HomeMy WebLinkAboutOrdinance 15- 1928 Amending Downtown Urban Renewal District I
I
�80Z
" I
r
rt�r,�co �a�Kr
I
ORDINANCE NO. 1928
AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF BOZEMAN,
MONTANA AMENDING THE DOWNTOWN AREA URBAN RENEWAL DISTRICT
PLAN ADOPTED BY PASSAGE OF ORDINANCE NO. 1409 AND AMENDED BY
PASSAGE OF ORDINANCE NO. 1628 WITH A TAX INCREMENT FINANCING
PROGRAM PURSUANT TO TITLE 7, CHAPTER 15, PARTS 42 AND 43 OF THE
MONTANA CODE ANNOTATED.
WHEREAS, pursuant to its authority under the City of Bozeman ("City") Charter and
the Montana Urban Renewal Law (Title 7, Chapter 15, Parts 42 and 43) the Bozeman City
Commission ("Commission") adopted Ordinance No. 1409 effective on December 20, 1995,
r
establishing the Downtown Area Urban Renewal District (the "URD") and adopting the
Downtown Area Urban Renewal District Plan (the "URD Plan") to remedy the conditions of
blight found in the area through approved rehabilitation and redevelopment projects; and
I'
WHEREAS, the Commission passed Ordinance 1628 on March 21, 2005, amending the
URD Plan; and
WHEREAS, the City is considering further amendments to the URD Plan for the
purposes of updating and revising it to address improvements to communications and other
infrastructure, and to further refine, prioritize and implement the URD's goals, pursuant to 7-15-
4221, MCA; and
WHEREAS, the City is interested in continuing to use tax increment financing as a tool
to foster rehabilitation and redevelopment pursuant 745-4282, MCA; and
Page 1 of 6
Ordinance No. 1928, Downtown Area Urban Renewal District Plan
WHEREAS, the URD includes all property in an area which is centered on Main Street
from 5th Avenue on the west side to Broadway Avenue on the east end, and generally from
Lamme Street on the north to Olive Street on the south, as established by Ordinance No. 1409
with no changes proposed to the existing boundary, with the legal description and map duly
recorded in Book 159 of Miscellaneous Records, Pages 1460— 1464 in the office of the Gallatin
County Clerk and Recorder and hereby incorporated herein by this reference; and
WHEREAS, the City has adopted a growth policy pursuant to Section 76-1-601,
M.C.A.; and
WHEREAS, the Bozeman Community Plan was duly adopted as the current growth
Ix
policy by the Commission by City of Bozeman Resolution No. 4163, dated June 1, 2009; and '
4
f'.
WHEREAS, the URD Plan was submitted to the Bozeman City Planning Board
("Planning Board") for review, and on November 17, 2015, the Planning Board 4'
executed a resolution finding the URD Plan to be in conformance with the Bozeman
Community Plan and found the URD area to be zoned in accordance with the
Bozeman Community Plan; and
k;
r
N
WHEREAS, a notice of the public hearings of the Planning Board and Commission was r
published on November 8 and November 15, 2015 in accordance with 7-1-4127, 7-15-4214(1),
and 7-15-4215, MCA; and
WHEREAS, a notice of the public hearing of the Commission, was mailed on November
17, 2015, not less than 10 days prior to the date of the hearing, by certified mail to all property
owners in the district based on a list obtained from the Montana Department of Revenue of the
geocodes for all real property, the assessor codes for all personal property, and a description of
any centrally assessed property located within the URD at the current time in accordance with 7-
1-4129, 7-15-4214(1), and 7-15-4215, MCA.
is
Page 2 of 6
i
Ordinance No. 1928, Downtown Area Urban Renewal District Plan
4[
NOW THEREFORE, BE IT ORDAINED BY THE CITY COMMISSION OF THE
CITY OF BOZEMAN, MONTANA:
i
Section 1
Legislative Findings.
1. The URD through the URD Plan seeks to provide long term economic stability and to
use planning and the development of public infiastructure as tools for well managed
growth.
2. The primary goal as stated on page 4 of the URD Plan is "an economically thriving
Downtown that attracts investment, stabilizes and strengthens the tax base and that
supports the vitality and diversity of the Gallatin Valley as its social and cultural center".
a=
3. As further stated in the URD Plan, "the community of Bozeman hopes to ensure the
vitality of its Downtown for generations to come, and to make Downtown a community
center in which its citizens can participate and take exceptional pride".
4. A sound and adequate financial program exists for the financing of URD projects,
including tax increment financing to assist with redevelopment and revitalization
activities, and encourage the retention and growth of economic development.
5. The URD Plan, as amended, supports the development of infrastructure that
encourages urban renewal and economic development in the community to deter age
obsolescence and deterioration Bozeman's old Downtown infrastructure and buildings.
6. The URD Plan, as amended, will afford maximum opportunity, consistent with the
sound needs of the City as a whole, for the rehabilitation and redevelopment of the URD
by private enterprise.
7. If a URD project requires displacement of persons in the URD, a workable and
feasible plan for making available adequate housing for such displaced persons will first
be adopted and approved by the Commission.
8. The URD Plan, as amended, conforms to the Bozeman Community Plan, the city's
adopted growth policy.
Page 3 of 6
s
i
Ordinance No. 1928, Downtown Area Urban Renewal District Plan
z
r,
9. The URD Plan, as amended, provides a strategy for redevelopment of the existing
u
commercially designated area to eliminate the conditions that contribute to blight, and
retain existing and attract new economic development.
l=
Section 2
It
Adoption of the Amended Downtown Area Urban Renewal District Plan.
is
The amended URD Plan attached as Exhibit "A" is hereby adopted and approved, including
without limitation the segregation and application of tax increments as provided in 7-15-4282
through 7-15-4293,MCA.
Section 3
Repealer.
All provisions of the ordinances of the City of Bozeman in conflict with the provisions of r
f
this ordinance are, and the same are hereby repealed and all other provisions of the ordinances of
F
the City of Bozeman not in conflict with the provisions of this ordinance shall remain in full
r.
force and effect.
Section 4
Savings Provision.
This ordinance does not affect the rights and duties that matured, penalties that were
incurred or proceedings that were begun before the effective date of this ordinance. All other
provisions of the Bozeman Municipal Code not amended by this Ordinance shall remain in full
force and effect.
Section 5
Severability.
That should any sentence, paragraph, subdivision, clause, phrase or section of this
ordinance be adjudged or held to be unconstitutional, illegal, or invalid, the same shall not affect
Page 4 of 6
Ordinance No. 1928,Downtown Area Urban Renewal District Plan
I
the validity of this ordinance as a whole, or any part or provision thereof, other than the part so
decided to be invalid, illegal or unconstitutional, and shall not affect the validity of the Bozeman
Municipal Code as a whole.
K
Section 6
Codification.
This Ordinance shall not be codified but shall be kept by the City Clerk and entered into a
disposition list in numerical order with other ordinances of the City.
F
f
Section 8
Effective Date.
i
This ordinance shall be in full force and effect thirty (30) days after final adoption.
PROVISIONALLY ADOPTED by the City Commission of the City of Bozeman,
Montana, on first reading at a regular session held on the 7th day of December, 2015.
V r '
t a
JEi�F Y K.' KRAUSS
r f
Mayor
L-
ATTEST:
y
N ra
u
STACY jf r� Ertl O 3
City Clerk
Page 5 of 6
Ordinance No. 1928, Downtown Area Urban Renewal District Plan
FINALLY PASSED,ADOPTED AND APPROVED by the City Commission of the
City of Bozeman, Montana on second reading at a regular session thereof held on the 28th of
December, 2015. The effective date of this ordinance is January 27, 2016.
i
f^
t'
i
JEFFREY`K. KRAUSS
Mayor
G
ATTEST:
STACYtLIVIE , CIVIC
City Clerk r �-
r
APPROVED AS TO FORM:
j
GRE SULLIVAN
City Attorney
r
Page 6 of 6
i
i
I
G
CITY OF BOZEMAN
URBAN RENEWAL PLAN
E
c
M
i :.
