Loading...
HomeMy WebLinkAbout612 W. Beall FACADE Assistance GrantF O C U S A R C H I T E C T S 612 W. Beall Renovation Project North 7th Rehab Façade Grant Program Fiscal Year 2016 date: January 24th, 2016 sent by: Brett Potter, AIA, LEED AP project name: 612 W. Beall Renovation Project attention: David Fine to: Planning Department P.O. Box 1230 Bozeman, MT 59771 Dear David Fine, contact #: (406) 579-8450 I am pleased to submit this application for the North 7 th Rehab Façade Grant Program (fiscal year 2016) for the 612 W. Beall Renovation Project. This application is for a Façade Grant to reimburse the project owner 15% of the costs to rehabilitate the existing run down exterior of this 1970’s office building. The following is a detailed breakdown of the project scope and how it meets the requirements set forth in the North 7 th Rehab Funding Program. Project Location 612 W. Beall Street, Bozeman MT 59715. Project Description FOCUS Architects is submitting this grant funding application for reimbursement for the following items: 1. Demolition and prep of exterior existing facades (all sides). 2. New brick masonry on all four sides. 3. New windows and doors. 4. New metal siding. 5. A new metal entry roof. 6. New roof parapet cap and gutter downspout system 7. New exterior lighting. Projected Timeline 1. Obtain a building permit by February 15th. 2. Begin construction March 1st. 3. Complete construction May 1st. 4. Grant funding disbursement at NSURB May meeting. Th e i n f o rm at io n i n t his d o cume nt is i n tende d o nly f o r th e in div idu a l o r e ntity t o w hi c h i t is ad d r es se d an d ma y c on t ai n i n f o rm at io n th at is p ro pr i e t a r y, c o nf ide n t i a l or e xem pt f ro m disc l o s u r e und er ap pli ca b le l a w. I f th e read er of t his d o cume nt is n ot th e i nt e nde d rec i p ie nt , or th e em p l o ye e o r age nt r e spo ns i b l e f o r d eli v er in g t hi s I n v oi c e t o th e i n tende d rec i p ie nt , y o u a r e h e re by no tif i e d th at a ny dis se m in at ion , dis t r ib ut io n, f o rw a r d in g o r c o py in g of t hi s d o cume nt i s strictly p ro h i bi te d. I f yo u ha ve r e c ei ve d t hi s d o cume nt in er r or , pl ea se no tify th e send er imme d i a t ely by e -m a i l, t e lephon e or FA X a n d d el e t e th e or i g in a l d o cume nt imme d i a te ly. Tha nk yo u. 312 Accola Avenue Bozeman, Montana 59715 Tel. 406 / 579.8450 Façade Assistance Requested This project will significantly enhance the N. 7th corridor by renovating a 1970’s building into a modern commercial office building. The preliminary estimated costs to perform this work will be $103,848.00 (final cost TBD based on actual hours spent as costing is T&M plus fixed