Loading...
HomeMy WebLinkAboutA3. The Cannery PUDPage 1 of 26 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Date: City Commission Public Hearing November 9, 2015 Project Description: A Preliminary Planned Unit Development application for a four phase commercial development located on 12.24 acres generally located northwest of the intersection of North Rouse Avenue and East Oak Street. Eleven relaxations are requested with this application. Project Location: Tracts 1, 2 and 3A of COS 2128B, Tract on COS 2548 and Portions of Block 2 of Imes Addition (Plat C-41) north of Oak Street. Minor Subdivision 391B, Imes Additiona to Bozeman Tracts 1, 2A, 3, 4, 5A and PLL1. The project is located within the Class II, Oak Street and North Rouse Avenue and Class I, I-90 Entryway Corridor Overlay Districts. Recommendation: Approval with conditions and code provisions. Recommended Concurrent Construction Motion: Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 15038 and move to approve the application for use of concurrent construction subject to all applicable code provisions. Recommended Main Motion: Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 15038 and move to approve the planned unit development, including relaxations 1 through 11, with conditions and subject to all applicable code provisions. Report Date: October 27, 2015 Staff Contact: Brian Krueger, Community Development Agenda Item Type: Action (Quasi-judicial) EXECUTIVE SUMMARY Unresolved Issues There are no unresolved issues. Project Summary The Cannery District Planned Unit Development (PUD) preliminary plan is a proposed plan to extend the development that exists at the Northside PUD onto the adjacent property to 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 2 of 26 create a larger commercial mixed use district. The property has split jurisdiction between the City of Bozeman and Gallatin County. The applicants are developing the site with the split jurisdiction and under the authority of an annexation district, that allows the properties to remain in County jurisdiction while contracting with the City for certain services (Fire service, water and sewer service and inspections of mains, and planning for future zoning entitlements) as outlined in the agreement The redevelopment includes the reuse and rehabilitation of the existing structures on the site, the construction of new structures and the development of common parking areas and open spaces. The proposed uses for the site include health and exercise, personal and convenience services, retail, office, light manufacturing, and restaurants. All properties are zoned B-2, Community Business District. The land use designation within the Bozeman Community Plan for the property is Community Commercial Mixed Use. The history of the property is varied, but includes the buildings associated with the historic Bozeman Pea Cannery operations. City sewer and water was extended into these properties under county jurisdiction in 1926. The PUD is not proposed in conjunction with a subdivision, but the existing lots are anticipated to be reconfigured through common boundary realignments to accommodate the zero lot line building pad lots within common parking area lots as designed. Eleven PUD relaxations to the Unified Development Code (UDC) are requested in Chapter 4 of the PUD application and further analyzed in Section 6 of this report. Unless the PUD modifies a standard the base requirements of the Unified Development Code remain in effect. The PUD appears to conform to the requirements of the Unified Development Code criteria as described in Section 6. A PUD is a discretionary approval and the review authority must find that the overall development is superior to that offered by the basic existing zoning standards. See Section 38.20.030.A.4, Bozeman Municipal Code (BMC). The obligation to show a superior outcome is the responsibility of the applicant. The application requests the option to utilize concurrent construction of City infrastructure and building permits for individual buildings within the individual phases. The Development Review Committee is supportive of that request subject to the applicant satisfying the requirements of the code prior to building permit issuance. Alternatives 1. Approve the application with the recommended conditions; 2. Approve the application with modifications to the recommended conditions; 3. Deny the application based on the Commission’s findings of non-compliance with the applicable criteria contained within the staff report; 4. Open and continue the public hearing on the application, with specific direction to Staff or the applicant to supply additional information or to address specific items. 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 3 of 26 TABLE OF CONTENTS EXECUTIVE SUMMARY ...................................................................................................... 1 Unresolved Issues ............................................................................................................... 1 Project Summary ................................................................................................................. 1 Alternatives ......................................................................................................................... 2 SECTION 1 - MAP SERIES .................................................................................................... 4 SECTION 2 - REQUESTED RELAXATIONS ....................................................................... 6 SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL ...................................... 7 SECTION 4 - CODE REQUIREMENTS REQUIRING PLAN CORRECTIONS ............... 10 SECTION 5 - RECOMMENDATION AND FUTURE ACTIONS ...................................... 11 SECTION 6 - STAFF ANALYSIS AND FINDINGS ........................................................... 12 Plan Review Criteria, Section 38.19.100, BMC. .............................................................. 12 Conditional Use Permit Review Criteria, Section 38.19.100, BMC. ............................... 18 Planned Unit Development Review Criteria, Section 38.20.090.E, BMC. ...................... 20 Entryway Overlay District Review Criteria, Section 38.17.060 BMC. ............................ 23 APPENDIX A - PROJECT SITE ZONING AND GROWTH POLICY ............................... 23 APPENDIX B - NOTICING AND PUBLIC COMMENT .................................................... 25 APPENDIX C - OWNER INFORMATION AND REVIEWING STAFF ............................ 25 APPENDIX D - PLANNED UNIT DEVELOPMENT INTENT .......................................... 25 FISCAL EFFECTS ................................................................................................................. 26 ATTACHMENTS ................................................................................................................... 26 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 4 of 26 SECTION 1 - MAP SERIES Project Boundaries 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 5 of 26 Overall project layout. 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 6 of 26 Detailed Layout and Phasing SECTION 2 - REQUESTED RELAXATIONS Planned Unit Development Relaxations are requested with this application. The applicant has requested relaxations to the following standards. The summary of each relaxation and the overall reasoning behind the relaxations is located in Chapter 4 of the PUD submittal. Summary List of Relaxations All references to the Unified Development Code, Bozeman Municipal Code a) 38.10.040 Commercial Lot area and Width-to reduce lot area and width to allow lots configured as building pads. 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 7 of 26 b) 38.10.050 Commercial Yard Setbacks-to reduce setbacks to zero to allow building pads to accommodate the building foundation only and to reduce the front yard setback requirement along Oak Street from 25 feet to 10 feet. c) 38.17.060 Entryway Corridor Overlay Setbacks-to reduce the corridor overlay setback from 25 feet to 10 feet. d) 38.24.090 Lot Frontage (38.23.030)-to allow some lots to not front on a public or private street or alley with greenway corridor. e) 38.24.090-3 Access Spacing-to allow the distance between accesses along an arterial street to be reduced below code requirements. f) 38.25.040 Parking Space Requirements-to allow an overall 15% reduction to the parking space requirements. g) 38.26.050 Unbroken Rows of Parking-to allow for longer rows of parking spaces unbroken by interior landscape islands. h) 38.28.070 Wayfinding Signage-to allow wayfinding sings for a district less than 30 acres. i) 38.10.020 Residential Use on the Ground Floor-to allow residential uses on the ground floor in the B-2 zoning district. j) 38.28.060 Building Frontage as applied in sign area calculations-to allow designated/fixed sign square footage for lots that do not have building frontage on a street. k) 38.10.060.A.2 Building Height-to allow Building E on site a maximum height of 59 feet exceeding the maximum height allowed in this location by 2 feet. SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL Please note that these conditions are in addition to any required code provisions identified in this report. These conditions are specific to the planned unit development. Recommended Conditions of Approval: 1. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. 2. The proposed covenants shall include a section which clearly indicates those portions of the covenants which were relied upon for the approval of the PUD. This section shall restrict those portions from alteration without written approval of the City of Bozeman. 3. The requested relaxations to the following sections are granted as proposed in the application materials and shall be reflected in the final PUD plan, design guidelines and associated documents as approved: a) 38.10.040 Commercial Lot area and Width-to reduce lot area and width to allow lots configured as building pads. b) 38.10.050 Commercial Yard Setbacks-to reduce setbacks to zero to allow building pads to accommodate the building foundation only and to reduce the front yard setback requirement along Oak Street from 25 feet to 10 feet. c) 38.17.060 Entryway Corridor Overlay Setbacks-to reduce the corridor overlay setback from 25 feet to 10 feet. d) 38.24.090 Lot Frontage (38.23.030)-to allow some lots to not front on a public or private street or alley with greenway corridor. 