Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Appendix 10 - Comprehensive Sign Plan 11x17
Cannery District Planned Unit Development Preliminary PUD Application Cannery District Partners, llc Appendix 10 Comprehensive Sign Plan The Cannery District - Preliminary PUD Application Cannery District Partners Comma-QArchitecture, Inc. Comprehensive Sign Plan The following Comprehensive Sign Plan drawings indicate the size and location of buildings and the size and location of existing and proposed signs to the extent possible given the current extent of building design. Permitted sign areas are given for all existing and proposed buildings. Proposed sign locations are given for existing building in the Cannery District PUD. The coordination of graphics and signs with building design is described in and governed by the Cannery District Design Guidelines. Because, upon build-out, the existing Northside PUD and the proposed Cannery PUD will function as a single development, the Comprehensive Sign Plan includes both developments. The intent is that the graphics and signs, including wayfinding signage in both developments is coordinated. TENANT SPACE F-1TENANT SPACEE.L.1ETENANT SPACEE.L.1WBUILDING EBUILDING FCOMMON SPACETENANT SPACE F-2a-bTENANT SPACE F-4a-cTENANT SPACE F-3BUILDING GBUILDING HBUILDING K100' - 6"120' - 0"74' - 5"144' - 10"80' - 0"172' - 0"95' - 11"42' - 2"38' - 1"135' - 11"82' - 0"32' - 5"BUILDING NBUILDING LBUILDING M162' - 6"162' - 6"95' - 0"112' - 5"81' - 9"81' - 7"BUILDING O102' - 6"102' - 0"B-2 MAXIMUM ALLOWED SIGNAGE BY LOT: 400 SF PER LOTBUILDING AFRONTAGE SOUTH:136(25x3+111x1.5) 241.5sfFRONTAGE EAST: 50(25x3+25x1.5) 112.5sfTOTAL354sfBUILDING BFRONTAGE SOUTH:100(25x2+75x1.5) 162.5sfFRONTAGE EAST: 84(25x3+59x1.5) 163.5sfTOTAL326sfBUILDING CFRONTAGE EAST:102(25x2+77x1.5) 165.5sfFRONTAGE SOUTH:76(25x3+51x1.5) 151.5sfTOTAL317sfBUILDING DFRONTAGE EAST:76(25x2+51x1.5) 126.5sfFRONTAGE SOUTH:81(25x2+56x1.5) 134sfTOTAL260.5sfBUILDING EFRONTAGE SOUTH:74(25x2+49x1.5) 123.5sfFRONTAGE EAST: 144(25x2+119x1.5) 228.5sfTOTAL352sfBUILDING FFRONTAGE SOUTH:120(25x2+95x1.5) 192.5sfFRONTAGE WEST: 100(25x2+75x1.5) 162.5sfTOTAL355sfBUILDING GFRONTAGE SOUTH:96(25x2+71x1.5) 156.5sfFRONTAGE WEST: 80(25x2+55x1.5) 106.5sfFRONTAGE NORTH:172(25x2+147x1.5) 198.5sfTOTAL459.5sfLIMIT400sfBUILDING HFRONTAGE EAST:38(25x2+13x1.5) 44.5sfFRONTAGE NORTH:42(25x2+17x1.5) 50.5sfTOTAL95sfBUILDING JFRONTAGE WEST:110(25x2+85x1.5) 177.5sfFRONTAGE NORTH:132(25x3+107x1.5) 183.5sfTOTAL361sfBUILDING KFRONTAGE SOUTH:136(25x3+111x1.5) 241.5sfFRONTAGE WEST: 32(25x2+7x1.5) 60.5sfFRONTAGE EAST:82(25x2+57x1.5) 135.5sfTOTAL437.5sfLIMIT400sfBUILDING LFRONTAGE SOUTH:162(25x2+137x1.5) 255.5sfFRONTAGE NORTH:162(25x2+137x1.5) 255.5sfTOTAL511sfLIMIT400sfBUILDING MFRONTAGE EAST:112(25x2+87x1.5) 108.5sfFRONTAGE NORTH:95(25x2+70x1.5) 155sfTOTAL258.5sfBUILDING NFRONTAGE SOUTH:82(25x3+57x1.5) 160.5FRONTAGE EAST:82(25x2+57x1.5) 135.5sfTOTAL296sfBUILDING OFRONTAGE SOUTH:102(25x2+77x1.5) 165.5FRONTAGE EAST:102(25x2+77x1.5) 165.5sfTOTAL331sfBUILDING JBUILDING DBUILDING ABUILDING BBUILDING C81' - 3"75' - 11"75' - 7"102' - 0"135' - 7"50' - 9"100' - 10"84' - 2"DATE:This drawing is not intended nor