bid). As of this preliminary estimate the total grant funding we are requesting will be approximately $15,000 +or- depending on final work. One of the reasons this number is not locked in is we do not know what type of discovery we will make once we complete the demolition phase of the project (i.e we may need to replace exterior building sheathing if there is dry rot etc). If you have any questions regarding this application please contact myself at (406) 579-8450. Thank you for the opportunity to submit this application and we look forward to your response. Sincerely Brett R. Potter, AIA, LEED AP Principal Th e i n f o rm at io n i n t his d o cume nt is i n tende d o nly f o r th e in div idu a l o r e ntity t o w hi c h i t is ad d r es se d an d ma y c on t ai n i n f o rm at io n th at is p ro pr i e t a r y, c o nf ide n t i a l or e xem pt f ro m disc l o s u r e und er ap pli ca b le l a w. I f th e read er of t his d o cume nt is n ot th e i nt e nde d rec i p ie nt , or th e em p l o ye e o r age nt r e spo ns i b l e f o r d eli v er in g t hi s I n v oi c e t o th e i n tende d rec i p ie nt , y o u a r e h e re by no tif i e d th at a ny dis se m in at ion , dis t r ib ut io n, f o rw a r d in g o r c o py in g of t hi s d o cume nt i s strictly p ro h i bi te d. I f yo u ha ve r e c ei ve d t hi s d o cume nt in er r or , pl ea se no tify th e send er imme d i a t ely by e -m a i l, t e lephon e or FA X a n d d el e t e th e or i g in a l d o cume nt imme d i a te ly. Tha nk yo u . 312 Accola Avenue Bozeman, Montana 59715 Tel. 406 / 579.8450 Current Projects Activities FOCUS Architects Exterior Renovation Cost Estimate Cross Building Item Description:AmountLINE ITEMS Brick Work 28,239.15$ 8 Zone Heating/Cooling System 26,512.00$ Phil Fulbright 21,360.00$ Window & Doors 32,516.00$ Metal Package 18,960.00$ Exterior Lighting 4,500.00$ TOTALS -$ -$ 103,848.00$ -$ Hourly Breakdown 1 ARCHITECT 312 ACCOLA DRIVE BOZEMAN, MT 59715 406-579-8450 ARCHITECTURAL: ARCHITECTURAL DESIGN BRETT R. POTTER, AIA, LEED AP A0.1TITLE SHEET S1.1TOPOGRAPHIC SURVEY A1.1EXISTING AND NEW SITE PLANS A2.1EXISTING AND NEW FLOOR PLANS A3.1BUILDING ELEVATIONS A4.1DETAILS / ADA BATHROOM E1.1LIGHTING & POWER PLANS M1.1MECHANICAL & PLUMBING - 12/18/15#1 SITE LOCATE MAPEXISTING BUILDING nts JANUARY 11th, 2016 100% BID SET DOCUMENTS FOR PERMITTING AND REGULATORY APPROVAL 1-11-16 BRETT R. POTTER 2599 BOZEMAN, MT TBD OWNER 612 W. BEALL ST. BOZEMAN, MT 59715 303-818-2296 CHETT CROSS NEW EXTERIOR RENOVATION nts STRUCTURAL S0.1STRUCTURAL NOTES S0.2STRUCTURAL SCHEDULES S1.1UPPER LEVEL FLOOR FRAMING PLANS S1.2ROOF FRAMING PLANS S2.1STRUCTURAL DETAILS - 12/27/15#2 - 1/11/16#3 16'-0"22'-0" 2'-0"10'-0"10'-0"9'-6"9'-6"NEW 5' SIDEWALK AT EAST SIDE