Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Anna Rosenberry, Administrative Services Director
SUBJECT: Adopt the Street Maintenance Fund Capital Improvement Plan (CIP)
for Fiscal Years 2017-2021.
AGENDA ITEM TYPE: Consent
MEETING DATE: December 14, 2015
RECOMMENDATION: Adopt the Street Maintenance Fund Capital Improvement Plan
(CIP) for Fiscal Years 2017-2021.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th. Similar to recent years
past, we are bringing various parts of the plan forward as items on the Consent agenda. We will
be prepared to address questions, if they arise, at the public meeting.
The Public Works, City Manager, and other city staff met in October to develop the attached
Capital Plan for the equipment and capital needs of the Street Maintenance Fund. The Street
Maintenance CIP encompasses the projects and equipment purchases that are not Curb
Replacements or Street Reconstructions in the Street Maintenance Fund. This plan was part of
the Public Works Master 15 year plan.
Item of Note:
• Significant increases in Pavement Maintenance projects over the 5 year plan.
94
• Revenue increases are a continuation of the policy we began in FY16; increasing the
assessment by $1 Million over 3 years, dedicated to pavement maintenance projects.
UNRESOLVED ISSUES: None.
ALTERNATIVES: As suggested by the City Commission. If the Commission does not
wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda.
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY17.
Report compiled on: November 16th, 2015
Attached: Street Maintenance CIP
95
Street Maintenance District Capital Improvement PlanFinancial SummaryCurrent YearFY16FY17FY18 FY19 FY20 FY21UnscheduledProjected Beginning Reserve Balance Dedicated to CIP335,623$ (481,014)$ (216,743)$ (23,747)$ 517,168$ 1,272,236$ Plus: Street Mtc Revenues Dedicated to CIP719,000$ 1,199,771$ 1,590,896$ 1,622,714$ 1,655,169$ 1,688,272$ ‐$ Plus: Gas Tax662,000$ 662,000$ 662,000$ 662,000$ 662,000$ 662,000$ Less: Scheduled CIP Project Costs(2,197,637)$ (1,597,500)$ (2,059,900)$ (1,743,800)$ (1,562,100)$ (1,907,500)$ (1,376,000)$ Projected Year‐End Cash Dedicated to CIP(481,014)$ (216,743)$ (23,747)$ 517,168$ 1,272,236$ 1,715,008$ Assumptions Made for Revenue Estimates:Current YearFY16FY17FY18FY19 FY20 FY21Estimated Undesignated Annual Street Mtc Revenues3,290,683$ 3,577,683$ 3,999,237$ 4,079,221$ 4,160,806$ 4,244,022$ Estimated Annual Increase ‐ Attributed to Annexations‐ 2%2%2%2%2% Annual Increase in Pavement Maintenance287,000 10%9%0%0%0%Total Estimated Revenues3,577,683$ 3,999,237$ 4,079,221$ 4,160,806$ 4,244,022$ 4,328,902$ Current Revenues Dedicated to CIP %20.0%20.0% 30.0% 39.0% 39.0% 39.0% Plus: Increase Dedicated to CIP0.0%10.0%9.0% 0.0% 0.0% 0.0% Total % Dedicated to CIP20.0%30.0% 39.0% 39.0% 39.0% 39.0%Total Estimated Revenues Dedicated to CIP715,537$ 1,199,771$ 1,590,896$ 1,622,714$ 1,655,169$ 1,688,272$ ProjectedProjectedCURRENT2,500,0002,000,0001,500,0001,000,000500,0000Street Maintenance Projects & Equipment 96
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY17UnscheduledFY21FY18FY19FY20Street Maintenance DistrictGF262STREETSPAVING AT SHOPS$37,500PW01 ‐ SHSTREETSSHOPS FACILITY EXPANSION PLAN$10,000STR01STREETSVEHICLE REPLACEMENTS$45,000$26,000$45,000STR20STREETSBIKE PATH IMPROVEMENTS$25,000$25,000$25,000$25,000$25,000STR22STREETSGRADER LEASE$50,000$50,000$50,000$50,000$50,000STR30STREETSANNUAL MEDIAN & BOULEVARD MAINTENANCE$55,000$55,000$55,000$55,000$55,000STR33STREETSASPHALT PATCH TRUCK$150,000STR34STREETSSWEEPERS$75,000$75,000$75,000$75,000$75,000STR35STREETSREGENERATIVE AIR SWEEPER$250,000STR38STREETSMINI LOADER$80,000STR40STREETSDUMP TRUCK WITH PLOW & SANDER$200,000$180,000STR49STREETSSANDERS$16,000$16,000$16,000$16,000$16,000STR50STREETSPLOWS$10,000$10,000$10,000$10,000$10,000STR56STREETSTACK OIL DISTRIBUTION UNIT$70,000STR57STREETSCOLD PLANER ATTACHMENT$30,000STR58STREETSTANDEM AXLE DUMP TRUCK WITH PLOW AND SANDER$250,000$230,000STR59STREETSPOWER TO SAND STORAGE TO RUN CONVEYOR.