shall it beused for construction purposes unless thesigned professional stamp of a registeredarchitect employed by Comma-QArchiteture, Inc. is affixed above.PROJECT #:CONSULTANTSORIGINAL DRAWING SIZE: 24" x 36"Q:\_Jobs14\04 MAP - Cannery District\14-04.01 - Entitlement Work\Revit\2014-04-29 CDi Site_Entitlement Work.rvtCannery District - Site Planning02/10/2015A-S.114-04.1Cannery District PartnersBuilding Signage PlanPreliminaryPUD SubmittalOak Street, Bozeman Montana 1" = 50'-0"1Sign Plan - Building Signage WALL SIGN32 sfEXTERNALLY LITWALL SIGN22.5 sfEXTERNALLY LITWALL SIGN42 sf(E)WALL SIGN11 sf(E)WALL SIGN6 sf(E)WALL SIGN6.5 sf(E)WALL SIGN10 sf eaBLADE SIGN4 sfUNLITBLADE SIGN4 sfUNLITWALL SIGN20 sfUNLITWINDOW SIGN20 sfUNLITWINDOW SIGN20 sfUNLITBLADE SIGN4 sfUNLITWALL SIGN72 sfEXTERNALLY LITWINDOW SIGN20 sfUNLITWALL SIGN52 sfEXTERNALLY LITWALL SIGN56 sfEXTERNALLY LITWALL SIGN42 sfEXTERNALLY LITWALL SIGN120 sfEXTERNALLY LITWALL SIGN120 sfEXTERNALLY LITWALL SIGN20SFEXTERNALLY LITWALL SIGN27SFEXTERNALLY LIT97ADDRESSWALL SIGN20SFEXTERNALLY LITWALL SIGN30 sfEXTERNALLY LITBUILDING IDSIGNWALL SIGN18 sfEXTERNALLY LITWALL SIGN47 sfEXTERNALLY LITNEW METAL ROOFING.TYPICAL ALLELEVATIONSBLADE SIGN4 sf, UNLITWALL SIGN6 sf, UNLITWALL SIGN6 sf, UNLITWALL SIGN80 sfEXTERNALLY LITDATE:This drawing is not intended nor shall it beused for construction purposes unless thesigned professional stamp of a registeredarchitect employed by Comma-QArchiteture, Inc. is affixed above.PROJECT #:CONSULTANTSORIGINAL DRAWING SIZE: 24" x 36"Q:\_Jobs14\04 MAP - Cannery District\14-04.01 - Entitlement Work\Revit\2014-04-29 CDi Site_Entitlement Work.rvtCannery District - Site Planning02/10/2015A-S.214-04.1Cannery District PartnersSign Plan ElevationsPreliminaryPUD SubmittalOak Street, Bozeman Montana 1/16" = 1'-0"1Buildings E & F - Cannery Building - SouthElevation Signs 1/16" = 1'-0"2Building E - Cannery Building - EastElevation Signs 1/16" = 1'-0"3Building F - Cannery Complex - WestElevation Signs 1/16" = 1'-0"4Building G - Canning Warehouse - WestElevation Signs 1/16" = 1'-0"5Building G - Canning Warehouse - SouthElevation Signs 1/16" = 1'-0"6G - Canning Warehouse - North ElevationSigns 1/16" = 1'-0"7Building H - Boiler House - East ElevationSigns 1/16" = 1'-0"8Building H - Boiler House - West ElevationSigns 1/16" = 1'-0"9Building H - Boiler House - North ElevationSigns 1/16" = 1'-0"10Building H - Boiler House - South ElevationSignsBUILDING 'E' (352sf allowed):TENANT SPACE L.1ETOTAL SIGNAGE ALLOWED: 30sfSIGNS PROPOSED:WALL SIGN: 26 sfBLADE SIGN: 4 sfTOTAL SIGNS PROPOSED: 30 sfTENANT SPACE L.1WTOTAL SIGNAGE ALLOWED : 240sfSIGNS PROPOSED:WALL SIGN SOUTH: 32 sfBLADE SIGN: 4 sfWALL SIGN EAST: 72 sfWALL SIGN EAST: 52 sfWALL SIGN NORTH: 80 sfTOTAL SIGNS PROPOSED: 240 sfTENANT SPACE L.2ETOTAL SIGNAGE ALLOWED: 20sfSIGNS PROPOSED:WALL SIGN: 20 sfTOTAL SIGNS PROPOSED: 20 sfTENANT SPACE L.2WTOTAL SIGNAGE ALLOWED: 20sfSIGNS PROPOSED:WINDOW SIGN: 20 sfTOTAL SIGNS PROPOSED: 20 sfTENANT SPACE L.3TOTAL SIGNAGE ALLOWED: 20sfSIGNS PROPOSED:WINDOW SIGN: 20 sfTOTAL SIGNS PROPOSED: 20 sfTENANT SPACE L.4TOTAL SIGNAGE ALLOWED: 20sfSIGNS PROPOSED:WINDOW SIGN: 20 sfTOTAL SIGNS PROPOSED: 20 sf 1/16" = 