Loading...
HomeMy WebLinkAbout14- Town Pump #8 (Cottonwood Road Improvements) Send(Id ' al to: City of Bozeman Department of Community Development P.O.Box 1230 Bozeman,MT 59771 IMPROVEMENTS AGREEMENT FOR TOWN PUMP##8 (COTTONWOOD ROAD IMPROVEMENTS) This AGREEMENT is made and entered into this day of 12014, by and between PARK STREET HOLDING, 600 S. Main Street, Butte MT 59701, hereinafter called the "Developer", and the CITY OF BOZEMAN, a municipal corporation and political subdivision of the State of Montana, with offices at City Hall, 121 North Rouse Avenue, P.O. Box 1230, Bozeman, MT 59771-1230, hereinafter called the "City". WHEREAS, it is the intent and purpose of the Developer to meet the conditions of Conditional Use Permit approval, Planning Application Nos. Z13132 and Z14289, for the construction of an automotive fueling station and retail store at 5050 S. Cottonwood Road;and WHEREAS, it is the intent and purpose of the Developer to obtain occupancy for Town Pump 48; and WHEREAS, the Final Site Plan for the Town Pump #8, was approved with conditions which require the installation of street improvements to Cottonwood Road which improvements i are not yet completed;and Town Pump#8 Cottonwood Road Expansion Improvements Agreement 1 WHEREAS, the municipal code of the City of Bozeman allows for occupancy of a building to be granted prior to completion of all required work filed prior to the installation of all required improvements with an improvements agreement with financial security; and WHEREAS, a separate improvements agreement has been prepared for improvements to landscaping related to the project; and WHEREAS, the City of Bozeman has committed transportation impact fee funds to pay for a portion of the widening of Cottonwood Road and the City funded portion of the project does not require a financial guarantee and therefore this improvements agreement is only for the i project related improvements; and WHEREAS, it is the intent and purpose of both the Developer and the City to hereby enter into an Agreement which will guarantee the full and satisfactory completion of the remaining required improvements related with the property hereinafter described; and it is the intent of this Agreement, and of the parties hereto, to satisfy the improvements guarantee requirements for the occupancy approval of Town Pump#8. NOW, THEREFORE, in consideration of the mutual covenants and conditions contained herein, it is hereby agreed as follows: 1. Property Description This Agreement pertains to, and includes, those properties which are designated and identified as being: Lot IA, Minor Subdivision No. 454A, according to the plat thereof, on file and of record in the office of the Clerk and Recorder, Gallatin County, Montana. Address is 5050 S. Cottonwood Road. i i 2. Improvements This Agreement specifically includes the following improvements for Town Pump#8: Town Pump#8 Cottonwood Road Expansion Improvements Agreement 2 F 1 Expansion of Cottonwood Road, stormwater controls, and improvements to the traffic signal at Huffine Lane and Cottonwood Road. The Estimated Cost of said improvements for these improvements has been estimated at Two Hundred Two Thousand Six Hundred Ninety-Seven Dollars and Seventy-Eight Cents ($202,697.78). The estimate is attached and made a part of this Agreement, as Exhibit"A". 3. Financial Guarantee, Ttme for Completion of Improvements, Additional restrictions It is the Developer's intent with this Agreement to obtain occupancy of the building prior to completion of all improvements. Therefore, this Agreement shall be secured by cashiers check for $304,046.67 (Cashiers Check No. ft,?) acceptable to the City of Bozeman, which is one hundred and fifty (150) percent of the Estimated Cost of said improvements. The Developer hereby agrees that all the improvements shall be installed and completed not later than October 1, 2015 in order to avoid default on the method of security. The Developer agrees that no delegation of performance required by this agreement shall relieve the Developer of any duty to perform or any liability for the breach of that duty to complete said subdivision improvements required for the Town Pump#8. Upon submission of fully documented invoices for the work performed, said work to be inspected and certified for payment by Developer's professional engineers and the City of Bozeman and or its agents as necessary, the City of Bozeman may release a portion of the letter of credit for the work completed by the referenced invoices. 