HomeMy WebLinkAboutA2. Storm Water Fund CIP
Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Anna Rosenberry, Administrative Services Director
SUBJECT: Adopt the Storm Water Fund Capital Improvement Plan (CIP) for
Fiscal Years 2017-2021.
AGENDA ITEM TYPE: Action
MEETING DATE: December 7, 2015
RECOMMENDATION: Adopt the Storm Water Fund Capital Improvement Plan (CIP)
for Fiscal Years 2017-2021.
SUGGESTED MOTION: I move to adopt the Storm Water Fund Capital Improvement Plan
for Fiscal Years 2017-2021.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th. Similar to recent years
past, we are bringing the various parts of the plan forward as items on the Consent agenda. We
will be prepared to address questions, if they arise, at the public meeting.
The Public Works, City Manager, and other city staff met in October to develop the attached
Capital Plan for the equipment and capital needs of the Storm Water Fund. With the adoption of
the new Storm Water Utility rate model (based on the budgeted “bronze plan”), items that were
previously grouped into large “pools” of dollars are now described in more specificity, as
individual projects.
253
Items of Note:
• The Storm Water Utility and Fund were created during FY13. Revenues in the Storm
Water Fund have been changing as we implement new rate policies. The final policy
change will occur in December 2015, as we add the charges for impervious service and
credits for existing infrastructure.
• We are basing our FY16 revenue estimates off detailed revenue analysis that was
completed for the rate changes. Annual customer growth was estimated to be 3% per
year in our most recent Wastewater rate model – and we are using that as our estimate in
this capital plan. Actual revenues will grow depending on the mix of impervious
areas/existing infrastructure use as property is annexed and developed.
670 - Storm Water Amount Change
2011 $ none none
2012 $ none none
2013 $ 238,735.00 -
2014 $ 268,531.00 12.5%
2015 $ 451,766.00 68.2%
Estimate - 2016 $ 967,100.00 114.1%
Average FY13- FY16 $ 481,533.00 64.9%
254
UNRESOLVED ISSUES: None.
ALTERNATIVES: As suggested by the City Commission. If the Commission does not
wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda.
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY16.
Report compiled on: November 25th, 2015
Attached: Storm Water CIP
$-
$200,000.00
$400,000.00
$600,000.00
$800,000.00
$1,000,000.00
$1,200,000.00
2011 2012 2013 2014 2015 Estimate -
2016
Storm Water Utility Revenue
255
Storm Water Utility Capital Improvement PlanFinancial SummaryCurrent YearFY16FY17FY18 FY19 FY20 FY21UnscheduledProjected Beginning Reserve Balance Dedicated to CIP99,000$ ‐$ ‐$ ‐$ ‐$ ‐$ Plus: Storm Water Utility Fees Dedicated to Capital231,000$ 655,080$ 674,732$ 694,974$ 715,824$ 737,298$ Less: Scheduled CIP Project Costs(231,000)$ (650,000)$ (650,000)$ (650,000)$ (650,000)$ (650,000)$ (424,300)$ Projected Year‐End Cash Dedicated to CIP99,000$ 5,080$ 24,732$ 44,974$ 65,824$ 87,298$ (424,300)$ Assumptions Made for Revenue Estimates:Current YearFY16FY17FY18FY19FY20FY21Estimated Annual Storm Water Utility Revenue967,000$ 1,200,000$ 1,236,000$ 1,273,080$ 1,311,272$ 1,350,611$ Estimated Annual Increase ‐ Attributed to Growth3%3%3%3%3% Estimated Annual Increase ‐ Rate Increase0%0%0%0%0%Total Estimated Revenues967,000$ 1,236,000$ 1,273,080$ 1,311,272$ 1,350,611$ 1,391,129$ Current Revenues Dedicated to CIP %24.0%53.0% 53.0% 53.0% 53.0% 53.0% Plus: Increase Dedicated to Capital0.0%0.0%0.0%0.0%0.0%0.0% Total % Dedicated to CIP24.0%53.0% 53.0% 53.0% 53.0% 53.0%Total Estimated Revenues Dedicated to CIP232,080$ 655,080$ 674,732$ 694,974$ 715,824$ 737,298$ ProjectedProjected700,000600,000500,000400,000300,000200,000100,0000Storm Water Projects 256