$20,000STR60STREETSARTICULATING TRACTOR$85,000STR61STREETSASPHALT PAVING MACHINE$110,000STR62STREETSREPLACE WATER TRUCK$160,000STR63STREETSREPLACE SIGNAL AT BABCOCK AND WILLSON$750,000STR64STREETSSTEEL DRUM ROLLER AND TRAILER$100,000STR65STREETSREPLACE SELF LOADING CRACK SEALER$85,00097
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY17UnscheduledFY21FY18FY19FY20STR67STREETSCOVERED STORAGE AT SHOPS COMPLEX$100,000STR71STREETSSTREET IMPROVEMENTS ‐ MAINTENANCE & REHABILITATION$1,466,500$723,000$1,113,900$1,342,800$1,321,100$1,897,500$1,526,500$2,049,900$1,733,800$1,552,100$1,376,000Street Maintenance DistrictSTR68STREETS‐ SIGN RECTANGULAR RAPID FLASHING BEACON$10,000$10,000$10,000$10,000$10,000STR69STREETS‐ SIGN REPLACE PAINT SPRAYER AND DRIVER$17,000STR72STREETS‐ SIGN DIGITAL MESSAGE BOARD$14,000STR73STREETS‐ SIGN AND SIGNALSMALL LIGHT DUTY 4X4 TRUCK USED FOR MAINTAINING STREET LIGHTS.$30,000$10,000$71,000$10,000$10,000$10,000Summary for Street Maintenance District (29 items)Totals by year:$1,907,500$1,597,500 $2,059,900$1,376,000FY21FY17FY18UnscheduledFY20$1,562,100$1,743,800FY1998
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
GF262
DEPARTMENT
STREETS
PROJECT NAME
PAVING AT SHOPS
FY17
$37,500
FY18 Unscheduled
DESCRIPTION OF PROJECT
Demolish and replace old asphalt. The existing parking lot tends to be very muddy as it’s only partially paved. Paving the lot will
reduce the amount of sediment leaving the site and going into Bozeman Creek. This project is phase 2 of CIP project GF237
approved for FY16, installation of stormwater system improvements at the Shops Complex.
ALTERNATIVES CONSIDERED
Do nothing and risk overwhelming the new stormwater infrastructure.
ADVANTAGES OF APPROVAL
This will allow the City to meet Stormwater permit goals and requirements.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
25% Street Maintenance, 25% Water Funds, 25% Wastewater Funds and 25% General Fund (Parks)
New
Replacement
Equipment
Project
FY19 FY20 FY21
99
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
PW01 - SH
DEPARTMENT
STREETS
PROJECT NAME
SHOPS FACILITY EXPANSION PLAN
FY17
$10,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
The construction of the new Vehicle Maintenance Shop at the Lower Yards on Rouse Avenue in FY10/FY11 was Phase I in
expanding and improving our ability to service equipment, store vehicles, and provide work space for Public Works, Parks, and
Facilitiy services. Questions remain about the long-term plan for construction, location, and expansion for: Streets, Sign & Signal,
Forestry, Water/Sewer Operations, Solid Waste Collection & Recycling, Facilities, and Parks & Cemetery departments. This
project would develop a master plan. In scheduling this project, we are recommending waiting until after the Vehicle Maintenance
Division is relocated to its new shop and the interior improvements are made to the Shop at Rouse and Tamarack Street for the
remaining divisions.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
From related divisions: General Fund 20% ($10,000), Water Fund 20% ($10,000), Wastewater Fund 20% ($10,000), Street Maintenance Fund
20% ($10,000), Solid Waste Fund 20% ($10,000).
