HomeMy WebLinkAbout2015-02-18 CDi Cannery Prelim PUD Book Part II ReducedDesign Guidelines
Cannery District Partners, llc
Comma-QArchitecture, Inc.
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page i
Comma-QArchitecture, Inc.
Table Of Contents
Part 2 - Design Guidelines
Team Contact Information 1
Section 1 - Project Overview 3
1.00 Project Overview 5
1.01 Improvements Schedule 9
1.02 Project Uses 11
Section 2 - Site Guidelines 13
2.00 Site Design Overview 15
2.01 Site Signage 17
2.02 Access Circulation and Parking 19
2.03 Pedestrian Access and Open Space 21
2.04 Site Grading and Drainage 23
2.05 Utilities, Communications and Refuse 25
2.06 Site Lighting 27
Section 3 - Landscape Design Guidelines 31
3.00 Landscape Design Overview 33
3.01 Vegetation 35
3.02 Hardscape 47
3.03 Maintenance 53
Section 4 - Building Design 55
4.00 Building Design Overview 57
4.01 Dimensional Considerations 61
4.02 Programmatic Considerations 65
4.03 Building Exterior 69
4.04 Building Lighting 75
4.05 Building Signage 77
Section 5 - Submittal Review Requirements and Procedures 83
5.00 Design Review Process and Requirements 85
Figure 5.01 - Viewsheds 91
Design Guideline Attachments
Attachment 1 - Cannery District Master Plan
Attachment 2 - Shared Parking description & Worksheet
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 1
Comma-QArchitecture, Inc.
Developer | Cannery District Partners, llc |
Scott Dehlendorf | (406) 522-7449 | scott@cannerydistrict.com |
Bozeman, Montana
Barry Brown | barry@cannerydistrict.com | Bozeman, Montana
Architect | Comma-Q Architecture | Ben Lloyd, AIA, LEED AP |
(406) 585-1112 | ben@commaq.com | Bozeman, Montana
Civil Engineer | Stahly Engineering & Associates, Inc| Cordell Pool, P.E. |
(406) 522-9526 | cpool@seaeng.com | Bozeman, Montana
Landscape Architect | Design 5 Landscape Architecture | Troy Scherer, RLA,
ASLA | (406) 600-0342| troy@design5la.com | Bozeman, Montana
Landscape Designer | Linda Iverson Landscape Design| Linda Iverson|
(406) 932-5840 | lilandscape@mtinthouch.net | Big Timber, Montana
Electrical Engineer | Consulting Design Solutions, Inc | Scott Elders, P.E. |
(406) 282-7082 | selders@cdsiengineering.com | Manhattan, Montana
Geotechnical Engineer | Allied Engineering Services, Inc | Craig Madson,
P.E. | (406) 582-0221 | craig@alliedengineering.com | Bozeman, Montana
Project Team
Comma-QArchitecture, Inc.
Cannery District Planned Unit Development
Design Guidelines
Cannery District Partners, llc
Section 1
Project Overview
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 5
Comma-QArchitecture, Inc.
The Cannery District is a vibrant and unique
development, located in Bozeman’s core,
that celebrates the site’s industrial past while
utilizing progressive development strategies.
The Cannery District is not a greenfield
development. The development revitalizes
an under-utilized former industrial site adding
density to Bozeman’s core. It builds upon the
history of the site by re-purposing existing
buildings while adding complementary new
construction. It also creates well defined
common spaces, some of which occupy unique
‘found’ spaces such as the water tower plaza
and the ‘alley’. Further, it references former
functions in site design with elements such as
the ‘Spur Trail’ . The result is a development that
has its own unique and authentic character.
The over-arching design objectives that should
guide all site, landscape, and building design at
the Cannery District are:
• Maintain honesty in design with regards
to function, materials & structures. The
form of the development and individual
components should reflect its historic
industrial/agricultural function AND its
current function as a progressive multi-use
development. Materials should remain true
to the nature of the material, no look-alike
materials. Exposed structure should be
efficient and authentic.
• Positive user experience should motivate
all design decisions. Navigating the
development by foot or vehicle should be
safe and intuitive for all users. Common
spaces should be comfortable and inviting.
There is a certain interest and charm
attached to the existing buildings and their
history which creates a place both intriguing
and inviting. This must be maintained as the
existing built environment is re-purposed for
contemporary uses.
a. Overview
It is the goal of this Development Manual to
set the standards for the planning, design
and construction of The Cannery District. All
entities, from individual Tenants, to the Owner,
to the City of Bozeman, will use this document
as a set of guidelines for creating a quality
development that builds upon a unique area in
Bozeman’s fabric. Any un-met code provisions,
or code provisions that are not specifically
listed, does not in any way create a waiver or
other relaxation of lawful requirements of the
Bozeman Municipal Code or Montana State law.
b. Intent of Guidelines
Project
Overview
1.00 Project Overview
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 6
Comma-QArchitecture, Inc.
The Cannery District, along with the Northside
Development, revitalizes property initially held
by three entities. All of these properties have
played an important roll in Gallatin Valley’s
agricultural and industrial past.
The Northside Development property sits at the
former location of Montana Flour Mills.
d. Site History
The Cannery District is located on 12.24 acres
along the north side of East Oak Street and west
of Rouse Avenue. The property is bounded by
Interstate 90 to the north. The Cannery District
is located within the Oak Street, Rouse Avenue
and Interstate 90 entryway corridors.
Prior to development, the Cannery District
property consisted of several parcels of land,
some located within the City of Bozeman and
others in the Gallatin County. As development
progresses, parcels will be annexed into the City.
As such, the entire Cannery District property is
anticipated to be within the City’s B-2 Zoning.
c. Location and Underlying Zoning
The renderings, plans and diagrams contained
throughout this Development Manual are based
on preliminary schematic design of the project.
While they exhibit the project’s overall design
intent, they do not present in its entirety, final
site conditions, landscaping or building location
and architecture. Photos throughout this
document are used only to visually emphasize
points within the text.
Historic Photos Courtesy
of the Pioneer Museum
Project
Overview
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 7
Comma-QArchitecture, Inc.
The central portion of the Cannery District
property, located to the west of the Northside
Development, was initially developed by local
entrepreneurs T.B. Story, Lester P Work, and LL
Brothertone who built and incorporated the
Bozeman Canning Company in 1917. The factory
opened in 1918 with a successful packing of
16,664 cases and by the 1923 season the Canning
Company shipped 326,000 cases across the
Country. Bozeman Canning Company packed
the peas of Gallatin County, “The Sweet Pea
Capital of the Nation,” until 1958 when a series
of events including hail, drought, and blight
damaged the pea crop. These events coupled
with the advent of frozen vegetables rendered
the Cannery financially inviable.
The portion of the Cannery District directly
North of the Northside PUD was formerly
owned by the Northern Pacific Railroad, an
entity that played a prominent role in the history
of the Pea Cannery. Four sets of railroad tracks
were historically located on the Pea Cannery
property. Three of these tracks were “industrial
spurs” used to transport coal and materials to
the site and to ship finished product to market.
The fourth set of tracks served the Milwaukee
Railroad’s electric trolley system which ran from
downtown Bozeman and terminated at the Pea
Cannery
Project
Overview
1928 Sanborn Map
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 9
Comma-QArchitecture, Inc.
The Cannery District PUD consists of four
phases, with each phase consisting of 2 or
more building pad site lots. The proposed PUD
phasing applies to core common open space
infrastructure, such as access, parking, and
utilities. The attached phasing diagram shows
proposed PUD phasing.
Within each PUD phase, building pad site lots
may be developed individually, with each
building undergoing site plan review. At the
time of pad site development, the site plan
review will determine the required common
open space PUD improvements necessary to
support completion of that individual building
pad site. It is anticipated that the bulk of the
common open space improvements will be
installed with the first building in each phase.
Ancillary common open space improvements
not required to support the developed pad
site will be provided with subsequent pad site
development within that PUD phase.
a. Phased PUD
It is anticipated that future site plan applications
will be made as necessitated by planned building
construction.
Site plan applications will be made for approval
of an individual building and those adjacent
common space improvements required for
approval of the proposed building.
The scope of each phase will be dependent upon
the requirements of the individual building.
b. Schedule and Scope of Future Phase
Applications
Improvements
Schedule
1.01 Improvements Schedule
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 11
Comma-QArchitecture, Inc.
The Bozeman Growth Policy identifies the
future land use of the Cannery District property
as Regional Commercial and Services. Defined
as an area for uses providing commercial
services to Bozeman, as well as the surrounding
community, this land use is consistent with uses
allowed under the B-2 Zoning designation.
As such, all uses allowed or conditionally
allowed under B-2 zoning will be allowed or
conditionally allowed in the Cannery District
PUD.
In addition to uses prohibited under B-2
zoning and prohibited by the Cannery District
Covenants, the following uses will NOT be
permitted:
• Adult-oriented establishments
• Automobile body shop
• Automobile parking garage
• Automobile service and/or repair facility
• Bus or taxi terminal
• Carwash
• Casinos
• Dumping, disposal, incineration, treatment,
processing, or reduction of garbage,sewage,
offal; dead animals or refuse
• Frozen food storage and locker rental
• Gasoline sales or sales of other flammable
and dangerous materials
• Large scale Industrial, manufacturing or
agricultural uses. Small scale industrial and
manufacturing uses such brewing or distilling
facilities or product assembly are allowed
with Design Review Board approval.
• Laundromat, laundry or dry cleaning facility
• Mortuary
• Theater
• Recycling facility
• Vehicle, mobile home, and boat sales and
rental
• Warehousing or indoor storage of goods or
material in quantities greater than normally
incidental to the uses permitted.
a. Permitted Uses Project Uses
1.02 Project Uses
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 12
Comma-QArchitecture, Inc.
The Cannery District development team
anticipates the following uses at the Cannery
District PUD. However, due many factors
including the phased build-out of this property
(which may take up to 10 years), it is likely these
specific uses will be modified to meet current
market demands.
B. Anticipated Uses
Building iDBuilding NameBuilding Footprint(square feet)StoriesTotal Building Area (square feet)UseFloor Area (FA)(square feet)Use Area(square feet)Use AreadescriptionE Cannery
Building
9,231 4 29,698 L1 West
Tenant
(Retail)
1644 1394 85% of FA
L1 Restaurant 6020 3500 seating area
L2 Office 7187 6109 85% of FA
L3 Office 4614 3922 85% of FA
L4 Office 4614 3922 85% of FA
F Cannery
Complex
12,000 1&2 16,500 level 1 office 2098 1783 85% of FA
level 1
distillary
2984 2111 85% of FA
(manufacturing)
500 seating area
level 1 retail 1836 1561 85% of FA
level 1
brewery
4647 1350 85% of FA
(manufacturing)
1200 seating area
level 2 office 3613 3071 85% of FA
G Brick
Building
13,760 1&2 20,000 Office 18,500 15,725 85% of FA
H Boiler House 1,650 1 1,650 Office 1650 1360 85% of FA
J Lone
Mountain
Gymnastics
Expansion
11,520 1
plus
mezz
12,500 Health &
Exercise
establishment
13,400 10,115 85% of FA
Accessory
Office
1500 1275 85% of FA
K 8,000 1
plus
mezz
10,000 Retail &
Office
10720 9112 85% of FA
L 12,700 2 26,500 Office/
Residential
26,500 22,525 85% of FA
M 8,700 2 16,000 Office 16,000 13,600 85% of FA
N 5,800 2 10,000 Office 10,000 8,500 85% of FA
O 9,100 2 18,000 Office 18,000 15,300 85% of FA
TOTAL GROSS AREA 160,918
Project Uses
Cannery District Planned Unit Development
Design Guidelines
Cannery District Partners, llc
Section 2
Site Guidelines
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 15
Comma-QArchitecture, Inc.