1'-0"11Building F - Cannery Complex - NorthElevation Signs 1/16" = 1'-0"12Building E - Cannery Building - NorthElevation SignsBUILDING F (355sf allowed):TENANT SPACE F-1:TOTAL SIGNAGE ALLOWED: 84 sfSIGNS PROPOSED:EXISTING WALL SIGN: 20 sfTOTAL SIGNS PROPOSED: 20 sfTENANT SPACE F-2a&b:TOTAL SIGNAGE ALLOWED: 68 sfSIGNS PROPOSED:EXISTING WALL SIGN: 23.5 sfTOTAL SIGNS PROPOSED: 23.5 sfTENANT SPACE F-3TOTAL SIGNAGE ALLOWED: 72 sfSIGNS PROPOSED:WALL SIGN WEST: 56 sfWALL SIGNS NORTH: 12 sfBLADE SIGN NORTH: 4 sfTOTAL SIGNS PROPOSED: 72 sfTENANT SPACE F-4aTOTAL SIGNAGE ALLOWED: 52 sfSIGNS PROPOSED:WALL SIGN: 42 sfTOTAL SIGNS PROPOSED: 42 sfTENANT SPACE F-4b&cTOTAL SIGNAGE ALLOWED: 80 sfSIGNS PROPOSED:WALL SIGN: 42 sfTOTAL SIGNS PROPOSED: 42 sfBUILDING G (400sf allowed):WALL SIGNAGE ALLOWED: 400 sfSIGNS PROPOSED:BLADE SIGN: 16 sfWALL SIGN WEST: 120 sf WALL SIGN SOUTH: 120 sfWALL SIGNS: 68 sfTOTAL SIGNS PROPOSED: 324 sfBUILDING H (95sf allowed):TOTAL SIGNAGE ALLOWED: 95 sfSIGNS PROPOSED:WALL SIGNS EAST: 30sfWALL SIGNS NORTH: 47sfWALL SIGNS WEST: 18sfTOTAL SIGNS PROPOSED: 95 sfPROPOSED SIGNSTHE FOLLOWING DESCRIBES SIGNS ALLOWED BY BUILDING AND WHERE POSSIBLE, BY TENANTSPACE. SIGN QUANTITIES, LOCATIONS AND TYPES ARE SUBJECT TO CHANGE AND TENANT SPACESIGN ALLOCATIONS ARE SUBJECT TO CHANGE. ANY ADJUSTMENT TO SIGN QUANTITIES WILL NOTRESULT IN SIGNS IN EXCESS OF THE TOTAL AMOUNT ALLOWED PER BUILDING. TENANT SPACE F-1TENANT SPACEE.L.1ETENANT SPACEE.L.1WBUILDING EBUILDING FCOMMON SPACETENANT SPACE F-2a-bTENANT SPACE F-4a-cTENANT SPACE F-3BUILDING GBUILDING HVEHICULARDIRECTIONALVEHICULARDIRECTIONALVEHICULARDIRECTIONALVEHICULAR DIRECTIONALLIGHT POLE MOUNTEDBUILDINGIDENTIFICATIONBUILDING MOUNTEDBUILDING IDBUILDING MOUNTEDBUILDINGIDENTIFICATIONBUILDING MOUNTEDBUILDINGIDENTIFICATIONBUILDING MOUNTEDBUILDINGIDENTIFICATIONBUILDING MOUNTEDBUILDINGIDENTIFICATIONBUILDING MOUNTEDBUILDINGIDENTIFICATIONBUILDING MOUNTEDBUILDING IDBUILDING MOUNTEDBUILDING IDBUILDING MOUNTEDBUILDING IDBUILDING MOUNTEDBUILDING IDBUILDING MOUNTEDBUILDING IDBUILDING MOUNTEDBUILDING IDBUILDING MOUNTEDMAP DISPLAYMAP DISPLAYPEDESTRIANDIRECTIONALPEDESTRIANDIRECTIONALPEDESTRIANDIRECTIONALPEDESTRIANDIRECTIONALPEDESTRIANDIRECTIONALPEDESTRIANDIRECTIONALPEDESTRIANDIRECTIONALPOLE SIGNPOLE SIGNLOW PROFILE SIGNBUILDING KBUILDING JBUILDING DBUILDING ABUILDING BBUILDING CBUILDING LBUILDING MBUILDING NBUILDING O7' - 0"2' - 8"1' - 8"VEHICULAR DIRECTIONALPEDESTRIAN DIRECTIONAL7' - 0"3' - 0"3' - 5"POLE OR LIGHT POSTMOUNTEDPOLE OR LIGHTPOSTMOUNTED9' - 0"VARIES5' - 0"3' - 0"3' - 0"BUILDING IDMONUMENTBUILDING IDBUILDING MOUNTEDMAP DISPLAYVARIES10' - 0"DATE:This drawing is not intended nor shall it beused for construction purposes unless thesigned professional stamp of a registeredarchitect employed by Comma-QArchiteture, Inc. is affixed above.PROJECT #:CONSULTANTSORIGINAL DRAWING SIZE: 24" x 36"Q:\_Jobs14\04 MAP - Cannery District\14-04.01 - Entitlement Work\Revit\2014-04-29 CDi Site_Entitlement Work.rvtCannery District - Site Planning02/10/2015A-S.314-04.1Cannery District PartnersSite Signage PlanPreliminaryPUD SubmittalOak Street, Bozeman Montana 1" = 50'-0"1Sign Plan - Wayfinding 1/4" = 1'-0"Wayfinding Signs