Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Anna Rosenberry, Administrative Services Director
SUBJECT: Adopt the Tree Maintenance Fund Capital Improvement Plan (CIP)
for Fiscal Years 2017-2021.
AGENDA ITEM TYPE: Consent
MEETING DATE: November 16, 2015
RECOMMENDATION: Adopt the Tree Maintenance Fund Capital Improvement Plan
(CIP) for Fiscal Years 2017-2021.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th. Similar to recent years
past, we are bringing various parts of the plan forward as items on the Consent agenda. We will
be prepared to address questions, if they arise, at the public meeting.
The Forestry Department, City Manager, and other city staff met in October to develop the
attached Capital Plan for the equipment and capital needs of the Tree Maintenance Fund.
Item of Note:
• FOR07 – Vehicle Replacements, this item was updated to include the replacement of a
2 ton grain truck in FY17, along with the ½ ton truck replacement that had previous been
identified.
• FOR08 – Backhoe Replacement, this item was moved from Unscheduled to FY17 and
the cost estimate increased from $70,000 to $90,000.
23
• Revenues for the Fund: This fund benefits from increases in the Tree Maintenance
Assessment, which is 100% dedicated to funding the Forestry operation. This CIP
contains more, on average, in capital costs than we have seen in the past. Without a
significant increase in annexed property, we will likely need to increase the Tree
Maintenance Assessment 1.5% each year for the next 5 years to fund this capital plan.
New Items:
• FOR10 – this item is a replacement for a 1996 stump grinder.
• FOR11 – this item is an unscheduled replacement of a 2001 Ford F650 with a crane.
• FOR12 – this item is a request for a new vehicle for use by the Forestry Superintendent
(new position). The recommendation to add this position comes from the recently
presented, but not yet approved, Urban Forestry Plan. If the position is not needed, this
item can be removed from the plan.
UNRESOLVED ISSUES: None.
ALTERNATIVES: As suggested by the City Commission. If the Commission does not
wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda.
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY17.
Report compiled on: November 10th, 2015
Attached: Tree Maintenance Fund CIP
24
Tree Maintenance Fund Capital Improvement PlanFinancial SummaryCurrent YearFY16FY17FY18 FY19 FY20 FY21UNSCHEDULEDProjected Beginning Reserve Balance Dedicated to CIP9,000$ 28,000$ (80,353)$ (67,903)$ (25,498)$ (1,981)$ ‐$ Plus: Tree Mtc Revenues Dedicated to CIP19,000$ 26,647$ 34,450$ 42,405$ 50,517$ 58,786$ ‐$ Less: Scheduled CIP Project Costs‐$ (135,000)$ (22,000)$ ‐$ (27,000)$ ‐$ (133,000)$ Projected Year‐End Cash Dedicated to CIP28,000$ (80,353)$ (67,903)$ (25,498)$ (1,981)$ 56,805$ (133,000)$ Assumptions Made for Revenue Estimates:Current YearFY16FY17FY18 FY19 FY20 FY21Estimated Annual Tree Mtc Revenues492,500$ 492,500$ 497,425$ 502,399$ 507,423$ 512,497$ Estimated Annual Increase ‐ Attributed to Annexations1%1%1%1%1%Total Estimated Revenues492,500$ 497,425$ 502,399$ 507,423$ 512,497$ 517,622$ Current Revenues Dedicated to CIP %3.9%3.9%5.4% 6.9% 8.4% 9.9% Plus: Increase Dedicated to CIP0.0%1.5%1.5% 1.5% 1.5% 1.5% Total % Dedicated to CIP3.9%5.4%6.9% 8.4% 9.9% 11.4%Total Estimated Revenues Dedicated to CIP18,996$ 26,647$ 34,450$ 42,405$ 50,517$ 58,786$ ProjectedProjectedCURRENT160,000140,000120,000100,00080,00060,00040,00020,0000Tree Maintenance Projects & Equipment25
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY17UnscheduledFY21FY18FY19FY20Tree Maintenance DistrictFOR07FORESTRYFORESTRY VEHICLE REPLACEMENTS$45,000$27,000FOR08FORESTRYBACKHOE REPLACEMENT$90,000FOR10FORESTRYSTUMP GRINDER$22,000FOR11FORESTRYLOG LOADER & TRUCK$100,000FOR12FORESTRYVEHICLE FOR FORESTRY SUPERINTENDENT (NEW POSITION)$33,000$135,000$22,000$27,000$133,000Summary for Tree Maintenance District (5 items)Totals by year:$135,000 $22,000$133,000FY21FY17FY18UnscheduledFY20$27,000FY1926
CIP Project Fund
Tree Maintenance District
PROJECT NUMBER
FOR07
DEPARTMENT
FORESTRY
PROJECT NAME
Forestry Vehicle Replacements
FY17
$45,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
FY17: This is a request to replace a 1978 2-Ton grain truck, a scheduled replacement of a department vehicle greater than 20
years of age. It is has reached the limits of safety, and Vehicle Maintenance Shop is reluctant to work on it: #190 Vehicle
Maintenance Record includes – 37,815 Miles; Overhauled Transmission/Clutch; Extensive Brake System Work; PTO Rebuild
Engine; Overheating Problems. FY20: Replacement of 1/2 Ton Truck.