<. G
lip
eel-
� � h
•• ,
�l •CC1. 0
I
k`
i
Adopted by
The Bozeman City Commission
November 1995
i
Amended
December 2015
CITY OF BOZEMAN
URBAN RENEWAL PLAN
Prepared by:
The Urban Renewal Study Committee
Bert Hopeman, Chairman Craig McVicker
Jim Drummond, Vice Chairman Chris Pope
Larry Bowman Kathy Rinker
Ed Brandt Steve Schnee
Tom Clark Laurie Shadoan
Kris Dunn Dick Shanahan
Joe Frost Keith Swenson
Dennis Hardin Jim Webster
Steve Johnson Michael Wong
Bruce McCallum
Prepared for:
The Bozeman City Commission
John Vincent, Mayor Don Stueck
Joe Frost Marcia Youngman
Al Stiff
INDEX
Preface 1
Introduction 3
c
Guiding Principles and Implementation Actions 5
Intent and Purpose 5
Guiding Principles 6
hs
Implementation Actions 9 '
Vision to Reality 14
Executing the Vision 15
Finance 19
Getting Started — First Year Annual Work Program 22
Appendix A — Ordinance No. 1409 A-1
Appendix B — District Description and Map A-2
h
r
i
I
PREFACE
Bozeman, Montana, the County Seat of Gallatin County, was founded over 125
years ago. Early in its history, Bozeman was awarded the State's agricultural college,
which expanded a mercantile and farming community into a center for higher learning.
With the passage of time, Bozeman enjoyed the economic benefits of the growing
popularity of Yellowstone National Park and the increasing interest in outdoor
recreational activities.
These events have kept Bozeman's economy and the health of its Downtown
relatively strong for a small city. However, this strength has not prevented age
obsolescence and deterioration from occurring to Bozeman's old Downtown
infrastructure and buildings. This weakness is magnified by the increased competition
that comes with suburban growth, and which has economically devastated so many
downtowns in the United States.
Responding to this dual threat, the Bozeman City Commission initiated two
actions: 1) it established a Downtown Area Urban Renewal District, hereinafter called
the Downtown Bozeman Improvement District (see Appendix B, District Description and
Map, for exact boundaries), and it directed the City staff to prepare a study of the Area
to determine the extent and nature of Downtown Area "blight", as defined by Montana
statute; and 2) established a committee of interested citizens to develop an Urban
Renewal Plan. This Committee represented a broad cross-section of Gallatin Valley
interests including city and county residents, the School District, business and City and
County government.
The Urban Renewal Study Committee used a matrix process to develop a
collective vision for improving Downtown. The process involved the Committee
agreeing upon general criteria with respect to how specific projects and programs would
be evaluated; placing those criteria in priority order; weighing the extent to which a
project or program satisfied those criteria, relative to its importance; and then comparing
the results for each project and program. The process purposely did not consider the
availability of funds to accomplish a project or program.
By this process, the Committee was able to develop a better understanding of
the possibilities for improving Downtown and of the guiding principles and
considerations which should govern a renewal effort. The Committee then developed a
list and determined the appropriate uses of possible funding sources as well as
implementation and operation policies and procedures. (See FINANCE section.)
The results of the Committee's deliberations are presented in this document and
constitute "The Plan".
The Plan is intended to establish a framework and direction to alleviate the
Downtown's obsolescence and deterioration and to provide for its growth and increased
- 1 -
i
prosperity. The Plan is specific in its direction, but not in details or timetables.
Developing project details, timetables and programs will be left to the Downtown
Bozeman Improvement District Board, hereafter referred to as the IDB. The IDB is
responsible for the implementation of this Plan, and is composed of individuals with a
demonstrated interest in Downtown Bozeman who are appointed by the City
Commission.
Prior to adoption, the Plan was presented to the public for comment. It was
presented to the City-County Planning Board for a determination of conformity with the
Master Plan, and to the City Commission for public hearing after providing notice to
property owners within the District and publishing notice in the newspaper. These steps
have helped secure citizen input in the process and the Plan.
Downtown Bozeman is a cherished public asset. Bozeman's citizens will be r
placing a great deal of trust in the IDB to be faithful stewards of this asset. It is the spirit
of this Plan to provide a fair, thoughtful and constructive vision of Downtown's future !'
development, forged with positive input and hardened through its careful
implementation.
K
r.
- 2 -
INTRODUCTION
MISSIONNISION STATEMENT
Bozeman, Montana, located in the Gallatin Valley, is evolving into one of the
most vibrant communities in the Northwestern United States. Its agrarian heritage,
outstanding schools, rich culture, beautiful natural surroundings, emerging industries
and overall attractiveness have all played important roles in its evolution. Equally
important is Bozeman's thriving Downtown, a focal point of local development since the
1850's.
Our Downtown has remained economically viable and provides Bozeman with an
extremely important sense of community, history and identity. The heart and soul of the
community is manifest in its historic Downtown fabric. The citizens of Bozeman
recognize that the identity and vitality of the city and the surrounding valley would be
irreparably harmed by any significant degradation of Downtown.
To prevent degradation, Bozeman's Downtown must be continually improved and
strengthened as the Bozeman community and its suburban commercial centers
develop. Given appropriate attention to its infrastructure, appearance and promotion,
the Plan envisions the continuation of Downtown as a prosperous and attractive
commercial and cultural center— one which is a desirable place to work, live, shop, visit
and recreate.
The Bozeman City Commission recognizes that Bozeman's Downtown belongs
to all the people of the Gallatin Valley. A community partnership of citizens and public,
private and educational institutions can harness the energy, resources and dedication
necessary to implement the Plan. The City Commission set the groundwork for this
partnership when it invited the participation of all interested parties on the Urban
Renewal Study Committee, resulting in broad representation from many of the interests
in the Valley.
The Plan envisions a Downtown that is user-friendly, safe, secure and healthy.
The Downtown must also maintain its diversity of businesses, institutions (e.g.,
Chamber of Commerce, Schools, Post Office, Banks, and City and County
government), housing and attractions. It is important to the success of the Downtown
area to improve the ease of access for all people, whether walking, biking or driving.
These elements must be accomplished while maintaining the ambience and
character of the Downtown area. Especially important is preserving the community's
heritage, reflected in the physical beauty and cultural vigor of Downtown.
A significant investment of time and money is essential for this vision to become
a reality. Since resources are always finite, the Plan acknowledges that decisions and
priorities must take into account costs and benefits with regard to accomplishing the
- 3 -
i
primary desired result. The Plan also recognizes that resources must be drawn from
numerous sources, public and private, and that projects must be funded by the most
appropriate means.
f
Our primary goal is an economically thriving Downtown that attracts investment, r
stabilizes and strengthens the tax base and that supports the vitality and diversity of the
Gallatin Valley as its social and cultural center. Through this Urban Renewal Plan, the
community of Bozeman hopes to ensure the vitality of its Downtown for generations to
come, and to make Downtown a community center in which its citizens can participate
and take exceptional pride.
u
k
i
I
F
t
f
r
F
I^
i.
