HomeMy WebLinkAboutC16. Water Impact Fee CIP
Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Anna Rosenberry, Administrative Services Director
SUBJECT: Adoption of the Water Impact Fee Fund Capital Improvement Plan
(CIP) for FY17-21.
AGENDA ITEM TYPE: Consent
MEETING DATE: December 14, 2015
RECOMMENDATION: Adopt the Water Impact Fee Fund Capital Improvement Plan
(CIP) for FY17-21.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th. The City’s Impact Fee
Advisory Committee (IFAC) met on November 17th and December 3rd to review and make
recommendations for the planned expenditures of Street Impact Fees. The Committee had no
quorum on December 3rd to make a vote; their general recommendations are embodied in this
plan.
Items of Note:
1. Under this plan, the Water Impact Fee Fund would be providing the Local Share in
advance of development for the WIF07, WIF21, WIF22, and WIF25 projects. These
projects are noted with an “*”.
o We anticipate that some of these payback amounts will come back to the Water
Impact Fee Fund as projects develop; but, for purposes of this plan we have not
270
relied on receiving any of that money to fund projects. This is a conservative
approach to a difficult-to-estimate cash flow.
o We anticipate a payback for “local share” of these projects would be made at the
time a development project is approved.
2. Debt service payments for WIF03 – 5.3MG Concrete Water Storage Reservoir project
have been added to the schedule, and increased to reflect the amount necessary to fund
the latest estimate of project costs. With preliminary engineering work completed, the
total project costs (design and engineering) are estimated at $8,820,000.
3. We have added items for water supply called “Groundwater Well Field.” This is an item
that will provide added water supply, as recommended by the City’s Integrated Water
Resource Plan. We anticipate we will need to borrow money for this project, backed by
the Water Fund, because cash is not expected to be available for this project.
o The related water rights issues will be funded with $1 million from Cash-In-Lieu
of Water Rights, as the Impact Fee program does not fund the acquisition of water
rights.
4. A new Water Impact Fee Study is included in this plan for FY17.
5. Revenues have been updated to reflect the 5-year average for Water Impact Fee
collections. Our annual collections in the most recent fiscal year (FY15) dipped slightly
below FY13’s amount. We estimate growth in revenues at 5% per year.
$-
$200,000.00
$400,000.00
$600,000.00
$800,000.00
$1,000,000.00
$1,200,000.00
$1,400,000.00
$1,600,000.00
$1,800,000.00
$2,000,000.00
2011 2012 2013 2014 2015 Average
Water Impact Fee Revenues
271
Revenue History - Water Impact Fees Amount Change
2011 $ 811,000.00 -
2012 $ 1,060,000.00 31%
2013 $ 1,726,000.00 63%
2014 $ 1,833,000.00 6%
2015 $ 1,663,000.00 -9%
Average 1,418,600.00
UNRESOLVED ISSUES: None.
ALTERNATIVES: As suggested by the City Commission. If the Commission is does
not wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda.
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY17.