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY17UnscheduledFY21FY18FY19FY20Storm Water FundSTRM02STORMWATERROCKY CREEK STORMWATER IMPROVEMENTS$20,000STRM04STORMWATERANNUAL PIPE REHABILITATION AND DRAINAGE PROJECTS' DESIGN$25,000$25,000$25,000$25,000$25,000STRM08STORMWATERROUSE AVENUE INFRASTRUCTURE$279,300STRM10STORMWATERANNUAL SYSTEM ENHANCEMENT PROJECTS' DESIGN$25,000$25,000$25,000$25,000$25,000STRM13STORMWATERANNUAL UNPLANNED PIPE REHABILITATIONS AND DRAINAGE PROJECTS$375,000$165,000$100,000$275,000$375,000STRM15STORMWATERANNUAL SYSTEM ENHANCEMENT PROGRAM ‐ COUNTY FAIR GROUNDS$225,000STRM18STORMWATERANNUAL SYSTEM ENHANCEMENT PROGRAM ‐ N WALLACE AND E TAMARACK$75,000STRM20STORMWATERANNUAL SYSTEM ENHANCEMENT PROGRAM ‐ S BLACK AND E CLEVELAND$100,000STRM21STORMWATERANNUAL SYSTEM ENHANCEMENT PROGRAM ‐ S BOZEMAN AND E CLEVELAND$62,500STRM24STORMWATERSTORMWATER FACILITY PLAN$100,000STRM25STORMWATERANNUAL SYSTEM ENHANCEMENT PROGRAM ‐ N ROUSE AND E LAMME$500,000STRM26STORMWATERSTORMWATER TV VAN REFURBISHMENT$125,000STRM27STORMWATERSTORMWATER OPERATIONS SERVICE TRUCK$45,000STRM28STORMWATERANNUAL PIPE REHABILITATION PROGRAM – TAMARACK (N WALLACE TO BOZEMAN CREEK)$40,000STRM29STORMWATERANNUAL SYSTEM ENHANCEMENT PROGRAM – N ROUSE AND E LAMME DESIGN$50,000STRM30STORMWATERANNUAL SYSTEM ENHANCEMENT PROGRAM – S 17TH AND W BABCOCK$100,000257
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY17UnscheduledFY21FY18FY19FY20STRM31STORMWATERANNUAL SYSTEM ENHANCEMENT PROGRAM – N 9TH AND W VILLARD$100,000STRM32STORMWATERANNUAL SYSTEM ENHANCEMENT PROGRAM – LANGHOR AND WESTRIDGE$62,500STRM33STORMWATERANNUAL SYSTEM ENHANCEMENT PROGRAM – N 11TH AND W KOCH$62,500STRM34STORMWATERANNUAL SYSTEM ENHANCEMENT PROGRAM – N ROUSE AND E PEACH$62,500STRM35STORMWATERANNUAL SYSTEM ENHANCEMENT PROGRAM – NORTH GRAND PARK$125,000$650,000$650,000$650,000$650,000$650,000$424,300Summary for Storm Water Fund (21 items)Totals by year:$650,000$650,000 $650,000$424,300FY21FY17FY18UnscheduledFY20$650,000$650,000FY19258
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM02
DEPARTMENT
STORMWATER
PROJECT NAME
ROCKY CREEK STORMWATER IMPROVEMENTS
FY17 FY18 Unscheduled
$20,000
DESCRIPTION OF PROJECT
Improvements to increase and restore the native vegetation cover and diversity, thereby reducing sedimentation and improving
water quality in Rocky Creek, as described on page 6-7 of the Stormwater Facility Plan.
ALTERNATIVES CONSIDERED
N/A
ADVANTAGES OF APPROVAL
Reduced sedimentation and improved water quality.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
N/A
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY19 FY20 FY21
259
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM04
DEPARTMENT
STORMWATER
PROJECT NAME
ANNUAL PIPE REHABILITATION AND DRAINAGE PROJECTS' DESIGN
FY17
$25,000
FY18
$25,000
Unscheduled
DESCRIPTION OF PROJECT
Contracting a qualified firm to complete engineering design for pipe rehabilitation and drainage projects completed each fiscal year.