I:
c;
r
fy
F;
i'
i
-4 -
GUIDING PRINICIPLES &
IMPLEMENTATION ACTIONS
The Urban Renewal Study Committee prepared an implementation strategy for
accomplishing the collective vision for improving Downtown. The matrix process used
by the Committee established the vision for Downtown by identifying criteria and
projects necessary and desirable to implement the Plan. These criteria and projects
form the "Guiding Principles" and "Implementation Actions" included below.
The nine "Guiding Principles" provide direction to those responsible for improving
Bozeman's Historic Downtown. The Urban Renewal Study Committee considered the
first three principles more important than the next three with the last three least
important. However, the Committee deemed all nine principles to be vital to achieving
the vision for Downtown.
The "Implementation Actions" are not exclusive lists. Actions appear in order of
importance relative to the Principle under which they are listed. However, the order in
which actions are accomplished will depend more on the availability of funds and the
economies of accomplishing certain items simultaneously with other items.
INTENT AND PURPOSE
It is the intention of the Urban Renewal Study Committee that the Guiding
Principles and Implementation Actions for improving Downtown be accomplished in
accordance with the following:
- Bozeman's historic character as a "working" Downtown shall be maintained.
- Traffic movement and access shall be designed with the emphasis on the
Downtown as a destination rather than improving the flow of through traffic.
- The facilitation of Private/Public Partnerships is encouraged in the
implementation of the Plan.
- Objectives shall be accomplished by incentives whenever possible.
- Private property rights will be respected.
- Administrative practices shall be conducted in a constructive manner which
fosters cooperation.
- All aspects of proposed projects shall undergo the necessary scrutiny to assure
that the project is needed, is well designed in accord with the Plan, and is
appropriately funded without unnecessary expenditures. Tools such as a
- 5 -
it
feasibility study based on a market forecast and economic analysis will be
utilized as a part of the decision making process. Infrastructure proposals will
also be subject to independent analysis.
G
- Because this Plan is specific in its direction, but not in details or timetables, this
Plan is further detailed, refined, prioritized and implemented by the "Downtown
Improvement Plan" which outlines specific programs and projects consistent with
this Urban Renewal Plan.
GUIDING PRINCIPLES
Principle 1: Strengthen Downtown's Economic Vitality,
Take those actions that will encourage economic growth and prosperity, thereby
enhancing the value of operating a business and owning property Downtown. Without
prosperous businesses and growing property values (tax base), the private and public
funds will not be generated to accomplish desired projects, which will continue the cycle
of improvement, investment and job formation.
Principle 2: "Community Partnership" is Fundamental to Downtown's Success.
Community Partnership is the motivating force behind the overall effort to
improve Downtown. Without strong, broad-based community backing, efforts to
improve Downtown will fail. Conversely, if all elements of the community are strongly
supportive of Downtown improvement efforts, success will surely be guaranteed.
Accordingly, this principle dictates the importance of all elements of the
community, private, public, and educational, in the plans for improving Downtown and of
l
selecting projects that require and encourage that participation.
Every citizen of the Gallatin Valley is an important customer of Downtown and
helps strengthen its economic vitality. However, the importance of Downtown to these
citizens far exceeds its economic potential. Downtown Bozeman represents the cultural
heart and soul of the community and symbolizes Gallatin Valley's unique, historical
identity. Communities without Downtowns are "faceless suburbs". Therefore, all of the
Valley's citizens are stakeholders in determining Downtown's future. Participation and a
sense of ownership by as many Valley residents as possible is crucial for the success of
the improvement effort.
Principle 3: Improve the Safety, Security and Health of the District.
In order to continue feeling comfortable and welcome in Downtown, people must
feel that their safety, security and health — real and perceived — are protected.
- 6 -
Principle 4: Downtown's Accessibility Shall Be Improved.
The health of Downtown depends on ease of access to the Downtown for
whatever reason. This includes improving traffic flow which is compatible with
Downtown as a destination and reducing through traffic, especially trucks; improving
access for individuals with disabilities; and enhancing availability of parking for vehicles
— whether bikes, cars, motorcycles, mass transit or tour busses. Public transportation
improvements and well-distributed public information regarding the easiest way to
access Downtown are also part of improved accessibility. Accessibility issues extend
beyond the boundaries of the Improvement District. Within the District core, pedestrian
safety, security and enjoyment must be given high priority.
Principle 5: Downtown's Diversity Shall be Facilitated.
Diversity refers to the broad range of activities, businesses, organizations, people
and events that typically are found in traditional downtowns and that broadly reflect the
interests and opportunities available to citizens from all walks of life. Downtown
Bozeman currently enjoys Diversity with professional offices, financial services, retail
outlets, public offices, theaters, schools, restaurants, entertainment establishments,
cultural events, housing, a vibrant non-profit community providing essential social
services, and a host of other uses.
Much of the rich diversity of older Downtowns, including Bozeman's, came to be
prior to the adoption of zoning and other regulatory controls. The well intentioned, but
often disruptive result of contemporary regulatory practice is evident. A paradigm
change in planning, regulatory practice, administrative procedures, transportation
design, and overall community design is occurring in response. It is imperative that this
change be fostered to stimulate continuing private investment, the construction of
additional housing units, and establishment of daycare facilities and other services to
address social and cultural needs.
Downtown has avoided becoming the domain of a single special interest, such as
becoming predominately a tourist trap, office complex or shopping center, and its
continued health and success are contingent upon maintaining its diversity.
Principle 6: The Cost of Projects and Programs Shall Be Weighed Against Their
Benefits.
This Principle is self explanatory as long as Benefit is understood to mean the
promotion of the other Principles in relation to their importance and that Benefits may
not be financial in nature.
- 7 -
Principle 7: Downtown Shall Become More User Friendly.
User Friendly means making Downtown an easy place to work, live, shop, and
recreate. One aspect of user friendliness is Accessibility. Because of its overriding
importance, Accessibility is a separate Principle. User Friendly encompasses all other
aspects of making Downtown a more pleasant and convenient place, including the
maintenance of overall cleanliness and the provision of conveniences such as street
furniture and public restrooms.
I
I
Principle 8: The Image of Downtown Shall Be Continuously Improved.
Image applies to physical appearance and character. Image is both what people
think of Downtown, as well as what they experience when in Downtown.
When thinking in physical terms, Image does not express a preference for a
specific style, except what is historically appropriate. Image does express a preference
for excellent design, whatever the style. Image includes such design elements of the
Downtown as the facades of the buildings, sidewalks, streets, lighting and signs.
r
Image also includes the preservation of Bozeman's "working" Downtown, with its
t
diverse activities that provide employment, and quality goods and services in a warm,
hospitable environment for all Valley residents and visitors.
i
a
Principle 9: Cultural Activities Shall Be Nurtured and Expanded Downtown.
C
Downtown Bozeman shall seek to retain its position as the Cultural Heart of the
Gallatin Valley. j
r
h
- 8 -
IMPLEMENTATION ACTIONS
Certain Implementation Actions relate to more than one Principle. After its initial listing,
Implementation Actions appear in italics to indicate that a previously cited Action is
reappearing in conjunction with a new Principle.
Principle 1: Strengthen Downtown's Economic Vitality.
Implementation Actions:
1. Provide more, conveniently located and better-managed parking.
2. Retain public offices, organizations and "anchor" businesses.
3. Facilitate continued commercial development.
4. Evaluate the City-County Master Plan, Zoning Code, development standards,
regulatory practices and administrative procedures with the objective being to
identify and eliminate all unnecessary barriers to investment and
reinvestment.
5. Enable high density housing in and around Downtown.
6. Design and implement a comprehensive marketing plan.
7. Improve overall accessibility (pedestrian and vehicular).
8. Take control of Main Street; eliminate through truck traffic, and restore as a
pedestrian-friendly downtown Main Street.
