HomeMy WebLinkAboutC14. Wastewater Fund CIP Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Anna Rosenberry, Administrative Services Director SUBJECT: Adopt the Wastewater Fund Capital Improvement Plan (CIP) for Fiscal Years 2017-2021. AGENDA ITEM TYPE: Consent MEETING DATE: December 14, 2015 RECOMMENDATION: Adopt the Wastewater Fund Capital Improvement Plan (CIP) for Fiscal Years 2017-2021. BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital Improvements Plan and submit it to the Commission by December 15th. Similar to recent years past, we are bringing the various parts of the plan forward as items on the Consent agenda. We will be prepared to address questions, if they arise, at the public meeting. The Public Works, City Manager, and other city staff met in October to develop the attached Capital Plan for the equipment and capital needs of the Wastewater Fund. The Wastewater Fund CIP tracks the capital equipment replacements and construction projects for Wastewater Operations (collection system) and the Water Reclamation Facility (WRF). Item of Note: • After review of the allocation of vehicle replacements for the Water Operations department in the Water Fund, we moved a number of vehicles to the Wastewater Fund 201 for replacement. The Water Operations and Wastewater Operations crews function as one unit and share equipment that is purchased by both funds. • PW02: Shops Facility Expansion Construction has been added to both the Water and Wastewater Fund, totaling $700,000 (50/50 split), to allow for an addition to our space available for shops crews and equipment. • WW73 – Wastewater Rate Study was added ($50,000). We are conducting a similar study in for the water system this year and would like to follow with a wastewater study. • WW71 – Facility Master Plan Update has been added ($150,000). • Numerous other items have been adjusted or added based on current projections. UNRESOLVED ISSUES: None. ALTERNATIVES: As suggested by the City Commission. If the Commission does not wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda. FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for FY17. Report compiled on: December 7, 2015 Attached: Wastewater Fund CIP 202 Wastewater Fund Capital Improvement PlanFinancial SummaryCurrent YearFY16FY17FY18 FY19 FY20 FY21UnscheduledProjected Beginning Reserve Balance Dedicated to CIP 1,112,180$     1,354,455$         1,137,472$      827,589$        1,562,035$  2,204,589$     ‐$                     Plus:  Wastewater Revenues Dedicated to CIP1,864,094$     1,920,017$         1,977,617$      2,036,946$     2,098,054$  2,160,996$     ‐$                     Less:  Scheduled CIP Project Costs(1,621,819)$    (2,137,000)$       (2,287,500)$    (1,302,500)$   (1,455,500)$ (1,182,500)$   (16,853,703)$   Projected Year‐End Cash Dedicated to CIP1,354,455$     1,137,472$         827,589$         1,562,035$     2,204,589$  3,183,085$     (16,853,703)$   Assumptions Made for Revenue Estimates:Current YearFY16FY17FY18FY19 FY20 FY21Estimated Annual Wastewater Revenues7,456,376$       7,456,376$           7,680,067$       7,910,469$       8,147,783$    8,392,217$         Estimated Annual Increase0.0%3%3%3%3%3%Total Estimated Revenues7,456,376$       7,680,067$           7,910,469$       8,147,783$       8,392,217$    8,643,983$       Current Revenues Dedicated to CIP %25.0%25.0% 25.0% 25.0% 25.0% 25.0%  Plus:  Increase Dedicated to CIP0.0%0.0%0.0%0.0% 0.0%0.0%  Total % Dedicated to CIP25.0%25.0% 25.0% 25.0% 25.0% 25.0%Total Estimated Revenues Dedicated to CIP1,864,094$       1,920,017$           1,977,617$       2,036,946$       2,098,054$    2,160,996$       ProjectedProjectedCURRENT18,000,00016,000,00014,000,00012,000,00010,000,0008,000,0006,000,0004,000,0002,000,0000Wastewater Fund Projects & Equipment 203 CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY17UnscheduledFY21FY18FY19FY20Wastewater FundGF227FINANCEERP REPLACEMENT "SUNGARD REPLACEMENT/UPGRADE"$333,333$333,333Wastewater FundWW27WRFWATERSHED STUDY & STREAM MODELING$60,000$200,000$60,000$60,000$60,000WW28WRFDESIGN PHASE II ‐ WRF PLANT IMPROVEMENTS$5,230,000WW29WRFMETHANE COGENERATION PROJECT DESIGN$350,000WW35WRFCOMMERCIAL MOWER$13,000WW39WRFSANDBLAST & PAINT CLARIFIER DRIVES, BEACH, BAFFLES & WEIRS$85,000$90,000$90,000WW42WRFPRIMARY CLARIFIER COVER$1,050,000WW44WRFFLOTATION THINKENER$500,000WW45WRFFINAL CLARIFIER LAUNDER COVER$40,000$40,000WW49WRFROLL‐OFF BUILDING AND 2ND SCREW PRESS & SCREW PRESS ENCLOSURE$600,000WW50WRFREFRIGERATED AUTOMATIC SAMPLERS$30,000WW53WRFPOSITIVE DISPLACEMENT LOBE PUMP$20,000$20,000$20,000WW58WRFCHIP SEAL WRF ASPHALT$47,370WW59WRFSPLITTER STRUCTURE AIR DIFFUSER$15,000WW60WRFNUTRIENT RECOVERY PROCESS CONSTRUCTION$2,000,000WW61WRFONLINE AMMONIA PROBES$35,000WW62WRFMETHANE COGENERATION PROJECT CONSTRUCTION$2,200,000WW66WRFODOR CONTROL FOR OLD PRETREATMENT BUILDINGS$15,000WW67WRFCONVERT BIO‐TRAIN #1 TO 5 STAGE BARDENPHO$5,000,000204 CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY17UnscheduledFY21FY18FY19FY20WW68WRFSECONDARY LAUNDER COVER$30,000$30,000$30,000WW69WRFWRF FACILITY R & R$50,000$50,000$50,000$50,000$50,000WW70WRFWRF FACILITY ENGINEERING & OPTIMIZATION$50,000$50,000$50,000$50,000$50,000WW71WRFWRF FACILITY MASTER PLAN UPDATE$150,000$160,000$510,000$1,090,000$280,000$160,000$16,470,370Wastewater FundGF262WW OPSPAVING AT SHOPS$37,500PW01 ‐ SHWW OPSSHOPS FACILITY EXPANSION PLAN$10,000PW02 ‐ SHWW OPSSHOPS FACILITY EXPANSION CONSTRUCTION$350,000STR67WW OPSCOVERED STORAGE AT SHOPS COMPLEX$50,000WW07WW OPSANNUAL PIPE REPLACEMENT PROGRAM ‐ DESIGN$22,500$22,500$22,500$22,500$22,500WW08‐17WW OPSWASTEWATER PIPE REPLACEMENT PROGRAM ‐ FY17$1,000,000WW08‐18WW OPSWASTEWATER PIPE REPLACEMENT PROGRAM ‐ FY18$1,000,000WW08‐19WW OPSWASTEWATER PIPE REPLACEMENT PROGRAM ‐ FY19$1,000,000WW08‐20WW OPSWASTEWATER PIPE REPLACEMENT PROGRAM ‐ FY20$1,000,000WW08‐21WW OPSWASTEWATER PIPE REPLACEMENT