Report compiled on: December 7, 2015
Attached: Draft Water Impact Fee Fund CIP
272
Water Impact Fee Capital Improvement Plan Financial SummaryCurrent YearFY16FY17FY18 FY19 FY20 FY21UnscheduledProjected Beginning Reserve Balance Dedicated to CIP(233,603)$ 666,115$ 20,365$ 663,865$ (675,898)$ (688,137)$ ‐$ Plus: Impact Fee Revenues Dedicated to CIP1,400,000$ 1,470,000$ 1,543,500$ 1,620,675$ 1,701,709$ 1,786,794$ ‐$ Plus: Loan for WIF14 ‐ 5.3MG Storage Reservoir8,820,000$ Plus: Loan for Well Field WIF19 & WIF201,000,000$ 2,000,000$ Plus: WIF19 ‐ Contribution from Cash in Lieu of Water Rights1,000,000$ Less: WTP Debt Service Final Payments(588,282)$ Less: Scheduled CIP Project Costs(8,732,000)$ (2,115,750)$ (2,900,000)$ (4,960,438)$ (1,713,948)$ (900,000)$ (44,361,600)$ Projected Year‐End Cash Dedicated to CIP666,115$ 20,365$ 663,865$ (675,898)$ (688,137)$ 198,657$ Assumptions Made for Revenue Estimates:Current YearFY16FY17FY18FY19 FY20 FY21Estimated Annual Water Impact Fee Revenues1,400,000$ 1,400,000$ 1,470,000$ 1,543,500$ 1,620,675$ 1,701,709$ Estimated Annual Increase0.0%5%5%5%5%5%Total Estimated Revenues1,400,000$ 1,470,000$ 1,543,500$ 1,620,675$ 1,701,709$ 1,786,794$ Current Revenues Dedicated to CIP %100.0%100.0% 100.0% 100.0% 100.0% 100.0% Plus: Increase Dedicated to Water Capacity Expansion CIP0.0%0.0%0.0%0.0% 0.0%0.0% Total % Dedicated to CIP100.0%100.0% 100.0% 100.0% 100.0% 100.0%Total Estimated Revenues Dedicated to CIP1,400,000$ 1,470,000$ 1,543,500$ 1,620,675$ 1,701,709$ 1,786,794$ ProjectedProjectedCURRENT50,000,00045,000,00040,000,00035,000,00030,000,00025,000,00020,000,00015,000,00010,000,0005,000,0000Water Impact Fee Projects 273
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY17UnscheduledFY21FY18FY19FY20Impact Fees WaterWIF05WATER IMPACTWEST WATER TRANSMISSION MAIN LOOP$28,617,600WIF07WATER IMPACTGRAF STREET EXTENSION*$701,929WIF09WATER IMPACT FEESCOTTONWOOD/STUCKY TRUNK MAIN LOOP$5,544,000WIF14WATER IMPACT FEES5.3MG CONRETE WATER STORAGE RESERVOIR ‐ DEBT PAYMENTS$600,000$600,000$6,800,000$600,000$600,000$600,000WIF17WATER IMPACT FEESLYMAN CREEK WATER SYSTEM IMPROVEMENTS ‐ CONSTRUCTION$2,000,000WIF18WATER IMPACT FEESLYMAN CREEK WATER SYSTEM IMPROVEMENTS ‐ DESIGN$270,000$300,000WIF19WATER IMPACT FEESGROUNDWATER WELL FIELD – LAND ACQUISITION, MITIGATION WATER AND WATER RIGHT PERMITTING$2,000,000WIF20WATER IMPACT FEESGROUNDWATER WELL FIELD DESIGN & CONSTRUCTION$2,000,000WIF21WATER IMPACTS 11TH (OPPORTUNITY TO ARNOLD)*$210,438WIF22WATER IMPACT FEESBAXTER LN (LASSO TO HARPERPUCKET) WATER MAIN EXTENSION*$493,821WIF23WATER IMPACTIMPACT FEE STUDY ‐ WATER$50,000WIF24WATER IMPACT FEESDEBT SERVICE ‐ WELL FIELD DEVELOPMENT$300,000$3,400,000$150,000$300,000WIF25WATER IMPACT FEESDAVIS LN (VALLEY CENTER TO CATAMOUNT ST)*$813,948$900,000$2,115,750$2,900,000$4,960,438$1,713,948$44,361,600Summary for Impact Fees Water (13 items)Totals by year:$900,000$2,115,750 $2,900,000$44,361,600FY21FY17FY18UnscheduledFY20$1,713,948$4,960,438FY19274
CIP Project Fund
Impact Fees Water
PROJECT NUMBER
WIF05
DEPARTMENT
WATER IMPACT FEES
PROJECT NAME
WEST WATER TRANSMISSION MAIN LOOP
FY17 FY18 Unscheduled
$28,617,600
DESCRIPTION OF PROJECT
Install a secondary trunk main from the WTP to the distribution network. The precise location of the required main is somewhat
flexible, but in general will be from Wagonwheel Road (extended) in S. 19th to Goldenstein to South 3rd to Nash Road.