The intent of these guidelines is to establish
a framework upon which to base site design
including site layout, circulation and parking, site
drainage, utilities, site lighting and site signage.
The intent of these guidelines is not to propose
design solutions; it is to establish a basis for site
design that responds to the history of the site,
the site’s new function as a progressive mixed-
use development, and the surrounding context.
a. Intent
b. General Site Design Guidelines
Along with the Cannery District’s over-
arching design goals (see Section 1.00 - Project
Overview), site improvements shall meet the
following objectives:
1. Site Design shall provide...
- clear and coherent identification of place;
- necessary emergency vehicle access;
- efficient and appropriately sized vehicle
circulation and parking;
- safe, legible, and inviting pedestrian
pathways;
- spacially articulated and attractive open
spaces;
- responsive, low-impact storm drainage;
- reliable and convenient utility services;
- safe site lighting that adds vitality to the
development’s night time image
2. Coherent outdoor spaces are of primary
importance at the Cannery District. Site
elements including buildings should be
arranged to create clearly defined and
attractive outdoor spaces that enhance the
user’s experience of the Development.
2.00 Site Design Overview Site Design
Overview
Cannery District Site
c1919
Historic Photo Courtesy
of the Pioneer Museum
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 16
Comma-QArchitecture, Inc.
c. Professional Competence
All site design for common space or pad site
development shall be done by or under the
supervision of a Civil Engineer, licensed to
practice in the state of Montana.
3. Design should be based on function and
should be economic in its use of materials
and construction methods. These site design
methods are intended to result in a site that
reflects the functionality and economy of
construction evident in the original design of
the historic Cannery site.
4. Site design should result in a development
that has a strong sense of place while
remaining an integral and connected part of
the surrounding neighborhood.
5. Low-impact design as described herein
and in the City of Bozeman UDC Section
38.20.090-2-7-f. Other sustainable site
design strategies are strongly encouraged.
6. All site design shall be in compliance with
City of Bozeman Unified Development Code
and the Cannery District PUD.
7. All public areas and buildings shall be
accessible per current ADA guidelines.
Site Design
Overview
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 17
Comma-QArchitecture, Inc.
The following design guidelines govern the design of
all wayfinding signs and signs identifying the Cannery
District Development as a whole. Signs identifying
individual businesses or buildings that are installed
by individual pad site owners or building tenants are
addressed in section 4 - Building Design.
All site signage will be designed under a
comprehensive sign package to assure all site signage
is meets the development’s over-arching aesthetic.
Following are general design criteria for site signage:
1. All site signage must comply with the Cannery
District Comprehensive Sign Plan.
2. Two pole signs and one low profile monument
sign may be installed to identify the Cannery
District at each main entry to the site.
3. A system of wayfinding signage including
directional signs, building ID signs and map
directories will clarify route-finding within
the Cannery District and will contribute to the
development’s sense of place.
4. The design of all signs should be compatible
with development’s over-arching design
guidelines. Sign form, material, texture, and size
should comply with building design guidelines
(see Section 4 - Building Design) and should be
integrated with the surrounding site, building, and
landscape design.
a. Site Signage
2.01 Site Signage
Site Signage
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 18
Comma-QArchitecture, Inc.
All site signs are required to be specifically approved
in writing by the Cannery District Design Review
Committee (CDRC) prior to installation.
1. Entities applying for signage approvals shall
submit complete signage design drawings with
sufficient information for the CDRC to clearly
understand signage locations, size, assembly,
materials, and lighting.
2. The following information to be included in all
signage approval submittals:
• Elevation drawings of the proposed signage
with dimensions indicating the size and
location of the proposed signage. Drawings
should include identification of materials,
color schemes, and illumination.
• Detail drawings showing sign fabrication
techniques, materials, illumination, and
mounting systems.
• Material samples, when requested by CDRC.
b. Sign Approvals
5. Prior to the fabricating any site sign, a sign
permit must be obtained by the City of Bozeman.
All site signs and sign lighting must comply
with City of Bozeman Unified Development
Code requirements and with the project’s
comprehensive sign plan.
Site Signage
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 19
Comma-QArchitecture, Inc.
The Cannery District Master Plan outlines
proposed access, circulation, and parking.
Alternative designs are acceptable, when the
function provided remains the same.
a. Intent
2.02 Access Circulation and Parking Access
Circulation and
Parking
b. General Guidelines
The following guidelines address general access,
circulation, and parking planning:
1. Parking lot drive aisles should be inter-
connected providing numerous circulation
routes. Dead end bays should be minimized
and restricted to specific parking needs.
Drive aisles shall remain unobstructed and
accommodate turning movements required
by emergency vehicles, delivery vehicles, and
snow removal equipment as required.
2. Development strategies that minimize
parking, such as mixed uses, bicycle parking
and changing rooms, mass transit, and “town
bike” programs are encouraged.
3. Transportation via bicycle to and through the
Cannery District PUD should be as accessible,
safe, and convenient as transportation
by automobile. Provide appropriate
connections to bicycle routes adjacent to
the development. Every building shall have
associated bike parking in convenient and
visible locations.
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 20
Comma-QArchitecture, Inc.
c. Parking Allocation
Parking within the Cannery District is shared
through a joint-use agreement. It is anticipated
that the mixed use nature of proposed uses
will allow individual peak parking demands to
be accommodated in common shared parking.
Thus, overall district parking requirements will
be less than the sum of the individual parking
needs.
Parking has been preliminarily allocated to
each building and use based on the proposed
uses as provided in the Parking Tracking Table
in Appendix 5 - Traffic Study. These allocations
are based on preliminary building sizes and uses
and should not be interpreted as a “reservation”
for the building. Parking requirements should
always be quantified based on a District-
wide parking study, in accordance with City
requirements, completed with each application,
in addition to an updated Parking Tracking Table.
It is the intention of the Cannery District that
parking allocation remains flexible throughout
the life of the project. Ultimately, parking
availability may limit the size, use, or re-use of
a building. If this occurs, mitigation of parking
requirements is encouraged within accordance
of City and industry accepted standards.
Individual lot owners may be allowed some
dedicated parking restrictions, if approved
by the Cannery District Property Owners
Association, and if the resulting changes make
parking use more efficient. An example of this
may be accessible spaces, short-term parking,
or drop-off parking restrictions near a building’s
main entry.
Access
Circulation &
Parking
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 21
Comma-QArchitecture, Inc.
a. Primary Pedestrian Access Routes and Open
Spaces
2.03 Pedestrian Access &and Open Space Pedestrian
Access and
Open Space
In addition to these key elements, the Cannery
District Master Plan outlines other proposed
pedestrian corridors and open spaces.
Alternative designs for the other pedestrian
elements are acceptable, when the function
provided remains the same. The following
guidelines direct the design of general
pedestrian access and open space elements:
1. Template design of sidewalks and boulevards
should be avoided as much as possible.
Respectful of its industrial/agricultural past
expansive “neighborhood style” sidewalks
are not appropriate, and these pedestrian
routes shall be clustered into more
appropriate defined corridors.
2. The existing unique and interesting outdoor
spaces between buildings should be
preserved and re-purposed to similarly to
the manner in which the existing industrial/
agricultural buildings at the Cannery District
are to be re-purposed and revitalized.
3. The pedestrian corridors and open spaces
should be of suitable width and dimension
to provide a multitude of uses. The
corridors shall always provide unobstructed
pedestrian and bicycle routes. However, the
corridor edges may be used for furniture,
art, outdoor seating, bike parking, display
of goods, and snow storage. The result is
a vibrant and inviting space that provides
connectivity through the Cannery District.
4. Pedestrian walkways into and through the
Cannery District PUD should be accessible,
safe, and convenient. The intent is that
all users may conveniently visit multiple
locations within the development on foot,
without returning to their vehicle.
The Rail Trail, the Tower Trail, and plazas
connected by these trails are the primary public
spaces at the Cannery District (see Cannery
District Master Plan). These outdoor spaces
along with the existing historic structures play a
primary roll in establishing the Cannery District
Development’s strong sense of place and image.
As such, the design of these spaces shall be as
described in the Landscape Design Guidelines,
Section 3.00.
b. General Guidelines
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 22
Comma-QArchitecture, Inc.
5. Pedestrian crossings at high traffic areas
should be designed for maximum safety.
For instance, crosswalks should be made
of a contrasting paving material to the
surrounding road surface.
6. In keeping with its industrial/agricultural
heritage, the use of expansive “lawn”
spaces, or otherwise empty green spaces, is
inappropriate and should be minimized.
7. Open spaces shall be adjacent to, or bordered
by, buildings where a building façade can
provide a shelter element.
Site Grading
and Drainage
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 23
Comma-QArchitecture, Inc.
The Cannery District will utilize Low Impact
Development (LID) design with respect to site
storm drainage. The site storm drainage system
shall be designed in accordance with City of
Bozeman UDC Section 38.20.090-2-7-f.
A range of LID strategies may be implemented
based on design appropriateness.
1. Drainage of common parking areas should
utilize bio-swale retention in landscape
islands as much as possible.
a. Low-Impact Development
2.04 Site Grading and Drainage Site Grading
and Drainage
Example of a Bio-swale
L.A. Zoo; photo Ciara
Gonzalez
a. General Guidelines
The Cannery District Master Plan outlines
the proposed site grading and drainage plan.
Alternative designs are acceptable, when the
function provided remains the same. The
following guidelines direct the design of site
grading and drainage elements:
1. Design finished grades to provide positive
drainage of all lawns and paved areas.
Surface water shall be directed away from
buildings per applicable building codes.
2. Parking lot slopes shall be a minimum of .05%
and maximum of 4%. Where possible, design
parking lots to drain to the naturally lower
edge rather than the center.
3. The slope of grass areas should be between
1.5% and 6%.
4. Preserve all useful topsoil. Stockpile topsoil
or other materials so as to not interfere
with drainage before, during, or after
construction.
5. Erosion control methods shall be utilized to
prevent siltation onto adjacent properties
and into pipelines
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 24
Comma-QArchitecture, Inc.
2. Conventional storm water collection mains
and retention areas may be also be utilized
to provide treatment redundancy for larger
storm events.