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 8 of 26 e) 38.24.090-3 Access Spacing-to allow the distance between accesses along an arterial street to be reduced below code requirements. f) 38.25.040 Parking Space Requirements-to allow an overall 15% reduction to the parking space requirements. g) 38.26.050 Unbroken Rows of Parking-to allow for longer rows of parking spaces unbroken by interior landscape islands. h) 38.28.070 Wayfinding Signage-to allow wayfinding sings for a district less than 30 acres. i) 38.10.020 Residential Use on the Ground Floor-to allow residential uses on the ground floor in the B-2 zoning district. j) 38.28.060 Building Frontage as applied in sign area calculations-to allow designated/fixed sign square footage for lots that do not have building frontage on a street. k) 38.10.060.A.2 Building Height-to allow Building E on site a maximum height of 59 feet exceeding the maximum height allowed in this location by 2 feet. 4. No property may be removed from the covenants once established without written approval of the City of Bozeman. 5. All portions of Tracts 1, 2 and 3A of COS 2128B, Tract on COS 2548 and Portions of Block 2 of Imes Addition (Plat C-41) north of Oak Street shall be aggregated and/or the common boundaries of said lots shall be reconfigured through the applicable subdivision review process to accommodate the project prior to subsequent final site plan approval for any individual phase. 6. Utility easements shall be provided for as shown on sheet C6.0 either through individual recordable documents or thorough the subdivision exemption review process prior to final site plan approval for any individual phase. 7. A notice prepared by the City shall be filed concurrently with the final plat so that it will appear on title reports. It shall read substantially as follows: Lots within the Cannery District are subject to specific design standards, unique building setbacks from property lines, and restrictions on use. These standards may be found in [insert correct reference to design standard location]. Lot owners are advised that these are specific to the Cannery District and are in place of the general development standards of the City of Bozeman Zoning. If a development standard is not specifically established in the approval documents the general standards of the City apply. Modification of the special standards would require an amendment to the Cannery District Planned Unit Development. Modifications are strongly discouraged. It is the obligation of the lot owner to be fully informed as to these standards before beginning any building or site design process. Approval by the design review entity established in the covenants of the development does not bind the City of Bozeman to approve a construction plan. 8. The City of Bozeman has relied upon the overall design standards proposed as part of the planned unit development application in Part 2 Design Guidelines. The design standards may not be altered without consent of the City. This restriction shall be included in Section 9 of the covenants. 9. The applicant shall submit with the application for Final Plan review and approval, a written narrative stating how each of the conditions of preliminary plan approval and 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 9 of 26 noted code provisions have been satisfactorily addressed, and shall include a digital copy (pdf) of the entire Final Plan submittal. This narrative shall be in sufficient detail to direct the reviewer to the appropriate plan, sheet, note, detail, guideline, covenant, etc. in the submittal. 10. The proposed design guidelines shall include a section on how a ground floor residential component shall be designed in such a way to include layers of space to transition from public to private space. 11. A cast iron tree grate design shall be selected for the entire development and a detail of that design shall be included in the design guidelines. 12. Scored concrete crosswalks the width of the adjacent pedestrian walkways shall be provided across all drive accesses and driveways where there is a pedestrian crossing. This detail shall be shown on the overall master plan and included in the design guidelines. 13. The rail trail shall be terminated on the east side of the site at North Rouse Avenue on the south side of E Lane in lieu of the standard sidewalk shown on the master plan. 14. The final lot configuration will not be clear until future applications are complete. The applicant will need to provide mutual access easements across all drive accesses and walkways as necessary to allow vehicular, pedestrian, and bike traffic across the project. Additionally, drainage course easements shall be provided as necessary for all drainage courses and stormwater facilities to allow all property owners access to facilities for maintenance. Alternatively, accesses and stormwater facilities may be placed in a common lot allowing access to all users in the property owners’ association. 15. The proposed 10-inch sewer main in the northeast part of the project will be constructed during Phase 1. However, other Phase 3 improvements will not be constructed during Phase 1. A minimum 12-foot wide, temporary all-weather surface must be located over the sewer main until the Phase 3, F Lane is constructed. 16. The proposed utility easements do not appear to include the fire hydrants. The utility easements must be placed around the fire hydrants. 17. The applicant should be advised that the latest update to the City of Bozeman Wastewater Collection Facilities Plan Update (June 2015) identified two downstream sewer mains, known as the North Frontage Road Bottleneck, that are approaching capacity. Timing for project phasing 2-4 may be impacted if that sewer main capacity is reached, due to the current growth rate in the City, prior to approval of phases 2-4 and upgrades to the mains have not yet been completed. 18. The traffic impact study for the project identified the need for two left-hand turn lanes associated with the accesses off Oak Street. The City is in the preliminary design process to construct improvements to Oak Street. The turn lanes must be coordinated with the City’s design. However, that portion of Oak Street may not be reconstructed within the timeframe of the proposed project. If Phase 2 of the proposed project is constructed prior to completion of the City project, the left-hand turn lanes must be constructed by the applicant. The cost of incorporating the turn lanes will be the responsibility of the 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 10 of 26 Cannery District developer. Timing for construction of the City’s Oak Street project at this location is currently not defined. 19. The traffic impact study for the project identified the need for a left-hand turn lane for the existing Cannery Access off Rouse Avenue. The Montana Department of Transportation (MDT) is planning upgrades to that section of Rouse Avenue. The proposed turn lane must be coordinated with MDT by the applicant. 20. A mid-block crossing of Oak Street will likely be constructed in the future at the intersection with the D Lane access and the proposed fairgrounds access for safe pedestrian crossing. Conduit should be placed as necessary for a future signal at that crossing. 21. The applicant must submit an application to vacate N. Montana Avenue right-of-way (ROW) and the former Oak Street ROW that intersects N. Montana Avenue and E. Oak Street. The streets must be vacated prior to Phase 2 FSP approvals. 22. Section 38.23.180 of the BMC requires provision for water rights or cash in lieu thereof. This provision shall be satisfied prior to FSP approvals for individual site plans. The Annexation District Agreement for Cannery District Property defined that water service has historically been provided for Phase 1 and as such does not require provision for water rights or cash in lieu thereof. However, the Agreement requires provision for water rights or cash in lieu thereof for Phases 2, 3, and 4. This shall be demonstrated prior to individual, FSP approval for each phase. 23. The geotechnical report for the project identified the need for corrosion protection due to highly corrosive soils for all metal piping including mains and services. The civil engineer for the project must define the required corrosion protection prior to FSP approvals of individual site plans. 24. The geotechnical report for the project identified the need to increase the depth of crushed rock under the sidewalks due to the soil conditions on the site. The subgrade for public sidewalks shall be constructed per the recommendations in the geotechnical report. SECTION 4 - CODE REQUIREMENTS REQUIRING PLAN CORRECTIONS A. Section 38.23.150.D.7.e BMC requires that all outdoor lighting shall be designed and located such that the maximum illumination measured in footcandles at the property line shall not exceed 0.3 onto adjacent residential properties and 1.0 onto adjacent commercial properties and public rights-of-way. The photometric plan submitted does not comply with this standard. B. Plans and specifications for any water, sewer and/or storm sewer main extensions and Public Streets (including curb/gutter and sidewalks) prepared by a Professional Engineer (PE) shall be provided to and approved by the City Engineer. Water and sewer plans shall also be approved by the Montana Department of Environmental Quality. The applicant shall provide Professional Engineering services for construction inspection, post-construction certification and preparation of mylar record drawings. Specific 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 11 of 26 comments regarding the existing and proposed infrastructure shall be provided at that time. Construction shall not be initiated on the public infrastructure improvements until the plans and specifications have been approved and a pre-construction conference has been conducted. C. Building permits will not be issued prior to City acceptance of the site infrastructure improvements unless all provisions set forth in Section 38.39.030.D of the Bozeman Municipal Code (BMC) are met to allow for concurrent construction. D. All construction activities shall comply with section 38.39.020.A.2 of the BMC. This shall include routine cleaning/sweeping of material that is dragged to adjacent streets. The City may require a guarantee as allowed for under this section at any time during the