New
Replacement
Equipment
Project
FY19 FY20 FY21
100
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR01
DEPARTMENT
STREETS
PROJECT NAME
VEHICLE REPLACEMENTS
FY17
$45,000
FY18
$45,000
Unscheduled
$26,000
DESCRIPTION OF PROJECT
This item is for the replacement of trucks and other light vehicles. See the following sheet for vehicle details.
ALTERNATIVES CONSIDERED
Drive it until it dies.
ADVANTAGES OF APPROVAL
A much more useable year round truck. Better fuel mileage and lower emissions.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Normal routine maintenance.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY19 FY20 FY21
101
Street Service TrucksAsset #Current Make/FeaturesModel YrCurrent MileageReplacement Make/FeaturesFY17FY18FY19UnscheduledFY20FY2111341 TON, CHEVY C‐35001988118,7603/4 TON, FLEX FUEL3081SIGN & SIGNAL: 1 TON, 2W DRIVE, MANUAL, FORD F‐350199280,4331 TON, FLEX FUEL1539COMPACT TRUCK, 2WD FORD RANGER199071,315Hybrid or electric vehicle$26,000.002749Ford 1 Ton Flatbed199763,0004 Wheel Drive$45,0001456Ford 1 Ton Flatbed199281,4334 Wheel Drive$45,000$26,000$45,000 $45,000Totals102
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR20
DEPARTMENT
STREETS
PROJECT NAME
BIKE PATH IMPROVEMENTS
FY17
$25,000
FY18
$25,000
Unscheduled
DESCRIPTION OF PROJECT
This item would provide for bike-related infrastructure including (but, not limited to) racks, signs, striping, curb-cuts, and
separated pathways. The Greater Bozeman Area Transportation Plan (2007 Update) Section 5.4 Recommended Bicycle Facility
Improvements outlines many facilities. The Bozeman Area Bicycle Advisory Board (BABAB) gave the City their top 2 priorities:
They are listed with City Engineering cost estimates: North 11th Ave - Mendenhall to Durston, $14,500; Willson Ave - Main
Street to Kagy Blvd, $54,300.
ALTERNATIVES CONSIDERED
Continue with existing infrastructure.
ADVANTAGES OF APPROVAL
Safety will likely be improved.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
No additional operating costs.
FUNDING SOURCES
100% Street Maintenance Fund
New
Replacement
Equipment
Project
FY19
$25,000
FY20
$25,000
FY21
$25,000
103
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR22
DEPARTMENT
STREETS
PROJECT NAME
GRADER LEASE
FY17
$50,000
FY18
$50,000
Unscheduled
DESCRIPTION OF PROJECT
This is a request to establish at a minimum a 20 year replacement schedule for our graders. Currently our fleet is comprised of a
1994, 1998, 2003, 2007 and 2014. The '94 will be replaced in FY16. Although the industry standard schedules a 15 year
replacement we believe with our extensive preventative maintenance schedule will allow us to get 20 years out of a grader. The
old grader would be traded in or auctioned.
ALTERNATIVES CONSIDERED
Budget 250k every 5 years to purchase. Cut back on our use of graders in the residential areas. Continue to use what we have and replace
when we have complete failure.
ADVANTAGES OF APPROVAL
Much more reliable and fuel efficient equipment.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Decrease in costs due to newer equipment.
FUNDING SOURCES
100% Street Maintenance Revenue
New
Replacement
Equipment
Project
FY19
$50,000
FY20
$50,000
FY21
$50,000
104
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR30
DEPARTMENT
STREETS
PROJECT NAME
ANNUAL MEDIAN & BOULEVARD MAINTENANCE
FY17
$55,000
FY18
$55,000
Unscheduled
DESCRIPTION OF PROJECT
This is a request for money to use for maintaining and upgrading our medians.
ALTERNATIVES CONSIDERED
None.
