Loading...
HomeMy WebLinkAboutAllison Subdivision Ph 3A - Public Infrastructure Improvements - Graft St. & Macnab St. - Roadway, Water, Sewer, StormSHEET INDEXCOVER SHEETALLISON SUBDIVISION PHASE 3 PUBLIC INFRASTRUCTURE IMPROVEMENTSCIVIL ENGINEERING BY:MADISON ENGINEERING895 TECHNOLOGY BOULEVARD, SUITE 203BOZEMAN, MT 59718(406) 586-0262 (406) 586-5740 FAXVICINITY MAPNTSPROJECT LOCATED INBOZEMAN, MONTANAMAY 2015DEVELOPER:BON TON, INC.PO BOX 906BOZEMAN, MT 59771-0906(406) 587-7950PUBLIC INFRASTRUCTURE IMPROVEMENTSFORALLISON SUBDIVISION PHASE 3GRAF STREET & MACNAB STREETROADWAY, WATER, SANITARY SEWER & STORM DRAINAS-BUILT Allison Ph 2Cr e e k P h 2 R-2 ZONE R-1 ZONE R-1 ZONE128.28' R-1 ZONEPHASE ASHEETALLISON PH IIIALLISON SUBDIVISION, PHASE 3 BOZEMAN, MT MADISON ENGINEERING 895 TECHNOLOGY BLVD. STE. 203 BOZEMAN, MT 59718 (406) 586-0262 (406) 586-5740 FAXALLISON PHASE III - PLAN1" =0SCALE40'8020 40GENERAL NOTESC0.1GENERAL NOTES & SITE PLANAS-BUILTDATUM: NAVD 88 GRAF STREETMACNAB STMACNAB ST. FIGGINS CREEK FIGGINS CREEK SHEETALLISON PH IIIALLISON SUBDIVISION, PHASE 3 BOZEMAN, MT MADISON ENGINEERING 895 TECHNOLOGY BLVD. STE. 203 BOZEMAN, MT 59718 (406) 586-0262 (406) 586-5740 FAXGRAF STREET - PROFILE1" =0SCALE30'6015 30GRAF STREETC2.0GRAF STREET PLAN & PROFILEGRAF STREET - PLANLEGENDAS-BUILTDATUM: NAVD 88 FIGGINS CREEKMACNAB STMACNAB ST.GRAF ST.SHEETALLISON PH IIIALLISON SUBDIVISION, PHASE 3 BOZEMAN, MT MADISON ENGINEERING 895 TECHNOLOGY BLVD. STE. 203 BOZEMAN, MT 59718 (406) 586-0262 (406) 586-5740 FAX MACNAB STREET - PLAN1" =0SCALE30'6015 30MACNAB STREETC2.1MACNAB STREETMACNAB STREET - PROFILEAS-BUILTDATUM: NAVD 88 GRAF STREETMACNAB STMACNAB STDETAIL1C3.0CONNECT TO EXISTING S.S. MANHOLESHEETALLISON PH IIIALLISON SUBDIVISION, PHASE 3 BOZEMAN, MT MADISON ENGINEERING 895 TECHNOLOGY BLVD. STE. 203 BOZEMAN, MT 59718 (406) 586-0262 (406) 586-5740 FAX MACNAB STREET SANITARY SEWER - PLAN1" =0SCALE30'6015 30MACNAB SEWERC3.0MACNAB ST. SANITARY SEWERMACNAB STREET SANITARY SEWER - PROFILEAS-BUILTDATUM: NAVD 88 GRAF STREET MACNAB ST.MACNAB STSHEETALLISON PH IIIALLISON SUBDIVISION, PHASE 3 BOZEMAN, MT MADISON ENGINEERING 895 TECHNOLOGY BLVD. STE. 203 BOZEMAN, MT 59718 (406) 586-0262 (406) 586-5740 FAX MACNAB ST-GRAF STWATER MAIN - PLAN1" =0SCALE30'6015 30MACNAB WATERC4.0MACNAB - GRAF ST. WATER MAINMACNAB ST-GRAF ST WATER MAIN - PROFILEAS-BUILTDATUM: NAVD 88 DETAIL1 C5.0TYPICAL GRAF STREET ROADWAY SECTIONDETAIL2 C5.0TYPICAL MACNAB STREET/CIRCLE ROADWAY SECTIONTYPICAL ROADWAYC5.0TYPICAL ROADWAY SECTIONSSHEETALLISON PH IIIALLISON SUBDIVISION, PHASE 3 BOZEMAN, MT MADISON ENGINEERING 895 TECHNOLOGY BLVD. STE. 203 BOZEMAN, MT 59718 (406) 586-0262 (406) 586-5740 FAXAS-BUILT DETAIL3C5.1PEDESTRIAN RAMP DETAIL2C5.1INTEGRAL CONCRETE CURB & GUTTERDETAIL4C5.1DEAD END BARRICADE DETAIL1C5.1CONCRETE SIDEWALKCIVIL DETAILSC5.1ROADWAY DETAILSSHEETALLISON PH IIIALLISON SUBDIVISION, PHASE 3 BOZEMAN, MT MADISON ENGINEERING 895 TECHNOLOGY BLVD. STE. 203 BOZEMAN, MT 59718 (406) 586-0262 (406) 586-5740 FAXAS-BUILT DETAIL1C5.2TYPICAL UTILITY TRENCH DETAILDETAIL3C5.2WATER SERVICE LINEDETAIL4C5.2FIRE HYDRANTDETAIL2C5.2TYPICAL BLOWOFFDETAIL5C5.2THRUST BLOCKING FOR WATER MAIN FITTINGSDETAIL6C5.2SANITARY SEWER SERVICE LINEDETAILSC5.2WATER & SEWER DETAILSSHEETALLISON PH IIIALLISON SUBDIVISION, PHASE 3 BOZEMAN, MT MADISON ENGINEERING 895 TECHNOLOGY BLVD. STE. 203 BOZEMAN, MT 59718 (406) 586-0262 (406) 586-5740 FAXAS-BUILT DETAIL4C5.3CURB INLETDETAIL3C5.3DETENTION POND CONTROL OUTLETDETAIL2C5.3STRAIGHT MANHOLE - INLET OR STD.DETAIL1C5.3CONNECT TO EXISTING S.S. MANHOLECIVIL DETAILSC5.3STRUCTURES DETAILSSHEETALLISON PH IIIALLISON SUBDIVISION, PHASE 3 BOZEMAN, MT MADISON ENGINEERING 895 TECHNOLOGY BLVD. STE. 203 BOZEMAN, MT 59718 (406) 586-0262 (406) 586-5740 FAXAS-BUILT