Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Comfort Inn cost estimate
URBAN RENEWAL BOARD N7Rehab Cost Estimate Worksheet Project Name: /51 zG &or4 Z.n Property Address: /3 70 fti 7 >L, �v e Is a public access easement being provided for sidewalk and/or boulevard landscaping installation?Yes_sC No Total Project Cost(attach cost estimates): $171, 7,T 11 1 71 x 0.15 = Eligible grant award amount*: Z 7 1) Demolition Costs: $ = SUBTOTAL 1 Description Have you assessed the buildings/site for presence of hazardous materials? Yes x: No 2) Fagade/Site Improvement Costs: Itemized eligible improvements: 1. $ '-lloo Description gee-,;r 2. $ 7 975 Description 3. $_Sgoon Description 2�c�. �a,w+:r•4 4. $23 yY Description / ;ti 0;,A 5. $/S000 Description Cov►cr,4e 6. $ l V 4? Description_ 2�4 e SUBTOTAL 2$ I `$ q13 3) Streetscape Enhance Costs: Itemized eligible improvements: r 1. $SG S77.7i Description �k S6!* e 2. $ Description 3. $ Description 4. $ Description SUBTOTAL 3$ 50 Z�7$.71 1)$ + 2)$_ + 3) $ J0 87$.7/ _ $ 17 Zft 1,*otal Eligible Costs *Not toe ceed NSURB fiscal year cap or amount o Bailable;FY 011 cap is$50,000 tGenerally, not to exceed 15% of total project cost '/ Lti �h Construction Contractor Project Address 3 76 ✓�' 7 Name: �'C Caok Company Name: kG C C L N 540--L4 o h gV%G . Phone Number: 5-! ,5_06 E-mail: kccoll, 4,y1 6,� Cows-lf"c�aH• Cd"� Address: 17 7(� /U IS — .dve_ City RoLt.rrG 4 State;!i Zip Has the above contractor or builder within the last 10 years ever failed to qualify as a responsible bidder, refused to enter into a contract after an award has been made, or failed to complete a construction development contract?Yes_Now If yes, please explain: CERTIFICATION I (we), L C o d v printed name printed name Certify that the statements and estimates within this Application as well as any and all documentation submitted as attachments to this Application or under separate cover are true and correct to the best of my(our) knowledge and belief. --------------------------------------------------------------------------------------------------------------------------------------------------------------- Construction Contractor Project Address Name: Company Name: Phone Number: E-mail: Address: City State Zip Has the above contractor or builder within the last 10 years ever failed to qualify as a responsible bidder, refused to enter into a contract after an award has been made, or failed to complete a construction development contract?Yes_No If yes, please explain: CERTIFICATION I (we), printed name printed name Certify that the statements and estimates within this Application as well as any and all documentation submitted as attachments to this Application or under separate cover are true and correct to the best of my(our) knowledge and belief. KM CONSTRUCTION CO., INC 6656 FALCON LANE, SUITE I BOZEMAN, MT 59718 (406) 587-9307 March 30, 2016 Karl Cook 1276 N 15th, Ste. 103 Bozeman, MT 59715 Following is a quote for asphalt repair at the Comfort Inn, 1370 N 7th Avenue. Saw cut, remove and dispose of the existing asphalt that has failed. Furnish and install road mix gravel, graded and compacted. Furnish and install asphalt surfacing, 3" final compacted depth. Approximate area -- 840 square feet Tack and fill small potholes. Price: $4100.00 Thank you for the opportunity to quote your project. If you choose to accept this quote, please return a signed copy. Sincerely, l Karen Moore President Accepted By Date Check out our website at www.kmconstructionco.com AMERICAN ASPHALT SEALCOATING CO. 1 Driftwood Drive Phone: 406-222.7282 Livingston, MT 59047 Cell: 406-223-5601 Charles-V.Vondra @ me.com Name_ Ca.1C � 7�— Phone Address '-r-' Fax Date/ p 7/S- Contact Job Location Engineer SEALCOATING _ # Coats��55• Sq. Ft. / / �-- 1.Thoroughly clean,degrease