Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Bob Murray, Project Engineer
Rick Hixson, City Engineer
SUBJECT: 2014 Wastewater Collection System Facility Plan Update - Amendment No. 4
MEETING DATE: December 14th, 2015
AGENDA ITEM TYPE: Consent
RECOMMENDATION: Approve and authorize City Manager to sign Amendment No 4 to the
Professional Services Agreement.
BACKGROUND: Attached is a copy of the partially executed Amendment No. 4 with
Morrsion Maierle for the 2014 Wastewater Collection System Facility Plan Update. As part of
the plan update, a new hydraulic model of the system was created. Since that time,
approximately 110 manholes, associated sewer mains, and one lift station have been installed in
the system. The primary purpose of this amendment will be to add these components to the model and bring it up to date. Additionally, the consultant will provide training to city staff on
an as needed basis on the model. The intent is that once updated, staff will maintain and
continually update the model. This will allow informed decisions regarding sewer capacity to be
made as development proposals are received, and also reduce the effort required for future
updates to the Wastewater Facility Plan.
The document is in the City’s standard format.
UNRESOLVED ISSUES: None
ALTERNATIVES: As suggested by the City Commission
FISCAL EFFECTS: The cost of $11,688.12 for the model update and up to $2,817.50 for
training is included in the current GIS Contracted Services budget.
Attachments: Amendment No. 4
Report compiled on: 12/4/15