9. Partner in community telecommunications networks as crucial infrastructure
necessary for next generation connectivity and business development.
10.Further refine, prioritize and implement the urban renewal plan by adopting
updates to the "Downtown Improvement Plan" outlining specific programs and
projects.
Principle 2: Community Partnership... is Fundamental to Downtown's Success.
Implementation Actions:
1. Evaluate the City-County Master Plan, Zoning Code, development standards,
regulatory practices and administrative procedures to identify and broaden
opportunities for diversity in housing, employment, business, cultural activities
and community events.
2. Retain public offices, organizations and "anchor"businesses.
3. Encourage the growth of cultural activities.
4. Enable high density housing in and around Downtown.
5. Facilitate continued commercial development.
6. Improve overall accessibility (pedestrian and vehicular).
7. Preserve and enhance the historic character of Downtown.
- 9 -
it
I
I
8. Further refine, prioritize and implement the urban renewal plan by adopting
updates to the "Downtown Improvement Plan"outlining specific programs and j
projects.
E
Principle 3: Improve the Safety. Security and Health of the District
k
Implementation Actions:
1. Improve the flow of traffic, emphasizing Downtown as a destination, and
improve pedestrian access and safety, especially at intersections.
2. Facilitate improved fire prevention measures.
3. Repair or replace defective sections of water and sewer mains.
4. Improve the appearance and adequacy of lighting compatible with the historic
character of Downtown.
5. Provide for prompt snow removal.
6. Improve sidewalks, reduce crossing lengths at intersections, and better define
pedestrian rights-of-way.
7. Increase police patrols.
8. Clean up hazardous wastes.
9. Improve alley and parking lot appearance and safety.
10. Take control of Main Street; eliminate through truck traffic, and restore as a
pedestrian-friendly downtown "Main Street".
11.Repair structurally dangerous buildings.
F
12.Develop storm water management techniques to protect Bozeman Creek,
13.Partner in community telecommunications networks as crucial infrastructure
necessary for next generation connectivity and business development.
14.Further refine, prioritize and implement the urban renewal plan by adopting
updates to the "Downtown Improvement Plan"outlining specific programs and
projects.
Principle 4: Improve the Downtown's Accessibility.
G
Implementation Actions:
1. Provide more convenientlylocated and better-managed parking.
g p g
2. Improve sidewalks, reduce crossing lengths at intersections, and better define
pedestrian rights-of-way.
3. Provide for prompt snow removal.
4. Improve the flow of traffic, emphasizing Downtown as a destination, and
improve pedestrian access and safety, especially at intersections.
5. Provide effective public transportation.
6. Accommodate bicycles as a means of reducing parking and automotive
circulation requirements.
- 10 -
7. Evaluate the City-County Master Plan, Zoning Code, development standards,
regulatory practices and administrative procedures with the objective of
identifying and eliminating any unnecessary low development densities and
thereby reducing reliance upon private automobiles.
8. Take control of Main Street; eliminate through truck traffic, and restore as a
pedestrian-friendly downtown "Main Street".
9. Improve alley and parking lot appearance and safety.
10.Further refine, prioritize and implement the urban renewal plan by adopting
updates to the "Downtown Improvement Plan"outlining specific programs and
projects.
Principle 5: Encourage Downtown Diversity.
Implementation Actions:
1. Evaluate the City-County Master Plan, Zoning Code, development standards,
regulatory practices and administrative procedures to identify and broaden
opportunities for diversity in housing, employment, business, cultural activities
and community events.
2. Enable high density housing in and around Downtown.
3. Facilitate continued commercial development.
4. Retain public offices, organizations and "anchor"businesses.
5. Encourage the growth of cultural activities.
6. Partner in community telecommunications networks as crucial infrastructure
necessary for next generation connectivity and business development.
7. Further refine, prioritize and implement the urban renewal plan by adopting
updates to the "Downtown Improvement Plan"outlining specific programs and
projects.
Principle 6: The Cost of Projects and Programs Shall Be Weighed Against Their
Benefits.
Implementation Actions:
1. Evaluate the City-County Master Plan, Zoning Code, development standards,
regulatory practices and administrative procedures with the objective being to
identify and eliminate all unnecessary barriers to investment and
reinvestment.
2. Provide for prompt snow removal.
3. Improve alley and parking lot appearance and safety.
4. Retain public offices, organizations and "anchor"businesses.
5. Encourage the growth of cultural activities.
6. Improve the management of parking.
- 11 -
i
7. Further refine, prioritize and implement the urban renewal plan by adopting
updates to the "Downtown Improvement Plan"outlining specific programs and
projects.
Principle 7: Downtown Shall Become More User FriendIV.
I
Implementation Actions:
1. Improve the flow of traffic, emphasizing Downtown as a destination, and
i
improve pedestrian access and safety, especially at intersections.
2. Provide for prompt snow removal.
3. Improve the appearance and adequacy of lighting compatible with the historic
character of Downtown.
4. Improve sidewalks, reduce crossing lengths at intersections, and better define
pedestrian rights-of-way.
5. Provide more conveniently located and better-managed parking.
6. Accommodate bicycles as a means of reducing parking and automotive
circulation requirements.
7. Improve alley and parking lot appearance and safety.
8. Provide public restrooms.
9. Encourage off-hours deliveries.
10.Partner in community telecommunications networks as crucial infrastructure
necessary for next generation connectivity and business development. E
11.Further refine, prioritize and implement the urban renewal plan by adopting
updates to the "Downtown Improvement Plan"outlining specific programs and
projects.
Principle 8: The Image of Downtown Shall Be Continuously Improved.
Implementation Actions:
1. Encourage the growth of cultural activities.
2. Design and implement a comprehensive marketing plan.
3. Preserve and enhance the historic character of Downtown.
4. Improve the appearance of sidewalks.
5. Improve the appearance and adequacy of lighting compatible with the historic
character of Downtown.
6. Provide for prompt snow removal.
7. Take control of Main Street; eliminate through truck traffic, and restore as a
pedestrian-friendly downtown "Main Street".
8. Improve alley and parking lot appearance and safety.
9. Retain public offices, organizations and "anchor"businesses.
10.Enhance the appearance of and accessibility to Bozeman Creek.
11.Install plaques describing Downtown Bozeman's historic resources.
- 12 -
12.Improve trash removal.
13.Further refine, prioritize and implement the urban renewal plan by adopting
updates to the "Downtown Improvement Plan"outlining specific programs and
projects.
Principle 9: Cultural Activities Shall Be Nurtured and Expanded Downtown.
Implementation Actions:
1. Encourage the growth of cultural activities.
2. Retain public offices, organizations and "anchor"businesses.
3. Preserve and enhance the historic character of Downtown.
4. Enable high density housing in and around Downtown.
5. Take control of Main Street; eliminate through truck traffic, and restore as a
pedestrian-friendly downtown "Main Street".
6. Further refine, prioritize and implement the urban renewal plan by adopting
updates to the "Downtown Improvement Plan"outlining specific programs and
projects.
- 13 -
i
E
VISION TO REALITY
Almost all towns and cities in the United States have been faced with
obsolescent and deteriorating downtowns. Only a small percentage have been able to
see past these problems and visualize the truly wonderful possibilities that exist for
renewing their downtowns. Only a small portion of this group have had the foresight
and fortitude to implement their visions. Those that have, however, have reaped great
rewards.
Today, Downtown Bozeman's Main Street is unfriendly to pedestrian traffic.