3. Pedestrian hardscapes and plazas are
encouraged to have adequate permeable
areas to retain runoff from these areas.
4. Where practical, runoff from building roofs
is encouraged to be discharged to dry wells,
bio-swales, rain gardens, or re-used for
landscape irrigation.
5. A consequence of LID storm water mitigation
is the necessary acceptance that storm
water treatment facilities will be present
and visible in the landscape and not “out of
site” or “out of mind”. This is especially the
case after large storm events. This concept
should be embraced by property owners and
accepted as part of the landscape of a low
impact development.
Example of permeable
pavers
EP Henry’s ECO™ Line of
Permeable Pavers
Site Grading
and Drainage
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 25
Comma-QArchitecture, Inc.
1. Solid waste shall be collected within
enclosed on-site containers, screened from
view. The design of trash enclosures shall
be in conformance with Section 4 - Building
Design Guidelines.
2. The location of the trash enclosures and
access should accommodate large collection
trucks.
3. Recycling is encouraged and materials stored
for pick-up should be within enclosures.
4. Trash facilities shall be provided in the
common open spaces for pedestrian use.
5. Pet waste collection centers shall be
provided for areas anticipated to be used by
pets.
b. Water and Sewer
2.05 Utilities, Communications and Refuse Utilities,
Communications
and Refuse
Example of a Bio-swale
L.A. Zoo; photo Ciara
Gonzalez
c. Solid Waste
1. Water supply for drinking and fire protection
and sewage collection shall be provided by
City of Bozeman Municipal System.
2. Plans for water and sewer utilities shall
be approved by the City of Bozeman and
Montana Department of Environmental
Quality.
3. Water for landscape irrigation should be
provided by on-site wells or storm water
re-use systems, and not be supplied by City
municipal systems.
4. Water and sewer mains shall be located
within easements allowing the regular
access to and repair of these facilities.
a. Intent
Site development shall include the provision of
essential utilities and services. The following
are general utilities, communications and refuse
guidelines:
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 26
Comma-QArchitecture, Inc.
d. Franchise utilities
1. Franchise utilities for power, gas, and
communication shall be provided to each
building site. These facilities shall be
installed underground where allowed by the
service providers.
2. Franchise utilities shall be located in
dedicated corridors through the common
open space and within utility easements on
private lots.
3. Above ground utility service structures
such as transformers and junction boxes
should not be located along the primary or
secondary building façade.
4. Cannery District PUD intends to be involved
with the Bozeman Fiber Initiative and have a
fiber optic connection to each building.
Utilities,
Communications
and Refuse
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 27
Comma-QArchitecture, Inc.
The following design guidelines govern the design
of lighting for drive aisles, parking, plaza areas and
pedestrian routes. Building lighting is addressed
in Section 4 - Building Design.
1. Site lighting should maintain appropriate light
levels to provide a sense of clarity and safety
for both vehicular and pedestrian movement
to and through the Cannery District site.
2. Site lighting should be designed to allow the
user to experience natural light levels. for
example, light should be judiciously distributed
so as not to make dusk feel like day or night
feel like dusk. In many locations on the site,
the user should feel the presence of the dark
sky.
a. General Guidelines
2.06 Site Lighting
Site Lighting
Example of site lighting
that allows users to
experience natural light
levels.
The High Line
-LObservatoire
International
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 28
Comma-QArchitecture, Inc.
3. Light fixtures should be simple, functional
and industrial in character. Concealed
fixtures are encouraged. Decorative light
fixtures are inappropriate.
4. Site lighting can be broken down into three
categories:
• Vehicular-scale lighting: high-mounted,
low illumination levels intended for
vehicular ways and parking lots.
• Pedestrian-scale lighting: Light that is
emitted from above the pedestrian level
providing illumination of the pedestrian
environment. Fixtures mounted 9-14 feet
above the ground plane.
• Subpedestrian-scale lighting: light
that is emitted from a few feet below
pedestrian head level. The light that
primarily illuminates the ground plane.
Fixtures mounted 1-4 feet above the
ground and directed down.
5. Illumination of the Rail Trail (see the Cannery District
Master Plan) shall be lit primarily through pedestrian-
scale lighting from pole lights and at wall-mounted at
building entries. This lighting should be supplemented by
subpedestrian-scale lighting.
6. Pedestrian-scale pole lights shall be installed along the
length of the Rail Trail. Pole-mounted lights should be
spaced such that users experience natural light levels as
they move down the trail. Pole-mounted lights should
be approximately 80 feet apart. Illumination levels shall
average between 4 and 6 footcandles. All pole-mounted
lights shall be on the same side of the pathway and shall
not exceed 13’ in height. Pole-mounted lights shall be
compact, low profile, rectangular type fixtures with
LED lamps, steel or wood poles, and 6” tall, 18” diameter
concrete bases.
Site Lighting
18” DIAM
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 29
Comma-QArchitecture, Inc.
7. All lighting at pedestrian ways and common spaces (except the
Rail Trail) should be primarily lit by subpedestrian-scale lighting
supplemented by pedestrian-scale wall-mounted fixtures.
Illumination at all pedestrian ways and plaza areas except the
Rail Trail should be between 1 and 3 footcandles.
8. Minimum parking lot and drive aisle illumination shall be .2
footcandles. Fixtures and poles may not exceed a height of
20 feet and shall be compact, low profile, rectangular type
fixtures with LED lamps and 30” tall, 24” diameter concrete
bases. All parking lot lights shall be turned off within one hour
of closing. Security lighting is permitted to remain on through
the night.
9. Security lighting is to be provided as part of the site lighting
design such that illumination levels dim to 30% of full output
illumination levels at night in public and non-public parking
and service areas.
10. All site lighting shall conform to City of Bozeman Unified
Development Code standards and shall meet the cut-off
shield requirements outlined therein.
Examples of pedestrian-
scaled site lighting
Examples of
subpedestrian-scaled site
lighting
Site Lighting
Cannery District Planned Unit Development
Design Guidelines
Cannery District Partners, llc
Section 3
Landscape Design
Guidelines
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 33
Comma-QArchitecture, Inc.
a. Intent
b. General Landscape Design Guidelines
3.00 Landscape Design Overview Landscape
Design
Overview
The intent of the landscape design guidelines is to ensure that
site and landscape development is consistent with the site’s
industrial and agricultural typology; to encourage sustainable
design that is complimentary to the natural environment of
the region; to realize the site’s new function as a progressive
mixed-use development, with an attractive and ecologically
balanced environment; and to provide positive experiences for
adjoining residents and visitors alike.
These guidelines provide: the buffering of properties from
wind and snow; the screening of parking from residences
and pedestrian areas; the enhancement of entry areas to the
development and to individual buildings; the conservation of
water and the use of native or adapted plant species; and other
landscape design techniques with the goal of creating a unique
and inviting environment.
1. All landscape designs within the commercial district
shall be drawn and stamped by a Landscape Architect
Licensed by the State of Montana, or professional
landscape designer with demonstrated native or
waterwise plant experience.
2. Landscaping and outdoor improvements must
be completed within one (1) year of substantial
completion of any or each structure.
3. Landscape themes and treatments should build
on the characteristics of the site through the use
of naturalized and indigenous plant and exterior
materials
4. Native and waterwise plant selection and minimal
turf lawn is recommended to reduce water usage.
5. Ensure proper erosion control techniques: All
disturbed areas must implement erosion control
techniques to ensure on-site and off-site protection.
Slope stabilization is required on all slopes 3:1 and
greater with Best Management Practices (BMP’S)
implemented as necessary.
6. Conflicts with Utilities: All landscape plans
shall clearly illustrate all proposed utilities
and infrastructure, both in plan and legend. All
landscaping and irrigation shall begin only after a
thorough utility location survey is completed. All
planting and irrigation within a utility easement shall
begin only after discussing their location with the
appropriate utility provider.
7. Landscape Remodels: All landscape remodel projects
are to be consistent with the Cannery District
design guidelines. Projects will take into account the
historical character of the site and will encourage
continued sustainable design. Landscape remodels
and additions must be reviewed and approved by the
Cannery District Design Review Committee (CDRC).
8. Landscape design shall utilize low impact
development techniques per City of Bozeman UDC
Section 35.26
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 35
Comma-QArchitecture, Inc.
a. Trees
3.01 Vegetation
Vegetation
Tree and shrub species shall be selected based upon:
species diversity, adaptability, hardiness, and maintenance
requirements. The provided species lists shall be used for
all tree and shrub selections. Alternative species will be
considered on a case-by-case basis with the approval of the
Cannery District Review Committee (CDRC).
Deciduous Trees:
Acer ginnala Maple, Amur ‘Flame’, ‘Embers’
Acer freemanii Maple, Hybrid ‘Sienna Glen’
Acer negundo Maple, Boxelder ‘Sensation’
Acer plantanoides Maple, Norway ‘Emerald Lustre’ , ‘Royal Red’, ‘Helena’
Acer rubrum Maple Red ‘Autumn Spire’, Scarlet Jewel’
Acer saccharum Maple Sugar ‘Green Mountain’
Acer tataricum Maple, Tatarian ‘Hot Wings’
Aesculus glabra Ohio Buckeye
Alnus hirsuta ‘Harbin’Alder , Manchurian ‘Prairie Horizon’
Ameliancher grandiflora Serviceberry ‘Autumn Brilliance’
Betula papyifera Birch, Paper
Betula platyphylla Birch, Asian White ‘Dakota Pinnacle’
Caragana arborescens
‘Pendula’
Caragana, Weeping
Celtis occidentalis Hackberry
Crataegus amibigua Hawthorn, Russian
Crataegus crus-galli var
inermis
Hawthorn, Thornless
Cockspur
Crataegus laevigata ‘Superba’Hawthorn ‘ Crimson Cloud’
Crataegus x mordenensis Hawthorn ‘Snowbird’, ‘Toba’
Euonymus bungeana Winterberry ‘Prairie Radiance’
Gleditsia triancanthos var
inermis
Honeylocust ‘Northern Acclaim’, ‘Skyline’, ‘Imperial’
Maackia amurensis Maackia, Amur
Malus sp Crab, Flowering Varieties with small, persistent fruit
and fireblight resistant
Prunus maackii Chokecherry, Amur
Prunus padus var commutata Mayday Tree, Birdcherry
Prunus ussuriensis Pear, Ussarian ‘Mountain Frost’, ‘Prairie Gem’
Prunus virginiana Red Chokecherry ‘Canada Red’
Quercus macrocarpa Oak Bur
Sorbus alnifolia Mountain Ash, Korean
Sorbus decora Mountain Ash, Showy
Sorbus hybrida Mountain Ash, Oakleaf
Syringa pekinensis ‘SunDak’Lilac, Peking ‘Copper Curls’
Syringa reticulata Lilac, Japanese Tree ‘Ivory Silk’, ‘Snowdance’
Tilia americana Linden, American ‘Boulevard’, ‘Lincoln’, ‘Redmond’
Tilia cordata Linden,Little Leaf ‘Greenspire’
Tilia hybrid Linden, Hybrid ‘Dropmore’
Ulmus americana Elm, American ‘Brandon’
Ulmus davidiana var japonica Elm, American ‘ Discovery’
Cannery District Tree List
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 36
Comma-QArchitecture, Inc.
b. Street and Parking Lot Trees
The project or site developer shall plant a
predetermined mix of approved street trees within the
right-of-way as indicated on the site Cannery District
Master Plan.