4. Inspection Town Punzp#8 Cottonwood Road Expansion Improvements Agreement 3 Representatives of the City shall have the right to enter upon the property at any reasonable time in order to inspect it and to determine if the Developer is in compliance with this Agreement, and the Developer shall permit the City and its representatives to enter upon and inspect the property at any reasonable time. S. Default Time is of the essence of this Agreement. If the Developer shall default in or fail to fully perform any of its obligations in conformance with the time schedule under this Agreement, and such default or failure shall continue for a period of thirty (30) days after written notice specifying the default is deposited in the United States mail addressed to the Developer at Park Street Holdings, 600 S. Main St. Butte MT 59701, or such other address as the Developer shall provide to the City from time to time, without being completely remedied, satisfied, and discharged, the City may elect to enforce any of the following specified remedies: A) The City may, at its option, declare the financial guarantee to be forfeited and secure the complete construction and inspection of the improvements described herein. The City's representative, contractors, and engineers shall have the right to enter upon the property and perform such work and inspection, and the Developer shall permit and secure any additional permission required to enable them to do so. In the event that any funds remain from the financial guarantee upon completion of all improvements, such funds shall be promptly returned to the Developer. B) The City may enforce any other remedy provided by law. 6. Indemnification The Developer hereby expressly agrees to indemnify and hold the City harmless for and against all claims, costs and liability of every kind and nature, for injury or damage received or I sustained by any person or entity in connection with, or on account of the performance of work at the development site and elsewhere pursuant to this Agreement. Developer further agrees to aid and defend the City in the event that.it is named as a defendant in an action concerning the Town Pump#8 Cottonwood Road Expansion Improvements Agreement 4 f s performance of work pursuant to this Agreement except where such suit is brought by the Developer. The Developer is not an agent or employee of the City. 7. Attorney_Fees In the event it becomes necessary for either party to this Agreement to retain an attorney to enforce any of the terms or conditions of this Agreement, then the prevailing party shall be entitled to reasonable attorneys fees and costs, including fees, salary, and costs of in-house counsel including City Attorney. 8. Warranty The Developer shall warrant against defects of all improvements and that these improvements are made in a good and workman-like manner for a period of two (2) years from the date of their written acceptance by the governing body. 9. Governing Law This Agreement shall be construed according to the laws of the State of Montana. In the event of litigation concerning this Agreement, venue is in the Eighteenth Judicial District Court, Gallatin County, State of Montana. 10. Modification or Alterations . No modifications or amendment of this Agreement shall be valid, unless evidenced by a writing signed by the parties hereto. 11. Invalid Provision The invalidity or unenforceability of any provision of this Agreement shall not affect the other provisions hereof, and this Agreement shall be construed in all respects as if such invalid or unenforceable provision were omitted. 12. No Assi2nnient Town Pump#8 Cottonwood Road Expansion Improvements Agreement 5 It is expressly agreed that the Developer shall not assign this Agreement in whole, or in pail, without prior written consent to City. 13. Successors Except as provided in paragraph twelve (12), this Agreement shall be binding upon, ensure to the benefit of, and be enforceable by the parties hereto and their respective heirs, successors and assigns. 