Many of the beautiful old buildings, representing true treasures of the West, have been
badly compromised over the years with architecturally incompatible face lifts. The
alleys to the north and south of Main Street, which are increasingly used by pedestrians
to go to and from parking areas, are extremely uninviting and even scary at night. !_
G
Main Street has enormous potential. The architectural character of its historical
buildings could be restored giving the street a deeper sense of its exciting heritage. The
g g g p g g !.
spirit of the rough and tumble Old West could once again come alive. Where needed
newer buildings could receive appropriate cosmetic attention. Decorative sidewalks
could be widened at street corners and other locations to shorten the walking distance
across the street and provide more room for attractive benches, trash collectors,
plantings, ramps, bike storage, information kiosks, and even occasional art work.
Historic light posts and attractive signage could adorn the street. Consideration might G,
even be given to uncovering Bozeman Creek just enough so people strolling Main
Street would know of its presence; or to closing one or more side streets for more
pedestrian open space. Such changes would greatly enhance the overall appearance
of Main Street and make it much more user friendly without compromising its unique
character, that of a "Working Downtown".
The alleys and the adjacent parking lots could be greatly improved by burying the
cables underground, improving the lighting, hiding the dumpsters, improving the paving
and cosmetically treating the backs of the buildings. They could become inviting to
pedestrians, greatly improving people's attitudes towards living, working, shopping and
recreating Downtown.
In conjunction with such improvements, attractive new residential apartments,
convention and performing arts centers and hotel accommodations will follow.
Downtown will have increased its charm and vitality, and greatly expanded its value to
the citizens of the Gallatin Valley.
- 14 -
EXECUTING THE VISION
INTRODUCTION
Once adopted, this Plan becomes the official policy guide for public action
regarding the Downtown Bozeman Improvement District. These policies can only be
transformed into action through an effective implementation program. The framework
for implementation described herein depends on sound processes of administration,
financing and evaluation. As the implementation of this Plan proceeds, new
opportunities will arise and unforeseen problems will emerge. The Plan's administration
must be sufficiently flexible to respond effectively to changing circumstances without
losing sight of long range goals.
ADMINISTRATION
To implement this Plan, an Urban Renewal Agency will be created, hereafter
referred to as the Downtown Bozeman Improvement District Board, or the IDB. The
IDB is responsible for the implementation of this Plan, pursuant to Section 7-15-4232,
M.C.A. Specifically, the IDB will: 1) develop plans which implement the vision for the
District; 2) review on an ongoing basis the operations and processes of all public
agencies to assure that such activities are supportive of the Plan; and 3) advocate and
coordinate the complete and full implementation of the Plan.
Individuals appointed to the IDB shall have a demonstrated interest in Downtown
Bozeman. Pursuant to Section 7-15-4234, M.C.A., the Mayor, by and with the advice
and consent of the City Commission, shall appoint the IDB, which shall consist of five
voting members. The initial voting membership shall consist of one IDB member
appointed for 1 year, one for 2 years, one for 3 years, and two for 4 years. Each
appointment thereafter shall be for 4 years. A certificate of the appointment or
reappointment of any voting member shall be filed with the Clerk of the municipality, and
such certificate shall be conclusive evidence of the due and proper appointment of such
member.
(1) Each voting member shall hold office until his/her successor has been
appointed and has qualified.
(2) A voting member shall receive no compensation for his/her services but shall
be entitled to authorized necessary expenses, including traveling expenses,
incurred in the discharge of his/her duties.
(3) Any persons may be appointed as voting members if they reside within the
municipality.
(4) A voting member may be removed for inefficiency, neglect of duty, or
misconduct in office.
(5) The appointment of voting members shall be ratified annually by the City
Commission.
- 15 -
it
A majority of the voting members shall not hold any other public office under the
municipality other than their membership or office with respect to the IDB.
The powers and responsibilities of the IDB shall be exercised by the members
thereof according to adopted bylaws approved by the City Commission. A majority of
the voting members shall constitute a quorum for the purpose of conducting business
and exercising the powers and responsibilities of the IDB and for all other purposes.
Action may be taken by the IDB upon a vote of a majority of the voting members
present unless in any case the bylaws shall require a larger number.
Y
In addition to the five voting members, the IDB shall be composed of a non-
voting membership of not more than seven individuals. The initial non-voting
membership shall consist of one IDB member appointed for 2 years, two for 3 years and
two for 4 years. Each appointment thereafter shall be for 4 years. In addition, upon a
recommendation of the IDB, the City Commission may appoint two additional non-voting
members for a term of 1 year. These individuals must also possess a demonstrated
interest in Downtown Bozeman and may represent, but not be limited to, the following
organizations in the community, unless such organization is represented among the
voting membership: Parking Commission, Chamber of Commerce, MSU/Museum of
E
the Rockies, Gallatin Development Corporation, Bozeman School District, the City of
Bozeman, Gallatin County, and the Downtown Bozeman Association.
(1) Each non-voting member shall hold office until his/her successor has been
appointed and has qualified.
(2) A non-voting member shall receive no compensation for his/her services but
shall be entitled to authorized necessary expenses, including traveling
expenses, incurred in the discharge of his/her duties.
(3) A non-voting member may be removed for inefficiency, neglect of duty, or
I
misconduct in office. 4
(4) The appointment of non-voting members shall be ratified annually by the City
Commission.
Special committees of the IDB may be appointed by the Chairman for purposes
and terms which the IDB approves.
i
F
Initial administrative staff duties for the IDB will be performed by City staff as ["
available until other funding shall be available from alternate sources and permanent
staff hired. The IDB will make every effort to fund its own staff, either by contracting for
services with existing public agency staff, contracting for services with a private firm, or
hiring a staff. The FY97 work program shall specify the staff arrangement.
The IDB may exercise any of the powers specified in Section 7-15-4233, M.C.A. I'
- 16 -
ANNUAL WORK PROGRAM, BUDGET, AUDIT AND EVALUATION
The IDB shall prepare an annual work program (AWP) and budget that will list
the activities and costs of activities for the coming fiscal year, as well as the method of
financing those activities. This program and budget may be amended during the course
of the City's fiscal year, in light of funding and program changes. All budgets and
revised budgets shall be reviewed and approved by the City Commission.
The IDB shall cause to be performed an annual audit conducted in conjunction
with the City's audit covering the operations of the IDB in carrying out this Plan. The
first such audit shall be completed within ninety (90) days of the close of the first fiscal
year following the adoption of this Plan by the City Commission. All such audits shall be
maintained as a part of the public records of the City of Bozeman.
The IDB shall also provide to the City Commission and the public an annual
program evaluation. Such evaluation shall review the Downtown Bozeman
Improvement District Plan and the past annual work program and other relevant IDB
activities for the year.
PLAN AMENDMENT
The Plan may be amended in accordance with Montana statute. The City
Commission may modify and amend the Plan, including modifications and amendments
to designate and approve urban renewal projects to be undertaken pursuant thereto, by
enacting an ordinance providing for and setting forth the modification and amendment.
No such ordinance shall be adopted until after a public hearing has been conducted
thereon and notice of said hearing has been given in the official newspaper once a
week for two consecutive weeks preceding the hearing.
If the modification or amendment involves the addition or deletion of land from
the District, mailed notice shall be given to all persons owning property to be added or
deleted at the time and in the manner provided by Section 7-15-4215(1), M.C.A. All
notices shall provide the information regarding the modification required by Section
7-15-4215(1), M.C.A. Nothing herein shall limit or affect the authority of the
Commission to undertake and carry out renewal activities on a yearly basis as provided
by Section 7-15-4220, M.C.A.
PROPERTY ACQUISITION
The IDB will assist and encourage public and private entities to eliminate blight or
blighting influences, and strengthen the City's economy by developing property in the
District. However, where necessary in the execution of this Plan, the IDB is authorized
to acquire property in the District in accordance with appropriate federal, state and local
law.