1. The Cannery District Property Owners Association
(CDi Association) will maintain all right-of-way trees
within the commercial areas.
2. See acceptable street tree list for guidance on tree
selection. Species not listed will be considered on a
case-by-case basis and must be approved by CDRC.
3. All street trees to be compatible with current City
of Bozeman Approved Street Tree list and approved
by City Forester prior to installation.
Trees Street/Parking
Large Shade Trees
Acer plantanoides Maple, Norway Emerald Lustre', 'Royal Red'
Acer rubrum Maple Red 'Autumn Spire', Scarlet Jewel', 'Helena',
Celtis occidentalis Hackberry
Gleditsia triancanthos Honeylocust 'Northern Acclaim', 'Skyline', 'Imperial'
Quercus macrocarpa Oak Bur
Tilia americana Linden, American 'Boulevard', 'Lincoln', 'Redmond'
Tilia hybrid Linden, Hybrid 'Dropmore'
Tilia cordata Linden, Little Leaf 'Greenspire'
Ulmus americana Elm, American 'Brandon'
Ulmus davidiana var
japonica
Elm, American 'Discovery'
Vegetation
Small Shade Trees: Acceptable in Parking Area Islands
Acer ginnala Maple, Amur Flame', 'Embers' (single stem)
Acer tataricum Maple, Tatarian 'Hot Wings' (single stem)
Aesculus glabra Ohio Buckeye
Maackia amurensis Maackia, Amur 'Summertime'
Prunus padus var
commutata
Birdcherry or Mayday
Tree
Prunus ussuriensis Pear, Ussarian 'Mountain Frost', 'Prairie Gem'
Sorbus aucuparia Hawthorn ‘Snowbird’, ‘Toba’, ‘Thornless Cockspur’
Syringa reticulata Lilac, Japanese Tree 'Ivory Silk', 'Snowdance' (single stem)
Evergreen Trees
Juniperus scopulorum Rocky Mountain Juniper
Picea abies Norway Spruce
Picea engelmannii Engelman Spruce
Picea glaca var densata Blackhills Spruce
Picea pungens Colorado Spruce
Pinus aristata Bristlecone Pine
Pinus nigra Austrian Pine
Pinus ponderosa Ponderosa Pine
Cannery District Tree List (CONT’D)
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 37
Comma-QArchitecture, Inc.
c. Shrubs
Shrubs shall be placed within the open spaces and
green spaces throughout the project to provide
accents, texture, color, and interest to the landscape.
1. See acceptable shrub list for guidance on shrub
selection. Species not listed will be considered
on a case-by-case basis and must be approved by
CDRC.
Vegetation
Deciduous Shrubs: Water-wise
*Montana Native
Archtostaphylos uva-ursi*Kinnickinnik
Artemisia cana*Sage, Silver
Artemisia tridentata*Sagebrush, Big
Caragana arborescens Peashrub, Siberian
Caragana frutex Peashrub, Globe
Caragana pygmaea Peashrub, Pygmy
Ceratoides lanata*Winterfat 'Open Range'
Chamaebatiaria millefollium Fernbush
Chyrsothamnus nauseosus*Rubber Rabbitbrush
Chyrsothamnus nauseosus 'nana'*Rubber Rabbitbrush Dwarf
Chyrsothamnus viscidiflorus*Rubber Rabbitbrush green
Fallugia paradoxa Apache Plume
Ribes aurium*Currant, Golden
Rhus aromatica Sumac 'Grow Low'
Yucca glauca*Yucca
Cannery District Shrub List
Deciduous Shrubs: Regular Watering
*Montana Native
Acer ginnala Maple, Amur 'Emerald Elf'
Amelanchier alnifolia*Serviceberry
Aronia melanocarpa var. alata Chokeberry, Glossy Black 'Iroquois Beauty'
Berberis repens*Oregon Grape
Berberis thunbergii'Barberry 'Golden, Emerald', 'Burgundy'
and 'Jade Carousel' 'Concorde',
'Crimson Pygmy', 'Cabernet '
Cotoneaster apiculatus Cotoneaster Cranberry
Cotoneaster ignavus Cotoneaster, 'Szechuan
Fire'
Cotoneaster lucidus Cotoneaster Peking
Daphne x burkwoodii Daphne 'Carol Mackie'
Diervilla lonicera Honeysuckle, Dwarf Bush
Elaeagnus commutata*Silverberry
Euonymus alatus Burning Bush, Dwarf
Euonymus alatus Burning Bush
Forsythia hybrid Forsythia 'Meadowlark',
Hydrangea arborescens Hydrangea 'Annabelle'
Hydrangea paniculata Hydrangea 'Tardiva'
Jamesia americana Waxflower
Lonicera involucrata*Honeysuckle, Twinberry
Lonicera hybrid Honeysuckle, 'Honeyrose'
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 38
Comma-QArchitecture, Inc.
Vegetation
Philadelphus lewisii*Mockorange Blizzard’, ‘Cheyenne’
Physocarpus monogynus*Ninebark, Mountain
Physocarpus opulifolius Ninebark ‘Center Glow’, ‘Diablo’,
‘Summer Wine’, ‘Little Devil
Physocarpus opulifolius var nanus Ninebark Dwarf
Physocarpus opulifolius Ninebark ‘Nugget’
Physocarpus opulifolius ‘Seward’Ninebark
Potentilla fruticosa*Potentilla Many varieties
Prunus besseyi*Sandcherry , Western
Prunus besseyi*Sandcherry ‘Pawnee Butte’
Prunus cistena Plum, Cistena
Prunus tomentosa Nanking Cherry
Prunus triloba Rose Tree of China
Rhus trilobata*Sumac Trilobe
Rhus typhina Sumac Staghorn
Ribes alpinum Currant Alpine, ‘Greenmound’
Rosa Hybrids Rose, Shrub Many varieties
Shepherdia argentea*Buffaloberry, Silver
Spiraea albiflora Spirea Japanese White
Spiraea betulifolia*Spirea Birchleaf ‘Tor’
Spiraea cineria Spirea Grefsheim
Spiraea fritschiana Spirea ‘Fritsch’
Spiraea japonica Spirea ‘Golden Elf’
Spiraea japonica Spirea ‘Little Princess’ ‘Norman’, ‘Magic Carpet’
Spiraea japonica Spirea ‘Magic Carpet’
Spiraea japonica var. alpina Spirea ‘Daphne’
Spiraea nipponica Spirea ‘Halwood’s Silver’
Spiraea prunifolia Spirea ‘Bridalwreath’
Spiraea trilobata Spirea ‘Fairy Queen’
Spiraea x arguta ‘Compacta’Spirea ‘Dwarf Garland’
Spiraea x bumalda Spirea ‘Froebel’ ‘Neon Flash’
Spiraea x bumalda Spirea ‘Goldflame’ ‘Goldmound’
Spiraea x vanhouttei Spirea ‘Renaissance’
Symphoricarpus albus*Snowberry
Syringa hybrid Lilac FairyTale Series ‘Thumbelina’, ‘Tinkerbelle’,
‘Prince Charming’, ‘Sugar
Plum Fairy’
Syringa vulgaris hybrid Lilac French Hybrid Many varieties
Syringa meyeri ‘Palibin’Lilac Dwarf Korean
Syringa patula Lilac’ Miss Kim’
Viburnum dentatum ‘Christom’Viburnum, Arrowwood ‘Blue
Muffin’
Viburnum lantana Viburnum ‘Mohican’
Viburnum lentago Viburnum Nannyberry
Viburnum trilobum Viburnum American
Cranberrybush
Viburnum trilobum Viburnum Dwf American
Cranberrybush
‘Alfredo’, ‘Bailey Compact’
Viburnum lantana Viburnum, ‘Mohican’
Viburnum, dentatum Viburnum, Arrowwood
Weigela florida Weigelia ‘Red Prince’
Deciduous Shrubs: Regular Watering (Cont’d)
*Montana Native
Cannery District Shrub List (Continued)
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 39
Comma-QArchitecture, Inc.
VegetationDeciduous Shrubs: Wet Areas
*Montana Native
Alnus tenufolia*Alder, Thinleaf
Cornus sericea*Dogwood, Red Twig
Cornus alba Dogwood, Yellow Twig 'Buds Yellow'
Cornus sericea var.
coloradoensis*
Dogwood Colorado Red
Osier
Cornus sericea*Dogwood Dwarf 'Isanti', 'Allemans Compact'
Cornus alba Dogwood, 'Ivory Halo'
Salix arenaria Willow, Blue Creek
Salix purpura Willow, Dwarf Arctic
Salix hybrid Willow, Flame
Cannery District Shrub List (Continued)
Evergreen Shrubs
Juniperus chinensis Juniper, Chinese 'Mint Julep'
Juniperus communis Juniper Common 'Alpine Carpet', 'Blueberry
Delight'
Juniperus horizontalis Juniper, Horizontal 'Blue Chip', 'Hughes', 'Prince of
Wales','Blue Rug'
Juniperus sabina Juniper Savin 'Broadmoor', 'Buffalo',
'Calgary Carpet'
Juniperus sabina var
tamariscifolia
Juniper, Tam
Juniperus
scopulorum
Juniper Rocky Mountain 'Cologreen',' Medora', 'Wichita
Blue'
Picea abies Spruce, Dwarf 'Little Gem', 'Birds Nest'
Picea pungens
'Globosa'
Spruce, Dwarf Blue
Globe
Pinus mugo Pine, Mugo 'Tannenbaum', 'Valley
Cushion', 'Slowmound'
Pinus sylvestris Pine, Scotch 'Hillside
Creeper'
Taxus x media Yew, Spreading 'Taunton'
Kinnickinnick Pawnee Butte Sandcherry Dwarf Rabbitbush
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 40
Comma-QArchitecture, Inc.
Vegetation d. Planting Beds
Planting beds shall be found along side trails and pedestrian corridors, next
to buildings, near site and building entrances, and as a backdrop to plazas,
patios, and seating areas. Landscaping and planting beds shall act as a unifying
element throughout the Cannery District as a whole, and shall strive to create
unique and interesting spaces through the use of planting elements, while
maintaining a visually coherent landscape and providing seasonal interest.
1. See acceptable plant list for guidance on plant selection. Species not listed
will be considered on a case-by-case basis.
