HomeMy WebLinkAboutComfort Inn Application North 7th Urban Renewal District
Redevelopment Incentive Program
UR BAN RE NEW AL BOAR D Application for N711ehab Funding
For what type of project(s) are you requesting N7Rehab grant funding:
Technical Assistance
Parade/Site Improvements
❑ Demolition J °?Streetscape Enhance
Property information
Property Address: t ti � 4 v e-
Property Owner: ack k_ Sl re,e 4- G h s 6 yvt o r'�- y h&1
Legal Description:_11J1 ►nv r �,jh 09 7 r 501 , 2 51 A 0 5 E, Lv i /je i _
Property Geo-Code: 0 62 0 7 J"3 Q 1 -- 1 -0 Z -o '7 -oo0 O
County Tax ID#: "(r 6 q l L'�—
Log on to hftp://webappa.-gallatin,mt.gov/mar)pers/to obtain Geo-codes and Tax ID#s
Applicants Legal Name and Contact Information
Name: _ l<c%c� ,.,k _
Company or LLC entity: G'm r,-, v_r - rse
Address: 13°7p iV Zt:!! -4✓e,
City/State/zip: /3c r-e "C" 1 !z'/7` 59 71,,.,5- _
Phone: v - (o- o�o'Z el U S- e-/sU
Email: _&V't I
Additional Information
1. Project Description
• Tell us about the type and scale of the development. Tell us why you want to redevelop a property along N.7«'Avenue
and how your project reduces the blighted condition of the property(not to exceed 1 typed page).
�2. Technical Assistance
• If applying for a Technical Assistance Grant, please provide the accreditations and building design/site development
experience of the professional assisting the property owner.
3. Site Plan&Renderings and Elevations
• These should be the same plans submitted for Site/Sketch Plan review to the Planning Department. Please provide
enough copies for each Board Member(11x17 versions are acceptable)
4. Total Project Cost Estimates
• Please include the total project cost estimate,with supporting independent bid documents. Two cost estimates are {
required for all eligible activities for which the applicant seeks funding. Use N7Rehab Cost Estimate work sheet(s).
Estimates may be provided in your application, but bid contracts are required prior to finalizing the development
agreement. tl
5. IMPORTANT
• Applications must be received at least 15 days prior to the next NSURB board meeting and in conjunction with an
Application to the City Planning Department.This is to allow adequate time to place the item on the NSURB meeting
agenda and for a thorough staff review of the application for presentation to the North 7th Urban Renewal Board.Approval
for N7Rehab funding does not guarantee approval from other City Departments. Failure to receive approvals from
applicable City Departments before beginning construction will result in the revocation of project funding award under this it
program. p
Submit 10 copies of application and attachments to: North Seventh Urban Renewal Board
20 E.Olive St., PO Box 1230, Bozeman,MT 59771 I
,
i;
it
tQ}
i
1
Comfort Inn Hotel
Oak street Partners
2/22/201 b
North Th Rehab Funding
I . Introduction
The owners of the Comfort Inn of Bozeman have realized that it is time to revitalize the
facade and landscaping of the hotel. We would like to improve upon what is currently
existing through the use of exterior enhancements and landscaping
Procedures/Scope of Work
t. The current exterior of the hotel is EFIS on the body and has one color. We would like
to use 2-3 colors to enhance the exterior of the main body.
2. The front elevation facing North 71h is EFIS and one color. We would like to develop a
plan to enhance the look with stone and /or a more natural facade on the postiche
3. The landscape on the building has been aging and some of the trees/shrubs have
died and been replaced over the years. We would like to make a major
enhancement to the Nth Ph facing front yard and update all the parking lot
landscaping with new trees/shrub and bedding.
4. The parking lot is failing in a number of areas from the approach to North 7fh to the
approach onto Oak Street.We would like to repair and seal coat the entire parking
area of the hotel.
5. The parking lot lighting that was installed nearly 20 years ago has a very dated look
we would like to remove and replace the lights with a similar look to what is currently
being installed on North 71h.
li . Endorsements
Custom earth designs "Chad Rempfer"
Legend Studio "Kira Ogle"
i
i
i
Page 2 of 2
t
° s City of Bozeman
F
Addresses
✓ Trails
x: Bike Lanes
Bike Routes
.�. s�r «•+ Shared Use Paths
•.
