Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Cost Estimate N 7th 11_30_2015 1 7-way
North 7th Construction Cost Estimate - Single 7-way conduit Phase 1 - Wilson School to Baxter Item One 7-way Future Path Conduit (Feet) Maintenance Holes (Number of) Directional Boring (Feet) Phase 2 - N 7th Baxter to End, Oak Street Item One 7-way Future Path Conduit (Feet) Maintenance Holes (Number of) Directional Boring (Feet) Phase 3 - Cannery - Evergreen, Gilkey, Griffin Item One 7-way Future Path Conduit (Feet) Maintenance Holes (Number of) Directional Boring (Feet) Unit 9703 29 9703 Unit 7633 16 7633 Unit 4800 5 4800 Cost 3.68 1800 48 Total Cost 3.68 1800 48 Total Cost 3.68 1800 48 Total Extended Cost 35707.04 52200 465744 553651.04 Extended Cost 28089.44 28800 366384 423273.44 Extended Cost 17664 9000 230400 257064