Perennials: Waterwise
*Montana Native
Achillea hybrid Yarrow 'Moonshine', 'Paprika',
'Terra Cotta'
Amemone patens*Pasqueflower
Anaphalis margaritacea*Pearly Everlasting
Anemone patons*Pasqueflower
Antennaria microphylla*Pussytoes, Rosy
Artemisia versicolor Sage 'Seafoam'
Centranthus ruber 'Coccineus'Jupiter's Beard
Clematis hirsutissima*Clematis Sugarbowls,
Vaseflower
Dianthus pinifolius Dianthus, Pineleaf
Geum triflorum*Prairie Smoke
Nepeta faassenii Catmint
Penstemon pinifolius Penstemon, Pineleaf
Penstemon procerus*Penstemon, Small
Flwered
Penstemon strictus Penstemon, Rocky
Mountain
Perkovskia atriplicifolia Russian Sage
Salvia nemerosa Salvia 'Cardonna', 'May Night'
Thymus species Thyme Creeping
Veronica liwenensis Veronica Turkish
Saponaria oxymoides Soapwort
Saponaria x lempergii Soapwort 'Max Frei'
Sedum species Sedum
Catmint Prairie Smoke Veronica Turkish
Northside Development
Linda Iverson
-Landscape Design
Example of planting bed
to highlight the site and
building entrance.
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 41
Comma-QArchitecture, Inc.
VegetationAjugaBugleweed
Alchemilla mollis Lady's Mantle
Amsonia hybrid Amsonia 'Blue Ice'
Aruncus dioicus Goatsbeard
Aster dumosus Aster, Woods
Aster hybrid Aster, Fall Professor Kippenburg', 'Tiny
Theo'
Brunneria macrophylla Brunneria 'Jack Frost'
Brunneria macrophylla Brunneria
Cerastrium tomentosum Snow in Summer
Dictamnus albus Gasplant
Echinacea purpurea Coneflower 'Harvest Gold' 'Sunrise',
'Sundown', 'Magnus', 'White
Swan'
Galium odoratum Sweet Woodruff
Geranium cantabrigiense Geranium 'Biokovo', 'Karmina', 'Tiny
Monster'
Geranium hybrid Geranium 'Rozanne'
Heliopsis helianthoides v
scabra
Sunflower, Summer Nights
Hemerocallus sp Daylily
Heuchera Coral Bells
Iris argentea-variegatum Iris, Variegated
Iris siberica Iris Siberian 'Caesars Brother'
Lamium maculatum Lamium
Origanum hybrid Oregano, Ornamental
'Herrenhausen'
Penstemon digitalis Pentemon 'Husker Red'
Potentilla x hybrid Potentilla Groundcover
Rudbeckia fulgida Black Eyed Susan 'Little Goldstar', 'Goldstrum'
Scabiosa caucasica Pincushion Flower 'House Hybrids', 'Fama'
Solidago canadensis Goldenrod 'Golden Baby','Baby Gold'
Solidago rugosa Goldenrod 'Fireworks'
Stachys monieri Betony 'Hummelo'
Veronica spicata Veronica
Perennials: Regular watering
Grasses: *Montana Native
Bouteloua curtipendula*Grama, Sideoats
Calamagrostis brachyticha Feather Reedgrass,
Korean
Calamagrostis x acutiflora Feather Reedgrass 'Karl Foester', 'Avalanche', El
Durato',
Festuca glauca Fescus, Blue
Helictotrichon sempervirens Blue Oat Grass
Miscanthus sinensis Maiden Grass 'Gracillimus'
Molina caerulea subsp
arundinacea
Moor Grass Tall
Purple
'Skyracer', 'Transparent'
Panicum virgatum*Switchgrass 'Cheyenne Sky, 'Northwind',
'Shenandoah'
Schizachyrum scoparium*Little Bluestem 'Blaze', 'The Blues'
Sporobolus heterolepsis*Prairie Dropseed
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 42
Comma-QArchitecture, Inc.
Vegetation e. Foundation Plantings
f. Screening and Buffering
g. Open Space
The use of foundation plantings shall be limited, their use
shall be restricted to screen unsightly foundations and
exposed space under porches or in areas where extreme
grade changes occur.
1. It is highly desirable to accent architectural qualities of
buildings with attractive and well-designed foundation
style plantings.
2. Foundation plantings may be mounded or massed to
accent the entrances to the buildings in the commercial
district.
3. The placement and use of foundation plantings must
be clearly indicated on all landscape plans, and are
subject to review by the CDRC prior to installation.
Screening and buffering shall be used to mitigate conflicts
between dissimilar land uses and to visually disguise
unsightly elements as viewed from both within and
outside of the site boundaries. All mechanical equipment
(including air conditioner condensers, power transformers,
tv/phone boxes, etc.) must be screened through landscape
or architectural means.
1. All plant material used for screening or buffering shall
be selected from the provided approved plant lists
and should have a minimum mature height 4 (four) ft,
within ten (10) years.
2. Berming may be created, where applicable, to mitigate
unsightly views, lessen noise from streets and drives,
channel pedestrian movements, and provide privacy. All
proposed beaming must be reviewed and approved by
CDRC prior to installation.
Open spaces throughout the project shall strive to
create places with distinct identities while maintaining
a consistent visual language throughout the Cannery
District. The open space areas indicated on the Cannery
District Master Plan represent a minimum standard. Any
additional open space must also adhere to the design and
site standards.
1. Pad Site developers shall coordinate the planning and
design of open spaces on the pad site property that
may be shared by both pad site and common open
space uses.
2. Lawns, gardens, eating courts and decks, porches,
balconies and plazas (outside of private property) must
function as usable public open space.
3. Undeveloped land that remains after construction
of the buildings and parking shall not be considered
functional open space.
Northside Development
Comma-Q Architecture
Northside development
Linda Iverson
-Landscape Design
Example of screening
through the use of
landscape elements
Example of open
space with a distinct
character within the
site
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 43
Comma-QArchitecture, Inc.
h. Native Seeding
The use of native and/or waterwise seeding in the rehabilitation of
disturbed areas within the site is encouraged.
1. All seed areas must be clearly illustrated on the landscape plan and
approved by the CDRC prior to installation.
2. The use of supplementary irrigation is required for an establishment
period of 3 (three) years in order to promote growth and weed
competition.
3. Mechanical weed control along with over seeding may be required
for all seed areas. Mechanical and organic methods are preferred to
chemical methods.
4. Any seeding shall be selected from the approved seed mixture list
and used in an appropriate environment for indicated seed mixture
type. Any substitution to the native seed mixture must be reviewed
and approved by CDRC prior to installation.
Vegetation
Seed Mixes for Cannery District
Mowed Native Grass Mix Seeding Rate:
.75/1000sqft
% of Mix Common Name Botanical Name
80 Fescue Idaho Festuca idahoensis
20 Bluegrass Canby 'Canbar'Poa canbyi
Mowed Non-Native Grass/
Waterwise
Seeding Rate:
1.5#/1000sqft
100 Fescue Tall 'Turf Type'Festuca arundinacea
Mowed or Unmowed Non-
Native Grass/Waterwise
Seeding Rate:
.5#/1000sqft
100 Sheep Fescue 'Covar'Festuca ovina
Non-Mowed Native Grass
and Wildflower Mix
Seeding Rate:
.5#/1000sqft
Grasses
10 Blue Grama 'Bad River'Bouteloua gracilis
10 Bluegrass Sandberg 'High
Plains'*
Poa sandbergii
30 Wheatgrass Streambank
'Sodar'
Elymus lanceolatus
30 Wheatgrass Western 'Rosana'Pascopyrum smithii
20 Fescue Idaho Festuca idahoensis
Forbs (can be added to mix
or broadcast irregularly)
Seeding Rate:
2oz/1000sqft
20 Blue Flax Linum lewisii
40 Prairie Coneflower Ratibida columnifera
20 Indian Blanketflower Gaillardia aristata
10 Showy Goldeneye Heliomeris multiflora
10 Showy Fleabane Erigeron speciosa
Mowed or Unmowed Grass
for Shady Places
Seeding
Rate:1#/1000sqft
100 Fescue Creeping Red Festuca rubra
Northside Development
Linda Iverson
-Landscape Design
Example of native
seeding of open space
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 44
Comma-QArchitecture, Inc.
Vegetation
j. Rail Trail
The Rail Trail provides an essential east - west
pedestrian connection through the entire development
(see the Cannery District Master Plan). A consistent
visual language through the use of plant and hardscape
material throughout the length of the Trail is necessary
in order to enhance the Trail’s presence within the site.
1. All areas adjacent to the Rail Trail shall be planted in
a similar visual language, enhancing the connectivity
through the site as a whole.
2. A ‘perennial drift’ style planting shall be used in all
planting beds adjacent to the Rail Trail, alternative
planting styles will be considered on a case-bay-
case basis by the CDRC.
3. Trail design and installation is to be coordinated
with adjoining properties and developers in order to
maintain Trail consistency throughout the site.
4. All planting selections shall be from the approved
species list, alterative species will be considered on
a case-by-case basis by the CDRC.
I. Plaza spaces
Plaza spaces are to be created as unique and interesting
places for site patrons though the use of vegetation,
public art, seating and gathering areas, and hardscape
materials.
1. Plaza spaces shall be along pedestrian corridors,
adjacent to the Rail Trail, or next to buildings.
2. All public plaza spaces shall remain accessible,
barrier free, and inviting for all visitors to the site.
3. Plaza design shall strive to create visually dynamic
experiences through the use of vegetative material
that honors the site’s heritage and character, and
encourages plaza use.
4. All planting selections shall be from the approved
species list, alterative species will be considered on
a case-by-case basis by the CDRC.
Northside Development
Linda Iverson
-Landscape Design
Example of using plant
material to create an
interesting public space
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 45
Comma-QArchitecture, Inc.
Vegetationk. Pedestrian Corridors
Pedestrian corridors provide ease of access for
pedestrian and bicycle traffic through the site.
Providing essential north to south connectivity
along with enhancing the east to west connection of
the Rail Trail.
1. Planting beds, lawn areas, and open spaces
adjoining pedestrian corridors shall be planted
in an inviting and visually appealing manner to
encourage their use and indicate their presence
for all site patrons.
2. No plant material shall impede accessibility and
safe use of pedestrian corridors.
3. Coordinate the design and installation of
pedestrian corridors with adjoining pad sites
and developers in order to maintain consistency
throughout the site.
4. Planting shall be selected from the approved
species list. Alternate species will be considered
on a case-by-case basis by the CDRC.
Example of drift
plantings and
pedestrian corridor
with seating
Northside Development
Comma-Q Architecture
L. Lawn and Pet Exercise areas
The use of irrigated sod lawns within the site is to be
limited. Alternative sustainable landscape design is
encouraged, the use of sod lawn is to be limited to
areas deemed appropriate by the CDRC.
1. The use of native and drought tolerant seeding is
encouraged in lawn areas and open space as an
alternative to traditional lawns.
2. Lawn areas can be used along trails and
pedestrian corridors, near plazas and open
spaces, and near parking facilities.