construction to ensure any damages or cleaning that are required are complete. The developer shall be responsible to reimburse the City for all costs associated with the work if it becomes necessary for the City to correct any problems that are identified. E. The Gallatin County Conservation District, Montana Department of Environmental Quality, and U.S. Army Corps of Engineers shall be contacted regarding the proposed project and any required permits (i.e., 310, 404, Turbidity exemption, etc.) shall be obtained and provided prior to final site plan (FSP) approvals. F. Plans and specifications for any fire service line must be prepared in accordance with the City’s Fire Service Line Policy by a Professional Engineer and be provided to and approved by the City Engineer prior to initiation of construction of the fire service or fire protection system. The applicant shall also provide Professional Engineering services for construction inspection, post-construction certification and preparation of mylar record drawings. Fire service plans (and domestic services 4” or larger) shall be a standalone submittal, separate from the FSP. Fire services shall be shown, with sizes labeled, on the FSP from main to building and approved by the Water/Sewer Superintendent. City of Bozeman applications for service shall be completed by the applicant. G. Proposed water/sewer mains, services and hydrants shall be a minimum horizontal separation of 10’ to landscape trees. SECTION 5 - RECOMMENDATION AND FUTURE ACTIONS The Development Review Committee (DRC) considered the Planned Unit Development on September 16, 23, 30 and October 7, 2015. The DRC found that the application is sufficient for continued review and recommended conditional approval of the application to the City Commission. In addition to the conditions of approval the DRC found code provisions that required correction. The Design Review Board (DRB) considered the Planned Unit Development on September October 14, 2015. The DRB supported the application and staff findings. There was not a 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 12 of 26 quorum of DRB members present at the meeting so no formal recommendation of approval of the application to the City Commission was provided. The City Commission is scheduled to consider the proposal on November 9, 2015. The City Commission public hearing will occur at 121 North Rouse Avenue, Bozeman MT, in the City Commission room at 6 pm. SECTION 6 - STAFF ANALYSIS AND FINDINGS Analysis and resulting recommendations are based on the entirety of the application materials, municipal codes, standards, and plans, public comment, and all other materials available during the review period. Collectively this information is the record of the review. The analysis in this report is a summary of the completed review. Plan Review Criteria, Section 38.19.100, BMC. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or State law. In considering applications for plan approval under this title, the advisory boards and City Commission shall consider the following: 1. Conformance to and consistency with the City’s adopted growth policy This project is proposing a phased mixed use project within a commercially planned area. The project includes the redevelopment of an underutilized brown field site. The development is compact and includes horizontal and vertical mixed uses. The project is in conformance to and consistent with the growth policy future land use designation and the plan’s goals and policies. Section 4.01.A of the application is the applicant’s response to this criterion and staff incorporates those responses into the findings for this section. See Appendix A for the description of the Community Commercial Mixed Use land use designation. 2. Conformance to this chapter, including the cessation of any current violations Phase 1 is under construction under County jurisdiction with State issued building permits and fire inspections. The City understands that all planning, zoning and building permit requirements related to the current construction on site have been met or are ongoing. The existing Northside PUD area is fully constructed and conforms to existing zoning and the PUD entitlement issued for that development area. There are existing nonconforming improvements within the City jurisdiction of the Cannery District development, specifically parking and circulation improvements that were completed on City property in phase 2 without City review or approval. These improvements occurred under the previous ownership of the property. This PUD plan provides for new improvements to replace the existing nonconforming parking and circulation, when phase 2 is developed. 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 13 of 26 The project proposes several alternative standards for development within the PUD. If the remaining PUD and subdivision exemption processes are completed, and the City Commission approves the requested relaxations, then the project will be in conformance. If the Commission does not approve the relaxations then the project will not be in conformance and should not be approved. 3. Conformance with all other applicable laws, ordinances, and regulations Applications for design and review of infrastructure, site plan review for individual phases and buildings and compliance with building permits, and related processes are future events. Compliance will be required as the project advances. Code provisions have been noted to address these issues. The PUD Master Plan, the PUD design guidelines and the property covenants will guide future development of individual phases. Other than the master site plan layout the PUD design guidelines are one of the primary was that the character and quality of the project is realized over time. Staff recommends conditions 2, 3, 4, 7 and 8 related to this issue to assure that all properties stay under the requirements of the covenants and design guidelines and to assure that the guidelines not be change without City approval. 4. Relationship of site plan elements to conditions both on and off the property The proposed PUD master plan in the application is consistent with the conditions on and off the property. The building configuration, building architecture, building presentation to the streets, open space layout, landscape design, pedestrian and vehicle circulation and parking comply with code requirements. The development is compatible with and sensitive to the immediate environment of the site and the adjacent neighborhoods and other approved development relative to architectural design, building mass and height, neighborhood identity, landscaping, orientation of buildings on the site and visual integration. The development phases and building are unlikely to have negative affects off the property. The proposed design guidelines and standards are proposed to mitigate potential conflicts. No particular conflicts have been identified at this time. 5. The impact of the proposal on the existing and anticipated traffic and parking conditions The traffic analysis required with the application identified improvements to the public streets adjacent to the development to allow the site and uses to function in compliance with transportation code requirements. Recommended engineering conditions 18, 19, 20 and 21 are related to this issue and specify the specific improvements to be installed to mitigate impacts to the City’s transportation system. Parking is provided per code requirements based upon the anticipated future uses. A relaxation is requested to allow up to a 15% reduction in the parking spaces required to allow for future flexibility, if market conditions allow the project to accommodate more intense future uses. Staff finds that the site is adequate in size 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 14 of 26 and has multiple parking areas that are well connected by pedestrian facilities in order to accommodate additional intensity of use. The most recent research demonstrates that mixed use developments internally capture multiple trips, by allowing customers to park once and visit multiple businesses on site. This pattern exists on the Northside PUD properties today. A relaxation is proposed to allow some rows of parking to exceed the maximum length of 100 feet unbroken by a landscaped island. The application proposes 148 feet long rows of parking to accommodate a central bioswale between rows. This proposal exceeds underlying standards for stormwater control and overall internal landscaping for this parking area. Staff finds that that site can function safely with the interior landscape islands removed and that the landscaping as proposed in the bioswale will offset the loss of interior landscaping within the parking space rows. 6. Pedestrian and vehicular ingress and egress Three vehicular accesses are proposed from the adjacent streets to provide vehicular ingress and egress to the new Cannery District building locations, which are connected via the internal parking and circulation areas. Montana Avenue, which is a primary egress for the Northside PUD, is proposed to be vacated and eliminated. The existing Northside PUD street access on Rouse Avenue will remain and the development will connect internally to the Cannery District via a drive access on the south side of the Granary Building. Pedestrian access is via boulevard sidewalks adjacent to East Oak Street. Future pedestrian access from Rouse Avenue will be provided by boulevard sidewalks to be installed by the Montana Department of Transportation (MDT) when they reconstruct Rouse Avenue in its entirety in the future. Internal sidewalks connect the proposed buildings to the sidewalks and the primary rail trail pedestrian facility which bisects the site east west and connects to buildings N and O. Staff recommends a condition to eliminate a pedestrian and auto conflict area on the east side of the site. Staff recommends a condition to require that the rail trail be terminated on the east side of the site at North Rouse Avenue on the south side of E Lane in lieu of the standard sidewalk shown on the master plan. There is no planned connecting location proposed for the terminus of the rail trail on the railroad right of way. MDT plans improvements to Rouse Avenue in the future; terminating the rail trail directly onto to Rouse Avenue without crossing the drive access in this location will best protect the public health safety and welfare. Recommended engineering conditions 18, 19, 20 and 21 are related to this issue and specify the specific improvements to be installed to mitigate impacts to the City’s transportation system and to allow for functional pedestrian and vehicular ingress and egress. 