14. Filing The Developer shall have this Agreement recorded in the Office of the Gallatin County Clerk and Recorder at the within 10 business days of the signature of the Community Development Director. Town Punip 98 Cottonwood Road Expansion Improvements Agreement 6 I I ' DEVELOPER PARK STREET HOLD1NG5-, LLG STATE OF MONTANA ) :ss County of Gallatin ) i �j On this day of (�}l?� ;2014, before me a Notary Public of the State of Montana, personally appeared , known to me to be the person that executed the foregoing Improvements Agreement, and acknowledged to me that they executed the same for and on behalf of said Developer. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my Notarial Seal the day and year first above written. (SEALI MONICA A.BURL Print acne ere NOTARY PUBLIC for the ;�`'•",< State ct Montana SEp,I Res',ding at butte,Montana Notary Public or t e State of M n1ana tAy Commiss'on Expires Residing at �FC f14 EebruVY 17,2016 I My Commission Expires: 8 {Use 4 digits for expiration y at) 'rown hump#8 Cottonwood Road Expansion Improvements Agreement 7 THE CITY OF BOZEMAN BY: WENDY THOMAS, COMMUNITY DEVELOPMENT DIRECTOR CITY OF BOZEMAN STATE OF MONTANA } :ss County of Gallatin } On the _day of i t; a El_E ? 2014, before me, a Notary Public for the State of Montana,personally appeared Wendy Thomas, known to me to be the person described in and who executed the foregoing instrument as Community Development Director of the City of Bozeman, whose name is subscribed to the within instrument and acknowledged to me that she executed the same for and on behalf of said City. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my seal on the day and year first written above. 4 1 (SEAL) ' (Printed Name Here) Notary Public for the State of Montana Residing at My Commission Expires: t- 1 (Use 4 digits for expiation y(iar) .I i i i Town Pump#8 Cottonwood Road Expansion Improvements Agreement 8 p EXHIBIT "A" ESTIMATED COST FOR IMPROVEMENTS Cottonwood Improvements for Town Pump#8 Public infrastructure Improvements Preliminary Cost Estimate& Bonding Amount Town Pump Share ITEM Unit No. ITEM DESCRIPTION Quantity: Unit . Price Subtofal Rawa ly 10 Pavement Sawcut 1,064 LF $1.75 $1,862.00 11 Asphalt Removal&Disposal Off-Site 1,064 SF $1,50 $1,696.00 12 Clear&Grub(9"Stripping)Dispose Off Site 30,838 SF $0.18 $5,550.84 13 Excavation 29"[Jeep-Dispose off-site 2,315 CY $6.50 $15.047.50 14 Ernbankment-On Site Material 609 CY $4.25 $2,585,26 16 Curb&Clutter 590 LF $12.75. $7,522,50 16 Asphalt(5"thickness) 28,040 SF $1.80 $50,472.00 17 1 112"minus crushed gravel base course(6"thick) 520 CY $24.00 $12,480.00 18 6"minus uncrusbed sub-base course(18"thick) 1,660 CY $18.00 $28,080.00 19 Woven Geofabric 3,116 SY $2.60 $7,788.89 20 PCC Sidewalk(6"M-4000 concrete, 3"gravel base) 156 SF $7.50 $1,170.00 21 Pedestrian Ramp(PCC) 98 SF $7.50 $660.00 22 Detectable Warning Surface-5'Wide 2 EA $550,00 $1,100.00 23 Curb Inlet 1 EA $3,250.00 $3,260.00 23 Signage 4 EA $475.00 $1,900,00 24 Topsoil-Boulevard (6"depth,bivd&slopea) 26 CY $22.00 $572.00 25 Remove ext'g striping a.8"White Epoxy 931 LF $1.50 $1,396.50 b.24"White Thermoplastic 29 LF $22.50 $662,50 c. 24"White Epoxy 44 LF $5.00 $220,00 d-"ONLY"Text and Turn Arrow Thermoplastic 3 EA $50.00 $150,00 e.4"Double Yellow Epoxy 1,122 LF $1.00 $1,122.00 f,24"Yellow Epoxy 93 LF $5,00 $465.00 26 4"White Epoxy 921 LF $1,00 $021,00 27 4"White Dashed Epoxy(10'.Lines, IS'Spacing) 020 LF $1.00 $920,00 28 8"wide Solid White Inlaid Thermoplastic 564 LF $8.70 $4,906,80 29 24"wide Solid White Inlaid Tl ermoplastlo 100 LF $32.00 $6,272.00 30 4"Double Yellow Epoxy I'm LF $2 00 $2,198.00 31 24"Yellow Epoxy 94 LF $36.00 $3,384.00 32 White Thermoplastic Symbols 10 EA $325,00 $3,250,00 33 Traffic Signal Modificatoins 0A LS $88,000,00 $35,200.00 Roaalway Widening Improvements Total $202,697.78 160%Bonding Amount $304,046.47 Approved by City Engineer's Offi Date if Town Pump#8 Cottonwood Road Expansion Improvements Agreement 9