HomeMy WebLinkAboutA1. Street and Curb Recon CIP
Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Anna Rosenberry, Administrative Services Director
SUBJECT: Adopt the Street and Curb Reconstruction Fund Capital
Improvement Plan (CIP) for Fiscal Years 2017-2021.
AGENDA ITEM TYPE: Action
MEETING DATE: December 14, 2015
RECOMMENDATION: Adopt the Street and Curb Reconstruction Fund Capital
Improvement Plan (CIP) for Fiscal Years 2017-2021.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th.
The Public Works, City Manager, and other city staff met in October and November to develop
the attached Capital Plan for the equipment and capital needs of the Street and Curb
Reconstruction Fund. This plan outlines the use of Street Maintenance District dollars that are
dedicated to the reconstruction of streets and curbs. The policy for required matches with
Special Improvement Districts (SID’s) is outlined in Commission Resolution No. 4507.
Item of Note:
• Each project is dependent upon the creation of a Special Improvement District to pay for
a share of the project costs.
288
• If preliminary information indicates that property owners along the street are likely to
have sufficient protests to prevent creation of the SID, we recommend moving to the next
project on the list.
UNRESOLVED ISSUES: None.
ALTERNATIVES: As suggested by the City Commission. If the Commission does not
wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda.
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY17.
Report compiled on: November 16th, 2015
Attached: Street and Curb Reconstruction CIP
289
Street and Curb Reconstructions (combined) Capital Improvement PlanFinancial SummaryCurrent YearFY16FY17FY18 FY19 FY20 FY21UnscheduledProjected Beginning Reserve Balance Dedicated to CIP773,000$ 74,209$ (653,637)$ (606,420)$ 186,373$ 295,136$ Plus: Street Maintenance Assessments Dedicated 647,609$ 673,773$ 687,248$ 700,993$ 715,013$ 729,313$ Plus: SID or other local contribution237,600$ 236,756$ 1,740,094$ 151,800$ 465,750$ 737,438$ Less: Carryover Capital Projects Less: Scheduled CIP Project Costs(1,584,000)$ (1,638,375)$ (2,380,125)$ (60,000)$ (1,072,000)$ (1,534,875)$ ‐$ Projected Year‐End Cash Dedicated to CIP74,209$ (653,637)$ (606,420)$ 186,373$ 295,136$ 227,012$ Assumptions Made for Revenue Estimates:Current YearFY16FY17FY18FY19 FY20 FY21Total Estimated Annual Street Assessment Revenue4,178,124$ 4,261,686$ 4,346,920$ 4,433,859$ 4,522,536$ 4,612,987$ Estimated Annual Increase ‐ Attributed to Annexations2%2%2%2%2%Total Estimated Revenues4,178,124$ 4,346,920$ 4,433,859$ 4,522,536$ 4,612,987$ 4,705,246$ Current Revenues Dedicated to Street & Curb CIP %15.5%15.5% 15.5% 15.5% 15.5% 15.5% Plus: Increase Dedicated to Reconstruction & Curbs0.0%0.0%0.0%0.0% 0.0%0.0% Total % Dedicated to CIP15.5%15.5% 15.5% 15.5% 15.5% 15.5%Total Estimated Revenues Dedicated to CIP647,609$ 673,773$ 687,248$ 700,993$ 715,013$ 729,313$ ProjectedProjectedCURRENT2,500,0002,000,0001,500,0001,000,000500,0000Street Reconstruction Projects 290
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY17UnscheduledFY21FY18FY19FY20Street and Curb Replacement FundSCR01ENGINEERINGANNUAL CURB REPLACEMENT & CONCRETE REPAIR PROGRAM$60,000$60,000$60,000$60,000$60,000SCR03ENGINEERINGW OLIVE (8TH TO GRAND) ‐ DESIGN AND CONSTRUCTION$1,578,375SCR04ENGINEERINGS GRAND (OLIVE TO HAYES) ‐ DESIGN AND CONSTRUCTION$2,320,125SCR05ENGINEERINGN GRAND (MENDENHAL TO PEACH) ‐ DESIGN AND CONSTRUCTION$1,083,875SCR06ENGINEERINGE OLIVE (BLACK TO CHURCH) ‐ DESIGN AND CONSTRUCTION$1,012,000SCR07ENGINEERINGS 3RD (OLIVE TO CLEVELAND) ‐ DESIGN AND CONSTRUCTION$1,696,250SCR08ENGINEERINGS BLACK (COLLEGE