3. The implementation of designated dog exercise
and play areas is encouraged throughout the
site. Vegetation within these areas may be sod
or native seeded lawn areas. All facilities must
contain approved trash containers and sanitary
stations
4. All dog facility locations must be reviewed and
approved by the CDRC prior to installation.
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 46
Comma-QArchitecture, Inc.
Vegetation m. Stormwater Facilities
All stormwater facilities
indicated in the Cannery
District Master Plan are
to be planted in a manner
which enhances their visual
appeal, while not impeding
their function or use.
1. Vegetation within bio-
swale and retention
areas is to be selected
in accordance with
their ability to maximize
stormwater filtration
and hardiness within the
respective environment.
2. All planting and
landscaping for
stormwater facilities
shall be coordinated
with the Cannery
District Master Plan
engineering and
landscape documents.
3. Plantings within
bio-swales shall
have supplemental
irrigation installed for
establishment and
possible periods of
prolonged drought.
4. All planting selections
shall be from the
approved Cannery
Bio-swale species list,
alterative species will be
considered on a case-
by-case basis by the
CDRC.
Cannery Bio-swale Plants
* Montana native
Common Name Botanical Name
Trees
Boxelder, Sensation*Acer negundo
Hackberry Celtis occidentalis
Maple 'Sienna Glen'Acer x freemanii
Maple, Red Acer rubrum
Quaking Aspen*Populus tremuloides
Thinleaf Alder*Alnus incana
Shrubs
Arrowwood Viburnum dentatum
Buffaloberry, Silver*Shepherdia argentea
Chokecherry*Prunus virginiana
Dogwood, Red Twig*Cornus sericea
Elderberry*Sambucus racemosa
Ninebark, Mallow*Physsocarpus malvaceus
Serviceberry*Amelaanchier alnifolia
Silverberry*Elaeagnus commutata
Spirea, Pink*Spiraea douglasii
Twinberry*Lonicera involcrata
Willow, Bebb*Salix bebbiana
Willow, Blue Arctic Salix purpurea 'Nana'
Perennials
Arnica, Heartleaf*Arnica cordifolia
Bee Balm*Monarda fistulosa
False Indigo Baptisa australis
False Solomon Seal*Smilacena racemosa
Goldenrod 'Fireworks'Solidago rugosa
Goldenrod, Stiff*Solidago rigida
Iris, Siberian Iris siberica
Joe Pye Weed*Eupatorium maculatum
Purple Coneflower Echinacea purpurea
Rocky Mountain Iris*Iris missouriensis
Spiderwort*Tradescantia occidentalis
Sunflower, Nuttalls*Helianthus nuttallii
Swamp Butterflyweed*Asclepias incarnata
Grasses
Alkali Sacaton*Sporobolus airoides
Basin Wildrye*Leymus cinereus
Bluejoint Reedgrass*Calamagrostis
canadensis
Prairie Dropseed*Sporobolus heterolepsis
Sedge, Palm Carex muskingumensis
Switchgrass*Panicum virgatum
Turfed Hairgrass*Deschampsia cespitosa
City of Peachland, BC
Bio-swale planting
example
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 47
Comma-QArchitecture, Inc.
All site furnishings are to be simple in character and
designed to be compatible with the historic character of the
Cannery District and its surroundings, while addressing the
needs of the project. All site furnishing requirements apply
to all commercial and multi-family projects. If an alternative
site furnishing is preferred, the site or project developer
shall submit manufacturer cut sheets and/or samples to the
CDRC for review and approval.
1. Benches and seating: installed within the commercial
projects are to be of a style illustrated in this section.
Some benches or seating should face each other to
encourage human interaction.
a. Site Furnishings
Illustration and
examples of site
furnishings with
historical and industrial
character embracing
the sites heritage.
Reclaimed timber picnic
table example.
Grijsen International
Pure Picnic Set II
3.02 Hardscape
Hardscape
2. Picnic Tables are to be used in open spaces, lawn
areas, along trails and pedestrian corridors, and plaza
spaces. Picnic tables are to be placed in locations that
will encourage their use, taking into account sun,
shade, wind, and views from within the site.
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 48
Comma-QArchitecture, Inc.
Hardscape
3. Bike Racks: All commercial lots shall have
at least one (1) bike rack installed for each
building entrance on the lot, or every 40
feet of building frontage, whichever is less.
The project or site developer may group
bike racks in one or two main entrances on
the site in order to centralize bike parking
facilities.
A functional bicycle
rack inspired by the
area’s railroad history
by Dino Grassini
Landscape Forms
Gretchen trash
container
4. Trash Containers: All commercial lots shall
have at least one (1) trash container for each
building or unit entrance (whichever is less),
should be located along the building frontage.
All open spaces, plazas, trails and pedestrian
corridors shall have trash containers
integrated into their design.
5. Public Art: The use of public art within
pedestrian plazas, open space, along trails
and pedestrian corridors, and near buildings
is encouraged. Art may also be directly
integrated into the design of a building.
Locations where art may be viewed from
pedestrian and vehicular circulation routes
should be given priority. The placement
of public art shall be coordinated with
the development of open spaces, trails,
and plazas on a lot. All public art must be
submitted for review and approval by CDRC
prior to installation.
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 49
Comma-QArchitecture, Inc.
Hardscapeb. Rail Trail
A consistent visual language through the use of plant and
hardscape material is necessary in order to enhance the
Trails presence and use within the site. Any alterations
to the Trail design illustrated in the Cannery District
Master Plan must be submitted to the CDRC for review
and approval. The installation of the Rail Trail is to be
coordinated with the development of buildings, parking,
open space, and plazas.
1. The Rail Trail provides an essential east to west
connection throughout the site, providing pedestrians
and cyclists with safe passage through the heart of the
development.
2. Through the use of paving materials, The Trail design
shall, honor the sites railroad and industrial heritage
and recall the rhythmic procession of railroad ties. The
paving patterns and layout developed in the Cannery
District Master Plan shall be used in the layout and
design of all sections of the Rail Trail.
3. All poured concrete surfaces shall be broom finished
with hand tooled edges and joints. Pavers are to be of
the character as illustrated. Any alternative pavers or
paving materials must be submitted to the CDRC for
review and approval prior to installation.
4. Furnishings along the Rail Trail are to be selected from
the approved site furnishings illustrated in section
3.02a. Site furnishing locations along the Rail Trail are to
be clearly indicated on all landscape plans.
Illustration of rhythmic
character of paving
delineating the trail
while honoring its
heritage.
Example of permeable
paver inlay
Design 5 Landscape
Architecture
Unilock: Eco-Priora
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 50
Comma-QArchitecture, Inc.
Hardscape c. Pedestrian Corridors
Pedestrian corridors provide patrons with safe access
to all areas within the site. Similar hardscape and
paving materials are to be used throughout pedestrian
corridors within the site in order to delineate their
use. The installation of pedestrian corridors are to
be coordinated with the development of buildings,
parking, open space, and plazas.
1. Pedestrian corridors are to be used to connect
any areas of the site not served by the Rail Trail.
Increasing the north to south connectivity along
with providing safe passage from parking facilities,
buildings, and surrounding properties, should be a
priority in all developed areas.
2. The paving materials used for pedestrian corridors
are to be simple in nature while, providing clear
visual connections between spaces within the site.
3. All poured concrete surfaces shall be broom
finished with hand tooled edges and joints. Any
alternative pavers or paving materials must be
submitted to the CDRC for review and approval
prior to installation.
4. Furnishings along pedestrian corridors are to
be selected from the approved site furnishings
illustrated in section 3.02a. Site furnishing locations
within pedestrian corridors are to be clearly
indicated on all landscape plans.
d. Plaza Space
Plaza spaces are typically hardscape areas with seating,
public art, and integrated planting beds. Plazas can be
for either public or private use on a lot.
1. Plazas provide site patrons with areas to gather,
socialize, relax, or work in a visually interesting
environment. Plazas can provide opportunity for
street sales or advertising within commercial
districts. Plazas function as public open space
within the development.
2. Visually appealing pavers and paving are to be used
to delineate plaza spaces from other site uses. The
use of one or two paving patterns or materials
should be used in a similar manner in all plazas
found within the site in order to create coherence.
3. All poured concrete surfaces shall be broom
finished with hand tooled edges and joints. Any
alternative pavers or paving materials must be
submitted to the CDRC for review and approval
prior to installation.
4. Furnishings within plaza spaces are to be selected
from the approved site furnishings illustrated in
section 3.02a. Site furnishing locations within plaza
spaces are to be clearly indicated on all landscape
plans.
Northside Development
pedestrian corridors.
Example of plaza space
within Commercial
District
Northside Development
Linda Iverson
-Landscape Design
Linda Iverson
-Landscape Design
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 51
Comma-QArchitecture, Inc.
Hardscapee. Planters
f. Boulders
Planters can be used throughout the
development along trails and pedestrian
corridors, near buildings, parking areas, entry
corridors, plaza spaces, and open spaces. They
shall be simple in nature honoring the site’s
historical heritage and industrial character.
1. Raised Planters are to be constructed from
either metal, wood, stone, or masonry and
their locations clearly located on landscape
plans. The design and construction of all
raised planters are to be submitted to
the CDRC for review and approval prior to
installation.
2. Grade Level Planters must be installed
with pre-approved edging in order to
reduce maintenance and maintain clear
visual boundaries between site uses. Edge
treatments can be made of metal or wood
and their design must be submitted to
the CDRC for review and approval prior to
installation.
3. Planter Materials: The reuse of materials
found on site, and/or reclaimed from
historical buildings or site features is
encouraged, in the construction of planters
throughout the development. Materials used
must be consistent with site character and
architecture and must be approved by CDRC
prior to installation.
Landscape boulders, the placement and
approximate dimensions of all landscape
boulders must be clearly indicated on landscape
plans and subject to review by the CDRC.
1. Allowable Uses: Boulders may be used only
for retaining soil and erosion control.
2. Boulder Specifications: All landscape
boulders are to be a minimum of two(2)
feet in diameter and of locally available
mineral content. Boulders are to be cut to a
rectangular shape.
Example of raised steel
planter with potential
for site and building
signage.
Example of landscape
boulders used within
planting beds to add
interest and structure.
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 53
Comma-QArchitecture, Inc.
a. Warranty
b. Irrigation
3.03 Maintenance
Maintenance
The project or site developer shall choose a landscape
contractor that will install all landscape and irrigation
elements with a warranty on all landscaping and irrigation
for at least one(1) year.
All landscape areas including parking lots, perimeter
landscape treatments, boulevards and right-of-ways, lawn
and seeding areas, trees, shrubs, and flower beds shall be
irrigated with a permanent automatic irrigation system
installed by a qualified irrigation contractor. The installation
of a moisture or weather sensor to monitor environmental
conditions and reduce water waste is required. The
irrigation system shall be charged in April and winterized
no later than October each fall all routine irrigation
maintenance is to be performed by a licensed irrigation
contractor.
