HomeMy WebLinkAboutC9. Solid Waste Fund
Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Anna Rosenberry, Administrative Services Director
SUBJECT: Adopt the Solid Waste Fund (Collection & Recycling) Capital
Improvement Plan (CIP) for Fiscal Years 2017-2021.
AGENDA ITEM TYPE: Consent
MEETING DATE: December 7, 2015
RECOMMENDATION: Adopt the Solid Waste Fund (Collection & Recycling) Capital
Improvement Plan (CIP) for Fiscal Years 2017-2021.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th. Similar to recent years
past, we are bringing the various parts of the plan forward as items on the Consent agenda. We
will be prepared to address questions, if they arise, at the public meeting.
The Public Works, City Manager, and other city staff met in October to develop the attached
Capital Plan for the equipment and capital needs of the Solid Waste Fund. The attached capital
replacement schedule is needed to continue operations for garbage collection and the recycling
program as they currently stand. This plan works in concert with the existing Solid Waste Rate
study that was completed in FY13, funding annual capital replacement at an amount similar to
annual depreciation expense noted in the rate study. Once an additional route vehicle is added,
the annual depreciation expense will be adjusted to include the added truck.
Item of Note:
151
• During FY16, many vehicles and/or truck packer units were replaced, according to plan.
This resulted in the Solid Waste Fund’s cash reserve being spent below customary levels
for capital. We will be recovering this balance over FY17 and FY18, which see
relatively low levels of capital spending.
• We anticipate needing to add a new service route truck in FY19. This will mark a
significant point in our operations – as positive customer growth is driving the need for
this equipment.
• Solid Waste Fund revenues have averaged growth of 3.2% per year over the past 5 years.
640 - Solid Waste Revenue history Amount Change
2011 $ 2,570,358.00 -
2012 $ 2,571,722.00 0.1%
2013 $ 2,519,436.00 -2.0%
2014 $ 2,721,913.00 8.0%
2015 $ 2,956,655.00 8.6%
Linear Trend - 2016 $ 3,000,000.00 1.5%
Average FY11-FY15 $ 2,668,016.80 3.2%
UNRESOLVED ISSUES: None.
$-
$500,000.00
$1,000,000.00
$1,500,000.00
$2,000,000.00
$2,500,000.00
$3,000,000.00
$3,500,000.00
2011 2012 2013 2014 2015 Linear
Trend -
2016
Solid Waste Fund Revenues
152
ALTERNATIVES: As suggested by the City Commission. If the Commission does not
wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda.
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY16.
Report compiled on: November 25th, 2015
Attached: Solid Waste CIP
153
Solid Waste Collection & RecyclingCapital Improvement PlanFinancial SummaryCurrent YearFY16FY17FY18 FY19 FY20 FY21UnscheduledProjected Beginning Reserve Balance Dedicated to CIP331,881$ (376,162)$ (129,462)$ 209,289$ 55,453$ (205,599)$ ‐$ Plus: Revenues Dedicated to CIP390,000$ 401,700$ 413,751$ 426,164$ 438,948$ 452,117$ ‐$ Less: Scheduled CIP Project Costs(1,098,043)$ (155,000)$ (75,000)$ (580,000)$ (700,000)$ (165,000)$ ‐$ Projected Year‐End Cash Dedicated to CIP(376,162)$ (129,462)$ 209,289$ 55,453$ (205,599)$ 81,518$ ‐$ Assumptions Made for Revenue Estimates:Current YearFY16FY17FY18 FY19 FY20 FY21Estimated Annual Revenues3,000,000$ 3,000,000$ 3,090,000$ 3,182,700$ 3,278,181$ 3,376,526$ Estimated Annual Increase in Revenues ‐ 3%3%3%3%3%Total Estimated Revenues3,000,000$ 3,090,000$ 3,182,700$ 3,278,181$ 3,376,526$ 3,477,822$ Current Revenues Dedicated to CIP %12.0%13.0% 13.0% 13.0% 13.0% 13.0% Plus: Increase Dedicated to CIP1.0%0.0%0.0% 0.0% 0.0% 0.0% Total % Dedicated to CIP13.0%13.0% 13.0% 13.0% 13.0% 13.0%Total Estimated Revenues Dedicated to CIP390,000$ 401,700$ 413,751$ 426,164$ 438,948$ 452,117$ Note: 2012 Rate Study identifies $367,000 in total annual depreciation expense.ProjectedProjectedCURRENT1,200,0001,000,000800,000600,000400,000200,0000Solid Waste Projects & Equipment 154