ADVANTAGES OF APPROVAL
Making our currently unmaintained medians into weed free low maintenance show pieces. We are partnering internally with the Water
Conservation Manager and externally with MSU to design and install low water easily maintained medians. Also contract out the maintenance
on our established medians.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None. Lower water use means lower utility costs.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY19
$55,000
FY20
$55,000
FY21
$55,000
105
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR33
DEPARTMENT
STREETS
PROJECT NAME
ASPHALT PATCH TRUCK
FY17
$150,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
This is a request to replace our 1991 patch truck. At the time of replacement it will be 26 years old. Before we decide on a
particular model we will demo several different types to decide which is best for our operations. With advancements in emission
reduction this new truck will emit less than ½ the emissions that the truck it replaces. 1991 Unit will be traded in or auctioned
off.
ALTERNATIVES CONSIDERED
Contract out patching. Continue to use this truck. Increase response time to pothole requests.
ADVANTAGES OF APPROVAL
Less emissions. More efficient operations. Decrease response time to pothole requests. Better safety systems on new unit.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
No increase in costs. Decrease in costs expected.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY19 FY20 FY21
106
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR34
DEPARTMENT
STREETS
PROJECT NAME
SWEEPERS
FY17
$75,000
FY18
$75,000
Unscheduled
DESCRIPTION OF PROJECT
This is a request to replace a sweeper every 5 years. In the past we depended on the State for funds through the MACI program
to purchase a sweeper every five years if funding was available. Funding is very sporadic. Industry standards recommend replacing
municipal street sweepers every 4-5 years. We will always pursue a sweeper through the MACI program when it becomes
available. Our current fleet of sweepers include a 2009 and two 2012 models.
ALTERNATIVES CONSIDERED
Budget 200k every year until all sweepers are replaced. Cut back on our sweeping There are no local contractors at this time. Continue to use
what we have.
ADVANTAGES OF APPROVAL
Much improved operations. Better air quality. Improved storm water discharge.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY19
$75,000
FY20
$75,000
FY21
$75,000
107
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR35
DEPARTMENT
STREETS
PROJECT NAME
REGENERATIVE AIR SWEEPER
FY17 FY18 Unscheduled
$250,000
DESCRIPTION OF PROJECT
This is a request for a new regenerative air (RA) sweeper. This would an addition to our sweeper fleet. RA sweepers use a blast
of air to dislodge the street debris and suck it into the hopper. It reuses the air so no polluted or particulate air is released into
the atmosphere. These type of sweepers help us to comply with air quality requirements (particulate matter of 2.5 microns or
less) and storm water Best Management Practices.
ALTERNATIVES CONSIDERED
Only use mechanical sweepers which discharge dust when sweeping.
ADVANTAGES OF APPROVAL
We could improve our discharge into the storm water system. Spring sweeping of the winter sand would generate less dust therefore
eliminating complaints from citizens and DEQ.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Normal sweeper maintenance costs.
FUNDING SOURCES
100% Street Maintenance District
New
Replacement
Equipment
Project
FY19 FY20 FY21
108
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR38
DEPARTMENT
STREETS
PROJECT NAME
MINI LOADER
FY17 FY18
$80,000
Unscheduled
DESCRIPTION OF PROJECT
This request is for a mini loader that would be used for sidewalk maintenance including plowing, removal and repairs. This loader
would accept many attachments that we already have such as brooms, sweepers and plows. This loader would be available for
use in other departments. It would be useful in tight situations where a full size loader wouldn’t fit such as when the mini
excavator is being used and material needs to be moved off site.
ALTERNATIVES CONSIDERED
No comparable equipment is available for rent.
ADVANTAGES OF APPROVAL
This loader will give us another piece of equipment that will utilize our attachments. The compact size will allow us to get in spaces that we
wouldn’t normally be able to access.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Routine maintenance.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY19 FY20 FY21
109
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR40
DEPARTMENT
STREETS
PROJECT NAME
DUMP TRUCK WITH PLOW & SANDER
FY17 FY18
$180,000
Unscheduled
DESCRIPTION OF PROJECT
This request is for a single axle dump truck with a 4 yard box. A plow and sander would also be included. This will replace a 1990
underpowered gasoline engine dump truck that averages about 3 MPG when used for plowing operations. The new truck could
be fueled with alternative fuels such as Biodiesel. Estimates shows that the 1990 spews over 30 tons of CO2 into the air per year
and by removing this from our fleet will help us in our goal of reducing municipal greenhouse emissions 15% below 2000 levels by
2020. The FY21 request will replace a 1993 underpowered gasoline engine dump truck.
ALTERNATIVES CONSIDERED
Continue with 1990 model.