- 17 -
ACTIONS BY THE CITY
I
The City shall aid and cooperate with the IDB in carrying out this Plan, and shall
take actions necessary to ensure the continued fulfillment of the purposes of this Plan
and to prevent the recurrence or spread in the area of conditions causing blight. To
assure the purposes of the Plan are fully considered, the City shall obtain and consider
the advice of the IDB regarding all development proposals, public works projects, or
other matters occurring within or adjacent to the Downtown Bozeman Improvement
District area or affecting any aspect of the Plan.
Other action b the City may include but not be limited to the following:
Y Y Y g
1. Institution and completion of proceedings for opening, closing, vacating,
widening, or changing the grades of streets, alleys and other public rights-of-
way and for other necessary modifications of the streets, the street layout and
other public rights-of-way in the Downtown Bozeman Improvement District
area. Such action by the City may include the requirement of abandonment
and relocation by the public utility companies of their operations in public
rights-of-way as appropriate to carry out this Plan.
2. Institution and completion of proceedings necessary for changes and
improvements in publicly-owned utilities within or affecting the Downtown
Bozeman Improvement District area. E_
3. Revision of Master Plan Zoningrequirements, development standards, and
regulatory practices to facilitate the execution of principles, policies and
implementation actions set forth by this Plan.
4. Performance of the above and of all other functions and services relating to
public health, safety, and physical development normally rendered in
accordance with a schedule that will permit the redevelopment of the
Downtown Bozeman Improvement District area to be commenced and carried
to completion without unnecessary delays. F
5. The undertaking and completing of any other proceedings necessary to carry
f
out the provisions of this Plan.
E
4i.
- 18 -
FINANCE
The programs, projects and administration of the Plan shall be financed from a
variety of sources both public and private. Public funds shall in general be used for
public improvement projects and the public portions of private development activities.
Tax Increment funds will not be used for the direct and exclusive benefit of private
property. Private funds and self-imposed taxes shall be used for all other purposes.
Numerous funding sources will be applied to the implementation of this Plan,
which in part may include:
Private — Grants; dues, for example from the Downtown Bozeman Association; self-
imposed taxes, such as Special Improvement Districts or Business Improvement
Districts; private investment; and donations.
Private Enterprise Assistance Programs — Housing and Urban Development, Small
Business Administration, and Community Reinvestment Act financial assistance.
Public — Tax increment financing; revenue bonds; City and County general funds; public
grants; utility districts; user fees; State-backed, low-interest loans; Montana Department
of Transportation; general obligation bonds; Bozeman Parking Commission; tax credits;
and enterprise funds.
The Planning Committee evaluated the Action Items in the Plan in consideration
of potential funding sources appropriate for each Action Item, and suggested the most
likely funding sources for each Action Item. Abbreviations are: BID — Business
Improvement District, DBA — Downtown Bozeman Association, TIF — Tax Increment
Financing (includes Increment Bonds), SID — Special Improvement District, SWM —
Storm Water Management.
The list of Action Items and potential funding sources follows:
Organization: BID, TIF, City General Fund, Planning Grants;
Additional Parking Spaces: Private Investment, SID, TIF, Revenue Bonds, Intercap
Loan, Parking Commission;
Better Parking Management: BID;
Sidewalks, Pedestrian Facilities: SID, TIF, Intercap Loan;
Bicycle Accommodation: Private Investment, SID;
Traffic Flows: TIF, MDOT Funding, SID;
Public Transportation: Public Grants, Enterprise Funds;
Control of Main Street: TIF, MDOT Funding;
Control of Deliveries: Private Investment, BID, City General Funds;
Water, Sewer: SID, TIF, Revenue Bonds, Enterprise Funds;
Fire Code*: Private Investment, TIF, SID;
Patrols: DBA;
Public Restrooms: BID, TIF;
- 19 -
i
Structural Repairs*: Private Investment, TIF;
Plaques, Guides: Private Investment, BID;
Preservation*: Private Investment, TIF, Public and Private Grants, Private Donations;
Commercial Development*: Private Investment, TIF; I
Additional Living*: Private Investment, TIF, Public Grants;
Main Street Appearance*: Private Investment, TIF;
Alley Improvements: Private Investment, SID, TIF;
Cultural Activities: Private Investment, BID, TIF, Revenue Bonds, Public and Private
Grants, Private Donations;
Maintain Offices Downtown*: Private Investment, TIF;
Zoning, Master Plan: City General Fund, City-County Planning Funds, TIF;
Snow Removal: BID, TIF;
Creeks and Streams: TIF, Public and Private Grants, SWM, Private Donations;
Waste: BID, DBA, TIF;
Asbestos*: Private Investment, TIF, Public Grants;
Marketing: Private Investment, DBA, BID;
Lighting: SID, TIF, Private Donations;
Retain Anchors*: TIF.
Asterisk indicates that the use of TIF is limited to public projects or the public portion of
private projects.
E
Tax Increment Financing will be implemented in accordance with Title VII,
Chapter 15, Part 42, Sections 4282-4292, and 4301-4324, M.C.A., except the use of
Tax Increment funds shall be limited to public projects or the public portion of private
projects. In the event that property taxes are reduced or replaced with some new form
of revenue, it is the intent of the Plan to use all available means to adjust the tax base or
allow the capture of that portion of the new revenue form necessary to offset the
reduced or lost increment.
In addition, notwithstanding the provisions of Title VII, Chapter 15, Part 42, E
Sections 4282-4292 and 4301-4324, M.C.A., tax increment payments made to the Tax
Increment District after the 11th year of payments or after the annual tax increment
reaches an inflation adjusted $750,000, whichever occurs first, shall be returned to the
4
taxing bodies as such payments would normally accrue to those bodies with the
exception that those payments which are pledged to the payment of principal and
interest of any outstanding tax increment bond shall remain with the Tax Increment
District for the payment of such principal and interest. The cap of $750,000 shall be
increased for inflation by a percentage equal to the percentage increase in the
Consumer Price Index for all Urban Consumers — All Items (Source: U.S. Department
of Labor, Bureau of Labor Statistics) from July 1995 to July in the year under
consideration. The Board shall not issue any tax increment bonds later than the year
following either the 11th year of payment or after the tax increment reaches an inflation
adjusted $750,000, whichever occurs first. The provisions of this paragraph shall be
accomplished by separate interlocal agreement between the City, County, and School
District.
- 20 -
The IDB will annually develop a program and budget to be reviewed and adopted
by the City Commission. During this procedure, specific actions will be proposed in
detail for community review. This process will allow maximum community input to
further the redevelopment interests of the community and to evaluate past actions of the
IDB.
- 21 -
GETTING STARTED
FIRST YEAR ANNUAL WORK PROGRAM
INTRODUCTION
Y
4
Initiating the implementation of the Downtown Bozeman Improvement District will
require skillful leadership, ample opportunity for citizen participation, and the personal
commitment of each member of the Improvement District Board. Demands for concrete
action will be high, but funds will be limited. Community interest will be significant. All
parties will be encouraged to be solution-oriented in their participation.
m
In short, the first year will be a period filled with challenges — but even greater
opportunities. The program, time line, responsibility statements and cost estimates set
forth below shall serve as a guide to the District Board and to the several agencies that
will be asked to help move this vital Public/Private Partnership forward.