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY17UnscheduledFY21FY18FY19FY20Solid WastePW01 ‐ SHCOLLECTIONSHOPS FACILITY EXPANSION PLAN$10,000SW32COLLECTIONFRONTLOAD REPLACEMENT TRUCK$270,000SW36COLLECTIONSIDE LOAD NEW ‐ (ADDITIONAL ROUTE)$290,000SW37COLLECTIONSIDE LOAD PACKER REPLACEMENT$165,000$140,000SW38COLLECTIONSIDE LOAD TRUCK REPLACEMENT$290,000$290,000SW39COLLECTIONRATE STUDY ‐ UPDATE SOLID WASTE$35,000SW42COLLECTIONSTORAGE BUILDING$75,000SW43COLLECTIONFRONT‐LOAD CONTAINER TRANSPORT TRUCK$60,000SW44COLLECTIONCOMPOST MIXER$50,000$165,000$155,000$75,000$580,000$700,000Summary for Solid Waste (9 items)Totals by year:$165,000$155,000 $75,000FY21FY17FY18UnscheduledFY20$700,000$580,000FY19155
CIP Project Fund
Solid Waste
PROJECT NUMBER
PW01 - SH
DEPARTMENT
COLLECTION
PROJECT NAME
SHOPS FACILITY EXPANSION PLAN
FY17
$10,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
The construction of the new Vehicle Maintenance Shop at the Lower Yards on Rouse Avenue in FY10/FY11 was Phase I in
expanding and improving our ability to service equipment, store vehicles, and provide work space for Public Works, Parks, and
Facilitiy services. Questions remain about the long-term plan for construction, location, and expansion for: Streets, Sign & Signal,
Forestry, Water/Sewer Operations, Solid Waste Collection & Recycling, Facilities, and Parks & Cemetery departments. This
project would develop a master plan.
ALTERNATIVES CONSIDERED
Most of the reconfiguration for the existing buildings is now complete. Also the improvements for the Laurel Glen building are complete and
that building is being used for Water/Sewer operations. This work would assess future needs for the departments at the current Shop location
at 814 N. Bozeman. We could also determine whether there is space for additions at both the 814 N. Bozeman location and the new Vehicle
Maintenance building site at 1812 N. Rouse.
ADVANTAGES OF APPROVAL
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
From related divisions: General Fund 20% ($10,000), Water Fund 20% ($10,000), Wastewater Fund 20% ($10,000), Street Maintenance Fund
20% ($10,000), Solid Waste Fund 20% ($10,000).
New
Replacement
Equipment
Project
FY19 FY20 FY21
156
CIP Project Fund
SOLID WASTE
PROJECT NUMBER
SW32
DEPARTMENT
COLLECTION
PROJECT NAME
FRONTLOAD REPLACEMENT TRUCK
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
This truck is a replacement for existing front-load truck currently collecting residential and commercial refuse. The new truck will
ensure continued efficient, cost-effective refuse collection that will allow the Division to meet the demands of a growing city while
maintaining the standards the Bozeman residents expect.
ALTERNATIVES CONSIDERED
Leasing a front-load truck.
ADVANTAGES OF APPROVAL
Reliable equipment to ensure routes completed in an efficient manner. Maintenance costs of new equipment will be lower.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Average maintenance costs: $10,000/year
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY19 FY20
$270,000
FY21
157
CIP Project Fund
Solid Waste
PROJECT NUMBER
SW36
DEPARTMENT
COLLECTION
PROJECT NAME
SIDE LOAD NEW - (ADDITIONAL ROUTE)
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
The Solid Waste Division continues to see substantial new growth in residential accounts. 2015 marks the third consecutive year
for residential growth exceeding 450 new accounts. To keep pace with this growth pattern we will need to add an additional
route, which will require the purchase of an additional side-load truck.