TO CONNECT ADA PARKING WITH ADA ENTRANCE TWO NEW LITTLE LEAF LINDEN BOULEVARD TREES A1.1 SITE PLAN 1/20" = 1'-0" POTTER Drawing Title Project No. Drawing No. Drawn Issued / Revised Architect Project GALLATIN COUNTY BOZEMAN CROSS ph. (406) 579-8450 312 Accola Drive, Bozeman, MT, 59715 F O C U S A R C H I T E C T S RENOVATION 12/18/15 100% License 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 N M L K J H G F E D C A B 1615141312111098754321 Contractor MONTANA PROJECT 1-11-16 BRETT R. POTTER 2599 BOZEMAN, MT Owner BOZEMAN, MT 59715 612 W. BEALL ST. CROSS RENOVATION PROJECT (303) 818-2296 12/27/15 100% 1/11/16 100% NTS NE VIEW BEFORE/AFTER1 EXISTING NE PERSPECTIVE PHOTO OF BUILDING NEW NE PERSPECTIVE RENDERING OF COMPLETED RENOVATION NTS SW VIEW BEFORE/AFTER4 EXISTING SW PERSPECTIVE PHOTO OF BUILDING NEW SW PERSPECTIVE RENDERING OF COMPLETED RENOVATION 1/20" = 1'-0" EXISTING CONDITION SITE PLAN2 1/20" = 1'-0" NEW SITE PLAN3 48'-0"24'-0"5'-418"8'-6"5'-4"6'-038"6'-012"11'-478"5'-418" 5'-418"8'-6"11'-438"11'-0"5'-418" 48'-0"24'-0"OFFICE OFFICE RECEP. WORK STATION STAIR STAIR BREAK RM. NEW ADA STOP PLATFORM LIFT ELEC 6'-538" REF. 5/A4.1 FOR BATHROOM ELEVATIONS CONF. HW 48'-0"24'-0"5'-418"8'-6"5'-4"6'-038"6'-012"11'-478"5'-418" 5'-418"8'-6"17'-934"11'-0"5'-418" 48'-0"24'-0"NEW ADA STOP PLATFORM LIFT STAIR STAIR24'-0"OFFICE OFFICE OFFICE OFFICE BREAK OFFICE BATH REF. 5/A4.1 FOR BATHROOM ELEVATIONS A2.1 FLOOR PLANS 1/4" = 1'-0" POTTER Drawing Title Project No. Drawing No. Drawn Issued / Revised Architect Project GALLATIN COUNTY BOZEMAN CROSS ph. (406) 579-8450 312 Accola Drive, Bozeman, MT, 59715 F O C U S A R C H I T E C T S RENOVATION 12/18/15 100% License 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 N M L K J H G F E D C A B 1615141312111098754321 Contractor MONTANA PROJECT 1-11-16 BRETT R. POTTER 2599 BOZEMAN, MT Owner BOZEMAN, MT 59715 612 W. BEALL ST. CROSS RENOVATION PROJECT (303) 818-2296 12/27/15 100% 1/11/16 100% 1'-0" = 1/4" EXISTING & NEW RENOVATED FLOOR PLANS1 EXISTING LOWER LEVEL FLOOR PLAN RENOVATED LOWER LEVEL FLOOR PLAN EXISTING UPPER LEVEL FLOOR PLAN RENOVATED UPPER LEVEL FLOOR PLAN NEW DARK BRONZE AND ALUMINUM PARAPET FLASHING CAP W/ GUTTER SYSTEM NEW DARK BRONZE AND ALUMINUM GUTTER DOWNSPOUTS NEW BRICK MASONRY EXTERIOR SIDING DESIGN NEW STOREFRONT ALUMINUM WINDOW SYSTEM NEW VERTICAL ALUMINUM CORRUGATED METAL SIDING ACCENT PANEL NEW NIGHT SKY COMPLIANT LIGHT FIXTURE EXISTING ROOF DUCTING EXISTING ROOF DUCTING NEW DARK BRONZE AND ALUMINUM PARAPET FLASHING CAP NEW BRICK MASONRY EXTERIOR SIDING DESIGN NEW DARK BRONZE METAL ENTRY ROOF SYSTEM NEW DARK BRONZE AND ALUMINUM PARAPET FLASHING CAP NEW DARK BRONZE AND ALUMINUM GUTTER DOWNSPOUTS NEW BRICK MASONRY EXTERIOR SIDING DESIGN NEW STOREFRONT