1. An ‘as-built’ irrigation plan is required upon completion
of installation, the plan shall clearly indicate the location
of all irrigation components including; all irrigation lines,
valves, wiring, and sleeves.
2. Water conservation is encouraged throughout all
aspects of landscaping within the development. The
use of water-wise plant selection and drought tolerant
species selections is encouraged. All landscape plans
must clearly indicate per week water use based on plant
species requirements.
3. Lawn and seed areas are to be irrigated with permanent
overhead watering systems utilizing spray or rotor
irrigation heads. Head to head coverage is required in
all irrigated lawn and seeding areas. All irrigation heads
are to be installed at a grade so not to be damaged by
maintenance equipment. Water schedules and timing
will be closely monitored and may be restricted by the
CDi Association if necessary. An initial establishment
period resulting in increased water use may be allowed
on a case-by-case basis by the CDi Association.
4. Perennial plantings are to be irrigated with a designated
drip irrigation system and should be adjusted
appropriately for plant requirements throughout the
growing season.
5. Trees and shrubs are to be irrigated with a designated
bubbler irrigation system adjusted appropriately for
tree species, maturity, and size. If trees and shrubs are
installed within the confines of a perennial planting
area with an established drip irrigation system,
the incorporation of these trees and shrubs will be
addressed on an individual basis and assessed by a
landscape professional.
The Cannery District Property Owners Association (CDi
Association) shall contract landscape maintenance service
for all of the developments within the Cannery District.
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 54
Comma-QArchitecture, Inc.
Maintenance c. Vegetation
All maintenance services are to be performed by a
landscape professional contracted by the CDi Association.
Routine and thorough weeding, mulching, and pruning,
along with proper irrigation are the preferred methods
for weed control and encouragement of plant growth and
health.
1. Trees and shrubs should be maintained in a healthy state,
any tree or shrub showing more than 30% desiccation or
damage shall be replaced.
2. Pruning and weeding is to be performed at a
preestablished regular interval established by the CDi
Association. All pruning and weeding is to be preformed
by a landscape professional at the appropriate times
throughout the growing season in order to prevent
shock to plant material and promote weed competition.
3. Mulch is to be used in all planting beds and around the
base of all trees and shrubs planted within lawns and
open spaces. Mulch type and depth is to be clearly
indicated on landscape plans and is subject to approval
by the CDRC prior to installation. A sample of proposed
mulch material is to be submitted to CDRC for approval
prior to installation.
4. Sod lawn areas are to be maintained at a mowed height
no less than 3 inches and be allowed to grow to a height
of 4”- 4 1/2” between cuttings. Native seed areas should
be mowed twice a year, once in May and again in the late
fall, with a mow height no less than 6 inches.
5. Fertilization and Pest Control: A predetermined
fertilization regiment shall be established by the CDi
Association working in conjunction with a landscape
professional. All lawn areas, native seeding, trees,
shrubs, and perennials shall be fertilized as necessary
in order to maintain plant health and promote long
term growth. Organic methods of pest control
are encouraged, the use of chemical pest control
applications on trees, shrubs, perennials, and lawn areas
will be allowed if deemed necessary by the landscape
maintenance professional with approval from the CDi
Association and applied by a licensed applicator. The use
of pollinator friendly pesticides is required and are to be
applied in a sustainable and environmentally conscious
manner.
d. Hardscape
All hardscape material including plazas, trails, pedestrian
corridors, parking areas, and sidewalks shall be maintained
in a manner that is safe for all public and private uses and is
representative of the original design intent.
1. Snow Removal: All plaza spaces, trails, pedestrian
corridors, sidewalks, parking areas, and patios will need
sweeping and/or snow removal. All public and private
hardscape shall be kept clear of any obstructions or
hazards.
2. Responsibility: Maintenance of the public open spaces
will be provided by the CDi Association.
Cannery District Planned Unit Development
Design Guidelines
Cannery District Partners, llc
Section 4
Building Design
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 57
Comma-QArchitecture, Inc.
There are ten individual buildings planned at the
Cannery District. Of these buildings, four are
existing (built prior to 1930) and proposed to be
renovated. Six new buildings are proposed to be
built. The intent of these guidelines is to establish
a framework upon which both new buildings and
building renovations may be based.
The intent of these guidelines is not to propose
design solutions, rather it is to establish a basis for
creating buildings that respond to the history of the
site, the site’s new function as a progressive mixed-
use development, and the surrounding context.
These guidelines are not intended to dictate an
architectural style such that the development
consists of a bland a set of interchangeable
buildings. The intent is to describe a design
approach which will result in a diverse yet
compatible set of buildings that support the
Cannery District’s over-arching design goals (see
Section 1.00 - Project Overview).
a. Intent
b. Building Design Objectives
In addition to the Cannery District’s over-arching
design objectives, the following building design
objectives should inform all architectural design
decisions:
1. Building design should respond to the site’s
agricultural/industrial past and the agricultural/
industrial typology of the existing buildings.
Existing building renovations should maintain
the essential characteristics of the existing
buildings, allowing their original functional
characteristics, forms, and patterns to remain
clearly understandable. New buildings should
not mimic historic agricultural/industrial
buildings but should instead be compatible with
buildings of this typology.
Example of a renovated &
re-purposed agricultural/
industrial building that
maintains is original
character.
Warehouse Building
at Northside PUD.
Comma-Q Architecture
4.00 Building Design Overview Building Design
Overview
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 58
Comma-QArchitecture, Inc.
2. Existing buildings should be seen as a
physical record of the time at which they
were built. New buildings, and/or additions
and alterations to existing buildings
should not create a false sense of historic
development. Rather they should be
recognizable as new elements.
3. All buildings should be logically and
coherently designed such that all building
components have an identifiable purpose.
4. The spaces between buildings should be
primary to the buildings themselves. All
buildings should have an active roll in
defining common spaces and creating
coherent spaces between buildings.
Example of buildings
defining a common
outdoor space.
JA+JA Architects
Affordable Housing
Competition
5. Buildings should transition in scale and level
of articulation to respond to high-speed
vehicular interaction (large scale forms)
and to pedestrian interaction (small scale
articulation).
Building Design
Overview
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 59
Comma-QArchitecture, Inc.
c. The Agricultural/Industrial Typology
The existing character of the Cannery District
site can be described as agricultural/industrial.
Architecturally, agricultural/industrial
buildings were created as a direct response
to their function. Buildings were scaled for
large equipment and flexibility of use. Ease
of construction and availability of materials
determined building systems. This resulted in
construction methods and details that were
repetitive and simple while maximizing usable
volume and minimizing building corners. The
detail, scale, mass, void, patterns, and usage of
materials seen at the Cannery District’s existing
buildings are characteristic of an agricultural/
industrial typology.
As a result of its architecture of functionality,
the agricultural/industrial typology is directly
linked to the history of a place. These buildings
are a timeless image of place not tied to
a specific style. Rather they are a symbol
of the human endeavour that led to their
construction. Because it is a response to a set
of functions and economic conditions of the
past, the agricultural/industrial typology can
not be authentically re-created. However, the
process of design, driven primarily by building
function, performance, and the availability of
efficient building materials and methods can be
implemented in today’s building design.
Existing buildings on the site, all of which
embody the agricultural/industrial typology,
should be sensitively renovated and re-
purposed such that the clarity of mass, scale,
detail, rhythm, openings, and materials is not
blurred.
New building design should be inspired by
the history of the site and the agricultural/
industrial typology. Building design should be
especially mindful of function and economical
construction methods.
Architectural drawings
of Bozeman Canning Co.
buildings, Dated June 12,
1926, MSU Archives
Building Design
Overview
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 60
Comma-QArchitecture, Inc.
d. Professional Competence
All building design shall be performed by or
under the supervision of, and stamped by, an
Architect licensed to practice in the State of
Montana.
Building Design
Overview
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 61
Comma-QArchitecture, Inc.
The unique character of the pre-development
site is shaped by many factors: the clarity
of existing building forms, the overall
industrial scale of the Cannery District site,
and the unintentional and unusual (yet clearly
articulated) spaces between buildings. The
characteristics of form and scale typical
of the agricultural/industrial typology, in
conjunction with the characteristics of form
and scale desirable in a progressive mixed-use
development should determine basic building
shape and layout.
The following guidelines inform building form
and scale for development in the Cannery
District:
1. The existing four-story portion of Cannery
Building and the water tower shall remain
the dominant vertical forms on the site. No
building shall block the predominant view
of these two structures from the vehicular
entries off Oak Street.
a. Building Form and Scale
2. New building forms should be primarily
horizontal. Any vertical elements should be
designed to not visually compete with the
dominant vertical structures as described
above.
3. Roof lines should be consistent and
relatively uniform, maintaining simplicity of
form typical of the agricultural /industrial
typology and contrasting the mountain
skyline beyond.
Photo showing the two
dominant vertical forms
on the site: The Cannery
Building and the water
tower.
The Bozeman Canning Co.
c. 1930, Gallatin County
Historical Society
Photo showing the
site with the Bridger
Mountain Range beyond.
The Bozeman Canning
Co. c. 1930, Gallatin
County Historical Society
4.01 Dimensional Considerations Dimensional
Considerations
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 62
Comma-QArchitecture, Inc.
4. Buildings inspired by the simplicity of form
and large-scale typical of the agricultural/
industrial typology are encouraged.
However, as one approaches the building,
elements should transition in scale and level
of articulation so they respond to pedestrian
interaction. Subtractive and additive
elements of the building form should be
composed to create emphasis on important
pedestrian areas such as building entries.
Example of articulated
entries responding to
pedestrian interaction.
Warehouse Building at
Northside PUD. Comma-Q
Architecture
5. Each individual building should not attempt
to focus all visual interest unto itself, but
rather be a part of the overall development.
The roll of the building form on the site is to
help define the common spaces between
buildings.
Example of individual
buildings massing working
together to define exterior
space.
Stven Architects
Lommen I NV
Dimensional
Considerations
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 63
Comma-QArchitecture, Inc.
Careful consideration should be given to any new
construction so that it does not visually compete
with the existing four story portion of the Cannery
Building or the water tower in mass, scale and
height. Design height restrictions are intended to
maintain a fairly uniform building height between
all buildings of the development with the exception
of the dominant structures. This will allow the
dominant structures to remain landmarks of both
the site and the surrounding neighborhood.
1. Additions to buildings must not exceed the
respective building’s maximum existing height.
2. Exceptions to the maximum height limit for
new construction will be granted to vertical
circulation necessary to access the Cannery
Building.
3. Building height shall be restricted per Bozeman’s
Unified Development Code (UDC), B-2 Zoning
requirements. New buildings are limited to a
façade height (measured from main entry grade
to top of parapet or fascia) of 38’-0” for buildings
with roof pitch less than 3:12. For sloped roofs
with greater than 3:12 pitch, the maximum ridge
height shall be 44’-0”. These building height
restrictions may be increased as allowed by
the UDC with approval by the Cannery District
Design Review Board.
