HomeMy WebLinkAboutA3. Arterial and Collector CIP
Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Anna Rosenberry, Administrative Services Director
SUBJECT: Adopt the Arterial and Collector District Capital Improvement Plan
(CIP) for Fiscal Years 2017-2021.
AGENDA ITEM TYPE: Action
MEETING DATE: December 14, 2015
RECOMMENDATION: Adopt the Arterial and Collector District Capital Improvement
Plan (CIP) for Fiscal Years 2017-2021.
SUGGESTED MOTION: I move to adopt the Arterial and Collector District Capital
Improvement Plan (CIP) for Fiscal Years 2017-2021.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th.
The Public Works department, City Manager, and other city staff met during October -
November to develop the attached Capital Plan for the capital needs of the Arterial and Collector
District (A&CD). This District’s capital plan is new to the CIP this year, coming after the
creation of the District this past summer.
Items of Note:
346
• Because of the role Street Impact Fees play in the expansion of our Arterial & Collector
streets, the A&CD capital plan is tied to projects on that CIP. Many projects receive
funding from both sources.
• The question of intersection funding is critical in scheduling both the Street Impact Fee
and Arterial & Collector District CIP’s. Our recommendation is to fund intersections at
80% impact fee eligible and 20% from the Arterial & Collector District.
o This is a policy change from a 60% Impact Fee/40% Local Share split that
currently exists for intersections.
o By using the Arterial & Collector District to help fund intersections at 20%, we
are able to build more intersection improvements than if the district were required
to contribute 40% to the projects. Therefore, this policy recommendation
maximizes improvements to the transportation network over the 5 year capital
improvement plan.
• In FY19, FY20 & FY21, the District will be providing the “local share” of some projects
in advance of development. These projects are noted with an “*”. The city will create a
payback district to recover the “local share” once an adjacent project is developed. This
payback will be deposited to the Arterial & Collector Fund. At the end of this 5-year
plan, payback improvements are estimated to total over $4.1 million.
o We have recorded the amount of “local share” payback improvements are funded
each year on the Financial Summary, below the Projected Year-End Cash.
o We anticipate that some of these payback amounts will come back to the Arterial
& Collector Fund as projects develop; but, for purposes of this plan we have not
relied on receiving any of that money to fund projects. This is a conservative
approach to a difficult-to-estimate cash flow.
o We anticipate a payback for “local share” of these projects would be made at the
time a development project is approved.
• The District’s revenues are projected to increase by the increments that were established
when we created the district. These changes will need to be approved each year, at the
time we adopt the annual Assessment Resolution.
UNRESOLVED ISSUES: None.
347
ALTERNATIVES: As suggested by the City Commission. If the Commission does not
wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda.
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY17.
Report compiled on: December 7, 2015
Attached: Arterial and Collector District CIP
348