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 15 of 26 7. Landscaping, including the enhancement of buildings, the appearance of vehicular use, open space, and pedestrian areas, and the preservation or replacement of natural vegetation The landscape plan is only developed to a general level of detail. Future site plan applications will need to demonstrate compliance with the landscaping requirements of Article 38.26 for Planned Unit Development lots. A general planting plan has been provided for the common open spaces, parking areas, plazas and building foundation areas which indicate a good faith effort to respond to the requirements. Additional screening between the parking and circulation areas and the public streets will be required with future site plans. Staff recommends condition 11 to provide a common tree grate design to be utilized throughout the development to enhance the continuity of the landscaping and urban design. This detail shall be added to the design guidelines. 8. Open space Open spaces are provide to meet PUD performance points. These spaces are interspersed throughout the development and are proposed to be landscaped and developed with site furniture and other amenities. 9. Building location and height The PUD proposes to place buildings along the East Oak Street right of way similar to the historic placement of buildings on the Northside PUD. Relaxations are proposed to allow a ten foot setback along the Oak Street frontage for buildings. Staff issupportive of the Oak Street setback relaxation as it reinforces the presence of the existing buildings along Oak Street and will overall reduce traffic speeds in this section of Oak. Buildings closer to the street provide more pedestrian interest and opportunities for occupants of the buildings to provide eyes on the street. A relaxation is proposed for building height to allow the existing Building E that is under construction to be conforming when it is annexed into the City. A building height of 59 feet for Building E is proposed. The base building height within the B- 2 district in this location is 57 feet without a relaxation. Staff finds the proposed relaxation supportable based upon the finding that the building is existing, is being improved for safety and access and that it provides excellence in design. 10. Setbacks The PUD proposes relaxations to the building setbacks along Oak Street as described above, to the I-90 entryway corridor for parking and for typical individual building pads to allow for zero lot line building pads and provide no setback between the building and a common open space lot containing the access area around the building and parking areas. Staff is supportive of the relaxations and incorporates the findings presented in the application section 4.03.A as evidence. 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 16 of 26 11. Lighting The proposed site lights and building mounted lights conform to the City’s dark sky requirements. The private lighting is subject to the proposed design guidelines which direct use of LED lighting. 12. Provisions for utilities, including efficient public services and facilities Adequate water and sewer capacity exists to support this development. Engineering staff recommends condition of approval 17 to notify the property owners that two downstream sewer mains are approaching capacity and that improvements to those mains may be necessary in order to support the full development of the PUD, depending on the timing of the PUD development. Existing water and sewer services are provided to the buildings in the Northside PUD and the existing buildings under renovation in Phase 1. Newly constructed water and sewer infrastructure encircles Phase 1. That infrastructure has been reviewed and inspected by City staff under the provisions of the annexation district agreement. New extensions of water and sewer mains are anticipated in order to serve the outlying buildings in Phases 2, 3 and 4. The applicant requests the use of concurrent construction as allowed through a PUD application to have the option to utilize concurrent construction in future phases. The DRC supports the use of concurrent construction for this project and staff has noted code provision D that states that no building permits will be issued until the requirements for PUD concurrent construction have been satisfied. New electrical, gas and communications services will be required for all new buildings. Although these connections with be analyzed with further development review, Staff recommends condition of approval 6 to assure that proper utility easements are provided to support the extensions of these utilities. 13. Site surface drainage The PUD plan includes a stormwater design that localizes the treatment and conveyance of stormwater. In lieu of intensive interior parking lot landscaping within rows of parking; the plan proposes interior parking lot landscape swales to catch and treat stormwater. This type of design is known as Low Impact Development and is supported by staff. The design guidelines encourage the use of pervious pavers in the design of the pedestrian walkways and plazas. Final stormwater calculations and stormwater design review will be completed with further development review for each building and or common parking area. 14. Loading and unloading areas No loading areas are required or proposed. 15. Grading The site generally slopes from the south to northwest. No substantial grading is proposed except for that required for the installation of the parking areas and stormwater system. Grading will be further analyzed with each site plan application. 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 17 of 26 16. Signage A comprehensive plan for building mounted signage is proposed. The applicant has proposed a relaxation for signage that is related only to those buildings that will not have street frontage. The code allocates signage for buildings based upon the length of the building frontage defined as the maximum width of a building front measured on a straight line parallel line to the street, but excluding facades facing alleys or driveways. The proposed relaxation would allow a flat signage amount for those buildings that do not have street frontage. The flat amounts proposed for those buildings would allow slightly more signage for the buildings away from the street than if they were fronting directly on a public street. For example: 1) Building F is proposed at 260 square feet of signage; if it were located with street frontage it would be allowed 200 square feet per code; 2) Building G is proposed with 300 square feet, versus the 267 square feet it would be allowed if located on street; and 3) Building O is proposed at 200 square feet, versus the 170 square feet of signage is would be allowed if located on street. Staff finds that the overall signage plan with relaxations is consistent with the Community Plan and the intent of the community’s signage regulations in Article 28 of the Unified Development Code, Chapter 38 BMC. Wayfinding signage is proposed for the Cannery District. A relaxation is requested to allow wayfinding signage in a district under 30 acres. Staff finds that wayfindng will be critical to the overall function of this district and that the combination of the Northside PUD and the Cannery District under one wayfinding plan will allow the superior functioning of the site by accommodating and directing pedestrians, cyclists and drivers. 17. Screening Screening is addressed in a general way in the design guidelines. Code requirements for parking, mechanical, and other buffer screening will be required with subsequent site plan review. 18. Overlay district provisions The project is located within the Class II, Oak Street and North Rouse Avenue and Class I, I- 90 Entryway Corridor Overlay Districts. The project is in general conformance to standards with a few exceptions. The detailed findings can be found further below under Entryway Overlay District Review Criteria section. 19. Other related matters, including relevant comment from affected parties No public comment has been received. 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 18 of 26 20. If the development includes multiple lots that are interdependent for circulation or other means of addressing requirement of this title, whether the lots are either: Configured so that the sale of individual lots will not alter the approved configuration or use of the property or cause the development to become nonconforming or The subject of reciprocal and perpetual easements or other agreements to which the City is a party so that the sale of individual lots will not cause one or more elements of the development to become nonconforming. The project includes multiple lots, tracts and rights of way that must be modified to accommodate the PUD design. Staff recommends conditions of approval 5 and 6 to address this issue. 21. Compliance with article 8 of chapter 10 of the Bozeman Municipal Code. Not applicable. 22. Phasing of development The PUD proposes four phases. Each phase has specific requirements for annexation under the annexation district agreement. The phases are adequate to enable the use and development of the property independent of other work. Conditional Use Permit Review Criteria, Section 38.19.100, BMC. E. In addition to the review criteria of section 38.19.100, the review authority shall, in approving a conditional use permit, determine favorably as follows: 1. That the site for the proposed use is adequate in size and topography to accommodate such use, and all yards, spaces, walls and fences, parking, loading and landscaping are adequate to properly relate such use with the land and uses in the vicinity; The site is adequate. The existing buildings and site constraints have been used as design features and are integrated into the development. Landscaped areas are coordinated with adjacent property and within the proposed development. The pedestrian circulation system is a strong element of the design. A hierarchy of types of circulation is provided and connections are available both in the north/south and east/west orientations. The vehicular accesses provide generally clear circulation through the development. The parking areas are broken into smaller fields between and behind buildings and away from the street frontages. The relaxations will allow a tighter development pattern. The designs for the subsequent buildings and surrounding access and plaza areas will require substantial care to conform to the design guidelines. The applicant has provided within the design guidelines specific 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 19 of 26 information to enable future designers to comply and to guide the overall character of the development over time. 2. That the proposed use will have no material adverse effect upon the abutting property. Persons objecting to the recommendations of review bodies carry the burden of proof; No adverse impacts to abutting properties have been identified. 