ALTERNATIVES CONSIDERED
Leasing a side-load truck
ADVANTAGES OF APPROVAL
Reliable equipment to ensure routes completed in an efficient manner. Maintenance costs of new equipment will be lower.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual operating and maintenance costs = $30,000
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY19
$290,000
FY20 FY21
158
CIP Project Fund
Solid Waste
PROJECT NUMBER
SW37
DEPARTMENT
COLLECTION
PROJECT NAME
SIDE LOAD PACKER REPLACEMENT
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
This replacement packer will be placed on an existing chassis, thus extending the life of the overall unit. The old packer will be
traded in or kept for replacement parts. New packers advancement in materials used have led to extend the life of the packer.
Because of all the moving parts, packers wear out within 4 years (7,000 hours) of use.
ALTERNATIVES CONSIDERED
To continue to operate existing packer with increased repair costs and down time. Leasing side-load equipment.
ADVANTAGES OF APPROVAL
To minimize repair costs and having reliable equipment to provide high customer service expectations.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual operating and maintenance costs = $6,000
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY19 FY20
$140,000
FY21
$165,000
159
CIP Project Fund
Solid Waste
PROJECT NUMBER
SW38
DEPARTMENT
COLLECTION
PROJECT NAME
SIDE LOAD TRUCK REPLACEMENT
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
This truck is a replacement for existing side-load truck currently collecting residential refuse. The new truck will ensure continued
efficient, cost-effective refuse collection that will allow the Division to meet the demands of a growing city while maintaining the
standards the Bozeman residents expect.
ALTERNATIVES CONSIDERED
To continue to operate existing truck with increased repair costs and down time. Leasing side-load truck.
ADVANTAGES OF APPROVAL
Reliable equipment to ensure routes completed in an efficient manner. Maintenance costs of new equipment will be lower.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual operating and maintenance costs = $30,000
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY19
$290,000
FY20
$290,000
FY21
160
CIP Project Fund
Solid Waste
PROJECT NUMBER
SW39
DEPARTMENT
COLLECTION
PROJECT NAME
RATE STUDY - UPDATE SOLID WASTE
FY17
$35,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
Update to 2012 Rate Study.
ALTERNATIVES CONSIDERED
Continue basing rates on 2012 Study
ADVANTAGES OF APPROVAL
Updating the rate study every 5 years will allow the division to ensure that they can continue operating and providing services at a fair rate
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY19 FY20 FY21
161
CIP Project Fund
Solid Waste
PROJECT NUMBER
SW42
DEPARTMENT
COLLECTION
PROJECT NAME
STORAGE BUILDING
FY17 FY18
$75,000
Unscheduled
DESCRIPTION OF PROJECT
This pole construction cold storage building would shelter some equipment and many of the containers currently stored outside.
ALTERNATIVES CONSIDERED
Continue to store items outside
ADVANTAGES OF APPROVAL
Protect equipment from the elements of weather; All of our containers can be stored inside, not collecting water, exposure to sun and be less
visible to adjacent properties.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Operating costs, electricity for lights = < $1,000/ year
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY19 FY20 FY21
162
CIP Project Fund
SOLID WASTE
PROJECT NUMBER
SW43
DEPARTMENT
COLLECTION
PROJECT NAME
FRONT-LOAD CONTAINER TRANSPORT TRUCK
FY17
$60,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
This equipment is for the delivery, exchange and/or removal of front-load metal dumpsters. The area of temporary dumpster
service is increasing in popularity. Temporary dumpster service requests range from general move-out, compost/brush removal to
small construction projects. We have maximized the current capacity of the truck we have now.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Continue to meet the needs of the customers
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Maintenance costs estimated < $1,000.00
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY19 FY20 FY21
163
CIP Project Fund
SOLID WASTE
PROJECT NUMBER
SW44
DEPARTMENT
COLLECTION
PROJECT NAME
COMPOST MIXER
FY17
$50,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
The compost mixer will blend the various feedstocks to optimize the composting process. Currently we mix using the loader
bucket, which is one of the least efficient ways of blending compost feedstocks. One of the more difficult tasks is maintaining
moisture content in the compost process. The best place to add moisture to compost is at the mixing stage. Introducing a
compost mixer to our system will allow us to handle more volume, as the composting process will require less time (6-8 weeks).
Introduction of the mixer will allow us to expand into food scrap composting.
ALTERNATIVES CONSIDERED
Continue with our current operations. Compost currently takes 3 years to complete.
ADVANTAGES OF APPROVAL
Composting benefits include; Soil conditioner, good for the environment and reduces landfill waste. Finished compost can be used in City parks
as a soil amendment.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project