INTRODUCTION
As we continue to monitor the mitigation systems in the Bridger Creek Estate's homes, we
occasionally find fluctuations in vacuum measurements or system operation that warrant
maintenance activities. We have made changes to several systems however, we anticipate one
additional home justifies a new fan and other system maintenance activities. Several homes will
continue to need mitigation inspections into 2016.
SCOPE OF SERVICES
This task order includes the following work activities;
O Continue to respond to homeowner requests for information, system monitoring,
modifications and other issues.
® Install replacement or larger blower in one home.
® Conduct quarterly inspection of any homes that have significant mitigation system
modifications for up to one year.
O Respond to City requests for information or assistance, and attend meetings, as needed.
PERIOD OF PERFORMANCE
The mitigation system maintenance work and inspections and reporting will occur as needed
through February 2016. The responses to homeowner requests and City requests are likely to
be ongoing, so a specific timeline cannot be projected.
COSTS
Estimated costs to complete the foregoing scope of services are $22,810, as detailed in Table 1.
The services will be conducted on a time and materials basis.
SPECIAL CONDITIONS: Execution of this Task Order constitutes acceptance of ail terms and
conditions contained in Tetra Tech's Professional Services Agreement with the City of Bozeman,
dated January 3, 1994 and Amendment Nos. 1, 2, 3, and 4 of the Professional Services
Agreement dated July 31, 1995; January 1, 1996; March 17, 1997; and December 10, 2001,
respectively.
3
Task Order For Mitigation System Maintenance and General Support
Bozeman Landfill
December 4, 2015
Page 2 of 2
CLIENT: CONSULTANT:
City of Bozeman Tetra Tech
By: By:
C9
Its: , c'alcke C Its: Senior Project Manager
Date: I �' L Date: December 4, 2015
e'er �" f .'f _'li`( f l�Fs'�'C. 1'" �� :. r`'ir, t " F•1`<r
Page 2 of 2
TABLE 1-ESTIMATED BUDGET
DECEMBER 2015 MITIGATION SYSTEM MAINTENANCE AND GENERAL SUPPORT
BOZEMAN LANDFILL
BOZEMAN,MONTANA
Date Submitted:12/04/2015
Mitigation System Maintenance and Inspections
Project Manager/Senior Hydrogeologist,per hour 8 $180.00 $1,440.00
Assistant Project Manager/Hydrogeologist,per hour 32 $90.00 $2,880.00
Principal Engineer,per hour 2 $275.00 $550.00
Field Technician,per hour 60 $75.00 $4,500.00
Administrative Personnel,per hour 12 $60.00 $720.00
Labor Subtotal $10,090.00
Subcontractors
Triple R Mitigation(new fan and installation) 2 $4,000.00 $8,000.00
Infrared Scans 1 $450.00 $450.00
Tetra Tech Subcontractor Markup(10%) $845.00
Direct Costs Subtotal $9,295.00
Mitigation System Maintenance Subtotal $19,385.00
Response to City Requests For Information
Project ManagerlSentor Hydrogeologist,per hour 10 8150.00 $1,800.00
Assistant Project Manager/Hydrogeologist,per hour 10 $90.00 $900.00
Environmental Scientist,per hour 0 $80.00 $0.00
Administrative Personnel,per hour 6 $60.00 $360.00
Labor Subtotal $3,060.00
DIRECT COSTS
Tetra Tech Vehicle Mileage,per mile 600 $0.60 $360.00
Photocopies,estimate 50 $0.10 $5.00
Direct Costs Subtotal $365.00
Response to City Requests Subtotal $3,425.00
TOTAL OF ALL TASKS r $22,810.00