3.That any additional conditions stated in the approval are deemed necessary to protect the public health, safety and general welfare. Such conditions may include, but are not limited to: a. Regulation of use; b. Special yards, spaces and buffers; c. Special fences, solid fences and walls; d. Surfacing of parking areas; e. Requiring street, service road or alley dedications and improvements or appropriate bonds; f. Regulation of points of vehicular ingress and egress; g. Regulation of signs; h. Requiring maintenance of the grounds; i. Regulation of noise, vibrations and odors; j. Regulation of hours for certain activities; k. Time period within which the proposed use shall be developed; l. Duration of use; m. Requiring the dedication of access rights; and n. Other such conditions as will make possible the development of the city in an orderly and efficient manner. The proposed covenants and design guidelines associated with the project and the conditions of approval proposed with this staff report address these areas. 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 20 of 26 F. In addition to all other conditions, the following general requirements apply to every conditional use permit granted: 1. That the right to a use and occupancy permit shall be contingent upon the fulfillment of all general and special conditions imposed by the conditional use permit procedure; and 2. That all of the conditions shall constitute restrictions running with the land use, shall apply and be adhered to by the owner of the land, successors or assigns, shall be binding upon the owner of the land, his successors or assigns, shall be consented to in writing, and shall be recorded as such with the county clerk and recorder's office by the property owner prior to the issuance of any building permits, final plan approval or commencement of the conditional use. The necessary recording of documents will be addressed as part of the final site plan process and will be required prior to approval of the final PUD plan. Planned Unit Development Review Criteria, Section 38.20.090.E, BMC. Section 4.03C of the application presents the applicant’s response to these criteria. 2. In addition to the criteria for all site plan and conditional use reviews, the following criteria will be used in evaluating all planned unit development applications. a. All development. All land uses within a proposed planned unit development shall be reviewed against, and comply with, the applicable objectives and criteria of the mandatory "all development" group. (1) Does the development comply with all city design standards, requirements and specifications for the following services: water supply, trails/walks/bike ways, sanitary supply, irrigation companies, fire protection, electricity, flood hazard areas, natural gas, telephone, storm drainage, cable television, and streets? Except for those standards proposed for relaxation the application conforms. (2) Does the project preserve or replace existing natural vegetation? The site has been substantially disturbed by previous development. There will be substantial placement of new vegetation within the open spaces and parking areas. The master plan includes overall landscaping proposed for setback, common parking and open space areas. (3) Are the elements of the site plan (e.g., buildings, circulation, open space and landscaping, etc.) designed and arranged to produce an efficient, functionally organized and cohesive planned unit development? Yes, the proposal appears cohesive and has a variety of coordinating elements ranging from design standards to physical site, circulation, open space and landscape configurations. 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 21 of 26 (4) Does the design and arrangement of elements of the site plan (e.g., building construction, orientation, and placement; transportation networks; selection and placement of landscape materials; and/or use of renewable energy sources; etc.) contribute to the overall reduction of energy use by the project? The project has lot layouts which are favorable to installation of solar systems. Such systems are not proposed at this time. Individual site designs have not been completed. The site will be integrated in to the existing and developing pedestrian and bicycle network which will enable travel without motor vehicles. The mixed use project will have a variety of uses allowing internal trip capture. The site is located at the intersection of two arterial streets. With the planned Front Street trail connection the project will be connected to the City’s trail systems. (5) Are the elements of the site plan (e.g., buildings, circulation, open space and landscaping, etc.) designed and arranged to maximize the privacy by the residents of the project? There are no residential units planned at this time. A relaxation is proposed to allow the option for the project to include ground floor residential uses. Staff recommends a condition to address the privacy of residents of the project by requiring layered separations from public to private space. The design guidelines will need to provide guidelines in this area which are related to this criterion. Condition of approval 10 is related to this issue. (6) Park land. Does the design and arrangement of buildings and open space areas contribute to the overall aesthetic quality of the site configuration, and has the area of park land or open space been provided for each proposed dwelling as required by section 38.27.020. The project does not propose any residential units at this time. If the market demands enable residential units in this development, parkland will be required per code requirements. Options exist in the code to satisfy parkland requirements in various ways other than providing parkland on site. (7) Performance. All PUDs shall earn at least 20 performance points. With a PUD, Section 38.20.090.E.2.a.7 requires at least 20 performance points for the subject property. There are 11 options provided in the UDC to meet this requirement. Points can be met using any combination of on-site and off-site open space or other options listed in the code. The Preliminary PUD must specify how the performance points are being met. Open space provisions for phased PUD developments: If a project is to be built in phases, each phase shall include an appropriate share of the proposed recreational, open space, affordable housing and other site and building amenities of the entire development used to meet the requirements of section 38.20.090.E.2. The appropriate share of the amenities for each phase shall be determined for each specific project at the time of preliminary approval and shall not be based solely upon a proportional or equal share for the entire site. 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 22 of 26 The PUD is proposing to satisfy the performance requirements with credits for additional open space, underutilized and brown field sites, low impact development plan and integrated and coordinated wayfinding measures. The tabulation is under the common open space section of the application in section 4.03C. This is the first PUD in the City that has incorporated this depth and variety of performance measures. The application satisfies the requirement. (8) Is the development being properly integrated into development and circulation patterns of adjacent and nearby neighborhoods so that this development will not become an isolated "pad" to adjoining development? The property is well integrated into the arterial and collector system. Internal drive accesses provide additional connectivity. A mid block crossing along Oak Street is proposed to provide access to the fair grounds. Pedestrian connections have been placed to improve connectivity to the City’s sidewalk system. c. Commercial. Planned unit developments in commercial areas (B-1, B-2, B-3 and UMU zoning districts) may include either commercial or multi-household development, however adequate but controlled access to arterial streets is essential. Activities would include a broad range of retail and service establishments designed to serve consumer demands of the city area. (1) If the project contains any use intended to provide adult amusement or entertainment, does it meet the requirements for adult businesses? No adult amusement or entertainment is proposed. (2) Is the project contiguous to an arterial street, and has adequate but controlled access been provided? The project is at the intersection of two arterial streets: North Rouse Avenue and East Oak Street. Adequate and controlled access is provided. (3) Is the project on at least two acres of land? Yes, the Cannery District is 12.24 acres. The Northside PUD includes additional area. (4) If the project contains two or more significant uses (for instance, retail, office, residential, hotel/motel and recreation), do the uses relate to each other in terms of location within the PUD, pedestrian and vehicular circulation, architectural design, utilization of common open space and facilities, etc.? Yes, the overall site layout and design guidelines provide a comprehensive design that coordinates pedestrian and vehicular circulation, architectural design and the utilization of common open space and facilities. 