TO S CUL‐DE‐SAC) ‐ DESIGN AND CONSTRUCTION$621,000SCR09ENGINEERINGS TRACY (BABCOCK TO COLLEGE) ‐ DESIGN AND CONSTRUCTION$1,474,875SCR10ENGINEERINGN TRACY (VILLARD TO PEACH) ‐ DESIGN AND CONSTRUCTION$529,000SCR11ENGINEERINGS 4TH AVE (COLLEGE TO BABCOCK) ‐ DESIGN AND CONSTRUCTION$1,295,000SCR12ENGINEERINGW KOCH (8TH TO TRACY) ‐ DESIGN AND CONSTRUCTION$1,575,500$681,000$1,638,375$2,380,125$1,072,000$60,000$7,654,500Summary for Street and Curb Replacement Fund (11 items)Totals by year:$681,000$1,638,375 $2,380,125$7,654,500FY21FY17FY18UnscheduledFY20$60,000$1,072,000FY19291
CIP Project Fund
Street and Curb Replacement Fund
PROJECT NUMBER
SCR01
DEPARTMENT
ENGINEERING
PROJECT NAME
ANNUAL CURB REPLACEMENT & CONCRETE REPAIR PROGRAM
FY17
$60,000
FY18
$60,000
Unscheduled
DESCRIPTION OF PROJECT
When a pedestrian ramp is installed, many times the adjacent curbs need to be replaced in order to get drainage to not stop at
new ramp. Smaller curb repairs can be necessary rather than replacing a whole block
ALTERNATIVES CONSIDERED
Continue current operations
ADVANTAGES OF APPROVAL
This will allow completion of smaller projects instead of waiting for an entire block to be repaired
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Cost of Materials
FUNDING SOURCES
Street & Curb Replacement Fund
New
Replacement
Equipment
Project
FY19
$60,000
FY20
$60,000
FY21
$60,000
292
CIP Project Fund
Street and Curb Replacement Fund
PROJECT NUMBER
SCR03
DEPARTMENT
ENGINEERING
PROJECT NAME
W OLIVE (8TH TO GRAND) - DESIGN AND CONSTRUCTION
FY17
$1,578,375
FY18 Unscheduled
DESCRIPTION OF PROJECT
Reconstruction of West Olive Street from 8th Street to Grand, including repairs to failed curbs and gutters. For planning
purposes, project estimates West Olive to function as a Major Collector, which would require a 15% contribution from property
owners via a Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Street and Curb Replacement Fund - 85%. Local SID - 15%.
New
Replacement
Equipment
Project
FY19 FY20 FY21
293
CIP Project Fund
Street and Curb Replacement Fund
PROJECT NUMBER
SCR04
DEPARTMENT
ENGINEERING
PROJECT NAME
S GRAND (OLIVE TO HAYES) - DESIGN AND CONSTRUCTION
FY17 FY18
$2,320,125
Unscheduled
DESCRIPTION OF PROJECT
Reconstruction of South Grand Street from Olive to Hayes, including repairs to failed curbs and gutters. For planning purposes,
project estimates South Grand to function as a Local Street, which would require a 75% contribution from property owners via a
Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY19 FY20 FY21
294
CIP Project Fund
Street and Curb Replacement Fund
PROJECT NUMBER
SCR05
DEPARTMENT
ENGINEERING
PROJECT NAME
N GRAND (MENDENHAL TO PEACH) - DESIGN AND CONSTRUCTION
FY17 FY18 Unscheduled
$1,083,875
DESCRIPTION OF PROJECT
Reconstruction of North Grand from Mendehal to Peach, including repairs to failed curbs and gutters. For planning purposes,
project estimates North Grand to function as a Local Street, which would require a 75% contribution from property owners via a
Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY19 FY20 FY21
295
CIP Project Fund
Street and Curb Replacement Fund
PROJECT NUMBER
SCR06
DEPARTMENT
ENGINEERING
PROJECT NAME
E OLIVE (BLACK TO CHURCH) - DESIGN AND CONSTRUCTION
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
Reconstruction of East Olive Street from Tracy to Church, including repairs to failed curbs and gutters. For planning purposes,
project estimates East to function as a Major Collector, which would require a 15% contribution from property owners via a
Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Street and Curb Replacement Fund - 85%. Local SID - 15%.