Arterial & Collector District Fund Capital Improvement Plan Financial SummaryCurrent YearFY16FY17FY18 FY19 FY20 FY21UnscheduledProjected Beginning Reserve Balance Dedicated to CIP‐$ ‐$ 80,000$ 469,956$ 524,880$ (179,409)$ Plus: Assessment Revenues Dedicated to CIP555,000$ 1,110,000$ 2,020,200$ 2,060,604$ 2,101,816$ 2,143,852$ ‐$ Less: Scheduled CIP Project Costs(555,000)$ (1,030,000)$ (1,630,244)$ (2,005,680)$ (2,806,105)$ (666,000)$ (692,400)$ Projected Year‐End Cash Dedicated to CIP‐$ 80,000$ 469,956$ 524,880$ (179,409)$ 1,298,443$ (692,400)$ Beginning Balance of Payback Improvements:‐$ ‐$ ‐$ ‐$ (1,320,000)$ (3,836,275)$ New Payback Projects‐$ ‐$ ‐$ (1,320,000)$ (2,516,275)$ (334,000)$ Ending Balance of Payback Improvements:‐$ ‐$ ‐$ (1,320,000)$ (3,836,275)$ (4,170,275)$ Assumptions Made for Revenue Estimates:Current YearFY16FY17FY18FY19FY20FY21Estimated Annual Assessment Revenues‐$ 555,000$ 1,110,000$ 2,020,200$ 2,060,604$ 2,101,816$ Estimated Annual Increase100.0%100%82%2%2%2%Total Estimated Revenues555,000$ 1,110,000$ 2,020,200$ 2,060,604$ 2,101,816$ 2,143,852$ Current Revenues Dedicated to CIP %100.0%100.0% 100.0% 100.0% 100.0% 100.0% Plus: Increase Dedicated to CIP0.0%0.0%0.0%0.0% 0.0%0.0% Total % Dedicated to CIP100.0%100.0% 100.0% 100.0% 100.0% 100.0%Total Estimated Revenues Dedicated to CIP555,000$ 1,110,000$ 2,020,200$ 2,060,604$ 2,101,816$ 2,143,852$ ProjectedProjectedCURRENT3,000,0002,500,0002,000,0001,500,0001,000,000FY17 FY18 FY19 FY20 FY21 UnscheduledArterial & Collector Projects 349
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY17UnscheduledFY21FY18FY19FY20Arterial & Collector StreetsSIF036STREET IFCOTTONWOOD (BABCOCK TO DURSTON)* ‐ CONSTRUCTION$1,277,942SIF039STREET IFFERGUSON & DURSTON (INTERSECTION) ‐ CONSTRUCTION$451,244SIF055STREET IFBAXTER (19TH TO DAVIS) ‐ CONSTRUCTION$500,000SIF057STREET IFOAK (FERGUSON TO COTTONWOOD) ‐ CONSTRUCTION$239,000SIF058STREET IFN. 27TH &OAK (INTERSECTION) ‐ CONSTRUCTION$200,000SIF061STREET IFOAK & FERGUSON (INTERSECTION) ‐ CONSTRUCTION$200,000SIF062STREET IFDURSTON (COTTONWOOD TO FOWLER) ‐ CONSTRUCTION$540,000SIF063STREET IFFOWLER & BABCOCK (INTERSECTION) ‐ CONSTRUCTION$200,000SIF069STREET IFFERGUSON & DURSTON (INTERSECTION) ‐ DESIGN$30,000SIF072STREET IFBAXTER (FERGUSON TO COTTONWOOD) ‐ CONSTRUCTION$500,000SIF073STREET IFFOWLER & DURSTON (INTERSECTION) ‐ CONSTRUCTION$200,000SIF074STREET IFFOWLER & OAK (INTERSECTION) ‐ CONSTRUCTION$200,000SIF076STREET IFFOWLER CONNECTION (HUFFINE TO OAK)* ‐ DESIGN$666,000SIF086STREET IFBAXTER & COTTONWOOD (INTERSECTION) ‐ CONSTRUCTION$92,400SIF098STREET IFOAK & COTTONWOOD (INTERSECTION ‐ ROUNDABOUT) ‐ CONSTRUCTION$685,680SIF102STREET IFS 11TH AVE (KAGY BLVD TO GRAF ST EXTENSION)* ‐ CONSTRUCTION$1,320,000SIF104STREET IFCOTTONWOOD & BABCOCK (INTERSECTION‐SIGNAL)$287,067350
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY17UnscheduledFY21FY18FY19FY20SIF105STREET IFCOTTONWOOD (DURSTON ‐ OAK)* ‐ CONSTRUCTION$1,238,333$666,000$1,030,000$1,630,244$2,005,680$2,803,342$692,400Summary for Arterial & Collector Streets (18 items)Totals by year:$666,000$1,030,000 $1,630,244$692,400FY21FY17FY18UnscheduledFY20$2,803,342$2,005,680FY19351
CIP Project Fund
Arterial & Collector Streets
PROJECT NUMBER
SIF036
DEPARTMENT
STREET IF
PROJECT NAME
COTTONWOOD (BABCOCK TO DURSTON)* - CONSTRUCTION
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
This project consists of widening Cottonwood Road from West Babcock Street to Baxter Street to a three lane urban arterial
standard. This includes one travel lane in each direction, bike lanes on each side, curb and gutter throughout, boulevard,
sidewalks and a raised median. Cottonwood Road serves as an important element in Bozeman's west side street system and
serves as a primary north-south corridor on the west side of the city.