ALTERNATIVES CONSIDERED
Do not build redundant transmission main.
ADVANTAGES OF APPROVAL
The city will be assured that water can be supplied even if one transmission main sustains damage and is offline for a number of days. The City
receives the majority of its water from the Water Treatment Plant through an existing 30 inch concrete transmission main. If this main is off-line
for any reason, the City will need to rely on storage from its three reservoirs. At 2005 water demand levels, storage reserves would be
depleted in three days during the average day demand, and in 24 hours during the maximum day demand. Not only will a second transmission
main provide the security of redundancy if the existing 30-inch main is removed from service, but the existing 30-inch main is expected to reach
capacity by the year 2020.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Impact Fees can not be spent on annual operations and maintenance costs. The Water Utility will see
incremental increases in general maintenance costs. Current cost estimate of $12,500 per water-main mile maintained annually.
FUNDING SOURCES
Impact Fees, developer contributions
New
Replacement
Equipment
Project
FY19 FY20 FY21
275
CIP Project Fund
Impact Fees Water
PROJECT NUMBER
WIF07
DEPARTMENT
WATER IMPACT FEES
PROJECT NAME
GRAF STREET EXTENSION*
FY17
$701,929
FY18 Unscheduled
DESCRIPTION OF PROJECT
This project is to extend Water Mains below Graf Street approximately ¼ mile in order to connect infrastructure east from 19th
Avenue. This is an important connection for public safety purposes – allowing fire service to meet their response time
requirements in areas where they currently cannot. The Water infrastructure should be installed at the same time the street
connection is made.
ALTERNATIVES CONSIDERED
Do nothing and wait for development to connect the infrastructure.
ADVANTAGES OF APPROVAL
Improves distribution network
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Routine annual maintenance
FUNDING SOURCES
100% Water Impact Fee – to be recovered by developer payback.
New
Replacement
Equipment
Project
FY19 FY20 FY21
276
CIP Project Fund
Impact Fees Water
PROJECT NUMBER
WIF09
DEPARTMENT
WATER IMPACT FEES
PROJECT NAME
COTTONWOOD/STUCKY TRUNK MAIN LOOP
FY17 FY18 Unscheduled
$5,544,000
DESCRIPTION OF PROJECT
Installation of a trunk water main loop from the intersection of Cottonwood and Huffine Lane south to Stucky Road then east to
South 19th Avenue.
ALTERNATIVES CONSIDERED
Postpone installation to some future time. It is unlikely that such an ambitious and expensive project could or would be installed by the
concerted effort of private developers. Even if that were to happen, the City would be asked to participate in the oversizing of these mains, all
of which exceed the local 8” diameter requirement.
ADVANTAGES OF APPROVAL
Provides the water main backbone which will support future growth In a large area of the City.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Incremental increase in the cost of operation and maintenance
FUNDING SOURCES
Impact fees, developer contribution for local equivalent share.
New
Replacement
Equipment
Project
FY19 FY20 FY21
277
CIP Project Fund
Impact Fees Water
PROJECT NUMBER
WIF14
DEPARTMENT
WATER IMPACT FEES
PROJECT NAME
5.3MG CONRETE WATER STORAGE RESERVOIR - DEBT PAYMENTS
FY17
$600,000
FY18
$600,000
Unscheduled
$6,800,000
DESCRIPTION OF PROJECT
Repayment of debt used to finance construction of WIF03 - 5.3 Million Gallon Concrete Water Storage Reservoir.
ALTERNATIVES CONSIDERED
The water facility plan reviewed numerous options. This is the preferred alternative of the adopted plan.
ADVANTAGES OF APPROVAL
Increased water storage to meet the needs of our growth community, and the requirement of MDEQ. Increased system water
pressure in the southern part of the City.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Requires minimal operation and maintenance. Checking of valves, level sensors and vents on an annual basis and diver inspection
and vacuuming every five years. Estimated at $4,000 annually.