ALUMINUM WINDOW SYSTEM NEW VERTICAL ALUMINUM CORRUGATED METAL SIDING ACCENT PANEL NEW DARK BRONZE METAL ENTRY ROOF SYSTEM NEW NIGHT SKY COMPLIANT LIGHT FIXTURE EXISTING ROOF DUCTING NEW DARK BRONZE AND ALUMINUM PARAPET FLASHING CAP NEW BRICK MASONRY EXTERIOR SIDING DESIGN NEW DARK BRONZE METAL ENTRY ROOF SYSTEM EXISTING ROOF DUCTING EXISTING ROOF DUCTING EXISTING ROOF DUCTING EXISTING STUCCO SIDING SYSTEM TO BE REMOVED EXISTING STUCCO SIDING SYSTEM TO BE REMOVED GUTTER DOWNSPOUT MECHANICAL UNIT SHALL BE SCREENED SEE DETAIL 4/A4.1 MECHANICAL UNIT SHALL BE SCREENED SEE DETAIL 4/A4.1 MECHANICAL UNIT SHALL BE SCREENED SEE DETAIL 4/A4.1 MECHANICAL UNIT SHALL BE SCREENED SEE DETAIL 4/A4.1 A3.1 ELEVATIONS 1/4" = 1'-0" POTTER Drawing Title Project No. Drawing No. Drawn Issued / Revised Architect Project GALLATIN COUNTY BOZEMAN CROSS ph. (406) 579-8450 312 Accola Drive, Bozeman, MT, 59715 F O C U S A R C H I T E C T S RENOVATION 12/18/15 100% License 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 N M L K J H G F E D C A B 1615141312111098754321 Contractor MONTANA PROJECT 1-11-16 BRETT R. POTTER 2599 BOZEMAN, MT Owner BOZEMAN, MT 59715 612 W. BEALL ST. CROSS RENOVATION PROJECT (303) 818-2296 12/27/15 100% 1/11/16 100% 1'-0" = 1/4" EXISTING SOUTH ELEVATION1 1'-0" = 1/4" EXISTING NORTH ELEVATION2 1'-0" = 1/4" NEW SOUTH ELEVATION3 1'-0" = 1/4" NEW NORTH ELEVATION4 1'-0" = 1/4" NEW WEST ELEVATION5 1'-0" = 1/4" NEW EAST ELEVATION6 NEW STOREFRONTNEW NIGHT SKY 6"MECHANICAL COMPRESSOR V.I.F.POWDER COATED DARK BRONZE METAL MECHANICAL SCREEN BOLTED INTO ROOF WITH GALVANIZED PANEL INSERTS, A TUBE STEEL FRAME, AND ACCESS GATE.2'-10"2'-6"2'-4"15"min.2'-6"2'-10"15"min.3'-6" KNEE SPACE HOT WATER PROTECTIVE LAV COVER 3'-5" 12"mx1'-6"4" RUBBER BASE KARNDEEN VINYL TILE FLOORING 48"" A.F.F. FIBERGLASS REINFORCED PANELS OVER 5/8" PAINTED GYPSUM WALL BOARD 48"" A.F.F. FIBERGLASS REINFORCED PANELS OVER 5/8" PAINTED GYPSUM WALL BOARD BATHROOM ELEV.BATHROOM ELEV. A4.1 EXTERIOR LIGHTING AND SIGNAGE VARIES POTTER Drawing Title Project No. Drawing No. Drawn Issued / Revised Architect Project GALLATIN COUNTY BOZEMAN CROSS ph. (406) 579-8450 312 Accola Drive, Bozeman, MT, 59715 F O C U S A R C H I T E C T S RENOVATION 12/18/15 100% License 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 N M L K J H G F E D C A B 1615141312111098754321 Contractor MONTANA PROJECT 1-11-16 BRETT R. POTTER 2599 BOZEMAN, MT Owner BOZEMAN, MT 59715 612 W. BEALL ST. CROSS RENOVATION PROJECT (303) 818-2296 12/27/15 100% 1/11/16 100% NTS EXISTING SOUTH ELEVATION1 NTS NIGHT SKY COMPLIANT EXTERIOR LIGHT FIXTURE2 NTS EXISTING MONUMENT SIGN #13 CITY SIGN CODE CALCULATIONS 48 LINEAL FEET OF BEALL STREET FRONTAGE 48 X 1.5 = 72SF OF SIGNAGE TOTAL BUILDING SIGNAGE AS