ADVANTAGES OF APPROVAL
Efficiency, less emissions, safety, fuel savings and more reliable equipment.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Less than current model.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY19 FY20 FY21
$200,000
110
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR49
DEPARTMENT
STREETS
PROJECT NAME
SANDERS
FY17
$16,000
FY18
$16,000
Unscheduled
DESCRIPTION OF PROJECT
Sanders wear out every 5 years depending on the winter. We have seven sanders so we will make them last 7 years.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
More reliable sanders. Less failures in the middle of a storm.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Decrease in maintenance costs.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY19
$16,000
FY20
$16,000
FY21
$16,000
111
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR50
DEPARTMENT
STREETS
PROJECT NAME
PLOWS
FY17
$10,000
FY18
$10,000
Unscheduled
DESCRIPTION OF PROJECT
This is to replace the worn plow blades. We have 7 large plows so they will be on a 7 year replacement schedule.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
A straight blade is easier to replace the cutting edge and is quieter when plowing.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY19
$10,000
FY20
$10,000
FY21
$10,000
112
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR56
DEPARTMENT
STREETS
PROJECT NAME
TACK OIL DISTRIBUTION UNIT
FY17 FY18
$70,000
Unscheduled
DESCRIPTION OF PROJECT
This is to replace a 1971 unit. This unit is obsolete. This is used to spray tack oil on asphalt patches and paving. Currently we are
doing it by hand with our patch truck.
ALTERNATIVES CONSIDERED
Continue to use what we have when it runs.
ADVANTAGES OF APPROVAL
More reliable and safer unit. Less chance of major spill.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Costs will be less with the newer unit.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY19 FY20 FY21
113
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR57
DEPARTMENT
STREETS
PROJECT NAME
COLD PLANER ATTACHMENT
FY17
$30,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
This is a request to replace the cold planer attachment that is used for milling around valve boxes, manholes, storm inlets and
small street repairs. Our current attachment has been rebuilt twice and is fatigued to the point that it needs to be replaced.
ALTERNATIVES CONSIDERED
Contract out the small milling jobs. Continue to use the worn out cold planer.
ADVANTAGES OF APPROVAL
Less maintenance costs and more reliable/efficient.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Routine maintenance.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY19 FY20 FY21
114
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR58
DEPARTMENT
STREETS
PROJECT NAME
TANDEM AXLE DUMP TRUCK WITH PLOW AND SANDER
FY17 FY18
$230,000
Unscheduled
$250,000
DESCRIPTION OF PROJECT
This is a request to replace a 1994 tandem axle truck with 128,000 miles and over 11,000 hours. With the widening of multiple
collectors and arterials, the continued need for a larger capacity truck to finish plow and sanding routes is critical to maintaining
our service to the traveling public. It is very important that we get the arterials and collectors done before 8AM. When a
tandem axle 10 yard truck is down for any period of time, the backup is a 1990 gas engine single axle 4 yard truck which takes
twice as long to finish a route if it stays in operation for the entire shift. Not acceptable to our customers. During paving
operations, being able to haul twice as much asphalt cuts down on the number of trips to the plant. This makes the paving crew
more efficient and uses less fuel. The 1994 truck would be used as a backup in the winter and still be used for paving instead of a
single axle truck.
ALTERNATIVES CONSIDERED
Continue with no tandem back up in the winter. Run single axle 4 yard dump trucks with asphalt operations
ADVANTAGES OF APPROVAL
Reliability, efficiency, less emissions and safety.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Less than the current model.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY19 FY20 FY21
115
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR59
DEPARTMENT
STREETS
PROJECT NAME
POWER TO SAND STORAGE TO RUN CONVEYOR.
FY17
$20,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
This is a request to run electricity directly to the sand storage facility. Currently we rent a generator to power our conveyor to
stockpile sand in the building. Rent for a generator is about $4,000 per year.