FUNDING SOURCES
100% Water Impact Fees
New
Replacement
Equipment
Project
FY19
$600,000
FY20
$600,000
FY21
$600,000
278
CIP Project Fund
Impact Fees Water
PROJECT NUMBER
WIF17
DEPARTMENT
WATER IMPACT FEES
PROJECT NAME
Lyman Creek Water System Improvements - Construction
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
Construction of Lyman Creek water system improvements including well infrastructure to expand the firm yield of the Lyman
Creek water source, if results of the Phase 2 PER are favorable, as well as construction of water storage infrastructure to replace
the existing Lyman Creek Reservoir. $7,000,000 project total, $2,000,000 in Water Impact Fees and $5,000,000 in Water Funds
ALTERNATIVES CONSIDERED
Alternatives considered with the Lyman Creek PER and Lyman Creek Water System Improvements design projects.
ADVANTAGES OF APPROVAL
The project implements the Integrated Water Resources Plan to expand the capacity of the Lyman Creek water supply system making additional
water available for the future needs of the City. Replacing the Lyman Creek Reservoir is crucial to the efficient and effective operation of the
overall water utility.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Currently unknown
FUNDING SOURCES
$2,000,000 Water Impact Fees
New
Replacement
Equipment
Project
FY19
$2,000,000
FY20 FY21
279
CIP Project Fund
Impact Fees Water
PROJECT NUMBER
WIF18
DEPARTMENT
WATER IMPACT FEES
PROJECT NAME
Lyman Creek Water System Improvements - Design
FY17
$270,000
FY18
$300,000
Unscheduled
DESCRIPTION OF PROJECT
Design of the Lyman Creek water system improvements will be built upon Phase I and Phase 2 of the Lyman Creek Preliminary
Engineering Report, completed in FY16 and FY17 respectively. The preliminary engineering report findings will set forth
infrastructure recommendations to the Lyman Creek system to expand the firm production yield of the Lyman Creek supply
source should exploration well drilling completed in Phase 2 of the PER phase yield favorable results. Furthermore, the existing
Lyman Creek Reservoir is nearing the end of its useful life and is in need of replacement. This project will complete engineering
design for the Lyman Creek water system as a whole, including the siting and design of a replacement water storage reservoir.
ALTERNATIVES CONSIDERED
Depending on the results of the exploration well drilling completed with Phase 2 PER, the Lyman Creek water system improvements design
project may be limited to a replacement water storage reservoir only.
ADVANTAGES OF APPROVAL
The project implements the Integrated Water Resources Plan to expand the capacity of the Lyman Creek water supply system making additional
water available for the future needs of the City. Replacing the Lyman Creek Reservoir is crucial to the efficient and effective operation of the
overall water utility.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Currently unknown
FUNDING SOURCES
100% Water Impact Fees
New
Replacement
Equipment
Project
FY19 FY20 FY21
280
CIP Project Fund
Impact Fees Water
PROJECT NUMBER
WIF19
DEPARTMENT
WATER IMPACT FEES
PROJECT NAME
Groundwater Well Field – Land Acquisition, Mitigation Water and Water Right Permitting
FY17 FY18
$2,000,000
Unscheduled
DESCRIPTION OF PROJECT
Project consists of three components: 1) Purchase land for construction and operation of a municipal groundwater well field; 2)
Obtaining mitigation water necessary to implement a DNRC-approved mitigation plan; and 3) Water right permitting to obtain a
beneficial water use permit, the legal water rights necessary to operate a municipal groundwater well. Cash in Lieu of Water
Rights will contribute for the purchase of water rights.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
The project puts critical elements in place needed in advance of the actual final design and construction of a groundwater well field.
