HomeMy WebLinkAbout15- Change Order for Water Renovations Project with Omdahl Excavation CHANGE ORDER
No. 01
DATE OF ISSUANCE 11-13-2015 EFFECTIVE DATE
OWNER City of Bozeman CONTRACTOR Omdahl Excavation&Utilities Inc
Contract:
Project: 2015 Water Renovations Project OWNER's Contract No.
ENGINEER City of Bozeman ENGINEER's Contract No.
You are directed to make the following changes in the Contract Documents:
•Description: • : • ` :f . s ••r : , • ■r -• •. i- ■ r t i
• - - -; • -: " - • ; . ". A sc install city shops storm
improvements as detailed in the attached contract drawings and described in the attached quote titled"Estimate
No. 436-1015." ri'�(
Reason for Change Order: Improving and expanding existing storm water treatment within the city limits by
addressing known deficiencies in our storm water infrastructure.
Attachments: Contractor quotes: #435-1015,#434-1015,#436-1015 & Shop Improvements Contract Drawings.
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price Original Contract Times:
Substantial Completion: 120
$ 1,119,148.00 Ready for final payment:
(days or dates)
Net Increase(Decrease)from previous Change Net change from previous Change Orders No. to
Orders No. to No._
Substantial Completion:
$ 0.00 Ready for final payment: (days)
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial Completion: 120
$ 1,119,148.00 Ready for final payment:
(days or dates)
Net increase(decrease) of this Change Order: Net increase(decrease)this Change Order:
Substantial Completion: 20
$ 38,800 Ready for final payment:
(days)
Contract Price with all approved Change Orders: Contract Times with all approved Change Orders:
Substantial Completion: 140
$ 1,157,948 Ready for final payment:
(days or dates)
Contractor certifies and agrees that there are no additional costs or claims for extra work, additional time,delays or
omitted items,of any nature whatsoever,associated with the subject change order items,except as identified and set
forth herein and unless expressly stated otherwise in the Change Order. And further,that the price agreed-upon herein
represents the full cost and value for the subject work performed and the materials supplied under the terms of the
contract and that the work quantities and value were properly determined and are correct.
813d/11)15—
CO TRACTOR(Au horized Signature) Date
RECOMMENDED BY: APPROVED BY r, c (;, -
7--) IAJ , ( 3 J
(ENGINEER-Signature) Date OWNER(Authorized Signature) Date
Page 1 of 2
R:1Dropzones\Kellen12015 Projects\S Willson Avenuelchange order116-COB Change Order Form.doc
li
EJCDC 1910-8-B (1996 Edition
Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America and the
Construction Specifications Institute.
CHANGE ORDER
INSTRUCTIONS
A. GENERAL INFORMATION
This document was developed to provide a uniform format for handling contract changes that affect Contract
Price or Contract Times. Changes that have been initiated by a Work Change Directive must be incorporated into
a subsequent Change Order if they affect Price or Times.
Changes that affect Contract Price or Contract Times should be promptly covered by a Change Order. The
practice of accumulating Change Orders to reduce the administrative burden may lead to unnecessary disputes.
If Milestones have been listed in the Agreement,any effect of a Change Order thereon should be addressed.
For supplemental instructions and minor changes not involving a change in the Contract Price or Contract Times,
a Field Order should be used.
B. COMPLETING THE CHANGE ORDER FORM
Engineer normally initiates the form, including a description of the changes involved and attachments based upon
documents and proposals submitted by Contractor,or requests from Owner, or both.
Once Engineer has completed and signed the form, all copies should be sent to Owner or Contractor for approval,
depending on whether the Change Order is a true order to the Contractor or the formalization of a negotiated
agreement for a previously performed change. After approval by one contracting party,all copies should be sent
to the other party for approval. Engineer should make distribution of executed copies after approval by both
parties.
If a change only applies to price or to times,cross out the part of the tabulation that does not apply.
Page 2 of 2
R:1Dropzones\Kellen12015 Projects IS Willson Avenuelchange order116-CO13 Change Order Form.doc
A
ry- OM
IPM
!i. ''' ,.way°,.-,�..s. L
OM
EXCAVATION iS UTILITIES-;Nam
Estimate
Date: 15 October 2015 Estimate.No. 436-1015
TO: City of Bozeman FR: Omdahl Excavation & Utilities
P.O. Box 1230 659 Morning Mist Road
Bozeman, MT 59771 Manhattan, MT 59741
Phone: 406-388-0196
RE: City Shops Improvements
We hereby submit the following estimate for the work referenced above. This is an estimate and not
intended to form a contract. If the terms contained in this estimate are acceptable to the customer, a
contract must be signed prior to the performance of any work. Omdahl Excavation &Utilities, Inc. to
provide all equipment, labor and materials necessary for the following:
Storm Tech System
Install chambers, manholes, storm drain pipe* $26,000.00
• Owner to supply all materials excluding Ye bedding gravel
• Owner to supply haul-off location for spoils
Concrete Pad
30'x40'x6" reinforced concrete pad $ 12,800.00
• Relocate 4 bollards, install owner provided trench drain
TOTAL: $ 38,800.00
Additional work will not be completed without a written and signed Change Order and will become an extra
charge over and above the contract amount.
Terms: Balance due upon completion and receipt of invoice. Any unpaid balance after 30 clays from the invoice date will
incur a late fee at the highest rate allowed by Law. Omdahl Excavation&Utilities, Inc.also reserves the right to file a notice
of Right to Claim a Lien against the property owner(s). In case legal collection procedures are necessary,Orridahl
Excavation&Utilities,Inc.is entitled to compensation for any and all attorneys fees and/or court costs involved with
collection.
NOTE: THIS ESTIMATE MAY BE WITHDRAWN IF NOT ACCEPTED WITHIN 10 DAYS.
Authorized Signature: ,.,,�
� 4 i ,, /� z64
Omaahl Excavation & Utilities, Inc. Date
ACCEPTANCE OF ESTIMATE -The above prices,specifications and conditions are satisfactory and are hereby
accepted. Orndahl Excavation&Utilities, Inc.will submit a contract for signature(s)upon acceptance and receipt of this
estimate.
- . "Authorized Signature: L- a
* ' City of Bozeman---Representative Date
:40C4 eB88i91?
06... t D8, .
F
E or e letm airy l Mar,,,
659 EV1ORNING MIST RD. I MANHATTAN, MT 59741