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 23 of 26 (5) Is it compatible with and does it reflect the unique character of the surrounding area? Yes. (6) Is there direct vehicular and pedestrian access between on-site parking areas and adjacent existing or future off-site parking areas which contain more than ten spaces? Yes. (7) Does the project encourage infill, or does the project otherwise demonstrate compliance with the land use guidelines of the city growth policy? This project is an infill project on an underutilized brown field site. (8) Does the project provide for outdoor recreational areas (such as additional landscaped areas, open spaces, trails or picnic areas) for the use and enjoyment of those living in, working in or visiting the development? Yes. Entryway Overlay District Review Criteria, Section 38.17.060 BMC. The site is located within the Class I, I-90 and Class II East Oak Street Entryway Corridor Overlay District. ADR staff has reviewed the proposal for conformance with the Bozeman Design Guidelines for Entryway Corridors. Staff finds the proposal to be in general conformance with the 2005 Bozeman Design Guidelines for Entryway Corridors except for the following, which is not in conformance and requires a condition of approval. Chapter 2 Site Design Guidelines H. Pedestrian and bicycle Circulation Systems, 5. Enhance a key pedestrian way at a street or dive crossing; use decorative or textured paving, signs and/or landscaping to identify the crossing point. The site layout successfully coordinates pedestrian circulation. The site does not include crosswalks that have decorative or textured paving to identify the crossing points as are provided in the Northside PUD. Recommended condition of approval 12 requires all crosswalks on-site to be scored concrete crosswalks matching the width of the connecting sidewalks and that they be provided across all driveway circulation areas and accesses on the site. APPENDIX A - PROJECT SITE ZONING AND GROWTH POLICY Zoning Designation and Land Uses: The subject property is zoned “B-2” (Community Business District). The intent of the “B-2” district is to provide for a broad range of mutually supportive retail and service functions located in clustered areas bordered on one or more sides by limited access arterial streets. 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 24 of 26 Adopted Growth Policy Designation: The Future Land Use Map of the Bozeman Community Plan designates the subject property to develop as “Community Commercial Mixed Use”. The “Community Commercial” classification states that activities within this land use category are the basic employment and services necessary for a vibrant community. Establishments located within these categories draw from the community as a whole for their employee and customer base and are sized accordingly. A broad range of functions including retail, education, professional and personal services, offices, residences, and general service activities typify this designation. In the “center-based” land use pattern, Community Commercial Mixed Use areas are integrated with significant transportation corridors, including transit and non-automotive routes, to facilitate efficient travel opportunities. The density of development is expected to be higher than currently seen in most commercial areas in Bozeman and should include multi-story buildings. A Floor Area Ratio in excess of .5 is desired. It is desirable to allow residences on upper floors, in appropriate circumstances. Urban streetscapes, plazas, outdoor seating, public art, and hardscaped open space and park amenities are anticipated, appropriately designed for an urban character. Placed in proximity to significant streets and intersections, an equal emphasis on vehicle, pedestrian, bicycle, and transit circulation shall be provided. High density residential areas are expected in close proximity. Including residential units on sites within this category, typically on upper floors, will facilitate the provision of services and opportunities to persons without requiring the use of an automobile. The Community Commercial Mixed Use category is distributed at two different scales to serve different purposes. Large Community Commercial Mixed Use areas are significant in size and are activity centers for an area of several square miles surrounding them. These are intended to service the larger community as well as adjacent neighborhoods and are typically distributed on a one mile radius. Smaller Community Commercial areas are usually in the 10- 15 acre size range and are intended to provide primarily local service to an area of approximately one-half mile radius. These commercial centers support and help give identity to individual neighborhoods by providing a visible and distinctive focal point. They should typically be located on one or two quadrants of intersections of arterials and/or collectors. Although a broad range of uses may be appropriate in both types of locations the size and scale is to be smaller within the local service placements. Mixed use areas should be developed in an integrated, pedestrian friendly manner and should not be overly dominated by any single land use. Higher intensity employment and residential uses are encouraged in the core of the area or adjacent to significant streets and intersections. As needed, building height transitions should be provided to be compatible with adjacent development. 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 25 of 26 APPENDIX B - NOTICING AND PUBLIC COMMENT Noticing was provided by publication in the Bozeman Daily Chronicle on October 18 and 25, 2015. The site was posted with a notice on October 16, 2015. Notice was provided to adjoining property owners on October 16, 2015. No public comment has been received. APPENDIX C - OWNER INFORMATION AND REVIEWING STAFF Owners: Cannery District Partners, LLC 1006 West Main Street Bozeman, MT 59715 Montana Avenue Partners, LLC 1006 West Main Street Bozeman, MT 59715 Green Thumb, LLC 1612 Gold Avenue Bozeman, MT 59715 Turczyn Jump, LLC 2712 Daisy Drive Bozeman, MT 59718 Applicant: Cannery District Partners, LLC 1006 West Main Street Bozeman, MT 59715 Representative: Comma Q Architecture 109 N. Rouse Avenue #1, Bozeman, MT 59715 Report By: Brian Krueger, Development Review Manager APPENDIX D - PLANNED UNIT DEVELOPMENT INTENT Sec. 38.20.010 BMC. Intent. A. It is the intent of the city through the use of the planned unit development (PUD) concept, to promote maximum flexibility and innovation in the development of land and the design of development projects within the city. Specifically, with regard to the improvement and protection of the public health, safety and general welfare, it shall be the intent of this chapter to promote the city's pursuit of the following community objectives: 1. To ensure that future growth and development occurring within the city is in accord with the city's adopted growth policy, its specific elements, and its goals, objectives and policies; 2. To allow opportunities for innovations in land development and redevelopment so that greater opportunities for high quality housing, recreation, shopping and employment may extend to all citizens of the city area; 3. To foster the safe, efficient and economic use of land and transportation and other public facilities; 4. To ensure adequate provision of public services such as water, sewer, electricity, open space and public parks; 5. To avoid inappropriate development of lands and to provide adequate drainage, water quality and reduction of flood damage; 6. To encourage patterns of development which decrease automobile travel and encourage trip consolidation, thereby reducing traffic congestion and degradation of the existing air quality; 15038 City Commission Staff Report for the Cannery District Preliminary Planned Unit Development (PUD) Page 26 of 26 7. To promote the use of bicycles and walking as effective modes of transportation; 8. To reduce energy consumption and demand; 9. To minimize adverse environmental impacts of development and to protect special features of the geography; 10. To improve the design, quality and character of new development; 11. To encourage development of vacant properties within developed areas; 12. To protect existing neighborhoods from the harmful encroachment of incompatible developments; 13. To promote logical development patterns of residential, commercial, office and industrial uses that will mutually benefit the developer, the neighborhood and the community as a whole; 14. To promote the efficient use of land resources, full use of urban services, mixed uses, transportation options, and detailed and human-scale design; and 15. To meet the purposes established in section 38.01.040 FISCAL EFFECTS No unusual fiscal effects have been identified. ATTACHMENTS The full application and file of record can be viewed at the Community Development Department at 20 E. Olive Street, Bozeman, MT 59715. Application materials – Primarily provided by link to Laserfiche archive with selected elements included with hard copy. Design Review Board Minutes –October 14, 2015 Development Review Application A1 Page 1 of 3 Revision Date 4-27-15 Required Forms:Varies by project type Recommended Forms:Presentation of submitted plans and specifications CITY OF BOZEMAN DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT REVIEW APPLICATION 1. PROJECT Development Name: Description: 2. PROPERTY OWNER Name: Full Address: Phone: Email: 3. APPLICANT Name: Full Address: Phone: Email: 4. REPRESENTATIVE Name: Full Address: Phone: Email: 5. PROPERTY Full Street Address: Full Legal Description: Current Zoning: Current Use: Community Plan Designation: A1 Cannery District Planned Unit Development By renovating and re-purposing existing structures, infilling with new compatible construction, and installing pedestrian scaled common open space,the Cannery District project revitalizes an existing under-utilized site, located within three prominent Bozeman entryway corridors. Block 2 of the Imes Addition to the City of Bozeman, Tract 3A of CCOS 2128B, Tracts 1,2 and 3 of COS 2877 Cannery District Partners, llc Cannery District Partners, llc 1006 West Main Street, Bozeman, MT 59715 1006 West Main Street, Bozeman, MT 59715 scott@cannerydistrict.com scott@cannerydistrict.com (406) 522-7449 (406) 522-7449 Comma-Q Architecture, inc 107 N. Rouse, Ste 1, Bozeman, MT 59715 ben@commaq.com laura@commaq.com (406) 585-1112 101 East Oak Street, Bozeman, MT 59715 B-2 Commercial and Vacant Regional Commercial and Services 179 The Cannery District - Preliminary PUD Application Cannery District Partners Page 22 Development Review Application A1 Page 1 of 3 Revision Date 4-27-15 Required Forms:Varies by project type Recommended Forms:Presentation of submitted plans and specifications CITY OF BOZEMAN DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT REVIEW APPLICATION 1. PROJECT Development Name: Description: 2. PROPERTY OWNER Name: Full Address: Phone: Email: 3. APPLICANT Name: Full Address: Phone: Email: 4. REPRESENTATIVE Name: Full Address: Phone: Email: 5. PROPERTY Full Street Address: Full Legal Description: Current Zoning: Current Use: Community Plan Designation: A1 Development Review Application A1 Page 1 of 3 Revision Date 4-27-15 Required Forms:Varies by project type Recommended Forms:Presentation of submitted plans and specifications CITY OF BOZEMANDEPARTMENT OF COMMUNITY DEVELOPMENTDEVELOPMENT REVIEW APPLICATION1. PROJECT Development Name: Description: 2. PROPERTY OWNER Name: Full Address: Phone: Email: 3. APPLICANT Name: Full Address: Phone: Email: 4. REPRESENTATIVE Name: Full Address: Phone: Email: 5. PROPERTY Full Street Address: Full Legal Description: Current Zoning: Current Use: Community Plan Designation: A1 Development Review Application A1 Page 1 of 3 Revision Date 4-27-15 Required Forms:Varies by project type Recommended Forms:Presentation of submitted plans and specifications CITY OF BOZEMAN DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT REVIEW APPLICATION 1. PROJECT Development Name: Description: 2. PROPERTY OWNER Name: Full Address: Phone: Email: 3. APPLICANT Name: Full Address: Phone: Email: 4. REPRESENTATIVE Name: Full Address: Phone: Email: 5. PROPERTY Full Street Address: Full Legal Description: Current Zoning: Current Use: Community Plan Designation: A1 Green Thumb, llc Montana Avenue Partners, llc Turczyn Jump, llc 1612 Gold Avenue, Bozeman, MT 59715 1006 West Main Street, Bozeman, MT 59715 2712 Daisy Drive, Bozeman, MT 59718 HelpDesk@PlanetNatural.com scott@dehlendorfgrp.com and barryinbozeman@yahoo.com admin@lonemountain.biz (406) 587-5891 (406) 522-7449 (406) 586-3493 Development Review Application A1 Page 1 of 3 Revision Date 4-27-15 Required Forms:Varies by project type Recommended Forms:Presentation of submitted plans and specifications CITY OF BOZEMANDEPARTMENT OF COMMUNITY DEVELOPMENTDEVELOPMENT REVIEW APPLICATION1. PROJECT Development Name: Description: 2. PROPERTY OWNER Name: Full Address: Phone: Email: 3. APPLICANT Name: Full Address: Phone: Email: 4. REPRESENTATIVE Name: Full Address: Phone: Email: 5. PROPERTY Full Street Address: Full Legal Description: Current Zoning: Current Use: Community Plan Designation: A1 Minor Subdivisions 391B, Imes Addition to Bozeman: Tracts 1, 2A, 3, 4, 5A and PLL1 1285 North Rouse Avenue, Bozeman, MT 59715 B-2 Mixed Use Regional Commercial and Services Development Review Application A1 Page 2 of 3 Revision Date 4-27-15 Required Forms:Varies by project type Recommended Forms:Presentation of submitted plans and specifications Overlay District: Neighborhood Conservation Entryway Corridor None Urban Renewal District: Downtown North 7th Avenue Northeast None 6. STATISTICS (ONLY APPLICATION TYPES 2-12, 17, 25 AND 27) Gross Area:Acres:Square Feet: Net Area:Acres:Square Feet: Dwelling Units: Nonresidential Gross Building Square Feet: 7. APPLICATION TYPES Check all that apply, use noted forms.Form Form 1. Pre-application Consultation None 17. Informal Review INF 2. Master Site Plan MSP 18. Zoning Deviation None 3. Site Plan SP 19. Zoning or Subdivision Variance Z/SVAR 4. Subdivision pre-application PA 20. Conditional Use Permit CUP 5. Subdivision preliminary plat PP 21. Special Temporary Use Permit STUP 6. Subdivision final plat FP 22 Comprehensive Sign Plan CSP 7. Subdivision exemption SE 23. Zoning Verification ZV 8. Condominium Review CR 24. Regulated Activities in Wetlands RW 9. PUD concept plan PUDC 25. Zone Map Amendment (non Annexation) ZMA 10. PUD preliminary plan PUDP 26. UDC Text Amendment ZTA 11. PUD final plan PUDFP 27. Growth Policy Amendment GPA 12. Annexation and Initial Zoning ANNX 28. Modification/Plan Amendment MOD 13. Administrative Interpretation Appeal AIA 29. Extension of Approved Plan EXT 14. Administrative Project Decision Appeal APA 30. Reasonable Accommodation RA 15. Commercial Nonresidential COA CCOA 31. Other: 1 6. Historic Neighborhood Conservation Overlay COA NCOA 8. APPLICATION FEES AND MATERIALS A. Fees are to be provided based upon the adopted fee schedule FS. Contact our office for an estimate. B. Applications received by a rolling deadline of Wednesday at 5pm will be reviewed to determine if they are acceptable within five working days of the application deadline. Applications deemed acceptable for review will begin staff review immediately or be scheduled for Development Review Committee review in ten working days from the application deadline. 3.02 2.17 0 36,744 131,551 94,807 Information for Northside PUD properties: (only under consideration for Relaxations 4, 8, and 10) 180 Development Review Application A1 Page 2 of 3 Revision Date 4-27-15 Required Forms:Varies by project type Recommended Forms:Presentation of submitted plans and specifications Overlay District: Neighborhood Conservation Entryway Corridor None Urban Renewal District: Downtown North 7th Avenue Northeast None 6. STATISTICS (ONLY APPLICATION TYPES 2-12, 17, 25 AND 27) Gross Area:Acres:Square Feet: Net Area:Acres:Square Feet: Dwelling Units: Nonresidential Gross Building Square Feet: 7. APPLICATION TYPES Check all that apply, use noted forms.Form Form 1. Pre-application Consultation None 17. Informal Review INF 2. Master Site Plan MSP 18. Zoning Deviation None 3. Site Plan SP 19. Zoning or Subdivision Variance Z/SVAR 4. Subdivision pre-application PA 20. Conditional Use Permit CUP 5. Subdivision preliminary plat PP 21. Special Temporary Use Permit STUP 6. Subdivision final plat FP 22 Comprehensive Sign Plan CSP 7. Subdivision exemption SE 23. Zoning Verification ZV 8. Condominium Review CR 24. Regulated Activities in Wetlands RW 9. PUD concept plan PUDC 25. Zone Map Amendment (non Annexation) ZMA 10. PUD preliminary plan PUDP 26. UDC Text Amendment ZTA 11. PUD final plan PUDFP 27. Growth Policy Amendment GPA 12. Annexation and Initial Zoning ANNX 28. Modification/Plan Amendment MOD 13. Administrative Interpretation Appeal AIA 29. Extension of Approved Plan EXT 14. Administrative Project Decision Appeal APA 30. Reasonable Accommodation RA 15. Commercial Nonresidential COA CCOA 31. Other: 1 6. Historic Neighborhood Conservation Overlay COA NCOA 8. APPLICATION FEES AND MATERIALS A. Fees are to be provided based upon the adopted fee schedule FS. Contact our office for an estimate. B. Applications received by a rolling deadline of Wednesday at 5pm will be reviewed to determine if they are acceptable within five working days of the application deadline. Applications deemed acceptable for review will begin staff review immediately or be scheduled for Development Review Committee review in ten working days from the application deadline. X X X 12.24 2.96 0 404,208 533,146 128,938 Updated Form 181 Development Review Application A1 Page 3 of 3 Revision Date 4-27-15 Required Forms:Varies by project type Recommended Forms:Presentation of submitted plans and specifications C. Application materials shall be submitted for each application as shown in the specific guidance and checklists that is provided for each application type. A common development review application form and common notice materials may be provided for an application that includes more than one application type. All other application materials shall be submitted for each individual application type per the project guidance and checklists. 9. CERTIFICATIONS AND SIGNATURES This application must be signed by both the applicant(s) and the property owner(s) (if different) before the submittal will be accepted. As indicated by the signature(s) below, the applicant(s) and property owner(s) submit this application for review under the terms and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and any special conditions established by the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may be assessed for my project. Further, I agree to grant City personnel and other review agency representative’s access to the subject site during the course of the review process (Section 38.34.050, BMC). I (We) hereby certify that the above information is true and correct to the best of my (our) knowledge. Certification of Completion and Compliance –I understand that conditions of approval may be applied to the application and that I will comply with any conditions of approval or make necessary corrections to the application materials in order to comply with municipal code provisions. Statement of Intent to Construct According to the Final Plan –I acknowledge that construction not in compliance with the approved final plan may result in delays of occupancy orcosts to correct noncompliance. Applicant Signature: Printed Name: OwnerSignature: Printed Name: OwnerSignature Printed Name: If signing as a corporation, please provide the title and position of the individual signing on behalf of the corporation. Attach separate sheets for additional owner signatures. CONTACT US Alfred M. Stiff Professional Building 20 East Olive Street 59715 (FED EX and UPS Only) PO Box 1230 Bozeman, MT 59771 phone 406-582-2260 fax 406-582-2263 planning@bozeman.net www.bozeman.net Barry Brown, Cannery District Partners, llc Barry Brown, Cannery District Partners, llc 182 _______________________________________ N1CITY OF BOZEMAN DEPARTMENT OF COMMUNITY DEVELOPMENT NOTICING MATERIALS Notice is required for certain projects in order for citizens to participate in decision making which affects their interests and provides opportunity to receive information pertinent to an application that would not otherwise be available to the decision maker. SITE PLAN, MASTER SITE PLAN, CONDITIONAL USE PERMIT, VARIANCE, DEVIATION, FIRST MINOR SUBDIVISON AND SIMILAR REQUIRED NOTICING MATERIALS Completed and signed property adjoiners certificate form N1. Legible list of full names and addresses of all property owners within 200 feet of the projectsite,attached to this checklist. Stamped, unsealed, plain (no return address) #10 envelopes preaddressed with the names and addresses of the adjoining property owners. MAJOR AND SUBSEQUENT MINOR SUBDIVISION REQUIRED NOTICING MATERIALS Completed and signed property adjoiners certificate form N1. Legible list of full names and addresses of all property owners within 200 feet of the project site and not physically contiguous (touching a boundary) to the subdivision, attached to this checklist.Clearly label list ADJOINER NOT