PROGRAM ‐ FY21$1,000,000WW52WW OPSREPLACE #2683 ‐ 1999 JOHN DEERE 310SE BACKHOE$105,000WW54WW OPSREPLACE #1783 ‐ 1995 FORD DUMP TRUCK$95,000WW55WW OPSREPLACE #3232 ‐ 2004 3/4 TON FORD PICKUP$33,000WW63WW OPSCHEMICAL ROOT CONTROL APPLICATOR$45,000WW64WW OPSSEWER FLOW METER$15,000WW65WW OPSDIGITAL UNIVERSAL CAMERA DUC$70,000205 CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY17UnscheduledFY21FY18FY19FY20WW73WW OPSRATE STUDY ‐ WASTEWATER$50,000WW74WW OPSREPLACE #2915 ‐ 2001 1 TON DODGE FLATBED/VALVE TRUCK$70,000WW75WW OPSREPLACE #1677 ‐ 1995 CHEVY S‐10 PICKUP$27,000WW76WW OPSREPLACE #3030 ‐ 2001 JOHN DEERE SKID STEER$40,000WW77WW OPSREPLACE #3157 ‐ 2003 STERLING DUMP TRUCK$105,000$1,022,500$1,627,000$1,197,500$1,022,500$1,295,500$50,000Summary for  Wastewater Fund (44 items)Totals by year:$1,182,500$2,137,000 $2,287,500$16,853,703FY21FY17FY18UnscheduledFY20$1,455,500$1,302,500FY19206 CIP Project Fund Wastewater Fund PROJECT NUMBER GF227 DEPARTMENT FINANCE PROJECT NAME ERP REPLACEMENT "SUNGARD REPLACEMENT/UPGRADE" FY17 FY18 Unscheduled $333,333 DESCRIPTION OF PROJECT Replacing/upgrading the current system installed in 1999. This is the system that runs all the financial, community development, land records, utility and business license applications. ALTERNATIVES CONSIDERED Continue running current SunGard package. Use SunGard.net (NaviLine EDGE) as an improvement to the current system, but not a full replacement. ADVANTAGES OF APPROVAL Simplified package. Easier to integrate the various applications/programs. Easier to pull out information for end users. Easier compiliation of Commission reports and packets for Community Development. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Unknown. Dependent on the option chosen. FUNDING SOURCES General Fund 33%; Water Fund 33%; Wastewater Fund 33% New Replacement Equipment Project FY19 FY20 FY21 207 CIP Project Fund Wastewater Fund PROJECT NUMBER GF262 DEPARTMENT WW OPS PROJECT NAME PAVING AT SHOPS FY17 $37,500 FY18 Unscheduled DESCRIPTION OF PROJECT Demolish and replace old asphalt. The existing parking lot tends to be very muddy as it’s only partially paved. Paving the lot will reduce the amount of sediment leaving the site and going into Bozeman Creek. This project is phase 2 of CIP project GF237 approved for FY16, installation of stormwater system improvements at the Shops Complex. ALTERNATIVES CONSIDERED Do nothing and risk overwhelming the new stormwater infrastructure. ADVANTAGES OF APPROVAL This will allow the City to meet Stormwater permit goals and requirements. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 25% Street Maintenance, 25% Water Funds, 25% Wastewater Funds and 25% General Fund (Parks) New Replacement Equipment Project FY19 FY20 FY21 208 CIP Project Fund Wastewater Fund PROJECT NUMBER PW01 - SH DEPARTMENT WW OPS PROJECT NAME SHOPS FACILITY EXPANSION PLAN FY17 $10,000 FY18 Unscheduled DESCRIPTION OF PROJECT The construction of the new Vehicle Maintenance Shop at the Lower Yards on Rouse Avenue in FY10/FY11 was Phase I in expanding and improving our ability to service equipment, store vehicles, and provide work space for Public Works, Parks, and Facilitiy services. Questions remain about the long-term plan for construction, location, and expansion for: Streets, Sign & Signal, Forestry, Water/Sewer Operations, Solid Waste Collection & Recycling, Facilities, and Parks & Cemetery departments. This project would develop a master plan. In scheduling this project, we are recommending waiting until after the Vehicle Maintenance Division is relocated to its new shop and the interior improvements are made to the Shop at Rouse and Tamarack Street for the remaining divisions. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES From related divisions: General Fund 20% ($10,000), Water Fund 20% ($10,000), Wastewater Fund 20% ($10,000), Street Maintenance Fund 20% ($10,000), Solid Waste Fund 20% ($10,000). New Replacement Equipment Project FY19 FY20 FY21 209 CIP Project Fund Wastewater Fund PROJECT NUMBER PW02 - SH DEPARTMENT WW OPS PROJECT NAME SHOPS FACILITY EXPANSION CONSTRUCTION FY17 $350,000 FY18 Unscheduled DESCRIPTION OF PROJECT The City Shops currently houses Water Operations, Wastewater Operations, Streets and Parks and is at full capacity. The Vehicle Maintenance Shop on North Rouse was originally intended to have two phases but only one has been completed. This project would allow Public Works to look at other options to open up space at the existing location. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 50/50 Water and Wastewater Utility Share New Replacement Equipment Project FY19 FY20 FY21 210 CIP Project Fund Wastewater Fund PROJECT NUMBER STR67 DEPARTMENT WW OPS PROJECT NAME Covered Storage at Shops Complex FY17 FY18 Unscheduled $50,000 DESCRIPTION OF PROJECT Covered storage at the Shops Complex to allow for storage of vehicles and equipment. ALTERNATIVES CONSIDERED Continue storing millions of dollars worth of equipment in the elements. ADVANTAGES OF APPROVAL Building covered storage for all vehicles and equipment currently parked at the City Shops will help keep this equipment out of the weather thus prolonging the life of the equipment. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Minimal Maintenance Costs FUNDING SOURCES Cost will be split between Water Operations (25%), Wastewater Operations (25%) and Streets (50%) New Replacement Equipment Project FY19 FY20 FY21 211 CIP Project Fund Wastewater Fund PROJECT NUMBER WW07 DEPARTMENT WW OPS PROJECT NAME ANNUAL PIPE REPLACEMENT PROGRAM - DESIGN FY17 $22,500 FY18 $22,500 Unscheduled DESCRIPTION OF PROJECT This item provides for design work to be completed every-other year, in anticipation of the Annual System Upgrades. As the Wastewater Operations Division televises (views) the existing system, maintenance projects become apparent. As annual televising continues, other more-urgent projects may be identified and designed under this project heading. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Provides for design of necessary sewer system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Wastewater Utility Fund New Replacement Equipment Project FY19 $22,500 FY20 $22,500 FY21 $22,500 212 CIP Project Fund Wastewater Fund PROJECT NUMBER WW08-17 DEPARTMENT WW OPS PROJECT NAME WASTEWATER PIPE REPLACEMENT PROGRAM - FY17 FY17 $1,000,000 FY18 Unscheduled DESCRIPTION OF PROJECT This project would complete design, bid and begin construction in the Spring/Summer of 2017. $149,603 of the project will cover E Olive from Black to Church to correspond with the FY18 street reconstruction on E Olive. $233,046 will cover W Koch from 8th to Grand to correspond with the FY23 street reconstruction on W Koch. The balance of $617,351 will be used to slip line and or replace some of the remaining deferred maintenance identified in the 2015 deferred maintenance exercise (40.1 miles @ $19.2M as of 11/19/15). ALTERNATIVES CONSIDERED None ADVANTAGES OF APPROVAL Provides for the construction of necessary sewer system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED This project results in a net decrease in overall maintenance costs over the lifecycle of all pipes. FUNDING SOURCES 100% Wastewater Utility Fund New Replacement Equipment Project FY19 FY20 FY21 213 CIP Project Fund Wastewater Fund PROJECT NUMBER WW08-18 DEPARTMENT WW OPS PROJECT NAME WASTEWATER PIPE REPLACEMENT PROGRAM - FY18 FY17 FY18 $1,000,000 Unscheduled DESCRIPTION OF PROJECT This project would complete design, bid and begin construction in the Spring/Summer of 2018. $91,959 will cover S Black from College to the southern cul-de-sac to coincide with the FY19 street reconstruction on S Black. The balance of $908,041 will be used to slip line and or replace some of the remaining deferred maintenance identified in the 2015 deferred maintenance exercise (40.1 miles @ $19.2M as of 11/19/15). ALTERNATIVES CONSIDERED None ADVANTAGES OF APPROVAL Provides for the construction of necessary sewer system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED This project results in a net decrease in overall maintenance costs over the lifecycle of all pipes. FUNDING SOURCES 100% Wastewater Utility Fund New Replacement Equipment Project FY19 FY20 FY21 214 CIP Project Fund Wastewater Fund PROJECT NUMBER WW08-19 DEPARTMENT WW OPS PROJECT NAME WASTEWATER PIPE REPLACEMENT PROGRAM - FY19 FY17 FY18 Unscheduled DESCRIPTION OF PROJECT This project would complete design, bid and begin construction in the Spring/Summer of 2019. $218,049 will cover S Tracy from Babcock to College to coincide with the FY20 street reconstruction on S Tracy. The balance of $781,951 will be used to slip line and or replace some of the remaining deferred maintenance identified in the 2015 deferred maintenance exercise (40.1 miles @ $19.2M as of 11/19/15). ALTERNATIVES CONSIDERED None ADVANTAGES OF APPROVAL Provides for the construction of necessary sewer system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED This project results in a net decrease in overall maintenance costs over the lifecycle of all pipes. FUNDING SOURCES 100% Wastewater Utility Fund New Replacement Equipment Project FY19 $1,000,000 FY20 FY21 215 CIP Project Fund Wastewater Fund PROJECT NUMBER WW08-20 DEPARTMENT WW OPS PROJECT NAME WASTEWATER PIPE REPLACEMENT PROGRAM - FY20 FY17 FY18 Unscheduled DESCRIPTION OF PROJECT This project would complete design, bid and begin construction in the Spring/Summer of 2020. $78,329 will cover N Tracy from Villard to Peach to coincide with the FY21 street reconstruction on S Tracy. The balance of $921,671 will be used to slip line and or replace some of the remaining deferred maintenance identified in the 2015 deferred maintenance exercise (40.1 miles @ $19.2M as of 11/19/15). ALTERNATIVES CONSIDERED None ADVANTAGES OF APPROVAL Provides for the necessary sewer system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED This project results in a net decrease in overall maintenance costs over the lifecycle of all pipes. FUNDING SOURCES 100% Wastewater Utility New Replacement Equipment Project FY19 FY20 $1,000,000 FY21 216 CIP Project Fund Wastewater Fund PROJECT NUMBER WW08-21 DEPARTMENT WW OPS PROJECT NAME WASTEWATER PIPE REPLACEMENT PROGRAM - FY21 FY17 FY18 Unscheduled DESCRIPTION OF PROJECT This project would complete design, bid and begin construction in the Spring/Summer of 2021. The money will be used to slip line and or replace some of the remaining deferred maintenance identified in the 2015 deferred maintenance exercise (40.1 miles @ $19.2M as of 11/19/15). ALTERNATIVES CONSIDERED None ADVANTAGES OF APPROVAL Provides for the construction of necessary sewer system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED This project results in a net decrease in overall maintenance costs over the lifecycle of all pipes. FUNDING SOURCES 100% Wastewater Utility Fund New Replacement Equipment Project FY19 FY20 FY21 $1,000,000 217 CIP Project Fund Wastewater Fund PROJECT NUMBER WW27 DEPARTMENT WRF PROJECT NAME WATERSHED STUDY & STREAM MODELING FY17 $200,000 FY18 $60,000 Unscheduled DESCRIPTION OF PROJECT Develop a comprehensive, multi-year watershed study and computer model for the East Gallatin River which would enable the City and DEQ to better determine stream load allocations and develop a more scientifically valid TMDL for the river segment we discharge to. This will require annual field sample collection, laboratory analytical work and detailed computer modeling using calibrated data. This multi-year study would consist of $45,000 in consulting and computer modeling fees for at least two fiscal years (FY14 and FY15) and stream sampling/lab fees of $15,000 each year. Craig recommends we should be prepared to continue this work beyond FY15 as necessary. ALTERNATIVES CONSIDERED Not undertake this work and risk having to accept the TMDL and waste load allocations the DEQ has proposed in their original draft documents. This decision could greatly limit our ability to appeal future nutrient limitations and could result in non-compliance. ADVANTAGES OF APPROVAL This watershed study will greatly enhance the City’s understand of our impact on the East Gallatin River and enable us to more successfully negotiate future permit limitations with the DEQ. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED None, unless additional stream sampling is desired in subsequent years. FUNDING SOURCES 100% Wastewater Fund New Replacement Equipment Project FY19 $60,000 FY20 $60,000 FY21 $60,000 218 CIP Project Fund Wastewater Fund PROJECT NUMBER WW28 DEPARTMENT WRF PROJECT NAME DESIGN PHASE II - WRF PLANT IMPROVEMENTS FY17 FY18 Unscheduled $5,230,000 DESCRIPTION OF PROJECT In January 2006 Morrison & Maierle Consulting Engineers completed a comprehensive Wastewater Facilities Plan. The plan recommends the City proceed with a 3-phased project schedule that includes the construction of the new Water Reclamation Facility (WRF), capable of handling our increased flows while also reducing the amount of Total Nitrogen discharged to the East Gallatin River. Phase two is expected to include one new primary clarifier, more BNR reactor basins, clarifiers, tertiary membrane filtration, liquid sludge storage tanks, anaerobic digestion, and an effluent re-use pumping station. The capacity expanding (impact fee eligible) elements are: bioreactor basins, clarifiers, and pumping station. It is possible that this phase of the project could be further divided into phase 2A and phase 2B, if necessary. ALTERNATIVES CONSIDERED A variety of treatment technologies and alternatives are presented in the January 2006 Wastewater Facilities Plan. ADVANTAGES OF APPROVAL Major capital expansion of the Bozeman WRF will enable the City to meet its estimated demand for wastewater services and still produce a high quality effluent that is in full compliance with the City’s MPDES discharge permit. Expansion of the Bozeman WRF is consistent with the City’s long-term need to accommodate rapid growth and economic development in the Gallatin Valley. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating & Maintenance Costs: no estimates at this time. FUNDING SOURCES Total Design Cost: $5,230,000. We estimate the majority of the project costs are related to regulation and maintenance issues and would be borne by the Utility Fund. Half are related to capacity expansion, and would be borne by Impact Fees. 50% Wastewater Fund, 50% Wastewater Impact Fee Fund. New Replacement Equipment Project FY19 FY20 FY21 219 CIP Project Fund Wastewater Fund PROJECT NUMBER WW29 DEPARTMENT WRF PROJECT NAME METHANE COGENERATION PROJECT DESIGN FY17 FY18 Unscheduled $350,000 DESCRIPTION OF PROJECT Consistent with the goals of the City’s Climate Action Plan & Sustainability Programs, the Bozeman WRF staff and Public Works Director recommend we move forward with our proposed investigation and installation of a methane recovery and co- generation system. This system will produce an average of 175 kW of electricity and 974,000 BTU/hour of thermal output using a generator powered entirely by WRF digester gas. This project has the potential to save the City at least $180,000 in electricity costs and substantially lower the carbon footprint of the new Bozeman WRF. This project would be implemented in 3 phases including (1) a feasibility / cost effectiveness study, (2) project engineering / design and (3) the purchase and installation of appropriate technology for the co-generation of electricity at the Bozeman WRF. Year 1: Project Feasibility Study. Year 2: Project Engineering Design - $350,000. Year 3: Equipment Purchase and Installation - $2,200,000. ALTERNATIVES CONSIDERED Continue to flare our digester methane gas. Micro-turbines and fuel-cells have been analysed and continue to be possible alternative energy recovery technologies for this project. Our research to date suggests the most proven technology currently available to help us accomplish our energy recovery goals is likely to be a GE Jenbacher internal combustion engine and heat recovery system. ADVANTAGES OF APPROVAL Current plant waste gases will be captured and utilized to reduce plant operating costs. The project has an estimated net dollar savings of $230,000 per year. It supports the City's Municipal Climate Action Plan goals. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Once construction is funded, this project results in an estimated net dollar SAVINGS of $230,000/year. FUNDING SOURCES Wastewater Fund, other grants or community partners. New Replacement Equipment Project FY19 FY20 FY21 220 CIP Project Fund Wastewater Fund PROJECT NUMBER WW35 DEPARTMENT WRF PROJECT NAME COMMERCIAL MOWER FY17 FY18 Unscheduled $13,000 DESCRIPTION OF PROJECT Replacement of 2001 Mower for use on the WRF grounds. ALTERNATIVES CONSIDERED Continue replacing parts as needed. ADVANTAGES OF APPROVAL Replacement parts will become more difficult to find as the mower ages. The increasing maintenance will mean less time for groundskeeping. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED No additional operating costs. May reduce maintenance costs. FUNDING SOURCES Wastewater Funds. New Replacement Equipment Project FY19 FY20 FY21 221 CIP Project Fund Wastewater Fund PROJECT NUMBER WW39 DEPARTMENT WRF PROJECT NAME SANDBLAST & PAINT CLARIFIER DRIVES, BEACH, BAFFLES & WEIRS FY17 $85,000 FY18 $90,000 Unscheduled DESCRIPTION OF PROJECT Sandblast and paint old clarifier drives, beaches, baffles weirs. ALTERNATIVES CONSIDERED Do nothing ADVANTAGES OF APPROVAL Replace lost & chipping paint on old clarifiers to prevent further deterioration of existing infrastructure. These clarifiers have not been painted since they were installed in 1985. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED No new operating costs. FUNDING SOURCES Wastewater Funds New Replacement Equipment Project FY19 $90,000 FY20 FY21 222 CIP Project Fund Wastewater Fund PROJECT NUMBER WW42 DEPARTMENT WRF PROJECT NAME PRIMARY CLARIFIER COVER FY17 FY18 Unscheduled $1,050,000 DESCRIPTION OF PROJECT INSTALLING A GEODESIC DOME COVER WITH 8 FOOT SIDE WALLS ON A PRIMARY CLARIFIER. THE INSTALLATION WOULD INCLUDE A DOOR, TWO SKYLIGHTS AND A VENT TUBE. ALSO CLARIFIER DRIVE MOTOR AND CONTROLS WOULD HAVE TO BE EXPLOSION PROOF. ALTERNATIVES CONSIDERED Do nothing ADVANTAGES OF APPROVAL COVERING THE PRIMARY CLARIFIERS WILL ALLOW ODOR CONTROL & ELIMINATE CLEANING & PAINTING. CLEANING & PAINTING OF ALL RAILINGS AND CATWALKS IS AN ON-GOING MAINTENANCE ISSUE TO REMOVE GREASE & DROPPINGS DEPOSITED BY BIRDS. COVERS ON PRIMARY CLARIFIERS WOULD ALLOW SOME CLARIFIERS NOT TO BE USED DURING THE WINTER ALLOWING MORE NEEDED CARBON TO ENTER THE BIO-TRAINS. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Only maintenance of odor control would be additional. FUNDING SOURCES Wastewater Funds New Replacement Equipment Project FY19 FY20 FY21 223 CIP Project Fund Wastewater Fund PROJECT NUMBER WW44 DEPARTMENT WRF PROJECT NAME FLOTATION THINKENER FY17 FY18 Unscheduled $500,000 DESCRIPTION OF PROJECT Modify the existing flotation thickener to treat the high levels of ammonia in the supernatant going back to the head of the plant from the screw press that is dewatering anaerobic sludge This modification will improve WRF processes. ALTERNATIVES CONSIDERED Increase the bio-train mass, add Mg(OH)2 to increase alkalinity and add Micro C 2000 provide carbon for de-nitrification in the post anoxic zones to treat the increased ammonia load ADVANTAGES OF APPROVAL Treating the return side stream will reduce the load on the bio-trains and reduce chemical costs associated with these loads. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Electrical costs for compressor, mixer and pumps. FUNDING SOURCES Wastewater Funds New Replacement Equipment Project FY19 FY20 FY21 224 CIP Project Fund Wastewater Fund PROJECT NUMBER WW45 DEPARTMENT WRF PROJECT NAME FINAL CLARIFIER LAUNDER COVER FY17 $40,000 FY18 $40,000 Unscheduled DESCRIPTION OF PROJECT To cover effluent launder of one final clarifier a year (4 total) to eliminate algal growth in the launder. THE BRUSH SYSTEM REQUIRES CONTINUAL MAINTENANCE. THERE IS RISK OF BRUSHES BREAKING OFF AND FALLING INTO THE CLARIFIER THAT MAY BLOCK THE WASTING HOPPER ALTERNATIVES CONSIDERED CURRENTLY A BRUSH SYSTEM IS USED TO REDUCE THE AMOUNT OF ALGAL GROWTH WHICH REQUIRES CONTINUAL MAINTENANCE. ADVANTAGES OF APPROVAL COVERING THE CLARIFIERS WILL ELIMINATE CURRENT MAINTENANCE AND HELP REDUCE POTENTIAL HAZZARDS. MAINTENANCE WOULD BE CUT TO TWICE A YEAR ALLOWING OPERATORS TO SPEND TIME ON OTHER DUTIES AT THE PLANT. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Reduce operating costs (time & materials) FUNDING SOURCES Wastewater Funds New Replacement Equipment Project FY19 FY20 FY21 225 CIP Project Fund Wastewater Fund PROJECT NUMBER WW49 DEPARTMENT WRF PROJECT NAME Roll-off Building and 2nd Screw Press & Screw Press Enclosure FY17 FY18 $600,000 Unscheduled DESCRIPTION OF PROJECT Roll-off Building, Screw Press & 2nd Screw Press Enclosure - Construction ALTERNATIVES CONSIDERED Construction of an additional screw press, screw press enclosure & roll-off building. ADVANTAGES OF APPROVAL The second screw press would provide needed redundancy if a screw press breaks down. It would provide extra sludge processing capacity now and for future needs. This building would also serve as storage for the sludge roll-offs to keep them from freezing. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED OPERATING COSTS COULD BE REDUCED. FUNDING SOURCES WASTEWATER FUNDS New Replacement Equipment Project FY19 FY20 FY21 226 CIP Project Fund Wastewater Fund PROJECT NUMBER WW50 DEPARTMENT WRF PROJECT NAME REFRIGERATED AUTOMATIC SAMPLERS FY17 FY18 Unscheduled $30,000 DESCRIPTION OF PROJECT PURCHASE (3) NEW REFRIGERATED SAMPLERS FOR THE INFLUENT, PRIMARY AND EFFLUENT ALTERNATIVES CONSIDERED Keep repairing old samplers until they fail. ADVANTAGES OF APPROVAL The samplers we are using have been in service since 2000 and we have been replacing worn out parts. We need to start replacing them before the circuit boards fail. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED NO ADDITIONAL COSTS. FUNDING SOURCES WASTEWATER FUNDS New Replacement Equipment Project FY19 FY20 FY21 227 CIP Project Fund Wastewater Fund PROJECT NUMBER WW52 DEPARTMENT WW OPS PROJECT NAME REPLACE #2683 - 1999 JOHN DEERE 310SE BACKHOE FY17 FY18 $105,000 Unscheduled DESCRIPTION OF PROJECT This vehicle replaces a 1999 John Deere backhoe with 2,904 hours on it. This vehicle is used to dig and backfill ditches that we dig to maintain our distribution and collection systems. ALTERNATIVES CONSIDERED Continue to use older vehicle which is becoming unreliable and costly to maintain. ADVANTAGES OF APPROVAL Increased reliability and safety for staff. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Waste Water utility. New Replacement Equipment Project FY19 FY20 FY21 228 CIP Project Fund Wastewater Fund PROJECT NUMBER WW53 DEPARTMENT WRF PROJECT NAME POSITIVE DISPLACEMENT LOBE PUMP FY17 $20,000 FY18 $20,000 Unscheduled $20,000 DESCRIPTION OF PROJECT Replacement of older wasting pump that cannot provide the necessary wasting rates. ALTERNATIVES CONSIDERED Do nothing. ADVANTAGES OF APPROVAL Controlling mixed liquor inventory is critical to producing high quality effluent. If solids in the mixed liquor cannot be removed fast enough, total suspended solids will increase in the effluent which will also increase the total phosphorus to the river. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED No new operating costs. Replacement of the lobe pump may actually increase efficiency. FUNDING SOURCES WASTEWATER FUNDS New Replacement Equipment Project FY19 FY20 FY21 229 CIP Project Fund Wastewater Fund PROJECT NUMBER WW54 DEPARTMENT WW OPS PROJECT NAME REPLACE #1783 - 1995 FORD DUMP TRUCK FY17 FY18 Unscheduled DESCRIPTION OF PROJECT This project will replace a 1995 Ford Dump Truck that has 25,117 miles on it. ALTERNATIVES CONSIDERED Continue to use older vehicle which is becoming unreliable and costly to maintain. ADVANTAGES OF APPROVAL Will be a more fuel efficient and lower emissions vehicle. The new vehicle will improve safety of the crews, there would be lower repair costs and it would help maintain current operations levels. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Waste Water Fund New Replacement Equipment Project FY19 FY20 $95,000 FY21 230 CIP Project Fund Wastewater Fund PROJECT NUMBER WW55 DEPARTMENT WW OPS PROJECT NAME REPLACE #3232 - 2004 3/4 TON FORD PICKUP FY17 FY18 Unscheduled DESCRIPTION OF PROJECT This project will replace a 2004 Ford Pickup truck with 43,355 miles on it. ALTERNATIVES CONSIDERED Continue to use older vehicle which is becoming unreliable and costly to maintain. ADVANTAGES OF APPROVAL Increased reliability and safety for staff. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Waste Water Fund New Replacement Equipment Project FY19 FY20 $33,000 FY21 231 CIP Project Fund Wastewater Fund PROJECT NUMBER WW58 DEPARTMENT WRF PROJECT NAME Chip Seal WRF Asphalt FY17 FY18 Unscheduled $47,370 DESCRIPTION OF PROJECT Chip Seal WRF Asphalt to keep it from deteriorating. ALTERNATIVES CONSIDERED Do nothing. ADVANTAGES OF APPROVAL Chip seal will protect the already paid for infrastructure. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED None FUNDING SOURCES WASTEWATER FUNDS New Replacement Equipment Project FY19 FY20 FY21 232 CIP Project Fund Wastewater Fund PROJECT NUMBER WW59 DEPARTMENT WRF PROJECT NAME SPLITTER STRUCTURE AIR DIFFUSER FY17 FY18 Unscheduled $15,000 DESCRIPTION OF PROJECT Install air diffusers to the end of the air lances in the flow splitter structure. ALTERNATIVES CONSIDERED Keep using air lances as is. ADVANTAGES OF APPROVAL AIR IS NEEDED IN THE FLOW SPLITTER STRUCTURE TO PREVENT SECONDARY PHOSPHORUS RELEASE. AIR DIFFUSERS PROVIDE A HIGHER OXYGEN TRANSFER RATE TO THE FLOW AND THEREFORE WILL REDUCE THE LOAD ON THE AIR TURBINES SAVING ELECTRICITY. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Will lower operating costs by lowering air flow needed to aerate sludge. FUNDING SOURCES WASTEWATER FUNDS New Replacement Equipment Project FY19 FY20 FY21 233 CIP Project Fund Wastewater Fund PROJECT NUMBER WW60 DEPARTMENT WRF PROJECT NAME NUTRIENT RECOVERY PROCESS CONSTRUCTION FY17 FY18 Unscheduled $2,000,000 DESCRIPTION OF PROJECT CONSTRUCTION OF NUTRIENT RECOVERY PROCESS TO CAPTURE NITROGEN AND PHOSPHORUS FROM ANAEROBICLY DIGESTED SLUDGE. ALTERNATIVES CONSIDERED DO NOTHING AND LOOSE A COMMODITY THAT IS A BI-PRODUCT OF ANAEROBIC DIGESTION ADVANTAGES OF APPROVAL THE PRODUCTION OF MAGNESIUM AMMONIUM PHOSPHATE TO BE SOLD AS A SLOW RELEASE FERTILIZER WILL RECYCLE LIMITED NUTRIENTS BACK INTO THE ECOSYSTEM. THIS PROCESS WILL REDUCE THE NITROGEN AND PHOSPHORUS IN OUR SIDESTREAM RETURNING TO THE HEAD OF THE PLANT WHICH WILL IN TURN REDUCE THE LOADING ON THE PROCESS. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED MAINTENANCE AND OPERATING COSTS THAT WILL BE OFF SET BY INCOME FROM THE SALE OF THE SLOW RELEASE FERTILIZER. FUNDING SOURCES WASTEWATER FUNDS New Replacement Equipment Project FY19 FY20 FY21 234 CIP Project Fund Wastewater Fund PROJECT NUMBER WW61 DEPARTMENT WRF PROJECT NAME ONLINE AMMONIA PROBES FY17 $35,000 FY18 Unscheduled DESCRIPTION OF PROJECT Buy 2 online ammonia probes. ALTERNATIVES CONSIDERED DO NOTHING AND ALWAYS WAIT 24 HOURS TO SEE IF THE AMMONIA LIMIT WAS MET. ADVANTAGES OF APPROVAL Continual readings of the effluent ammonia would allow operators to detect problems with the de-nitrification process before the 24 hour composite is tested. Early detection of problems would prevent violations. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Maintenance to the probes and a slight increase in electrical costs. FUNDING SOURCES WASTEWATER FUNDS New Replacement Equipment Project FY19 FY20 FY21 235 CIP Project Fund Wastewater Fund PROJECT NUMBER WW62 DEPARTMENT WRF PROJECT NAME METHANE COGENERATION PROJECT CONSTRUCTION FY17 FY18 Unscheduled $2,200,000 DESCRIPTION OF PROJECT Consistent with the goals of the City’s Climate Action Plan & Sustainability Programs, the Bozeman WRF staff and Public Works Director recommend we move forward with our proposed investigation and installation of a methane recovery and co- generation system. This system will produce an average of 175 kW of electricity and 974,000 BTU/hour of thermal output using a generator powered entirely by WRF digester gas. This project has the potential to save the City at least $180,000 in electricity costs and substantially lower the carbon footprint of the new Bozeman WRF. This project would be implemented in 3 phases including (1) a feasibility / cost effectiveness study, (2) project engineering / design and (3) the purchase and installation of appropriate technology for the co-generation of electricity at the Bozeman WRF. Year 1: Project Feasibility Study. Year 2: Project Engineering Design - $350,000. Year 3: Equipment Purchase and Installation - $2,200,000. ALTERNATIVES CONSIDERED Continue to flare our digester methane gas. Micro-turbines and fuel-cells have been analyzed and continue to be possible alternative energy recovery technologies for this project. Our research to date suggests the most proven technology currently available to help us accomplish our energy recovery goals is likely to be a GE Jenbacher internal combustion engine and heat recovery system. ADVANTAGES OF APPROVAL Current plant waste gases will be captured and utilized to reduce plant operating costs. The project has an estimated net dollar savings of $230,000 per year. It supports the City's Municipal Climate Action Plan goals. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Once construction is funded, this project results in an estimated net dollar SAVINGS of $230,000/year FUNDING SOURCES Wastewater Fund, other grants or community partners. New Replacement Equipment Project FY19 FY20 FY21 236 CIP Project Fund Wastewater Fund PROJECT NUMBER WW63 DEPARTMENT WW Ops PROJECT NAME Chemical Root Control Applicator FY17 $45,000 FY18 Unscheduled DESCRIPTION OF PROJECT The applicator will be installed on our flusher truck and will apply the chemical. The chemical will kill the roots in the pipe without harming the trees. It also includes an growth inhibitor which will prevent roots from growing back in the main. Roots in our main are a problem and will help prevent sewer main backup from roots. ALTERNATIVES CONSIDERED We have cut roots with saws, chains and wire brushes this type of root cutting slowly damages the clay pipe. ADVANTAGES OF APPROVAL A more effective way to eliminate roots in the main and keep them from coming back. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED 14,000.00 a year in chemical costs. FUNDING SOURCES 100% Wastewater Utility Fund New Replacement Equipment Project FY19 FY20 FY21 237 CIP Project Fund Wastewater Fund PROJECT NUMBER WW64 DEPARTMENT WW OPS PROJECT NAME Sewer Flow Meter FY17 $15,000 FY18 Unscheduled DESCRIPTION OF PROJECT This meter can record sewer flows in the sewer main which is critical for planning for new mains. This meter will replace a 10 year old meter which is no longer working. ALTERNATIVES CONSIDERED Renting of meter. ADVANTAGES OF APPROVAL The ability to do in house monitoring of sewer flows. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Waste Water Utility Fund New Replacement Equipment Project FY19 FY20 FY21 238 CIP Project Fund Wastewater Fund PROJECT NUMBER WW65 DEPARTMENT WW OPS PROJECT NAME Digital Universal Camera DUC FY17 FY18 $70,000 Unscheduled DESCRIPTION OF PROJECT The Digital Universal Camera (DUC) is a semi-autonomous, high resolution digital CCTV side scanning camera designed for rapid and detailed condition assessment of our wastewater system. ALTERNATIVES CONSIDERED Continue to use the stop and go method (SAG) and take longer to TV the mains. We have a goal to TV the entire system every 5 years, this is getting harder to do with the increasing growth of our collection system. ADVANTAGES OF APPROVAL This camera allows us to TV the main non-stop will allows us to increase the amount of pipe we TV in a day up to 5 to 10 times more than the traditional stop and go method that we now use. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Waste Water Utility Fund New Replacement Equipment Project FY19 FY20 FY21 239 CIP Project Fund Wastewater Fund PROJECT NUMBER WW66 DEPARTMENT WRF PROJECT NAME Odor Control for Old Pretreatment Buildings FY17 FY18 Unscheduled $15,000 DESCRIPTION OF PROJECT Old Pretreatment building odor is vented out the roof next to Springhill Road. ALTERNATIVES CONSIDERED Run the risk of more odor complaints. ADVANTAGES OF APPROVAL Foul air from the sewer system coming into the old pretreatment building needs to be collected and treated. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED No additional operating costs if another inline fan is not needed. FUNDING SOURCES Wastewater New Replacement Equipment Project FY19 FY20 FY21 240 CIP Project Fund Wastewater Fund PROJECT NUMBER WW67 DEPARTMENT WRF PROJECT NAME Convert Bio-Train #1 to 5 Stage Bardenpho FY17 FY18 Unscheduled $5,000,000 DESCRIPTION OF PROJECT Modify Bio-train #1 to a 5 Stage Bardenpho configuration ALTERNATIVES CONSIDERED Construct two new 5 Stage Bardenpho bio-trains to treat increased flows and provide redundancy. ADVANTAGES OF APPROVAL Bio-train #1 uses the PNDN process which does not produce the level of nitrogen removal that the 5 Stage Bardenpho does. Modifying Bio- train #1 to a 5 Stage Bardenpho will not degrade the quality of effluent that the plant produces and will realize the design flow of the plant expansion at a reduced cost. Will also provide redundancy if a bio-train #2 or #3 fails. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED None FUNDING SOURCES Wastewater New Replacement Equipment Project FY19 FY20 FY21 241 CIP Project Fund Wastewater Fund PROJECT NUMBER WW68 DEPARTMENT WRF PROJECT NAME Secondary Launder Cover FY17 $30,000 FY18 $30,000 Unscheduled DESCRIPTION OF PROJECT Cover effluent launder of one final clarifier to eliminate algal growth in the launder. ALTERNATIVES CONSIDERED Continue using a brush system to reduce the amount of algal growth. This method requires continual maintenance and there is a risk of brushes breaking off and falling into the clarifier. This could block the wasting hopper in the clarifier. ADVANTAGES OF APPROVAL Elimination of the brush system with its maintenance and dangers. Maintenance on the launder would be cut to twice a year for a quick manual cleaning allowing operators to spend time on other duties. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED None. Would actually cut operating costs (time and materials) FUNDING SOURCES 100% Wastewater Funds New Replacement Equipment Project FY19 $30,000 FY20 FY21 242 CIP Project Fund Wastewater Fund PROJECT NUMBER WW69 DEPARTMENT WRF PROJECT NAME WRF Facility R & R FY17 $50,000 FY18 $50,000 Unscheduled DESCRIPTION OF PROJECT Repair and replacement of equipment is an ongoing job at the Bozeman WRF. These funds would be used to repair or replace equipment that fails unexpectedly in an emergency situation. ALTERNATIVES CONSIDERED Not having this fund would defer other needed maintenance. ADVANTAGES OF APPROVAL Most processes run 27/7 and have backup systems but when the first system fails there is no backup system and repairs need to be made immediately. Not all repairs or equipment failures can be predicted and budgeted as a capital improvement project. Extra projects come up like the security upgrades at the WRF. The upgrade is needed to protect city personnel and equipment but was not predicted and put into CIP. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED None FUNDING SOURCES 100% Wastewater Funds New Replacement Equipment Project FY19 $50,000 FY20 $50,000 FY21 $50,000 243 CIP Project Fund Wastewater Fund PROJECT NUMBER WW70 DEPARTMENT WRF PROJECT NAME WRF Facility Engineering & Optimization FY17 $50,000 FY18 $50,000 Unscheduled DESCRIPTION OF PROJECT To allow engineering to be done on needed projects and to study plant optimization options before spending money on equipment that might not be needed or the proper type. Allow studies to be conducted to make sure that proposed plant optimizations will actually improve the effluent quality at a reasonable expense. ALTERNATIVES CONSIDERED Order replacement or upgrades to equipment that may not be sized correctly or made of the proper materials. Proceed with optimization projects without knowing if the project will actually improve plant performance. ADVANTAGES OF APPROVAL The advantage of having funds available to do engineering studies before any project is started will make sure that the right equipment is purchased and that it will perform properly. Optimization studies will predict actual cost/benefit over time to make sure the city is spending its money efficiently. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Currently unknown FUNDING SOURCES 100% Wastewater Funds New Replacement Equipment Project FY19 $50,000 FY20 $50,000 FY21 $50,000 244 CIP Project Fund Wastewater Fund PROJECT NUMBER WW71 DEPARTMENT WRF PROJECT NAME WRF Facility Master Plan Update FY17 FY18 $150,000 Unscheduled DESCRIPTION OF PROJECT The Master Plan Update will compare past predictions of the loadings on the city’s Water Reclamation Facility with current loadings. New projections will be made using these data trends to determine the best course of action and sequencing of projects to meet the needs of the facility. ALTERNATIVES CONSIDERED Not being proactive in predicting the best way to accommodate future loading at the Bozeman WRF will not fulfill the city’s needs to meet future discharge limits. ADVANTAGES OF APPROVAL Bozeman’s rapid population growth dictates a review of the WRF’s treatment processes to make sure they will meet requirements now and in the future. Establishing a clear incremental improvement process will prevent mistakes and eliminate inefficient spending of funds. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED No additional costs FUNDING SOURCES 100% Wastewater Funds New Replacement Equipment Project FY19 FY20 FY21 245 CIP Project Fund Wastewater Fund PROJECT NUMBER WW73 DEPARTMENT WW OPS PROJECT NAME RATE STUDY - WASTEWATER FY17 $50,000 FY18 Unscheduled DESCRIPTION OF PROJECT Wastewater Rate Study Update ALTERNATIVES CONSIDERED Keep the existing rate structure. ADVANTAGES OF APPROVAL The last wastewater rate study was completed almost 10 years ago. Updating this study will allow our user charges to better match the actual cost of service. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Wastewater Funds New Replacement Equipment Project FY19 FY20 FY21 246 CIP Project Fund Wastewater Fund PROJECT NUMBER WW74 DEPARTMENT WW OPS PROJECT NAME REPLACE #2915 - 2001 1 TON DODGE FLATBED/VALVE TRUCK FY17 $70,000 FY18 Unscheduled DESCRIPTION OF PROJECT This project replaces a 2001 Dodge truck with 51,311 miles on it and also replacement of the water valve mechanical turner. ALTERNATIVES CONSIDERED Continue to use older vehicle which is becoming unreliable and costly to maintain. ADVANTAGES OF APPROVAL Increased reliability and safety for staff. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Water Fund New Replacement Equipment Project FY19 FY20 FY21 247 CIP Project Fund Wastewater Fund PROJECT NUMBER WW75 DEPARTMENT WW OPS PROJECT NAME REPLACE #1677 - 1995 CHEVY S-10 PICKUP FY17 $27,000 FY18 Unscheduled DESCRIPTION OF PROJECT This project will replace a 1995 Chevy Pickup with 60,778 miles on it. ALTERNATIVES CONSIDERED Continue to use older vehicle which is becoming unreliable and costly to maintain. ADVANTAGES OF APPROVAL Increased reliability and safety for staff. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Water Fund New Replacement Equipment Project FY19 FY20 FY21 248 CIP Project Fund Wastewater Fund PROJECT NUMBER WW76 DEPARTMENT WW OPS PROJECT NAME REPLACE #3030 - 2001 JOHN DEERE SKID STEER FY17 FY18 Unscheduled DESCRIPTION OF PROJECT This project replaces the 2001 John Deere Skid Steer with 768 hours on it. It is a critical piece of machinery in our department. ALTERNATIVES CONSIDERED Continue to use older piece of equipment which is becoming unreliable and costly to maintain. ADVANTAGES OF APPROVAL Increased reliability and safety for staff. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Water Fund New Replacement Equipment Project FY19 FY20 $40,000 FY21 249 CIP Project Fund Wastewater Fund PROJECT NUMBER WW77 DEPARTMENT WW OPS PROJECT NAME REPLACE #3157 - 2003 STERLING DUMP TRUCK FY17 FY18 Unscheduled DESCRIPTION OF PROJECT This project is to replace a 2003 Sterling Dump Truck which has 21,626 miles on it. This is the only front line single rear axle dump truck in our fleet which is advantageous in working in tight areas. ALTERNATIVES CONSIDERED Continue to use older piece of equipment which is becoming unreliable and costly to maintain. ADVANTAGES OF APPROVAL Increased reliability and safety for staff. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100 % Water Fund New Replacement Equipment Project FY19 FY20 $105,000 FY21 250