ALTERNATIVES CONSIDERED
Continue to rent or purchase.
ADVANTAGES OF APPROVAL
Not depending on availability of rental generator.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Metered electricity.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY19 FY20 FY21
116
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR60
DEPARTMENT
STREETS
PROJECT NAME
ARTICULATING TRACTOR
FY17
$85,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
This is a request for a articulating tractor with attachments. We have asked Parks Department to share in this purchase. We
would use this with a boom flail mower to mow rights of ways, storm water detention ponds and natural medians (Davis).
ALTERNATIVES CONSIDERED
Contract out. Continue using 1800’s technology (sickle bar).
ADVANTAGES OF APPROVAL
Safer, more efficient, better quality, better customer service and less wear and tear on the operator.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Less than current equipment.
FUNDING SOURCES
Street Maintenance Revenue District Cost shared with Parks
New
Replacement
Equipment
Project
FY19 FY20 FY21
117
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR61
DEPARTMENT
STREETS
PROJECT NAME
ASPHALT PAVING MACHINE
FY17
$110,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
This is a request for a paver that is capable of paving local streets. It will allow us to connect to the dump truck which will give us
a better quality surface and will make us much more efficient with our time.
ALTERNATIVES CONSIDERED
Continue to use our small paver that doesn’t allow us to connect to the trucks giving a less that desirable driving surface and inefficient
operations.
ADVANTAGES OF APPROVAL
Able to produce a much higher quality street surface and more production.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Routine maintenance.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY19 FY20 FY21
118
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR62
DEPARTMENT
STREETS
PROJECT NAME
REPLACE WATER TRUCK
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
This request is to replace a 1995 water truck (#2751) with 500,000 miles. It has a manual transmission and with CDL laws
making you test in the type of transmission that you will drive, new employees can’t test in it and therefore can’t operate it.
ALTERNATIVES CONSIDERED
Let employees hired before 2015 drive it until it dies. Lease or rent.
ADVANTAGES OF APPROVAL
Everyone can drive it, less down time due to failures, more fuel efficient and less emissions.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Routine maintenance.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY19
$160,000
FY20 FY21
119
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR63
DEPARTMENT
STREETS
PROJECT NAME
REPLACE SIGNAL AT BABCOCK AND WILLSON
FY17 FY18 Unscheduled
$750,000
DESCRIPTION OF PROJECT
Upgrade signal. This signal can’t have Opticom for fire trucks. Underground conduit is full and failing. Pedestrian functions
should be upgrade to new type such as count down and vibratory tactile. Also should conform with ADA.
ALTERNATIVES CONSIDERED
Leave as is until failure.
ADVANTAGES OF APPROVAL
Fire department can use Opticom to pass through the light. ADA requirements would be met. Room for future expansion in the conduit.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Routine maintenance.
FUNDING SOURCES
Arterial and Collector Fund
New
Replacement
Equipment
Project
FY19 FY20 FY21
120
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR64
DEPARTMENT
STREETS
PROJECT NAME
STEEL DRUM ROLLER AND TRAILER
FY17 FY18
$100,000
Unscheduled
DESCRIPTION OF PROJECT
This is a request for a larger roller for our paving operations. This roller will allow us to get better compaction therefor giving a
better finished product. The roller we currently have is for smaller projects and tighter areas.
ALTERNATIVES CONSIDERED
Rent if available. Lease.
ADVANTAGES OF APPROVAL
Best paving possible for longer pavement life. Improve PCI.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Normal maintenance.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY19 FY20 FY21
121
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR65
DEPARTMENT
STREETS
PROJECT NAME
REPLACE SELF LOADING CRACK SEALER
FY17
$85,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
This is a request to replace our 20 year old crack sealer. This machine is used to load, heat and dispense the hot rubberized
material to fill the cracks in the asphalt. By filling the cracks we can extend the life of the asphalt as well as keep potholes from
forming. The heating vessel has rusted out to the point it is hard to keep it lit. Safety and emissions improvements have been
made since this was purchased.
ALTERNATIVES CONSIDERED
Contract out crack sealing. Continue to use the old unit until it is no longer serviceable.