CONTIGUOUS. Stamped, unsealed, plain (no return address) #10 envelopes preaddressed with the names and addresses of the adjoining property owners. Legible list of full names and addresses of all property owners physically contiguous (touching a boundary) including recorded purchasers under contract for deed to be sent certified mail attached to this checklist.Clearly label list CONTIGUOUS. Stamped, unsealed, plain (no return address) #10 envelopes preaddressed with the names and addresses of the physically contiguous property owners including recorded purchasers under contract for deed. Two sets additional mailing labels with the names and addresses of the physically contiguous property owners including recorded purchasers under contract for deed attached. NOTICE Current property owners of record can be found at the Gallatin County Clerk and Recorder’s Office in the Gallatin County Courthouse 311 West Main Street Bozeman, Montana. CERTIFICATION I, _____________________________________________, hereby certify that, to the best of my knowledge, the attached name and address list of all adjoining property owners (including all condominium owners, within 200 feet of the property located at ________________________________________________________, is a true and accurate list from the last declared Gallatin County tax records. I further understand that an inaccurate list may delay review of the project. Signature CONTACT US Alfred M. Stiff Professional Building 20 East Olive Street 59715 (FED EX and UPS Only) PO Box 1230 Bozeman, MT 59771 phone 406-582-2260 fax 406-582-2263 planning@bozeman.net www.bozeman.net Noticing Materials Page 1 of 1 Revision Date 4-27-15 Required Forms: N1 Recommended Forms: NA 101 East Oak Street and 1285 N Rouse Ave., Bozeman, MT Barry Brown X X X Previously Page 31 183 The Cannery District - Preliminary PUD Application Cannery District Partners Page 35 Adjoiners List Property Owners within 200’ George E. Westlake and DK Martinen LLC 15008 SE Graham Rd. Vancouver, WA 98683-8541 City of Bozeman P.O. Box 1230 Bozeman, MT 59771-1230 Gallatin County Fairgrounds 311 W. Main St. Bozeman, MT 59715 Big Sky Montana Properties LLC P.O. Box 835 Bozeman, MT 59771-0835 Montana Rail Link Inc. P.O. Box 16390 101 International Dr. Missoula, MT 59808 BNSF Railway 2650 Lou Menk Dr. Fort Worth TX 76131-2830 Northern Pacific Railway Co. P.O. Box 961089 Fort Worth, TX 76161-0089 Gallatin County 311 W. Main St. Bozeman, MT 59715 Montana Avenue Partners LLC C/O Scott Dehlendorf 1006 W. Main St. Bozeman, MT. 59715 State of Montana P.O. Box 201601 Helena, MT. 59620 Northside Property Owners Assoc. 1006 W. Main St. Bozeman, MT 59715-3219 Green Thumb LLC 1612 Gold Ave. Bozeman, MT 59715-2488 Turczyn Jump LLC 2712 Daisy Dr. Bozeman, MT 59718-6024 Curtis and Alisa Porteus 1070 Baxter Lane E Bozeman, MT 59718 Kenyon Noble Lumber Co PO Box 1109 Bozeman, MT 59771-1109 Zimtor Architecture, LLC 415 E Birch Street Bozeman, MT 59715-3073 184 Figure 1.2 Site Illustration Northside PUD (only under consideration for relaxations 4,8, and 10 185 Cannery District Planned Unit Development Preliminary PUD Application Cannery District Partners, llc Appendix 1 Plans Set 186 187 188 189 190 191 192 193 194 195 196 197 198 11 SPACESOAK STREETSTORMWATERRETENTION BASIN/SNOW STORAGEPROPERTY LINE30 SPACES40 SPACES15 SPACES22 SPACES22 SPACES20 SPACES9 SPACES6 SPACES8 SPACES23 SPACES13 SPACES11 SPACESWATERTOWERBLDG OBLDG HBLDG NBLDG GBLDG FBLDG KBLDG JBLDG CBLDG DBLDG BBLDG ABLDG MBLDG L29 SPACES31 SPACESPARKING PLAZA14 SPACES11 SPACES16 SPACES11 SPACES11 S P A C E S 11 SPACES19 SPACES27 SPACESPROPOSEDFAIRGROUNDSACCESSROUSE AVERAIL TRAILRAIL TRAILLOADINGTRASHTRASHTRASHTRASHTRASHTRASHTRASHTRASHRAIL TRAILPROPERTY LINEPROPERTY LINE20' DEDICATION FO R OAK PRO P E R T Y LI N E PROPE RTY LINEPHASE 1PHASE 2PHASE 3PHASE 4BLDG E11 SPACES5 SPACES22 SPACESTOWER TRAILTRASH21 SPACESTRASHPARKING PLAZA21 SPACES9 SPACES19 SPACESSTORMWATER BIOSWALE/SNOW STORAGENORTHSIDE PUD(EXISTING)BIOSWALEBIOSWALERAISED PATIOPATIOPATIOBIOSWALEBIOSWALEMAINT.C LANEE LANED LANEA LANEB LANEG LANEF LANEA LANEC LANEE LANENATIVE SEED ZONES (NON IRRIGATED)NATIVE SEED ZONES(NON IRRIGATED)OPEN SPACE, LAWN AND PERENNIAL ZONES (IRRIGATED)33,834 SQUARE FEET92,642 SQUARE FEETCANOPY AND ORNAMENTAL TREESPLANT TABLEDATE:This drawing is not intended nor shall it beused for construction purposes unless thesigned professional stamp of a registeredarchitect employed by Comma-QArchiteture, Inc. is affixed above.PROJECT #:CONSULTANTSORIGINAL DRAWING SIZE: 24" x 36"Cannery District - Site Planning02/12/2015L 1.014-04.1Cannery District PartnersLANDSCAPE PLANPreliminaryPUD SubmittalOak Street, Bozeman MontanaLinda Iversonlandscape design199 DS1S5S5S5S5DS1DS1S5S5S5S3S5DS12222222224444442222222TTTTTTTTTTTTTTTTTTTTTTTTW TENANT SPACE F-1TENANT SPACEE.L.1ETENANT SPACEE.L.1WBUILDING EBUILDING FCOMMON SPACETENANT SPACE F-2a-bTENANT SPACE F-4a-cTENANT SPACE F-3BUILDING GBUILDING HBUILDING KBUILDING NBUILDING LBUILDING MBUILDING OB-2 MAXIMUM ALLOWED SIGNAGE BY LOT: 400 SF PER LOTBUILDING AFRONTAGE OAK ST:136(25x3+111x1.5) 241.5sfFRONTAGE ROUSE AVE: 50(25x3+25x1.5) 112.5sfTOTAL354sfBUILDING BFRONTAGE ROUSE: 86(25x3+59x1.5) 166.5sfTOTAL166.5sfBUILDING CFRONTAGE OAK ST WEST:48(25x3+23x1.5) 109.5sfFRONTAGE OAK ST SOUTH:76(25x3+51x1.5) 151.5sfTOTAL261sfBUILDING DSIGNAGE AREA PER PUDLIMIT200sfBUILDING ESIGNAGE AREA PER PUDLIMIT300sfBUILDING FSIGNAGE AREA PER PUDLIMIT260sfBUILDING GSIGNAGE AREA PER PUDLIMIT300sfBUILDING HSIGNAGE AREA PER PUDLIMIT64sfBUILDING JFRONTAGE OAK:170(25x3+144x1.5) 291sfTOTAL291sfBUILDING KFRONTAGE OAK ST:158(25x3+133x1.5) 274.5sfTOTAL274.5sfBUILDING LSIGNAGE AREA PER PUDLIMIT260sfBUILDING MSIGNAGE AREA PER PUDLIMIT200sfBUILDING NFRONTAGE OAK ST:96(25x3+71x1.5) 181.5TOTAL181.5sfBUILDING OSIGNAGE AREA PER PUDLIMIT200sfBUILDING JBUILDING DBUILDING ABUILDING BBUILDING C75' - 7"135' - 7"50' - 9"86' - 2"170' - 8"46' - 7"158' - 6"95' - 9"DATE:This drawing is not intended nor shall it beused for construction purposes unless thesigned professional stamp of a registeredarchitect employed by Comma-QArchiteture, Inc. is affixed above.PROJECT #:CONSULTANTSORIGINAL DRAWING SIZE: 24" x 36"Q:\_Jobs14\04 MAP - Cannery District\14-04.01 - Entitlement Work\Revit\2014-04-29 CDi Site_Entitlement Work.rvtCannery District - Site Planning10/13/2015A-S.114-04.1Cannery District PartnersBuilding Signage PlanPreliminaryPUD SubmittalOak Street, Bozeman Montana 1" = 50'-0"1Sign Plan - Building Signage200 WALL SIGN32 sfEXTERNALLY LITWALL SIGN22.5 sfEXTERNALLY LITWALL SIGN22.5 sfEXTERNALLY LIT(E)WALL SIGN11 sf(E)WALL SIGN6 sf(E)WALL SIGN6.5 sf(E)WALL SIGN10 sf eaBUILDING ID SIGN2 sfINTERNALLY LITBLADE SIGN4 sfUNLITWALL SIGN20 sfUNLITWINDOW SIGN20 sfUNLITWINDOW SIGN20 sfUNLITCANNERY BUILDINGBLADE SIGN4 sfUNLITWALL SIGN22.5 sfEXTERNALLY LITWINDOW SIGN20 sfUNLITWALL SIGN56 sfEXTERNALLY LITWALL SIGN42 sfINTERNALLY LITWALL SIGN120 sfEXTERNALLY LITWALL SIGN56 sfEXTERNALLY LITTENANT ROSTER16SFUN-LITWALL SIGN20SFEXTERNALLY LITTENANT ROSTER16SFUN-LIT97ADDRESSWALL SIGN20SFEXTERNALLY LITWALL SIGN30 sfEXTERNALLY LITBUILDING IDSIGNWALL SIGN18 sfEXTERNALLY LITNEW METAL ROOFING.TYPICAL ALLELEVATIONSWALL SIGN24 sf, EXTERNALLYDATE:This drawing is not intended nor shall it beused for construction purposes unless thesigned professional stamp of a registeredarchitect employed by Comma-QArchiteture, Inc. is affixed above.PROJECT #:CONSULTANTSORIGINAL DRAWING SIZE: 24" x 36"Q:\_Jobs14\04 MAP - Cannery District\14-04.01 - Entitlement Work\Revit\2014-04-29 CDi Site_Entitlement Work.rvtCannery District - Site Planning10/13/2015A-S.214-04.1Cannery District PartnersSign Plan ElevationsPreliminaryPUD SubmittalOak Street, Bozeman Montana 1/16" = 1'-0"1Buildings E & F - Cannery Building - SouthElevation Signs 1/16" = 1'-0"2Building E - Cannery Building - EastElevation Signs 1/16" = 1'-0"3Building F - Cannery Complex - WestElevation Signs 1/16" = 1'-0"4Building G - Canning Warehouse - WestElevation Signs 1/16" = 1'-0"5Building G - Canning Warehouse - SouthElevation Signs 1/16" = 1'-0"6G - Canning Warehouse - North ElevationSigns 1/16" = 1'-0"7Building H - Boiler House - East ElevationSigns 1/16" = 1'-0"8Building H - Boiler House - West ElevationSigns 1/16" = 1'-0"9Building H - Boiler House - North ElevationSigns 1/16" = 1'-0"10Building H - Boiler House - South ElevationSignsBUILDING 'E' (300sf allowed):TENANT SPACE L.1ETOTAL SIGNAGE ALLOWED: 160sfSIGNS PROPOSED:WALL SIGN SOUTH: 32 sfWALL SIGN EAST: 22.5 sfTOTAL SIGNS PROPOSED: 54.5 sfTENANT SPACE L.1WTOTAL SIGNAGE ALLOWED : 40sfSIGNS PROPOSED:WALL SIGN: 22.5 sfTOTAL SIGNS PROPOSED: 22.5 sfTENANT SPACE L.2ETOTAL SIGNAGE ALLOWED: 30sfSIGNS PROPOSED:WALL SIGN: 20 sfTOTAL SIGNS PROPOSED: 20 sfTENANT SPACE L.2WTOTAL SIGNAGE ALLOWED: 30sfSIGNS PROPOSED:WINDOW SIGN: 20 sfTOTAL SIGNS PROPOSED: 20 sfTENANT SPACE L.3TOTAL SIGNAGE ALLOWED: 30sfSIGNS PROPOSED:WINDOW SIGN: 20 sfTOTAL SIGNS PROPOSED: 20 sfTENANT SPACE L.4TOTAL SIGNAGE ALLOWED: 30sfSIGNS PROPOSED:WINDOW SIGN: 20 sfTOTAL SIGNS PROPOSED: 20 sf 1/16" = 1'-0"11Building F - Cannery Complex - NorthElevation Signs 1/16" = 1'-0"12Building E - Cannery Building - NorthElevation SignsBUILDING F (260sf allowed):TENANT SPACE F-1:TOTAL SIGNAGE ALLOWED: 60 sfSIGNS PROPOSED:EXISTING WALL SIGN: 20 sfWALL SIGN NORTH: 24 sfTOTAL SIGNS PROPOSED: 44 sfTENANT SPACE F-2a&b:TOTAL SIGNAGE ALLOWED: 60 sfSIGNS PROPOSED:EXISTING WALL SIGNS: 23.5 sfTOTAL SIGNS PROPOSED: 23.5 sfTENANT SPACE F-3TOTAL SIGNAGE ALLOWED: 60 sfSIGNS PROPOSED:WALL SIGN WEST: 56 sfTOTAL SIGNS PROPOSED: 56 sfTENANT SPACE F-4aTOTAL SIGNAGE ALLOWED: 30 sfSIGNS PROPOSED:WALL SIGN: 22.5 sfTOTAL SIGNS PROPOSED: 22.5 sfTENANT SPACE F-4b&cTOTAL SIGNAGE ALLOWED: 50 sfSIGNS PROPOSED:WALL SIGN: 22.5 sfTOTAL SIGNS PROPOSED: 22.5 sfBUILDING G (300sf allowed):TOTAL SIGNAGE ALLOWED: 260 sfSIGNS PROPOSED:WALL SIGN WEST: 120 sf WALL SIGN SOUTH: 72 sfWALL SIGNS: 56 sfTOTAL SIGNS PROPOSED: 248 sfBUILDING H (64sf allowed):TOTAL SIGNAGE ALLOWED: 64 sfSIGNS PROPOSED:WALL SIGNS EAST: 30sfWALL SIGNS WEST: 18sfTOTAL SIGNS PROPOSED:48 sfPROPOSED SIGNSTHE FOLLOWING DESCRIBES SIGNS ALLOWED BY BUILDING AND WHERE POSSIBLE, BY TENANTSPACE. SIGN QUANTITIES, LOCATIONS AND TYPES ARE SUBJECT TO CHANGE AND TENANT SPACESIGN ALLOCATIONS ARE SUBJECT TO CHANGE. ANY ADJUSTMENT TO SIGN QUANTITIES WILL NOTRESULT IN SIGNS IN EXCESS OF THE TOTAL AMOUNT ALLOWED PER BUILDING.201 The Cannery District - Preliminary PUD Application Cannery District Partners Page 79 Figure 4.1 Open Space 202 203