ALTERNATIVES CONSIDERED
SID for full financing, Urban funds or incremental construction by developers.
ADVANTAGES OF APPROVAL
Improved traffic flow and safety in this corridor.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost estimate of
$8,725 per street mile maintained annually.
FUNDING SOURCES
This project is funded by Street Impact Fees ($1,275,178) and the Arterial & Collector District ($1,280,705). A development payback district
will be created to reimburse Arterial & Collector District for any local share (project related) costs that may be allocated to future
developments (estimated at $1,400,000).
New
Replacement
Equipment
Project
FY19 FY20
$1,277,942
FY21
352
CIP Project Fund
Arterial & Collector Streets
PROJECT NUMBER
SIF039
DEPARTMENT
STREET IF
PROJECT NAME
FERGUSON & DURSTON (INTERSECTION) - CONSTRUCTION
FY17 FY18
$451,244
Unscheduled
DESCRIPTION OF PROJECT
Control of the intersection of 7th Avenue and Griffin Drive. Includes the installation of a traffic signal or roundabout. Future
development and the resulting increased traffic indicate that intersection improvements will be needed.
ALTERNATIVES CONSIDERED
Accept the current level of service (do nothing). Alternative financing could be provided by creating an SID or Payback District.
ADVANTAGES OF APPROVAL
Improved traffic flow and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs.
FUNDING SOURCES
This project is funded by Street Impact Fees ($1,804,976) and the Arterial & Collector District ($451,244).
New
Replacement
Equipment
Project
FY19 FY20 FY21
353
CIP Project Fund
Arterial & Collector Streets
PROJECT NUMBER
SIF055
DEPARTMENT
STREET IF
PROJECT NAME
BAXTER (19th TO DAVIS) - CONSTRUCTION
FY17
$500,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
Complete Baxter Road from 19th to Davis to a 3 lane urban minor arterial standard including sidewalks, parking, medians,
boulevards and bike lanes.
ALTERNATIVES CONSIDERED
SID for full financing, Urban funds or incremental construction by developers.
ADVANTAGES OF APPROVAL
This project will expand the capacity of our street network and improve safety for drivers and pedestrians.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost estimate of
$8,725 per street mile maintained annually.
FUNDING SOURCES
This project is funded by Street Impact Fees ($1,000,000) and the Arterial & Collector District ($500,000). A development payback district will
be created to reimburse Street Impact Fees for any local share (project related) costs that may be allocated to future developments (etimated at
$500,000).
New
Replacement
Equipment
Project
FY19 FY20 FY21
354
CIP Project Fund
Arterial & Collector Streets
PROJECT NUMBER
SIF057
DEPARTMENT
STREET IF
PROJECT NAME
OAK (FERGUSON TO COTTONWOOD) - CONSTRUCTION
FY17 FY18
$239,000
Unscheduled
DESCRIPTION OF PROJECT
This Project is the completion of the street segment of Oak Street, from New Holland to Ferguson. Currently, the south half of
the street is missing, creating a bottleneck in the street network.
ALTERNATIVES CONSIDERED
Leave as-is. Wait for the developer to build the street.
ADVANTAGES OF APPROVAL
This project will expand the capacity of our street network and improve safety for drivers and pedestrians.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost estimate of
$8,725 per street mile maintained annually.
FUNDING SOURCES
This project is funded by Street Impact Fees ($761,000) and the Arterial & Collector District ($239,000). A development payback district will
be created to reimburse Street Impact Fees for any local share (project related) costs that may be allocated to future developments (estimated
at $261,000).
New
Replacement
Equipment
Project
FY19 FY20 FY21
355
CIP Project Fund
Arterial & Collector Streets
PROJECT NUMBER
SIF058
DEPARTMENT
STREET IF
PROJECT NAME
N. 27th &OAK (INTERSECTION) - CONSTRUCTION
FY17 FY18
$200,000
Unscheduled
DESCRIPTION OF PROJECT
Includes installation of a traffic signal, roundabout or other adequate traffic control device when warrants are met.