WORK PROGRAM
City Fiscal Year 1996
Calendar Estimated
QuarterNr. Programmed Actions Responsibility Cost
1995
3rd Finalize Urban Renewal Plan URSC & staff Items
combined
3rd Publicize and present Plan to community URSC & staff $ 5,000
3rd Review and recommendation CCPB
3rd Develop three year planning/budgeting cycle URSC & staff
i
r
3rd-4th Secure planning/assessment funds URSC/DBIDB $ 5,000
4th Public Hearing CC
4th Administrative Staff/Consultant decisions DBIDB & staff
- 22 -
City Fiscal Year 1996
Calendar Estimated
QuarterNr. Programmed Actions Responsibility Cost
1996
1st-2nd Physical Concept Plan and Program DBIDB & Consultant $50,000
1st Public Safety Assessment and Plan CF/P & Consultant $10,000
1st Sewer/Water Assessment and Plan CPW& Consultant $ 5,000
1st Parking Management Study CPC & Consultant $10,000
1st Marketing Plan DBA $ 5,000
1st DBID Financial Program Development DBIDB & staff
2nd AWP Funding Options Assessment and Plan DBIDB & staff& others $ 5,000
TOTAL $95,000
ABBREVIATIONS
URSC Urban Renewal Study Committee
CCPB City-County Planning Board
Staff City Staff
DBID(B) Downtown Bozeman Improvement District (Board)
CC City Commission
Consultant Independent Consultant meeting Plan criteria
CF/P City Fire and Police Departments
CPW City Public Works Departments
CPC City Parking Commission
DBA Downtown Bozeman Association
AWP Annual Work Program
- 23 -
PROGRAMMED ACTION DISCUSSION
1. Finalize Urban Renewal Plan Draft— URSC & staff
Complete the Downtown Bozeman Improvement District plan draft for
review by the public, the City-County Planning Board, and the City
Commission.
2. Publicize and resent Plan —
n to communit
y ity URSC & staff
i
Conduct a public review and input session.
x
3. Public Hearing — CCPB
f
In conjunction with the CCPB review of the Plan, a public hearing may be
held at the discretion of the CCPB.
4. Develop three-year planning/budgeting cycle — URSC & staff
Prepare AWP three-year budget forecast.
5. Secure planning/assessment funds — URSC/DBIDB
A transitional element from the Planning Committee to the Improvement
District board — identify and secure funding to accomplish the tasks
identified in this AWP.
6. Public Hearing — CC I'
Conduct the mandated hearing on the Plan.
F
7. Administrative Staff/Consultant decisions— DBIDB & staff
Plan implementation responsibilities for completion of the AWP and
secure the necessary staff/funding to accomplish.
8. Physical Concept Plan and Program — DBIDB & Consultant
Prepare an Urban Design Plan for the Downtown Bozeman Improvement
District.
9. Public Safety Assessment and Plan — CF/P & Consultant
Prepare a plan for fire code compliance within the DBID, including the
installation of dedicated water supply as required.
-24-
10.Sewer/Water Assessment & Plan — CPW & Consultant
Review existing assessments of water and sewer facilities within the
DBID, and revise or evaluate more specifically as warranted. Review for
coordination with water supply requirements for fire code compliance.
11.Parking Management Study— CPC & Consultant
Evaluate options and recommend approaches to maximize value of
parking faciliti4es within the DBID. Review Organization of parking
management promotion, Effectiveness of existing parking, both on and off-
street, as well as evaluating facility needs.
12.Marketing Plan — DBA
DBA will develop a coordinated marketing plan for the downtown.
13.DBID Financial Program Development— DBIDB & staff
Develop financial programs to assist in DBID redevelopment efforts.
14.AWP Funding options Assessment and Plan — DBIDB, staff and others
-25-
i
APPENDIX A
i
ORDINANCE NO. 1409
r
E
r
is
4
f
d.'
to
t
Ei
C':
ORDINANCE NO. 1409
AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF
BOZEMAN, MONTANA, ADOPTING AN URBAN RENEWAL PLAN FOR
PORTIONS OF THE DOWNTOWN BOZEMAN AREA.
WHEREAS, the Bozeman City Commission did, on the 6th day of March, 1995,
adopt Resolution No. 3046, declaring that blighted areas exist within the municipality and
that the rehabilitation, redevelopment, or a combination thereof, of such area or areas is
necessary; and
WHEREAS, the Bozeman City Commission appointed an Urban Renewal Planning
Committee to prepare an urban renewal plan; and
WHEREAS,the Urban Renewal Planning Committee has prepared a proposed Urban
Renewal Plan; and
WHEREAS,the Bozeman City-County Planning Board has found the proposed Urban
Renewal Plan to be in conformance with the 1990 Bozeman Area Master Plan Update, the
adopted comprehensive plan for the Bozeman Planning jurisdiction; and
WHEREAS, the Bozeman City Commission did, on the 6th day of November, 1995,
conduct a public hearing to consider the proposed Urban Renewal Plan.
NOW THEREFORE, BE IT ORDAINED BY THE CITY COMMISSION OF THE CITY OF
BOZEMAN, MONTANA:
SECTION 1: That the Urban Renewal Plan, attached hereto as Exhibit "A", is
hereby adopted.
SECTION 2 - REPEALS&
All resolutions, ordinances, and sections of the Bozeman Municipal Code and parts
thereof in conflict herewith are hereby repealed.
SECTION 3 - SEVERA ILA ITY.
If any provisions of this ordinance or the application thereof to any person or
circumstances is held invalid, such invalidity shall not affect the other provisions of this
ordinance which may be given effect without the invalid provision or application and, to this
onrl +hn nrnvioi^ne of tide nrAirtannn 7rn Annitarnri to hn ecvnrnhin
law.
PASSED by the City Commission of the City of Bozeman, Montana on first reading
this 6th day of November, 1995.
i
i
J VINCENN Mayor
C
fEf
ATTEST:
K
4
ROBIN L. SULLIVAN
Clerk of the Commission r
E
i<
r
PASSED, ADOPTED and FINALLY APPROVED by the City Commission of the City
of Bozeman, Montana on second reading this 20th day of November, 1995.
VVN AA
J VINCENT, ayor
ATTEST:
p y P
ROBIN SUL000O00///LIVAN
Clerk of the Commission
APPROVED AS TO FORM:
•�7
P UL J. L/UWE
City Att ney
i
t
APPENDIX B
DISTRICT DESCRIPTION AND MAP
i
i
N. 7th
S. 6t AvL F M 11 PAU1464
n p
oaac
N. 5th Ave
Grand Ave. . r
t-L
El
En Ave. �a.: . V)
Trac Ave, a_:>... .
S. Black lAve
ji
E:
FBozeman Ave.