New
Replacement
Equipment
Project
FY19
$1,012,000
FY20 FY21
296
CIP Project Fund
Street and Curb Replacement Fund
PROJECT NUMBER
SCR07
DEPARTMENT
ENGINEERING
PROJECT NAME
S 3RD (OLIVE TO CLEVELAND) - DESIGN AND CONSTRUCTION
FY17 FY18 Unscheduled
$1,696,250
DESCRIPTION OF PROJECT
Reconstruction of South 3rd Ave from Olive to Cleveland, including repairs to failed curbs and gutters. For planning purposes,
project estimates S 3rd to function as a Minor Collector, which would require a 50% contribution from property owners via a
Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Street and Curb Replacement Fund - 50%. Local SID - 50%.
New
Replacement
Equipment
Project
FY19 FY20 FY21
297
CIP Project Fund
Street and Curb Replacement Fund
PROJECT NUMBER
SCR08
DEPARTMENT
ENGINEERING
PROJECT NAME
S BLACK (COLLEGE TO S CUL-DE-SAC) - DESIGN AND CONSTRUCTION
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
Reconstruction of South Black from College to the Cul-de-Sac, including repairs to failed curbs and gutters. For planning
purposes, project estimates South Black to function as a Local Street, which would require a 75% contribution from property
owners via a Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY19 FY20 FY21
$621,000
298
CIP Project Fund
Street and Curb Replacement Fund
PROJECT NUMBER
SCR09
DEPARTMENT
ENGINEERING
PROJECT NAME
S TRACY (BABCOCK TO COLLEGE) - DESIGN AND CONSTRUCTION
FY17 FY18 Unscheduled
$1,474,875
DESCRIPTION OF PROJECT
Reconstruction of South Tracy Street from Babcock to College, including repairs to failed curbs and gutters. For planning
purposes, project estimates South Tracy to function as a Minor Collector, which would require a 50% contribution from property
owners via a Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Street and Curb Replacement Fund - 50%. Local SID - 50%.
New
Replacement
Equipment
Project
FY19 FY20 FY21
299
CIP Project Fund
Street and Curb Replacement Fund
PROJECT NUMBER
SCR10
DEPARTMENT
ENGINEERING
PROJECT NAME
N TRACY (VILLARD TO PEACH) - DESIGN AND CONSTRUCTION
FY17 FY18 Unscheduled
$529,000
DESCRIPTION OF PROJECT
Reconstruction of North Tracy Street from Villard to Peach, including repairs to failed curbs and gutters. For planning purposes,
project estimates North Tracy to function as a Minor Collector, which would require a 50% contribution from property owners
via a Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Street and Curb Replacement Fund - 50%. Local SID - 50%.
New
Replacement
Equipment
Project
FY19 FY20 FY21
300
CIP Project Fund
Street and Curb Replacement Fund
PROJECT NUMBER
SCR11
DEPARTMENT
ENGINEERING
PROJECT NAME
S 4TH AVE (COLLEGE TO BABCOCK) - DESIGN AND CONSTRUCTION
FY17 FY18 Unscheduled
$1,295,000
DESCRIPTION OF PROJECT
Reconstruction of South 4th Ave from College to Babcock, including repairs to failed curbs and gutters. For planning purposes,
project estimates South 4th to function as a Local Street, which would require a 75% contribution from property owners via a
Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY19 FY20 FY21
301
CIP Project Fund
Street and Curb Replacement Fund
PROJECT NUMBER
SCR12
DEPARTMENT
ENGINEERING
PROJECT NAME
W KOCH (8TH TO TRACY) - DESIGN AND CONSTRUCTION
FY17 FY18 Unscheduled
$1,575,500
DESCRIPTION OF PROJECT
Reconstruction of West Koch Street from 8th to Tracy, including repairs to failed curbs and gutters. For planning purposes,
project estimates West Koch to function as a Minor Collector, which would require a 50% contribution from property owners
via a Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Street and Curb Replacement Fund - 50%. Local SID - 50%.
New
Replacement
Equipment
Project
FY19 FY20 FY21
302