PER NEW DESIGN AS FOLLOWS: EXISTING SIGN #1 = 32SF 72-32=40 SF REMAINING BEALL ST. UPDATE CONTENT TO EXISTING MONUMENT SIGN NTS MECHANICAL SCREEN DETAIL4 1/2" = 1'-0" ADA BATHROOM ELEVATIONS5 6'-538"24'-0"24'-0"48'-0" 5'-418"11'-0"17'-934"8'-6"5'-418" 5'-418"11'-478"6'-012"6'-038"5'-4"8'-6"5'-418"24'-0"48'-0"24'-0"48'-0" 5'-418"11'-0"11'-438"8'-6"5'-418" 5'-418"11'-478"6'-012"6'-038"5'-4"8'-6"5'-418"24'-0"48'-0" 6'-538"24'-0"24'-0"48'-0" 5'-418"11'-0"17'-934"8'-6"5'-418" 5'-418"11'-478"6'-012"6'-038"5'-4"8'-6"5'-418"24'-0"48'-0"24'-0"48'-0" 5'-418"11'-0"11'-438"8'-6"5'-418" 5'-418"11'-478"6'-012"6'-038"5'-4"8'-6"5'-418"24'-0"48'-0" E1.1 ELECTRICAL PLANS 1/4" = 1'-0" POTTER Drawing Title Project No. Drawing No. Drawn Issued / Revised Architect Project GALLATIN COUNTY BOZEMAN CROSS ph. (406) 579-8450 312 Accola Drive, Bozeman, MT, 59715 F O C U S A R C H I T E C T S RENOVATION 12/18/15 100% License 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 N M L K J H G F E D C A B 1615141312111098754321 Contractor MONTANA PROJECT 1-11-16 BRETT R. POTTER 2599 BOZEMAN, MT Owner BOZEMAN, MT 59715 612 W. BEALL ST. CROSS RENOVATION PROJECT (303) 818-2296 12/27/15 100% 1/11/16 100% LOWER LEVEL LIGHTING PLAN UPPER LEVEL LIGHTING PLAN LOWER LEVEL POWER PLAN UPPER LEVEL POWER PLAN 6'-538"24'-0"24'-0"48'-0" 5'-418"11'-0"17'-934"8'-6"5'-418" 5'-418"11'-478"6'-012"6'-038"5'-4"8'-6"5'-418"24'-0"48'-0"24'-0"48'-0" 5'-418"11'-0"11'-438"8'-6"5'-418" 5'-418"11'-478"6'-012"6'-038"5'-4"8'-6"5'-418"24'-0"48'-0" 6'-538"24'-0"24'-0"48'-0" 5'-418"11'-0"17'-934"8'-6"5'-418" 5'-418"11'-478"6'-012"6'-038"5'-4"8'-6"5'-418"24'-0"48'-0"24'-0"48'-0" 5'-418"11'-0"11'-438"8'-6"5'-418" 5'-418"11'-478"6'-012"6'-038"5'-4"8'-6"5'-418"24'-0"48'-0" E1.1 MECH/PLUMB PLANS 1/4" = 1'-0" POTTER Drawing Title Project No. Drawing No. Drawn Issued / Revised Architect Project GALLATIN COUNTY BOZEMAN CROSS ph. (406) 579-8450 312 Accola Drive, Bozeman, MT, 59715 F O C U S A R C H I T E C T S RENOVATION 12/18/15 100% License 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 N M L K J H G F E D C A B 1615141312111098754321 Contractor MONTANA PROJECT 1-11-16 BRETT R. POTTER 2599 BOZEMAN, MT Owner BOZEMAN, MT 59715 612 W. BEALL ST. CROSS RENOVATION PROJECT (303) 818-2296 12/27/15 100% 1/11/16 100% LOWER LEVEL MECHANICAL ZONES UPPER LEVEL MECHANICAL ZONES LOWER LEVEL PLUMBING PLAN UPPER LEVEL PLUMBING PLAN MINI-SPLIT HEAT PUMP ZONE HEATING & COOLING MINI-SPLIT HEAT PUMP ZONE HEATING & COOLING MINI-SPLIT HEAT PUMP ZONE HEATING & COOLING ELECTRIC WALL HEATER W/ THERMOSTAT ELECTRIC WALL HEATER W/ THERMOSTAT ELECTRIC WALL HEATER W/ THERMOSTAT MINI-SPLIT HEAT PUMP ZONE HEATING & COOLING MINI-SPLIT HEAT PUMP ZONE HEATING & COOLING MINI-SPLIT HEAT PUMP ZONE HEATING & COOLING