ALTERNATIVES CONSIDERED
Utilize internal engineering design services.
ADVANTAGES OF APPROVAL
Timely and professional design will be incorporated into all projects.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
N/A
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY19
$25,000
FY20
$25,000
FY21
$25,000
260
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM08
DEPARTMENT
STORMWATER
PROJECT NAME
ROUSE AVENUE INFRASTRUCTURE
FY17 FY18 Unscheduled
$279,300
DESCRIPTION OF PROJECT
This project is to be completed in coordination with the MDOT improvements to Rouse Avenue. It entails the upsizing of
Stormwater Infrastructure on Rouse. We will need to be prepared to fund this project in according the construction timeline
established by MDOT, which is fairly fluid at this point.
ALTERNATIVES CONSIDERED
MDOT covers the cost for all improvements.
ADVANTAGES OF APPROVAL
The pipe segment under Rouse Avenue has seen past failures and continues to function in a severely degraded state. Improvements to this
section of pipe are necessary to avoid future structural and public safety issues.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
N/A
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY19 FY20 FY21
261
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM10
DEPARTMENT
STORMWATER
PROJECT NAME
ANNUAL SYSTEM ENHANCEMENT PROJECTS' DESIGN
FY17
$25,000
FY18
$25,000
Unscheduled
DESCRIPTION OF PROJECT
Contracting a qualified firm to complete engineering design for system enhancement projects completed each fiscal year.
ALTERNATIVES CONSIDERED
Utilize internal engineering design services.
ADVANTAGES OF APPROVAL
Timely and professional design will be incorporated into all projects.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
N/A
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY19
$25,000
FY20
$25,000
FY21
$25,000
262
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM13
DEPARTMENT
STORMWATER
PROJECT NAME
ANNUAL UNPLANNED PIPE REHABILITATIONS AND DRAINAGE PROJECTS
FY17
$165,000
FY18
$100,000
Unscheduled
DESCRIPTION OF PROJECT
Contracting a qualified firm to complete underground pipe repair and projects to help drainage/flooding issues. Types of work
include full pipe replacement, slip lines, installation of new systems, and capacity expansion. Condition scoring, underground
assessment video, public notifications, and close coordination with other utility improvements will determine the type of repair(s)
necessary. Historically, the City has completed minimal system maintenance allowing its contained pipes, inlets, and detention
ponds to accumulate excessive amounts of sediment, vegetation, rocks, and debris causing flooding and waterway pollution.
ALTERNATIVES CONSIDERED
City staff completes all pipe rehabilitations and drainage projects resulting in a response based program limited to addressing issues as they
become apparent or obvious through system failures. Past failures include flooding, pipe collapse, and regulatory warnings.
ADVANTAGES OF APPROVAL
Funding will allow the City to be proactive in the repair of stormwater infrastructure that has or is likely to fail reducing flooding, meeting permit
requirements, and improving public safety. In addition, the use of contracted services to repair and construct solutions to deferred issues will
reduce the strain on internal resources allowing crews to focus on recurring maintenance activities.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
N/A
FUNDING SOURCES
Stornwater Fund
New
Replacement
Equipment
Project
FY19
$275,000
FY20
$375,000
FY21
$375,000
263
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM15
DEPARTMENT
STORMWATER
PROJECT NAME
ANNUAL SYSTEM ENHANCEMENT PROGRAM - COUNTY FAIR GROUNDS
FY17
$225,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
Construction of a regional stormwater basin designed to capture and store stormwater until it infiltrates into the ground. The
project will occur on Gallatin County Fairground property treating a 90 acre urban drainage area and a portion of the fairgrounds
that currently discharges directly into Bozeman Creek. This project will also be leveraged as a highly visible educational space.
ALTERNATIVES CONSIDERED
Pursue other alternatives such as acquiring the land to the south of the proposed Rouse Justice Center or installing localized treatment solutions
throughout the 90 acre urban drainage area.