ALTERNATIVES CONSIDERED
Do nothing or consider other alternatives as suggested by MDT. Create an SID or identify other and apply for other potential sources of
funding (CMAQ…)
ADVANTAGES OF APPROVAL
Increased capacity and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: None
FUNDING SOURCES
This project is funded by Street Impact Fees ($800,000) and the Arterial & Collector District ($200,000).
New
Replacement
Equipment
Project
FY19 FY20 FY21
356
CIP Project Fund
Arterial & Collector Streets
PROJECT NUMBER
SIF061
DEPARTMENT
STREET IF
PROJECT NAME
OAK & FERGUSON (INTERSECTION) - CONSTRUCTION
FY17 FY18
$200,000
Unscheduled
DESCRIPTION OF PROJECT
Includes installation of a traffic signal, roundabout or other adequate traffic control device when warrants are met.
ALTERNATIVES CONSIDERED
Do nothing or consider other alternatives as suggested by MDT. Create an SID or identify other and apply for other potential sources of
funding (CMAQ…)
ADVANTAGES OF APPROVAL
Increased capacity and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost estimate of
$8,725 per street mile maintained annually.
FUNDING SOURCES
This project is funded by Street Impact Fees ($800,000) and the Arterial & Collector District ($200,000).
New
Replacement
Equipment
Project
FY19 FY20 FY21
357
CIP Project Fund
Arterial & Collector Streets
PROJECT NUMBER
SIF062
DEPARTMENT
STREET IF
PROJECT NAME
DURSTON (COTTONWOOD TO FOWLER) - CONSTRUCTION
FY17 FY18
$540,000
Unscheduled
DESCRIPTION OF PROJECT
Complete Durston Road from Fowler Lane to Cottonwood to an urban minor arterial standard.
ALTERNATIVES CONSIDERED
Continue with the facility as is.
ADVANTAGES OF APPROVAL
Increased capacity and safety in this corridor, both for motorized vehicles as well as bicycles and pedestrians.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost estimate of
$8,725 per street mile maintained annually.
FUNDING SOURCES
This project is funded by Street Impact Fees ($1,073,000) and the Arterial & Collector District ($540,000). A development payback district will
be created to reimburse Street Impact Fees for any local share (project related) costs that may be allocated to future developments (estimated
at $540,000).
New
Replacement
Equipment
Project
FY19 FY20 FY21
358
CIP Project Fund
Arterial & Collector Streets
PROJECT NUMBER
SIF063
DEPARTMENT
STREET IF
PROJECT NAME
FOWLER & BABCOCK (INTERSECTION) - CONSTRUCTION
FY17 FY18 Unscheduled
$200,000
DESCRIPTION OF PROJECT
Identified in the 2007 Transportation Plan Update. Includes installation of a traffic signal, roundabout or other adequate traffic
control device when warrants are met.
ALTERNATIVES CONSIDERED
SID for full financing, Urban funds or incremental construction by developers.
ADVANTAGES OF APPROVAL
Increased capacity and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Incremental increases in sweeping, plowing and general maintenanc
FUNDING SOURCES
This project is funded by Street Impact Fees ($800,000) and the Arterial & Collector District ($200,000).
New
Replacement
Equipment
Project
FY19 FY20 FY21
359
CIP Project Fund
Arterial & Collector Streets
PROJECT NUMBER
SIF069
DEPARTMENT
STREET IF
PROJECT NAME
FERGUSON & DURSTON (INTERSECTION) - DESIGN
FY17
$30,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
Includes design of a traffic signal, roundabout or other adequate traffic control device when warrants are met.
ALTERNATIVES CONSIDERED
SID for full financing, Urban funds or incremental construction by developers.
ADVANTAGES OF APPROVAL
Increased capacity and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs.
FUNDING SOURCES
This project is funded by Street Impact Fees ($120,000) and the Arterial & Collector District ($30,000).