ALTERNATIVES CONSIDERED
Continue to use existing vehicle. As directed by Commission.
ADVANTAGES OF APPROVAL
Replacing this equipment provide the division with more reliable equipment, improved safety, lower exhaust emissions, tow large trailers and
use to water street and park trees with large water tank.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Operating costs (maintenance and fuel/oil) of a newer vehicle are expected to be lower.
FUNDING SOURCES
100% Tree Maintenance District Fund
New
Replacement
Equipment
Project
FY19 FY20
$27,000
FY21
27
CIP Project Fund
Tree Maintenance District
PROJECT NUMBER
FOR08
DEPARTMENT
FORESTRY
PROJECT NAME
BACKHOE REPLACEMENT
FY17
$90,000
FY18 Unscheduled
DESCRIPTION OF PROJECT
Replace existing 1970's era small backhoe. While the existing backhoe is still functioning, we want to budget for a replacement of
a small, reliable machine with modern safety features; ROPS (roll over protection systems) and FOPS (falling object protection
systems). This piece of equipment is used largely for planting and removing trees throughout the City. Vehicle Maintenance is
reluctant to work on this anymore, because its unsafe and parts are impossible to find. Additional info: #230 – 1974 John Deere
301A Backhoe
4645 Hours
Rebuild Engine
Rebuild Front End and Steering
Resealed Hydraulic Cylinders
No ROPS or FORPS Protection
ALTERNATIVES CONSIDERED
Continue to use the existing machine.
ADVANTAGES OF APPROVAL
Less breakdowns, less difficulty in finding replacement parts, modern safety features for the operator and the public at large.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Similar as current operating costs.
FUNDING SOURCES
100% Tree Maintenance District Fund
New
Replacement
Equipment
Project
FY19 FY20 FY21
28
CIP Project Fund
Tree Maintenance District
PROJECT NUMBER
FOR10
DEPARTMENT
FORESTRY
PROJECT NAME
STUMP GRINDER
FY17 FY18
$22,000
Unscheduled
DESCRIPTION OF PROJECT
This is a request to replace a 1996 Vermeer stump grinder. This would be a scheduled replacement of an department forestry
equipment that is nearing 20 years of age. Forestry needs a larger, and more modern stump grinder. Additional info: #2671 –
1996 Vermeer 630B Stump Grinder
286 Hours
Replace All Wiring
Replace Cutter Belts
ALTERNATIVES CONSIDERED
Continue to use existing equipment. As directed by Commission.
ADVANTAGES OF APPROVAL
Replacing this equipment will provide the Forestry division with an larger and more reliable piece of equipment. Also it will improve
productivity and will be safer for the operator. Trade in on new purchase or put in public auction.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Tree Maintenance District Fund
New
Replacement
Equipment
Project
FY19 FY20 FY21
29
CIP Project Fund
Tree Maintenance District
PROJECT NUMBER
FOR11
DEPARTMENT
FORESTRY
PROJECT NAME
LOG LOADER & TRUCK
FY17 FY18 Unscheduled
$100,000
DESCRIPTION OF PROJECT
This a request to replace an 2001 Ford F650. This is an unscheduled replacement of a piece of Forestry equipment that is both
unsafe and impractical. Additional info: #3125 – 2001 Ford F650 – National Crane N50 – Palift Hydraulic Dump
8968 Miles/1066 Hours
Hydroboost Brake System Repair
Leaky Rear Seals
GVWR 26000 Max – 24500 LBS. Empty
Not True Forestry Equipment
ALTERNATIVES CONSIDERED
Continue to use existing vehicle. As directed by Commission.
ADVANTAGES OF APPROVAL
Replacing this Forestry equipment will provide better production and improved safety to the operator. This truck and crane was pieced
together and is over its safe gvw empty. Replace for a true Forestry log and brush loader. Trade in or public auction the existing truck.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Tree Maintenance District Fund
New
Replacement
Equipment
Project
FY19 FY20 FY21
30
CIP Project Fund
Tree Maintenance District
PROJECT NUMBER
FOR12
DEPARTMENT
FORESTRY
PROJECT NAME
Vehicle for Forestry Superintendent (new position)
FY17 FY18 Unscheduled
$33,000
DESCRIPTION OF PROJECT
1/2 or 3/4 ton truck for the Forestry Superintendent - a new position as recommended by the Urban Forestry Plan. This item is
preliminary - and may not be needed if the Commission does not decide to pursue this recommendation of the plan.
ALTERNATIVES CONSIDERED
As described in the Urban Forestry Plan.
ADVANTAGES OF APPROVAL
As described in the Urban Forestry Plan.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Normal maintenance and upkeep.
FUNDING SOURCES
100% Tree Maintenance District
New
Replacement
Equipment
Project
FY19 FY20 FY21
31