ADVANTAGES OF APPROVAL
Installation will allow the City to implement an effective treatment system, leverage rare green space within the downtown core, offer a
quantifiable pollutant reduction in Bozeman Creek, and provide a system improvement reportable within the City’s MS4 Permit Annual Report.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Biannual maintenance of the treatment system completed by internal crews.
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY19 FY20 FY21
264
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM18
DEPARTMENT
STORMWATER
PROJECT NAME
ANNUAL SYSTEM ENHANCEMENT PROGRAM - N WALLACE AND E TAMARACK
FY17
$75,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
Installation of a stormwater sediment, trash, and oil separation system within the public right-of-way near the intersection of N
Wallace and E Tamarack in coordination with the reconstruction of N Wallace. This unit will treat stormwater originating from a
101 acre urban drainage area prior to being discharged into Bozeman Creek.
ALTERNATIVES CONSIDERED
Installation of numerous smaller system improvements throughout the 101 acre urban drainage area.
ADVANTAGES OF APPROVAL
Provides stormwater treatment for a large urban drainage area, a quantifiable pollutant reduction, and a system improvement documentable
within the City’s MS4 Permit Annual Report.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Biannual maintenance of the treatment system completed by internal crews.
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY19 FY20 FY21
265
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM20
DEPARTMENT
STORMWATER
PROJECT NAME
ANNUAL SYSTEM ENHANCEMENT PROGRAM - S BLACK AND E CLEVELAND
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
Installation of a stormwater sediment, trash, and oil separation system within the public-right-of-way near the intersection of S
Black and E Cleveland. This unit will treat stormwater originating from a 147 acre urban drainage area prior to being discharged
into Bozeman Creek.
ALTERNATIVES CONSIDERED
Installation of numerous smaller system improvements throughout the 147 acre urban drainage area.
ADVANTAGES OF APPROVAL
Provides stormwater treatment for a large urban drainage area, a quantifiable pollutant reduction, and a system improvement documentable
within the City’s MS4 Permit Annual Report.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Biannual maintenance of the treatment system completed by internal crews.
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY19
$100,000
FY20 FY21
266
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM21
DEPARTMENT
STORMWATER
PROJECT NAME
ANNUAL SYSTEM ENHANCEMENT PROGRAM - S BOZEMAN AND E CLEVELAND
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
Installation of a stormwater sediment, trash, and oil separation system within the public right-of-way near the intersection of S
Bozeman and E Cleveland. This unit will treat stormwater originating from a 38 acre urban drainage area prior to being discharged
into Bozeman Creek.
ALTERNATIVES CONSIDERED
Installation of numerous smaller system improvements throughout the 38 acre urban drainage area.
ADVANTAGES OF APPROVAL
Provides stormwater treatment for a large urban drainage area, a quantifiable pollutant reduction, and a system improvement documentable
within the City’s MS4 Permit Annual Report.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Biannual maintenance of the treatment system completed by internal crews.
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY19
$62,500
FY20 FY21
267
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM24
DEPARTMENT
STORMWATER
PROJECT NAME
STORMWATER FACILITY PLAN
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
A planning update and modeling effort that will identify insufficiencies within Bozeman’s Stormwater Program, update past
recommendations, and identify components of the City’s pipe network that requires improvement.
ALTERNATIVES CONSIDERED
Continue to use and implement recommendations established in Bozeman’s 2008 Stormwater Facility Plan.
ADVANTAGES OF APPROVAL
Receipt of an updated Stormwater Facility Plan that will contain recommendations and guidance to ensure Bozeman is on track to meet
regulatory compliance, is making cost effective investments, is strategically addressing infrastructure issues, and is staying consistent with
industry standard codes and requirements.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
N/A
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY19
$100,000
FY20 FY21
268
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM25
DEPARTMENT
STORMWATER
PROJECT NAME
ANNUAL SYSTEM ENHANCEMENT PROGRAM - N ROUSE AND E LAMME
FY17 FY18
$500,000
Unscheduled
DESCRIPTION OF PROJECT
Installation of a stormwater sediment, trash, and oil separation system within the public right-of-way near the intersection of N
Rouse and E Lamme in coordination with MDOT’s planned reconstruction of N Rouse. This unit will treat stormwater
originating from a 354 acre urban drainage area prior to being discharged into Bozeman Creek.