cn �
o
FUndleyPI. 1
■
77
No Sacs
CITY OF BOZEMAN Erna wo
URBAN RENEWAL DISTRICT
November 1995
_ INDEXFo HIS INSTRUMENT WAS FILED FOR RECORD IN THIS OFFICE ON
31 `ey Q�RECORDER
— ER) +113 28 DAY OF DECEMBER , A.D., 19 95
FICE OF COUNTY AT 11:00 AM, AND S DULY RECORDED IN BOOK 159
1UNTY OF GALLATIN )
ATE OF MONTANA ) OF RECORDS, PAGE 1423
�r,� 00 tblal) M, �qNY RECORDER. BY DEPUTY
CITY OF BOZEMAN
t
1F
URBAN RENEWAL DISTRICT BOUNDARY
Beginning at the southeast corner of Block D, Tracy's 3rd Addition to the City of
Bozeman, Montana; thence easterly along the north right-of-way line of Lamme Street a
distance of 384 feet to the southwest corner of Block B of said Tracy's 3rd Addition;
thence southerly along the east right-of-way line of Grand Avenue a distance of 200 feet
to the north line of the alley in Block B, Tracy's 2nd Addition to the City of Bozeman;
thence easterly along the north line of the alleys in Blocks B and A of said Tracy's 2nd
Addition a distance of 668 feet to the west right-of-way line of Tracy Avenue; thence
northerly along said west line of Tracy Avenue a distance of 140 feet to the northeast
corner of Block A of said Tracy's 2nd Addition; thence northerly a distance of 60.3 feet
to the southeast corner of Lot 3 of the amended plat of Block A of Tracy's 3rd Addition;
thence northerly along the east line of said Lot 3 a distance of 50.7 feet; thence easterly
a distance of 53.8 feet to the southwest corner of Block M of Original Townsite, City of
Bozeman; thence easterly along the north right-of-way line of Lamme Street a distance
of 377 feet to the southwest corner of Block L of said Original Townsite; thence
southerly along the east right-of-way line of Black Avenue a distance of 210 feet to the
southwest corner of Lot 22, Block H, of said Original Townsite; thence easterly along
the north line of the alleys in Blocks H and I of said Original Townsite a distance of 895
feet to the west right-of-way line of Rouse Avenue; thence northerly along said west line
of Rouse Avenue a distance of 210.1 feet to the southeast corner of Block K of said
Original Townsite; thence easterly along the north right-of-way line of Lamme Street a
distance of 494.2 feet to the southwest corner of Block 2, Babcock and Davis Addition
to the City of Bozeman; thence southerly along the east right-of-way line of Church
Avenue a distance of 380 feet to the southwest corner of Block H, Rouse's Addition to
the City of Bozeman; thence easterly along the north right-of-way line of Mendenhall
Street a distance of 892 feet to the southwest corner of Block 32, Northern Pacific
Addition to the City of Bozeman; thence southeasterly along the north right-of-way line
of Mendenhall Street a distance of 237.6 feet to the southeast corner of said Block 32,
Northern Pacific Addition; thence easterly a distance of 71 feet more or less to the
southwest corner of Block 33 of said Northern Pacific Addition; thence southwesterly
along the east right-of-way line of Broadway Avenue a distance of 370.1 feet more or
less to the southwest corner of Block 30 of said Northern Pacific Addition; thence
southeasterly a distance of 94.2 feet more or less to the northwest corner of Lindley
Park; thence southerly along the westerly line of Lindley Park a distance of 313.5 feet;
thence westerly along the Lindley Park property line a distance of 250 feet to a point on
the east right-of-way line of vacated Ida Street; thence S00°45'05"W along said east line
of vacated Ida Street a distance of 684 feet, to the south right-of-way line of vacated
Curtiss Street; thence S89013'47"W along said south line of vacated Curtiss Street a
distance of 133.77 feet; thence S23010'38"W a distance of 39.01 feet; thence
S37°19'25"W a distance of 125.80 feet; thence S17001'59"W a distance of 47.36 feet;
thence S32052'38"W a distance of 95.44 feet; thence S23°59'25"W a distance of 39.99
feet to a point on the east line of Block F, Rouse's 2nd Addition to the City of Bozeman;
thence S00004'23"E along said east line of Block F of Rouse's 2nd Addition a distance
i
k
of 366.58 feet; thence S89°13'53"W along the south line of said Block F of Rouse's 2nd
Addition a distance of 120 feet; thence S00009'25"W along the east line of vacated
Wallace Avenue a distance of 295.24 feet to a point on the north line of Electric Heights
Addition to the City of Bozeman; thence S89059'50"W along said north line of Electric
Heights Addition a distance of 381.17 feet; thence S35°24'06"W a distance of 119.61
feet to a point on the east right-of-way line of Church Avenue; thence northerly along
said east line of Church Avenue a distance of 385.48 feet more or less to the south line
of Block E of said Rouse's 2nd Addition; thence N89013'53"E along said south line of
Block E, Rouse's 2nd Addition a distance of 168.10 feet; thence N37°42'44"E a distance
of 53.96 feet to a point on the west line of the alley in said Block E, Rouse's 2nd
Addition; thence S00°00'41"W along said west alley line a distance of 42.24 feet; thence
N89013'53"E a distance of 25 feet; thence N00°00'41T along the east line of said alley
in Block E, Rouse's 2nd Addition, a distance of 302.18 feet; thence N89°13'35"E along
the line common to Lots 31 and 30, Block E, Rouse's 2nd Addition, a distance of 164.97
feet to a point on the west right-of-way line of Wallace Avenue; thence northerly along
said west line of Wallace Avenue a distance of 1020 feet to the northeast corner of
Block A of said Rouse's 2nd Addition; thence westerly along the south right-of-way line
of Babcock Street a distance of 392 feet to the northwest corner of said Block A of
Rouse's 2nd Addition; thence southerly along the east right-of-way line of Church
Avenue a distance of 170 feet; thence westerly a distance of 210 feet to a point on the
east line of the north/south alley in Block A, Harper's Addition to the City of Bozeman;
thence northerly along said east line of the north/south alley in Block A, a distance of 10
feet; thence westerly along the south line of the east/west alley in said Block A of
I
Harper's Addition a distance of 244 feet to the east right-of-way line of Rouse Avenue;
thence southwesterly a distance of 58.8 feet to a point on the west right-of-way line of
Rouse Avenue, said point being 150 feet north of the north right-of-way line of Olive
Street; thence westerly along a line 150 feet north of and parallel to the north line of Live
Street a distance of 521 feet to the east right-of-way line of Bozeman Avenue; thence
westerly 57 feet to a point on the west right-of-way line of Bozeman Avenue, said point
being 51 feet north of the northeast corner of Lot A of Certificate of Survey No. 490;
thence along the southerly property line of the property currently owned by Bozeman
Elks Lodge No. 463 the following metes and bounds: westerly 37 feet, southerly 1.5
feet, westerly 138.67 feet, southerly 12.5 feet, and westerly 118.86 feet to a point on the
east right-of-way line of Black Avenue; thence westerly a distance of 58 feet to a point
on the west right-of-way line of Black Avenue; thence northerly along said west line of
Black Avenue a distance of 164 feet to the south right-of-way line of Babcock Street;
thence westerly along said south line of Babcock Street a distance of 1055.98 feet to
the east right-of-way line of Grand Avenue; thence southerly along said east line of
Grand Avenue a distance of 360 feet to the south right-of-way line of Olive Street;
thence westerly along said southerly line of Olive Street a distance of 621 feet to the
west right-of-way line of Fourth Avenue; thence northerly along said west line of Fourth
Avenue a distance of 382.5 feet to the south right-of-way line of Babcock Street; thence
westerly along said south line of Babcock Street a distance of 405 feet more or less to
the west right-of-way line of Fifth Avenue extended; thence northerly along said west
line of Fifth Avenue a distance of 336 feet to the northeast corner of Block E, Story's
Addition to the City of Bozeman; thence northeasterly a distance of 91.6 feet more or
less to the southeast corner of Block E, Tracy's Addition to the City of Bozeman; thence
northerly along the west right-of-way line of Fifth Avenue a distance of 160 feet; thence
easterly along the north line of the alley in Block D of said Tracy's Addition a distance of
338 feet to the southwest corner of Lot 34 of said Block D of Tracy's Addition; thence
northerly along the west line of said Lot 34 a distance of 191 feet more or less to a point
on the north right-of-way line of Mendenhall Street; thence easterly along said north line
of Mendenhall Street a distance of 252 feet to the west right-of-way line of Third
Avenue; thence northerly along said west line of Third Avenue a distance of 360 feet to
the southeast corner of Block D of Tracy's 3rd Addition to the City of Bozeman, the point
of beginning.