 7th Urban Renewal District
Redevelopment Incentive Program
Property Information
Property Address: _______________________________________________________________________
Property Owner: ________________________________________________________________________
Legal Description: _______________________________________________________________________
Property Geo-Code: ____________________________________________________________________
County Tax ID #: _______________________________________________________________________
Log on to http://webapps.gallatin.mt.gov/mappers/ to obtain Geo-codes and Tax ID#s
Applicants Legal Name and Contact Information
Name: _______________________________________________________________________________
Company or LLC entity: __________________________________________________________________
Address: ______________________________________________________________________________
City/State/zip: __________________________________________________________________________
Phone: ________________________________________________________________________________
Email: _________________________________________________________________________________
Additional Information
1. Project Description
Tell us about the type and scale of the development. Tell us why you want to redevelop a property along N. 7th Avenue
and how your project reduces the blighted condition of the property (not to exceed 1 typed page).
2. Technical Assistance
If applying for a Technical Assistance Grant, please provide the accreditations and building design/site development
experience of the professional assisting the property owner.
3. Site Plan & Renderings and Elevations
These should be the same plans submitted for Site/Sketch Plan review to the Planning Department. Please provide
enough copies for each Board Member (11x17 versions are acceptable)
4. Total Project Cost Estimates
Please include the total project cost estimate, with supporting independent bid documents. Two cost estimates are
required for all eligible activities for which the applicant seeks funding. Use N7Rehab Cost Estimate work sheet(s).
Estimates may be provided in your application, but bid contracts are required prior to finalizing the development
agreement.
5. IMPORTANT
Applications must be received at least 15 days prior to the next NSURB board meeting and in conjunction with an
Application to the City Planning Department. This is to allow adequate time to place the item on the NSURB meeting
agenda and for a thorough staff review of the application for presentation to the North 7th Urban Renewal Board. Approval
for N7Rehab funding does not guarantee approval from other City Departments. Failure to receive approvals from
applicable City Departments before beginning construction will result in the revocation of project funding award under this
program.
Submit 10 copies of application and attachments to: North Seventh Urban Renewal Board
20 E. Olive St., PO Box 1230, Bozeman, MT 59771
For what type of project(s) are you requesting N7Rehab grant funding
Technical Assistance Façade/Site Improvements
Demolition Streetscape Enhance
Bar 3 Barbeque
Technical Assistance Grant Applicaon
May 2016
North Seventh Urban Renewal District | Redevelopment Incen ve Program
1) Project Descripon
The exis ng building and site located at 215 North Seventh Avenue is an ideal candidate for
the North Seventh Urban Renewal District Redevelopment Incen ve Programs. The subject
property is located within the North Seventh Tax Increment District and would be consistent
with the Design and Connec vity Plan (DCP), the Design Objec ves Plan, the Bozeman
Community Plan and the Unified Development Code.
The property is presently used as Bar 3 Barbeque (restaurant). In 2001, Hunter Lacey
purchased the property and started his restaurant business. The building was used as another
restaurant space prior, and at some point before that the building was a KFC as well. Hunter
has made several upgrades to the building and site. He would like to explore the op ons for
his property, either through the expansion of his current restaurant facility or through
redevelopment via demoli on of the exis ng building and the design/construc on of a new
mixed-use building. The expansion of the exis ng building or the new mixed-use building
would be consistent with the newly adopted B-2M (Community Business District—Mixed) and
would include main level restaurant and retail space, along with offices and residen al above
on subsequent levels above grade.
This Technical Assistance Grant would specifically explore the following:
· As Built Drawings
· Preliminary Building Condi on Assessment (If needed, Structural, Mechanical, Electrical…)
· Parking and Site Analysis
· Building Code Research
· Unified Development Ordinance Analysis—’Midtown’ Code Changes
· Conceptual Site and Building Design Analysis
· Engineering Assessments, if needed
· Preliminary Cost Es mates
· Explora on of Development Scenarios & Conceptual Designs
· Conceptual Tenant Configura ons
· Scenario Planning
· Municipal Review Processes Analysis
The owner requests the full amount ($7,200) be applied to this project. The owner is also
interested in exploring addi onal future funding for façade/site improvements and
streetscape improvements.
2) Technical Assistance—Firm Experience
The property owners would like to retain Intrinsik Architecture, Inc. to collaborate with on
their poten al property redevelopment. Intrinsik Architecture, Inc. specializes in professional
planning, architectural design and building. Over the past 13 years, Intrinsik has dis nguished
itself as a very unique studio with an emphasis in projects that embody and preserve the spirit
of clients, the project and the place.