ALTERNATIVES CONSIDERED
Installation of numerous smaller system improvements throughout the 354 acre urban drainage area.
ADVANTAGES OF APPROVAL
Provides stormwater treatment for a large urban drainage area, a quantifiable pollutant reduction for Bozeman Creek, and a system
improvement documentable within the City’s MS4 Permit Annual Report.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Biannual maintenance of the treatment system completed by internal crews.
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY19 FY20 FY21
269
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM26
DEPARTMENT
STORMWATER
PROJECT NAME
STORMWATER TV VAN REFURBISHMENT
FY17 FY18 Unscheduled
$125,000
DESCRIPTION OF PROJECT
Refurbishment of existing Stormwater TV Van routinely completed every 5 years to replace worn parts and remain consistent
with new technology.
ALTERNATIVES CONSIDERED
Purchase a new TV Van at an estimated cost of $250,000.
ADVANTAGES OF APPROVAL
Provides for the timely replacement of critical maintenance equipment.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Decrease in maintenance costs
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY19 FY20 FY21
270
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM27
DEPARTMENT
STORMWATER
PROJECT NAME
STORMWATER OPERATIONS SERVICE TRUCK
FY17
$45,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
Purchasing of a service truck that will be used by fulltime Stormwater Division crew members for daily maintenance tasks,
pollution response, and other stormwater related activities. Stormwater crew members currently borrow Water and Sewer
Department service vehicles.
ALTERNATIVES CONSIDERED
Continue to borrow service vehicles from the Water and Sewer Department.
ADVANTAGES OF APPROVAL
Specific truck for stormwater operations that can be outfitted as necessary and is available for use without scheduling conflicts.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual vehicle maintenance
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY19 FY20 FY21
271
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM28
DEPARTMENT
STORMWATER
PROJECT NAME
ANNUAL PIPE REHABILITATION PROGRAM – TAMARACK (N WALLACE TO BOZEMAN CREEK)
FY17
$40,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
Replacement and upsizing of a 370 foot stormwater gravity main beneath E Tamarack (N Wallace to Bozeman Creek) in
coordination with the N Wallace road reconstruction.
ALTERNATIVES CONSIDERED
N/A
ADVANTAGES OF APPROVAL
Allows for the proper conveyance of stormwater to Bozeman Creek by avoiding a constriction point when the stormwater infrastructure under
N Wallace is replaced and upsized during reconstruction.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual maintenance by internal crews
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY19 FY20 FY21
272
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM29
DEPARTMENT
STORMWATER
PROJECT NAME
ANNUAL SYSTEM ENHANCEMENT PROGRAM – N ROUSE AND E LAMME DESIGN
FY17
$50,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
Contracting of a qualified firm to assist with the N Rouse and E Lamme stormwater sediment, trash, and oil separation system
project scheduled for FY18. This will be a large project that requires a multi-year design effort, coordination with MDOT, right of
way acquisition, and bid preparation prior to construction.
ALTERNATIVES CONSIDERED
Utilize internal engineering design services.
ADVANTAGES OF APPROVAL
Timely and professional design will be completed, while not overburdening internal resources.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
N/A
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY19 FY20 FY21
273
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM30
DEPARTMENT
STORMWATER
PROJECT NAME
ANNUAL SYSTEM ENHANCEMENT PROGRAM – S 17TH AND W BABCOCK
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
Installation of a stormwater sediment, trash, and oil separation system on city-owned property in close proximity to the
intersection of S 17th and W Babcock. This unit will treat stormwater originating from a 55 acre urban drainage area prior to
being discharged into a tributary of Mandeville Creek.
ALTERNATIVES CONSIDERED
Installation of numerous smaller system improvements throughout the 55 acre urban drainage area.
ADVANTAGES OF APPROVAL
Provides stormwater treatment for a large urban drainage area, a quantifiable pollutant reduction, and a system improvement reportable within
the City’s MS4 Permit Annual Report.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Biannual maintenance of the treatment system completed by internal crews.