Groundwater is indentified in the Integrated Water Resources Plan as an important source of new water to meet the City’s future water supply
needs.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Currently unknown
FUNDING SOURCES
50% Water Impact Fees - 50% Cash in lieu of water rights
New
Replacement
Equipment
Project
FY19 FY20 FY21
281
CIP Project Fund
Impact Fees Water
PROJECT NUMBER
WIF20
DEPARTMENT
WATER IMPACT FEES
PROJECT NAME
Groundwater Well Field Design & Construction
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
Design and construction of a municipal groundwater wellfield including wells, pumps, industrial and automation controls,
disinfection facilities, control building, primary and backup power supply, and transmission main connection to the existing
municipal water distribution system.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Adds new source of water supply to the City of Bozeman, pursuant to the Integrated Water Resources Plan, to meet the City’s future water
supply needs.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Currently unknown
FUNDING SOURCES
100% Water Impact Fees
New
Replacement
Equipment
Project
FY19
$2,000,000
FY20 FY21
282
CIP Project Fund
Impact Fees Water
PROJECT NUMBER
WIF21
DEPARTMENT
WATER IMPACT FEES
PROJECT NAME
S 11TH (OPPORTUNITY TO ARNOLD)*
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
Install a new 8” water main along S. 11th from Opportunity to Arnold.
ALTERNATIVES CONSIDERED
Do nothing and wait for development to connect the infrastructure.
ADVANTAGES OF APPROVAL
Improves distribution network.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Routine operating and maintenance.
FUNDING SOURCES
WATER IMPACT FEES, to eventually recover local share via a payback district (estimated at $210,438).
New
Replacement
Equipment
Project
FY19
$210,438
FY20 FY21
283
CIP Project Fund
Impact Fees Water
PROJECT NUMBER
WIF22
DEPARTMENT
WATER IMPACT FEES
PROJECT NAME
BAXTER LN (LASSO TO HARPERPUCKET) WATER MAIN EXTENSION*
FY17
$493,821
FY18 Unscheduled
DESCRIPTION OF PROJECT
Install a new 12" water main along Baxter Ln from Lasso to Harperpucket. This is a recommended project from the Water
Facility Plan to provide increased capacity.
ALTERNATIVES CONSIDERED
Do nothing and wait for development to connect the infrastructure.
ADVANTAGES OF APPROVAL
Provides increased capacity
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Incremental increase in the cost of operation and maintenance
FUNDING SOURCES
Water Impact Fees, with some Local Share recovered via payback district
New
Replacement
Equipment
Project
FY19 FY20 FY21
284
CIP Project Fund
Impact Fees Water
PROJECT NUMBER
WIF23
DEPARTMENT
WATER IMPACT FEES
PROJECT NAME
IMPACT FEE STUDY - WATER
FY17
$50,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
Update to the current Fee Study.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Impact Fees, developer contributions
New
Replacement
Equipment
Project
FY19 FY20 FY21
285
CIP Project Fund
Impact Fees Water
PROJECT NUMBER
WIF24
DEPARTMENT
WATER IMPACT FEES
PROJECT NAME
DEBT SERVICE - WELL FIELD DEVELOPMENT
FY17 FY18 Unscheduled
$3,400,000
DESCRIPTION OF PROJECT
This items is for the repayment of the loan that financed the groundwater well-field design and construciton.
ALTERNATIVES CONSIDERED
Once issued, the debt will need to be repaid.
ADVANTAGES OF APPROVAL
Debt financing helps to provide the cash necessary to complete the project, and spread payments over time.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Water Impact Fees. However, this debt will need to be "backed" or guaranteed by the Water Utility Fund. If Impact Fee collections
aren't sufficient, the Water Utility will need to make the payment.
New
Replacement
Equipment
Project
FY19
$150,000
FY20
$300,000
FY21
$300,000
286
CIP Project Fund
Impact Fees Water
PROJECT NUMBER
WIF25
DEPARTMENT
WATER IMPACT FEES
PROJECT NAME
DAVIS LN (VALLEY CENTER TO CATAMOUNT ST)*
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
Install a 12" water main
ALTERNATIVES CONSIDERED
Wait for adjacent development to occur. Install at a later date.
ADVANTAGES OF APPROVAL
Provides service to an increased area and improves overall network performance.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Routine operating and maintenance
FUNDING SOURCES
Water Impact Fees, with some Local Share recovered via payback district.
New
Replacement
Equipment
Project
FY19 FY20
$813,948
FY21
287