New
Replacement
Equipment
Project
FY19 FY20 FY21
360
CIP Project Fund
Arterial & Collector Streets
PROJECT NUMBER
SIF072
DEPARTMENT
STREET IF
PROJECT NAME
BAXTER (FERGUSON TO COTTONWOOD) - CONSTRUCTION
FY17
$500,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
Complete Baxter from Ferguson to Cottonwood to a 3 lane urban minor arterial standard with bike lanes.
ALTERNATIVES CONSIDERED
SID for full financing, Urban funds or incremental construction by developers.
ADVANTAGES OF APPROVAL
This project will expand the capacity of our street network and improve safety for drivers and pedestrians.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in sweeping, plowing and general
FUNDING SOURCES
The $1,500,000 total cost of this project is funded by Street Impact Fees ($764,475), Arterial and Collector District ($500,000), and TOPS
($235,525). A development payback district will be created to reimburse Stret Impact Fees for any local share (project related) costs that may
be allocated to future developments (estimated at $264,475).
New
Replacement
Equipment
Project
FY19 FY20 FY21
361
CIP Project Fund
Arterial & Collector Streets
PROJECT NUMBER
SIF073
DEPARTMENT
STREET IF
PROJECT NAME
FOWLER & DURSTON (INTERSECTION) - CONSTRUCTION
FY17 FY18 Unscheduled
$200,000
DESCRIPTION OF PROJECT
Identified in the 2007 Transportation Plan Update. Includes installation of a traffic signal, roundabout or other adequate traffic
control device when warrants are met.
ALTERNATIVES CONSIDERED
SID for full financing, Urban funds or incremental construction by developers.
ADVANTAGES OF APPROVAL
Increased capacity and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs.
FUNDING SOURCES
This project is funded by Street Impact Fees ($800,000) and the Arterial & Collector District ($200,000).
New
Replacement
Equipment
Project
FY19 FY20 FY21
362
CIP Project Fund
Arterial & Collector Streets
PROJECT NUMBER
SIF074
DEPARTMENT
STREET IF
PROJECT NAME
FOWLER & OAK (INTERSECTION) - CONSTRUCTION
FY17 FY18 Unscheduled
$200,000
DESCRIPTION OF PROJECT
Identified in the 2007 Transportation Plan Update. Includes installation of a traffic signal, roundabout or other adequate traffic
control device when warrants are met.
ALTERNATIVES CONSIDERED
Leave as-is. Wait for the developer to build the street.
ADVANTAGES OF APPROVAL
Increased capacity and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs.
FUNDING SOURCES
This project is funded by Street Impact Fees ($800,000) and the Arterial & Collector District ($200,000).
New
Replacement
Equipment
Project
FY19 FY20 FY21
363
CIP Project Fund
Arterial & Collector Streets
PROJECT NUMBER
SIF076
DEPARTMENT
STREET IF
PROJECT NAME
FOWLER CONNECTION (HUFFINE TO OAK)* - DESIGN
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
Design Fowler from Huffine to Oak to an urban minor arterial standard. Design includes 3 intersections.
ALTERNATIVES CONSIDERED
Leave as-is. Wait for the developer to build the street.
ADVANTAGES OF APPROVAL
This project will expand the capacity of our street network and improve safety for drivers and pedestrians.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost estimate of
$8,725 per street mile maintained annually.
FUNDING SOURCES
This project is funded by Street Impact Fees ($334,000) and the Arterial & Collector District ($666,000). A development payback district will
be created to reimburse Arterial & Collector District for any project related costs that may be allocated to future developments (estimated at
$334,000).
New
Replacement
Equipment
Project
FY19 FY20 FY21
$666,000
364
CIP Project Fund
Arterial & Collector Streets
PROJECT NUMBER
SIF086
DEPARTMENT
STREET IF
PROJECT NAME
BAXTER & COTTONWOOD (INTERSECTION) - CONSTRUCTION
FY17 FY18 Unscheduled
$92,400
DESCRIPTION OF PROJECT
Identified in the 2007 Transportation Plan Update. Includes installation of a traffic signal, roundabout or other adequate traffic
control device when warrants are met.