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY19 FY20 FY21
$100,000
274
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM31
DEPARTMENT
STORMWATER
PROJECT NAME
ANNUAL SYSTEM ENHANCEMENT PROGRAM – N 9TH AND W VILLARD
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
Installation of a stormwater sediment, trash, and oil separation system within the public right-of-way near the intersection of N
9th and W Villard. This unit will treat stormwater originating from a 142 acre urban drainage area prior to being discharged into a
tributary of Mandeville Creek.
ALTERNATIVES CONSIDERED
Installation of numerous smaller system improvements throughout the 142 acre urban drainage area.
ADVANTAGES OF APPROVAL
Provides stormwater treatment for a large urban drainage area, a quantifiable pollutant reduction, and a system improvement documentable
within the City’s MS4 Permit Annual Report.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Biannual maintenance of the treatment system completed by internal crews.
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY19 FY20
$100,000
FY21
275
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM32
DEPARTMENT
STORMWATER
PROJECT NAME
ANNUAL SYSTEM ENHANCEMENT PROGRAM – LANGHOR AND WESTRIDGE
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
Installation of a stormwater sediment, trash, and oil separation system within the public right-of-way near the intersection of
Langhor and Westridge. This unit will treat stormwater originating from a 174 acre urban drainage area prior to being discharged
into Figgins Creek.
ALTERNATIVES CONSIDERED
Installation of numerous smaller system improvements throughout the 174 acre urban drainage area.
ADVANTAGES OF APPROVAL
Provides stormwater treatment for a large urban drainage area, a quantifiable pollutant reduction, and a system improvement documentable
within the City’s MS4 Permit Annual Report
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Biannual maintenance of the treatment system completed by internal crews.
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY19 FY20
$62,500
FY21
276
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM33
DEPARTMENT
STORMWATER
PROJECT NAME
ANNUAL SYSTEM ENHANCEMENT PROGRAM – N 11TH AND W KOCH
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
Installation of a stormwater sediment, trash, and oil separation system within the public right-of-way near the intersection of N
11th and W Koch. This unit will treat stormwater originating from a 36 acre urban drainage area prior to being discharged into
Mandeville Creek.
ALTERNATIVES CONSIDERED
Installation of numerous smaller system improvements throughout the 36 acre urban drainage area.
ADVANTAGES OF APPROVAL
Provides stormwater treatment for a large urban drainage area, a quantifiable pollutant reduction, and a system improvement documentable
within the City’s MS4 Permit Annual Report.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Biannual maintenance of the treatment system completed by internal crews.
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY19 FY20
$62,500
FY21
277
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM34
DEPARTMENT
STORMWATER
PROJECT NAME
ANNUAL SYSTEM ENHANCEMENT PROGRAM – N ROUSE AND E PEACH
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
Installation of a stormwater sediment, trash, and oil separation system within the public right-of-way near the intersection of N
Rouse and E Peach. This unit will treat stormwater originating from a 54 acre urban drainage area prior to being discharged into
Bozeman Creek.
ALTERNATIVES CONSIDERED
Installation of numerous smaller system improvements throughout the urban drainage area.
ADVANTAGES OF APPROVAL
Provides stormwater treatment for a large urban drainage area, a quantifiable pollutant reduction, and a system improvement documentable
within the City’s MS4 Permit Annual Report.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Biannual maintenance of the treatment system completed by internal crews.
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY19
$62,500
FY20 FY21
278
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM35
DEPARTMENT
STORMWATER
PROJECT NAME
ANNUAL SYSTEM ENHANCEMENT PROGRAM – NORTH GRAND PARK
FY17 FY18 Unscheduled
DESCRIPTION OF PROJECT
Construction of a regional stormwater basin designed to capture and hold stormwater until it infiltrates into the ground. The
project will occur on City-Owned property treating a 78 acre urban drainage area. This project will also be leveraged as a highly
visible educational space.
ALTERNATIVES CONSIDERED
Installation of numerous smaller system improvements throughout the 78 acre urban drainage area.
ADVANTAGES OF APPROVAL
Provides stormwater treatment for a large urban drainage area, a quantifiable pollutant reduction, and a system improvement documentable
within the City’s MS4 Permit Annual Report.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Biannual maintenance of the treatment system completed by internal crews.
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY19 FY20 FY21
$125,000
279