Intrinsik has completed over 20 Technical Assistance Grants for the Downtown Bozeman
Partnership. Some of the more notable Technical Assistance Grants which lead to actual
projects include the Downtown Community Co-Op, the Thrive building remodel and façade
improvements, the Baxter Hotel Sign and most recently the Bozeman Taproom and Fill
Sta on. While everyone on the Design team will contribute to this project, Rob Pertzborn will
serve as the Project Principal and Peter Andrews will serve as the Project Manager.
As a registered Montana architect and a prac cing planner, Rob Pertzborn bridges the gap
between buildings and neighborhoods. Rob has worked in design and planning for the past 20
years and has a wide range of experience ranging from historic civic and commercial
renova ons to land and municipal facili es planning to designing infill urban mixed use
projects and residences. Rob specializes in big picture thinking and master planning to assure
mely, quality and sustainable projects for the client, future residents and users, and the
greater community. Rob is from Madison, Wisconsin and has lived in the Twin Ci es before
seHling in Bozeman in 1989. Rob holds a Master of Architecture degree from Montana State
University.
Peter is a registered architect, LEED AP and Project Manager at Intrinsik. His unique journey to
Architecture (beginning with a bachelor’s degree from Boston College, a volunteer year with
the Jesuit Volunteer Corps, and a fellowship with Architecture for Humanity all the way to
receiving his Master of Architecture from Montana State University) contributes to our
eclec c and mul disciplinary approach to design. His experience includes a wide variety of
projects including single household residen al projects, mul -family and commercial work.
3) Prospecve project would support the Design and
Connecvity Plan (DCP), the Design Objecves Plan,
the Bozeman Community Plan and the Unified
Development Code.
Site renova on and/or redevelopment would support the Design and Connec vity Plan (DCP),
the Design Objec ves Plan, the Bozeman Community Plan and the Unified Development Code
as follows:
“Encourage the rehabilitaon and redevelopment of p arcels that are underulized... (Page 8
Design and Connecvity Plan).
This building and site is a prime example of an underu lized and underdeveloped site which
makes it a perfect candidate for a Technical Assistance Planning grant.
“Develop the corridor as a focus for commercial and entertainment acvies that serve
residents and visitor alike” (Page 8 Design and Connecvity Plan).
The exis ng property owner concedes his building lacks the adequate sea ng/serving area to
make it an honest dine-in restaurant. The goal of u lizing Grant funding is to re-envision his
business to expand the sea ng capability and create a des na on restaurant in the
burgeoning Midtown District.
“Improve auto, bicycle and pedestrian circulaon al ong the corridor” (Page 12 Design and
Connecvity Plan).
The reduc on of the public right of way for West Beall Street as it crosses North 7th Avenue
directly effects the si ng and use of the property. Through expansion explora on and
poten al redevelopment strategies, how the corner/intersec on is addressed will be studied.
“The intent of the B-2M community business district—mixed is to funcon as a vibrant
mixed-use district that accommodates substanal gro wth and enhances the character of the
city.” (Midtown Zoning Text Amendments).
An expanded sea ng area will allow the Bar 3 Barbeque business to grow and become more of
a des na on restaurant, which would ul mately contribute to the revitaliza on of the overall
district and help the transi on from vehicle dominated thorough-fare to a more pedestrian
orientated neighborhood.
4) An esmated meline indicang benchmarks for
compleng technical evaluaon, beginning the
project and compleng the project.
DATE ITEM
5/20/16 Submit Grant Applica on
6/01/16 Projected Start Date
6/01/16 - 9/01/16 · Parking and Site Analysis
· Building Code Research
· Unified Development Ordinance Analysis
· Municipal Review Processes Analysis
· Conceptual Site and Building Design Analysis
· Engineering Assessments
· Preliminary Cost Es mates
· Explora on of Development Scenarios & Conceptual Designs
· Conceptual Tenant Configura ons
· Scenario Planning
9/30/16 Es mated Comple on of Grant Funded Report
9/01/16 - 9/15/16 DraN Review and Revisions
Note: Data and Informaon from the Grant Project St eps will be ulized in important decision
making and forward progress prior to final submi!al.
Site
N
Aerial Site Image Image Source: Bozeman GIS Dept.
Site Map
Photo 1
Photo 2
Site Photographs
Photo 3
Photo 4