Loading...
HomeMy WebLinkAboutGVFC1_N7Rehab-Program-applicationNorth 7th Urban Renewal District Redevelopment Incentive Program Application for N7Rehab Funding Property Information Property Address: _______________________________________________________________________ Property Owner: ________________________________________________________________________ Legal Description: _______________________________________________________________________ Property Geo-Code: ____________________________________________________________________ County Tax ID #: _______________________________________________________________________ Log on to http://webapps.gallatin.mt.gov/mappers/ to obtain Geo-codes and Tax ID#s Applicants Legal Name and Contact Information Name: _______________________________________________________________________________ Company or LLC entity: __________________________________________________________________ Address: ______________________________________________________________________________ City/State/zip: __________________________________________________________________________ Phone: ________________________________________________________________________________ Email: _________________________________________________________________________________ Additional Information 1. Project Description Tell us about the type and scale of the development. Tell us why you want to redevelop a property along N. 7th Avenue and how your project reduces the blighted condition of the property (not to exceed 1 typed page). 2. Technical Assistance If applying for a Technical Assistance Grant, please provide the accreditations and building design/site development experience of the professional assisting the property owner. 3. Site Plan & Renderings and Elevations These should be the same plans submitted for Site/Sketch Plan review to the Planning Department. Please provide enough copies for each Board Member (11x17 versions are acceptable) 4. Total Project Cost Estimates Please include the total project cost estimate, with supporting independent bid documents. Two cost estimates are required for all eligible activities for which the applicant seeks funding. Use N7Rehab Cost Estimate work sheet(s). Estimates may be provided in your application, but bid contracts are required prior to finalizing the development agreement. 5. IMPORTANT Applications must be received at least 15 days prior to the next NSURB board meeting and in conjunction with an Application to the City Planning Department. This is to allow adequate time to place the item on the NSURB meeting agenda and for a thorough staff review of the application for presentation to the North 7th Urban Renewal Board. Approval for N7Rehab funding does not guarantee approval from other City Departments. Failure to receive approvals from applicable City Departments before beginning construction will result in the revocation of project funding award under this program. Submit 10 copies of application and attachments to: North Seventh Urban Renewal Board 20 E. Olive St., PO Box 1230, Bozeman, MT 59771 For what type of project(s) are you requesting N7Rehab grant funding: U Technical Assistance U Façade/Site Improvements U Demolition U Streetscape Enhance 923 N. 7th Ave DMC Properties LLC Durston 2nd Sub, S01, T02 S, R05 E, Block 2, Lot 8-11, Acres 1.606, N 40' Lot 7 & N 40' less S. 15' of Lot 12 Plus N 175' Vacated Alley, Plat E33 06-0798-01-3-07-07-0000 Brian Cattin DMC Properties LLC 923 N. 7th Ave Bozeman, MT 59715 406.587.5423 brian@gvfc1.com x 000RGG2301 document 4515 Valley Commons Drive #201, Bozeman Montana 59718 P: 406.585.4161 F: 406.585.6919 www.bechtlearchitects.com scottb@bechtlearchitects.com   NORTH SEVENTH URBAN RENEWAL DISTRICT SUBMITTAL NARRATIVE    Gallatin Valley Furniture Carpet One, located at 923 North 7th street, is proposing to upgrade  their buildings façade, landscaping and building approach to contribute to the rehabilitation of  the North 7th Urban Renewal District.      We are proposing:   Landscaping update approach along North 7th and Juniper Street.   160 lineal feet along North 7th façade, 216 lineal feet along Juniper Street, 160 lineal  feet at rear of building facing future North 8th Street, and 216 lineal feet along south  alleyway update:  o Demolition of existing exterior finish  o New double pain, low‐e insulated aluminum storefront systems.  o New parapet walls to cover double gable end walls and roof line with Brick  veneer, FunderMax metal paneling, and horizontal flat soffit metal wall panel.  o Steel framed canopy at entry doors.  o New signage on building façades.   Demolition of roof top elements not in service, and replace RTUs with new units to be  screened from view.   Reroof entire building with single ply PVC membrane, with new cricket redirecting roof  drainage.    The proposed façade update and revised landscape will enhance the quality of the pedestrian  experience along North 7th Avenue frontage. The simplified landscaping will minimize visual  clutter along the North 7th corridor.  The new sidewalks and entryways will accommodate  pedestrians and bicyclists. The new façade will provide a stronger relationship between the  building and the street through a stronger entry presence on both North 7th Avenue and the  east portion of the Juniper Street frontage.  The updating of the rear façade aligns with the  Master Plan for the eventual connection of Juniper to 8th Street and transformation to  compliant parallel parking along that frontage as it relates to visibility from North 7th Avenue  corridor. The goal of the revised façades is to create a building design that adds interest as seen  from the road and while establishing a design compatible with the local Bozeman character.  The new parapet walls hiding the two‐building gable look will create a building design that has a  feeling of more than one story that helps define the commercial edge of the entryway corridor.     Thank you in advance for your consideration.    Gallatin Valley Furniture Carpet One and Bechtle Architects.  Langlas Associates Inc. 1019 East Main Street Suite 101 Bozeman, Mt 59715 GALLATIN VALLEY FURNITURE CARPET ONE 5/26/16 Preliminary Design Budget DIVISION 1 GENERAL CONDITIONS $88,689 DIVISION 2 SITEWORK AND GENERAL EXCAVATION $22,030 DIVISION 3 CONCRETE $25,190 DIVISION 4 MASONRY $124,236 DIVISION 5 STRUCTURAL STEEL AND AWNINGS $166,587 DIVISION 6 CARPENTRY/DEMO $156,889 DIVISION 7 ROOFING/SIDING/INSULATION/WATER PROOFING $669,540 DIVISION 8 DOORS AND WINDOWS $137,100 DIVISION 9 FINISHES $15,000 DIVISION 10 SPECIALTIES $0 DIVISION 15 MECHANICAL $208,000 DIVISION 16 ELECTRICAL $25,000 TOTAL TI Budget $1,638,260 W/ MARKUP @ 7.0%$1,752,938