C) City Llmita
' 1
Parcels
Open Space
Roads
r�,
.........- s
r
City
e-
r
Y
f Bozeman
IN
GIs Depoltment
1,
" Thls product fa for Informational purposes and may not have been
0 0 0 0 ed for,or be suitsVo for legal,a mead
f: 939 Users e8 ng w or surveying Purposes.
Users of this Information should reNew or consult the primary data and
Feet Information sources to ascertain the usaNlity of the Information.
I
y1
i
jl
custom earth designs
Custom Earth Designs has been designing award winning landscapes in the Rocky Mountain west since
2003. We have been part of design teams working on projects as large as major subdivisions and public
parks to retail complexes and small residential. We have worked on countless projects within the city
limits of Bozeman and understand the process and how to efficiently create a landscape design that
meets the needs of the client and the city standards.
Chad Rempfer,Owner and lead designer of Custom Earth Designs graduated from Montana State
University in 2001 with a degree in horticulture/landscape design and has been in the landscape
industry ever since.
Project References
Comfort inn and Suites,Valley Center Rd Bozeman
Hilton Home2 271h St Billings MT
Wingate Inn Sidney MT
Candlewood Inn Sidney MT
Outlaw Steak House Williston ND
Town Pumps, 19th and Baxter/Main St and N Broadway and Huff ine and Cottonwood Rd Bozeman
Woodland Park Subdivision, Huffine Lane Bozeman
If you have any other questions or would like examples of past projects please feel free to contact me
directly. Thank you for the opportunity to be part of your design team
Regards j
i
Chad Rempfer
406.539.7030
chad@customearthdesign.com
�I
l
3;
V
i .
C .............
*.nv
LEGENDSTUD10
KIRA E. OGLE PRINCIPAL/PROJECT MANAGER
EDUCATION � R
Bachelor of Arts in Architecture "
Montana State University-1995
Bozeman,Montana ago
PROFESSIONAL MEMBERSHIPS
Associate Member of AIA � - 10
Member of NCARB � gai
r fit crz d p b to 4n er en�dX`e
AREAS OF DESIGN EXPERIENCE ��dEIVe � �� ak
M M Yam" Zll�
Master Planning �aPtt I1g '+,,1g!i,1 nusTrlti
Remodeling/Renovation Klraisrs�lol?sble fpralQJeCof;i� fr?17Xg
Historical Restoration
s>;hernatre deslgn through constrttctlon docarnetils as�►zell
Industrial Design a
Commercial Design ! aS pt a/eC1�SeC1f1611107tS,C[1el?t mLetlligS Cl/3d llegatl[ItloliS,
Custom and Standard Residential and GantCaCtor 41dding p11C1 negotlatioo.perrr11tt1ng,pn Sfte
Commercial Interiors Construction aditilstrotron,and project:te , selection
COMMERCIAL
; and coordlliatlon from schematic deslgn`through
SAMPLE PROJECT LIST construction
Golden Rule Building Bozeman,Mr Throughout design 'and construction Kira maintains a close
Murdoeh's Ranch&Home Supply Bozeman,MT working,relationship with the client and project team to
American Legion Bozeman,MT see the project to completion.
Pacific Steel and Recycling Belgrade,MT When Kira started Legends Studio her focus was on
Foundant Technologies Belgrade,MT residential design, this quickly expanded to a range of
Baja Fresh-Canyons Burger Great Falls,MT
Goodwill Building Bozeman,MT commercial design from historic preservatianJrestoration
Bozeman Brick,Block and Tile Belgrade,MT to new commercial and industrial design.
AWARDS Bayliss Architects,AC,Bozeman,Montana,1997-2003:
Award for Excellence in Historic While working for Bayliss Architects, Kira's responsibilities
Preservation—Golden Rule Building
included project management and lead designer for many
Bozeman Historic Preservation
Advisory Board 2007 high-end custom residential projects in the states of
Montana and Wyoming. Kira was responsible for the
PRESS production of project documents and specifications for the
Parade of Homes 2006 project through construction. Kira was also responsible
Parade of Homes 2005
At Home Magazine October 2005 for client meetings, project team coordination and
Balance Magazine April2004 meetings, in office and on-site construction
administration, and governing agency coordination for
permitting.
i
x
I':