ADVANTAGES OF APPROVAL
Safety, lower emissions, more productivity and more reliable unit.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Normal maintenance.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY19 FY20 FY21
122
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR67
DEPARTMENT
STREETS
PROJECT NAME
COVERED STORAGE AT SHOPS COMPLEX
FY17 FY18 Unscheduled
$100,000
DESCRIPTION OF PROJECT
Build covered parking for equipment.
ALTERNATIVES CONSIDERED
Keep parking millions of dollars’ worth of equipment outside.
ADVANTAGES OF APPROVAL
Better equipment management.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Normal building maintenance.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY19 FY20 FY21
123
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR68
DEPARTMENT
STREETS- SIGN AND SIGNAL
PROJECT NAME
RECTANGULAR RAPID FLASHING BEACON
FY17
$10,000
FY18
$10,000
Unscheduled
DESCRIPTION OF PROJECT
This request is for a RRFB for an intersection. We get several requests a year for these and would like to have one ready to
install. These would be like the ones we have on Kagy.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
By having one on hand, we are able to install it in the same construction season it is requested without waiting for a budget cycle.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY19
$10,000
FY20
$10,000
FY21
$10,000
124
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR69
DEPARTMENT
STREETS- SIGN AND SIGNAL
PROJECT NAME
REPLACE PAINT SPRAYER AND DRIVER
FY17
$17,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
This is a request to replace our oldest paint sprayer (2007) and upgrade the driver to a more powerful model. This would allow
us to do yellow curb painting when it is decided that contracted prices exceed our cost to do the painting in house.
ALTERNATIVES CONSIDERED
Continue to use current unit and contract out yellow paint.
ADVANTAGES OF APPROVAL
More efficient use of paint and time.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Routine maintenance.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY19 FY20 FY21
125
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR71
DEPARTMENT
STREETS
PROJECT NAME
STREET IMPROVEMENTS - MAINTENANCE & REHABILITATION
FY17
$723,000
FY18
$1,113,900
Unscheduled
DESCRIPTION OF PROJECT
This money will be used to increase our pavement preservation program (chip seal and mill & overlay). We plan to chip seal and
mill & overlay the following lengths in each fiscal year: FY17, 5.6 miles of chip seal and 1.8 miles of mill & overlay; FY18, 4.2 miles
of chip seal and 3.7 miles of mill & overlay; FY19, 18.4 miles of chip seal and 2.2 miles of mill & overlay; FY20, 15.6 miles of chip
seal and 2.4 miles of mill & overlay; FY21, 19.3 miles of chip seal and 2.7 miles of mill & overlay.
ALTERNATIVES CONSIDERED
NONE
ADVANTAGES OF APPROVAL
Increases the lifespan of streets within the City of Bozeman
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
This project results in a net decrease in overall maintenance costs over the lifecycle of all pavements.
FUNDING SOURCES
Street Maintenance Fund
New
Replacement
Equipment
Project
FY19
$1,342,800
FY20
$1,321,100
FY21
$1,466,500
126
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR72
DEPARTMENT
STREETS- SIGN AND SIGNAL
PROJECT NAME
DIGITAL MESSAGE BOARD
FY17
$14,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
This would be a new message board. We have a large one now that is used almost every week during construction and special
events. This one would be smaller and fit in tighter spaces such as the parking area on a street. It would be used during parades,
city projects and special events.
ALTERNATIVES CONSIDERED
Rent. Latest quote was $1000 per month.
ADVANTAGES OF APPROVAL
Be able to cover both directions and both ends of a project. A smaller one would be better in parking lanes and other limited spaces.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Routine maintenance.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY19 FY20 FY21
127
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR73
DEPARTMENT
STREETS- SIGN AND SIGNAL
PROJECT NAME
SMALL LIGHT DUTY 4X4 TRUCK USED FOR MAINTAINING STREET LIGHTS.
FY17
$30,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
This truck would be used for repair of luminaire maintenance and repair. Currently the lighting technician does not have a
designated vehicle.
ALTERNATIVES CONSIDERED
Continue to borrow trucks as they are available.
ADVANTAGES OF APPROVAL
Dedicated response vehicle for better customer service.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Normal routine maintenance.
FUNDING SOURCES
Street Lighting District - TBD
New
Replacement
Equipment
Project
FY19 FY20 FY21
128