ALTERNATIVES CONSIDERED
Identified in the 2007 Transportation Plan Update. Includes installation of a traffic signal, roundabout or other adequate traffic control device
when warrants are met.
ADVANTAGES OF APPROVAL
Increased capacity and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs.
FUNDING SOURCES
This project is funded by Street Impact Fees ($369,600) and the Arterial & Collector District ($92,400).
New
Replacement
Equipment
Project
FY19 FY20 FY21
365
CIP Project Fund
Arterial & Collector Streets
PROJECT NUMBER
SIF098
DEPARTMENT
STREET IF
PROJECT NAME
OAK & COTTONWOOD (INTERSECTION - ROUNDABOUT) - CONSTRUCTION
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
Identified in the 2007 Transportation Plan Update. Includes installation of a traffic signal, roundabout or other adequate traffic
control device when warrants are met.
ALTERNATIVES CONSIDERED
SID for full financing, Urban funds or incremental construction by developers.
ADVANTAGES OF APPROVAL
Increased capacity and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost estimate of
$8,725 per street mile maintained annually.
FUNDING SOURCES
This project is funded by Street Impact Fees ($2,742,721) and the Arterial & Collector District ($685,680).
New
Replacement
Equipment
Project
FY19
$685,680
FY20 FY21
366
CIP Project Fund
Arterial & Collector Streets
PROJECT NUMBER
SIF102
DEPARTMENT
STREET IF
PROJECT NAME
S 11TH AVE (KAGY BLVD TO GRAF ST EXTENSION)* - CONSTRUCTION
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
Complete S 11th from Kagy to Graf to an urban collector standard including sidewalks, curb and gutter and bike lanes.
ALTERNATIVES CONSIDERED
Leave as-is. Wait for the developer to build the street.
ADVANTAGES OF APPROVAL
This project will expand the capacity of our street network and improve safety for drivers and pedestrians.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost estimate of
$8,725 per street mile maintained annually.
FUNDING SOURCES
This project is funded by Street Impact Fees ($1,320,000) and the Arterial & Collector District ($1,320,000). A development payback district
will be created to reimburse Arterial & Collector District for any project related costs that may be allocated to future developments (estimated
at $1,320,000).
New
Replacement
Equipment
Project
FY19
$1,320,000
FY20 FY21
367
CIP Project Fund
Arterial & Collector Streets
PROJECT NUMBER
SIF104
DEPARTMENT
STREET IF
PROJECT NAME
COTTONWOOD & BABCOCK (INTERSECTION-SIGNAL)
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
Install a signal at the intersection of Cottonwood & Babcock.
ALTERNATIVES CONSIDERED
Leave as-is.
ADVANTAGES OF APPROVAL
This project will expand the capacity of our street network and improve safety for drivers and pedestrians.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost estimate of
$8,725 per street mile maintained annually.
FUNDING SOURCES
80% IMPACT FEES, 20% ARTERIAL AND COLLECTOR DISTRICT This project is funded by Street Impact Fees (80%) and the Arterial &
Collector District (20%).
New
Replacement
Equipment
Project
FY19 FY20
$287,067
FY21
368
CIP Project Fund
Arterial & Collector Streets
PROJECT NUMBER
SIF105
DEPARTMENT
STREET IF
PROJECT NAME
COTTONWOOD (DURSTON - OAK)* - CONSTRUCTION
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
Complete the construction of Cottonwood Road, from Durston Road - Oak street.
ALTERNATIVES CONSIDERED
Leave as-is. Wait for the developer to build the street.
ADVANTAGES OF APPROVAL
This project will expand the capacity of our street network and improve safety for drivers and pedestrians.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost estimate of
$8,725 per street mile maintained annually.
FUNDING SOURCES
This project is funded by Street Impact Fees ($1,238,333) and the Arterial & Collector District ($1,238,333). A development payback district
will be created to reimburse Arterial & Collector District for any local share (project related) costs that may be allocated to future
developments (estimated at $1,238,333).
New
Replacement
Equipment
Project
FY19 FY20
$1,238,333
FY21