and prepare all asphalt surfaces CAST: �O t 2.Apply thick coat(s)of Asphalt based Rubberized Thermoseal Extra Heavy Coat "Premium" Sealer fortified with Latex Polymer Additives RSA ©Extra Sand And wear enhancer G1'7. u Slurry Seal lbs. sand/gal. 3.Professionally applied with"State of the Art"equipment for Rate of Coverage: Outstanding wearability and appearance. Gal.per sq.yard CRACK SEALING 60 1.Clean and remove debris from cracks. COST-4 (75 2. Fill with HOT Rubberized Elasto>7>eric Crack Filler to prevent water ©Gator Pave Crack Sealant Penetration to sub-surface o Route/Machine Clean Cracks XASTM 3405 Crack Sealant ASPHALT REPAIR(Patching, Resurfacing, Paving) sq. ft. COST: a Cut out& remove deteriorated asphalt/ © Resurface area as diagramed. to Roll& compact with 5 ton vibratory roller. LINE STRIPING �' � #of lines COST: a Yellow t2 White ci Blue H.C. o Arrows 2 No Park OTHER SERVICES COST: Specify Total Estimate: ` 7 d°- 2 Year Warranty Warranty does not cover any abnormal wear,oil spots,or pooling of water. Acceptance of Proposal Authorized Signature This estimate may be withdrawn a$er 30 days.All proposals are subject to approval.Baiwvxs not paid within 30 days will be subject to a I5%service charge plus 2%peT month Ctmcaflatron of this prnposal afisr either a verbal or wraren comrmfMaW wtA be chwgad a fw of 21%ofthe tnm!job cost. We here at American Asphalt SeWcoaang me catatnitDed to pTcr�idu'8 yo;u witb rho highest quality same,rig the highest quality nmterisIs attd equipment avlalable. We staff ewiru oua told quaiifted prufemuonal people whose goal is to deliver outstendmg service and rewlm to cmwm your sausratuan- Jones Painting, Inc. 220 Fly's Crossing Manhattan,MT 59741 406.539.2205 406.388.2959 April 8, 2016 Estimate submitted to: Vinny Fillipini Attn: Vinny Re: Comfort Inn- Repaint Exterior: *Apply 2 coat of Elastomeric Paint. *Apply 2 coats of DTM paint to metal handrails. *Includes cost of all masking, caulking, and prep work. *Includes cost of all paint and materials. Total Exterior: $58,000.00 All work above and beyond this proposal will be billed at $40.00 per man hour. Change orders will be billed on a per item basis or at $40.00 per man hour. Specialty painting, antiquing or faux painting, will be billed on a per item basis. Submitted by Don Jones Jones Painting, Inc. President Acceptance Signature: Date: 1 1/ D.E. Electric, Inc. Estimate 121 Explorer Trail Bozeman, MT 59718 Date Estimate# 4/22/2016 1516 Name/Address Karl Cook Construction 1276 North 15th#103 Bozeman,MT 59715 Project Comfort INN Parkin... Item Description Cost Qty Total Service Electrical estimate for replacing parking lot light Comfort 1.125.00 20 22,500.00 Inn.Replacing 150 Watt Metal halide with 50 watt LED Service Electrical labor 16 man hour at 60.00 per hour 60.00 16 960.00 Bid as per plan Total $23.460.00 Signature ESTIMATE Cornerstone Concrete, Inc. Date Number P.O. Box 11750 Bozeman, MT 59719-1750 4/01/16 2342 Bill To Comfort Inn of Bozeman. 1370 North 7th Avenue Bozeman, MT 59715 P.O. No. Terms Project Description Qty Rate Amount Remove ramp at entry on south side Replace concretE Add ADA ramp $15,000.00 Email:mtndconcrete@gmail.com Total $15,000.00 Fax: 406-586-5553 Proposal Red Barn Trees Client Name: Comfort Inn Project Name: Parking Lot Improvements Jobsite Address: N 7th Ave Bozeman,MT 59715 Billing Address: N 7th Ave Bozeman,MT 59715 Estimate ID: EST312214 Date: Mar 31,2016 Parking Lot improvements 32 Hours Skid Steer-Track Machine $909.12 4 Large Canopy Tree- 1.5-2"caliper $820.00 24 Deciduous Shrub large- 12-18" $764.88 36 Deciduous Shrub small-12-18" $1,016.64 36 Ornamental Grasses- 1 Gallon $388.80 42.5 Premium Rock Mulch-cubic yard $3,981.40 128 Hours Construction Crew-Labor 4 Man Construction Crew $5,888.00 3 Debris Haul off $1,330.38 Subtotal $15,099.22 Taxes $0.00 Estimate Total $15,099.22 Estimate authorized by: Estimate approved by: Company Representative Customer Representative Signature Date: Signature Date: Page 1 of 1 3084 Thorpe Rood p.4065397030 redbarntrees.com Belgrade,MT 59714 email:chad@redbarntrees.com Proposal Red Barn Trees Client Name: Comfort Inn Project Name: Comfort Inn Entry Jobsite Address: N 7th Ave Bozeman,MT 59715 Billing Address: N 7th Ave Bozeman,MT 59715 Estimate ID: EST312197 Date: Mar 31,2016 I Prom Wry 1 Bristlecone Pine-6'B&B $405.57 20 Deciduous Shrub large- 12-18" $637.40 6 Deciduous Shrub small- 12-18" $169.44 5 Evergreen Shrubs-5 Gallon $174.70 3 Specimen Evergreen Shrub-7 $169.47 gallon 30 Ornamental Grasses- 1 Gallon $324.00 70 Perennials-1 Gallon $976.50 20 Moss Rock Boulders-per ton $3,170.80 40 Topsoil unscreened-cubic yard $864.80 28 Premium Rock Mulch-cubic yard $2,623.04 1200 Turf Grass Sod-square foot $300.00 20 Hours Skid Steer-Track Machine $568.20 150 Hours Construction Crew-Labor 4 Man Construction Crew $6,900.00 1 Debris Haul off $443.46 160 Pro Steel Edging-Ln Ft $921.60 Subtotal $18,648.98 Taxes $0.00 Estimate Total $18,648.98 Estimate authorized by: Estimate approved by: Company Representative Customer Representative Page 1 of 2 3084 Thorpe Road p.4065397030 redbarntrees.com Belgrade,MT 59714 email:chad@redbarntrees.com Proposal Red Barn Trees Client Name: Comfort Inn Project Name: Building Improvements Jobsite Address: N 7th Ave Bozeman,MT 59715 Billing Address: N 7th Ave Bozeman,MT 59715 Estimate ID: EST312223 Date: Mar31,2016 BuAding Improvemenh _ _ _ 11_1U 24 Hours Skid Steer-Track Machine $681.84 8 Deciduous Shrub large- 12-18" $254.96 30 Deciduous Shrub small- 12-18" $847.20 6 Evergreen Shrubs-5 Gallon $209.64 3 Moss Rock Boulders-per ton $475.62 24 Ornamental Grasses- 1 Gallon $259.20 5 Topsoil unscreened-cubic yard $108.10 25 Pro Steel Edging-Ln Ft $144.00 128 Hours Construction Crew-Labor 4 Man Construction Crew $5,888.00 25 Premium Rock Mulch-cubic yard $2,342.00 Subtotal $1 1,210.56 Taxes $0.00 Estimate Total $11,210.56 Estimate authorized by: Estimate approved by: Company Representative Customer Representative Signature Date: Signature Date: Page I of 1 3084 Thorpe Road p.4065397030 redbarntrees.com Belgrade.MT 59714 email:chadsredbarntrees.com Proposal Red Barn Trees Client Name: Comfort Inn Project Name: South Entry Jobsite Address: N 7th Ave Bozeman,MT 59715 Billing Address: N 7th Ave Bozeman,MT 59715 Estimate ID: EST312229 Date: Mar 31,2016 3 Quaking Aspen- 1.5-2" $446.22 1 Large Canopy Tree- 1.5-2"caliper $205.00 2 Deciduous Shrub large-24-36" $63.74 4 Deciduous Shrub small- 12-18" $1 12.96 3 Evergreen Shrubs-5 Gallon $104.82 6 Ornamental Grasses- 1 Gallon $64.80 15 Perennials- 1 Gallon $209.25 3 Moss Rock Boulders-per ton $475.62 50 Pro Steel Edging-Ln Ft $288.00 6 Premium Rock Mulch-cubic yard $562.08 64 Hours Construction Crew-Labor 4 Man Construction Crew $2,944.00 1 Debris Haul off $443.46 Subtotal $5,919.95 Taxes $0.00 Estimate Total $5,919.95 Estimate authorized by: Estimate approved by: Company Representative Customer Representative Signature Date: Signature Date: Page 1 of 1 3084 Thorpe Road p.4065397030 redbarntrees.com Belgrade,MT 59714 email:chadgredbarntrees.com PO Box 10296 ESTIMATE BOZEMAN, MT 59719 DATE ESTIMATE# PHONE#406.388.0832 4/22/2016 346 FAX# 406.388.0833 C4RNS GREATER ROCKY MOUNTAIN STONE NAME /ADDRESS KARL COOK CONSTRUCTION 1276 NORTH 15TH STE. 103 BOZEMAN, MT 59715 PROJECT COMFORT INN REMODEL DESCRIPTION SQUARE FEET RATE TOTAL CULTURED STONE TO BE DETERMINED ENTRY WAINSCOT- 1001 x 4' 400 28.00 11,200.00 SILLS 100 15.00 1.500.00 COLUMNS- 16'x 16' 256 28.00 7,168.00 ***HEAT&SHELTER BILLED AS T&M IF NEEDED*** THANK YOU FOR THE OPPORTUNITY TOTAL $19.s6s.00 WWW.RMSTONE.NET