4. The following table describes the anticipated
height of proposed buildings. These heights are
subject to change due to future programmatic
requirements.
b. Building Height
Building iDBuilding NameStoriesMaximum Building HeightE Cannery Building 4 62 ft
F CanneryComplex 1&2 30 ft
G Brick Building 1&2 30 ft
H Boiler House 1 25 ft
J Lone Mountain
Gymnastics
Expansion
1 plus mezz 26 ft
K 1 plus mezz 26 ft
L 2 44 ft
M 2 38 ft
N 2 38 ft
O 2 38 ft
Dimensional
Considerations
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 65
Comma-QArchitecture, Inc.
a. Street Frontage
The Cannery District site is identified by the
City of Bozeman Department of Community
Development as being within three of
Bozeman’s entryway corridors. As such, it
is highly visible. Most sides of all planned
buildings are visible from at least one (if not
more) intensely utilized public ways. This results
in a condition where there is no ‘back of building’
on most planned structures.
The following guidelines provide specific
instruction for building design as it relates to
street frontage:
1. Buildings must be designed such that all
facades contribute to the quality of common
space at the overall development.
2. Buildings with frontage on Oak street should
be constructed as close to the lot line
adjacent to the Oak Street right-of-way as
allowed given site conditions. The building
elevation facing Oak Street shall be either
the primary or secondary building facade and
should be designed to add interest to the
Oak Street streetscape. Awnings or other
building articulation at pedestrian scale is
required on Oak Street facades.
3. Buildings with frontage on the Rail Trail
should be located with a zero lot line set
back on the south side and shall be designed
such that the south facade facing the Rail
Trail is the primary facade. The exception
to this rule is any building with an existing
building located within 30 feet to the
south. In this case the south facade may
be a secondary facade. Awnings, display
windows, or other building articulation
at pedestrian scale is required on Rail Trail
facades.
Example of a building
with multiple frontages
including frontage on a
public way that does not
house the structure’s
primary entry but still
adds significant interest
to the street.
Bozeman Coop -
Comma-Q Architecture
4.02 Programmatic Considerations Programmatic
Considerations
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 66
Comma-QArchitecture, Inc.
As previously described in these guidelines,
individual buildings are not encouraged
to be visually “attention grabbing” design
expressions on the site and for the surrounding
neighborhood. In contrast, building entrances
provide an opportunity to implement
architectural design components that create an
identity unique to each building’s use within the
development. This is an opportunity to express
the function of the building as it exists within
the overall industrial fabric of the site.
1. Main entrances should face the primary
pedestrian circulation path. When a building
is fronted on more than one side by major
pedestrian circulation paths, the side most
accessible under adverse weather conditions
and by those with physical disabilities should
include the main entry.
b. Building EntriesProgrammatic
Considerations
2. Main entries should be articulated at the
pedestrian-scale and primarily transparent.
The use of mirrored glass at building entries
is discouraged. Doors constructed of opaque
materials are acceptable if clear glass is
adjacent to or in close proximity to the door.
3. Main entries shall open directly, or by way
of a vestibule, into a publicly accessible
portion of the building such as a sales floor, a
reception area, or a lobby.
4. Secondary entrances are encouraged on all
building facades facing primary pedestrian
circulation paths. Secondary entries
shall provide a pedestrian-friendly and
transparent entry to encourage interaction
with the passer-by and provide visual
interest to the common space or public way
upon which they face.
Examples of a
transparent and
welcoming primary
entries.
left: Sky Lake, Black Box
right: O’donnell and
Thomey Architects, the
Photo Gallery
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 67
Comma-QArchitecture, Inc.
Programmatic
Considerations5. Any building or tenant space within a building
facing Oak Street should have either a
primary or secondary entrance on the Oak
Street facade. Entrances from Oak Street
should open to a public portion of the
building.
6. Any building or tenant space within a
building facing the Rail Trail shall have a
primary entrance on the Rail Trail facade.
Entrances from the Rail Trail should open to
a public portion of the building. Through the
use of large operable doors, exterior seating
or display (or other means), buildings facing
the Rail Trail are encouraged to visually and
spatially engage the Rail Trail.
7. Service entries should be compatible with
the building design and may be industrial in
nature as required for their use.
Examples of building
entries that engage
adjacent exterior space.
Northside Granary
Building, and Plonk
Restaurant - Comma-Q
Architecture
Example of a compatible
service entry.
Brown Building -
Comma-Q Architecture
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 68
Comma-QArchitecture, Inc.
All mechanical equipment and utilities visible
from public ways must be screened. The
following guidelines apply to screening.
1. If feasible, building service areas and
mechanical equipment should be integrated
into the overall building design such that it is
not visible from a public way.
2. Screening should use elements, materials,
and forms compatible with the building
design and shall be compliant with all
guidelines pertaining to building design
described herein.
3. Screening shall be as required by the City of
Bozeman’s Unified Development Code.
c. Mechanical Equipment and UtilitiesProgrammatic
Considerations
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 69
Comma-QArchitecture, Inc.
Materials characteristic of the agricultural/industrial
typology were highly functional, economical, and
regionally and readily available. Time and exposure
have aged these materials leaving rich textural
facades that embody the history of the structure. The
following guidelines describe how the agricultural/
industrial materiality should inform new buildings and
building renovation at the Cannery District:
a. Materials
1. New materials should be true to the nature of the
material. Imitative materials that mimic natural
materials or authentic methods of detailing and
construction are inappropriate to the Cannery
District Development.
2. Materials should be applied in a manner that is
consistent with their inherent material properties.
Concrete should be used to express mass and
solidity. The use of corrugated sheet metal
as a building skin or an overhead element is
appropriate. Furthermore, installation methods
should be carefully detailed to provide clean
transitions at corners, between panels, material
changes, and openings. Brick should be stacked in
a running bond pattern. A “stack” brick pattern is
discouraged. The role of brick as a compressive
structural element should be reinforced through
careful detailing around openings, at corners, and
material transitions. Brick applied on one façade
without turning a corner is unacceptable.
4.03 Building Exterior Building
Exterior
Examples of typical
agricultural/industrial
building materials
left: Future Scape
Architecture
Cottage in Tsumari
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 70
Comma-QArchitecture, Inc.
3. Where new materials are installed on an
existing building. The new materials should
be distinguishable as new and should
contrast and enhance the character of the
existing material.
4. When seen from a distance, materials should
emphasize the form of the structure. When
viewed at a closer range, materials should
have a rich textural quality.
5. Exposed structure is appropriate and
encouraged but must be authentic and
efficient. Structural systems of one
materials that are wrapped or disguised
to make them appear as another material
(ie structural steel wrapped with a wood
veneer) are unacceptable unless done so in a
response to building code requirements.
6. Appropriate exterior materials include the
following:
• Brick
• Metal Wall Panels, Metal Roof Panels,
Plate Steel, Trim, Exposed steel structure
• Wood, Exposed wood structure
• Metal roof panels
• Concrete
7. The following materials will not be allowed:
• EIFS
• Cultured Stone
• ‘Thin’ Brick
• Vinyl Siding
Building
Exterior
Examples of new
building materials
installed on an existing
building
left: Made by Cohen
Windsor Warehouse
Residence
right: Olsen Kundig
Architecture
The Brain
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 71
Comma-QArchitecture, Inc.
b. Patterns
Material texture, repetitive structure, window
placement, and decoration add a pattern or
rhythm to architectural design. The following
guidelines inform the use of pattern in building
design at the Cannery District:
1. Patterns should be subtle and repetitive
from a distance so as to enhance the
building form and its relation to the space
created between structures. As seen
from a distance, buildings should read as a
‘backdrop’ to common outdoor spaces and
landscaping.
2. Patterns should be used to reinforce the
inherent properties of the respective
material. For example, corrugated steel,
board-formed concrete, or running bond
brick patterns are patterns consistent with
the material’s application and/or creation.
3. Patterns should be used to create a human
scale and increased level of detail when
experiencing the building in close proximity.
Building
Exterior
Examples of rhythm,
texture, and patterns in
material use
left: DMVA Architects
right: Areal Architecture
Town Home EM
bottom: Beilden Fowles
Ty Pren
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 72
Comma-QArchitecture, Inc.
Fenestration design in historic agricultural/industrial
buildings was primarily the result of the building use
and the need for natural light. Window placement
was typically directly linked to the building’s
structural grid. The following guidelines inform
fenestration type size and placement in building
design at the Cannery District:
1. Fenestration should establish pattern and rhythm
on exterior walls. Fenestration layout should
relate to structural bays, where applicable.
2. Large-scale window openings, characteristic
of the agricultural/industrial typology are
appropriate. However, fenestration should also
relate to the human scale.
3. The building form should use a combination of
fenestration as punctures and larger glazing
systems. Careful consideration should be given
to both as they relate to the overall façade and
building elements.
4. The scale and location of fenestration should
allow the primary building skin and structure
enough room to form an intuitive visual
connection. The size and location of fenestration
should be balanced with the need for the building
to maintain ins overall form
5. Fenestration should be used to provide adequate
natural light to the building interior. It should also
provide interest to the development at night with
use of artificial lighting to express the building
interior.
6. Operable windows are encouraged.
c. FenestrationBuilding
Exterior
Example of large-scale
window openings
typical of agricultural/
industrial typology
Steven Harris Architects
Townhouse
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 73
Comma-QArchitecture, Inc.
Shading and sheltering devices at windows and
building entrances contribute to positive user
experiences. They provide protection and safety
from the weather and the elements and add human-
scaled feel to building facades. Fenestration
treatment, designed under the following guidelines is
encouraged at the Cannery District:
1. Shading and sheltering devices are not typically
seen in historic agricultural/industrial building.
For this reason, any fenestration treatment added
to an existing building should read as a new,
rather than historic, building element.
2. Careful consideration should be given to shading
devices for the applicable building facades. These
devices shall be consistent in materials and
detailing for the overall building design.
3. Shading devices should read as an integral
element to the building form and mass.
Connections and finishes should provide an
opportunity for creative detailing that can be
experienced at a pedestrian scale when close to
the building.
d. Fenestration Treatment
Plantings, vehicles, public art, tenant signage, building
interiors seen through windows and people, not
necessarily building materials, will add the majority
of color to the Cannery District. The following
guidelines inform color selection in building design at
the Cannery District:
1. Colors used should be consistent with their
material properties whenever possible and as
applicable to the material performance.
2. Primary fenestration systems should be finished
black or very dark bronze.
3. Bright colors are appropriate only when used
as small building accents or surfaces occurring
within the overall primary building façade.
e. Colors
Building
Exterior
Example of black
fenestration system
finish
Jonsara Ruth
Vinateria
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 75
Comma-QArchitecture, Inc.
Site lighting at pedestrian and vehicular ways
and parking areas is addressed in Section 2.01
Site Lighting. Lighting guidelines specific to
signs are described in the Section 2.01 Site
Signage and Section 4.04 Building Signage.
The following guidelines pertain to architectural
lighting on the exterior of buildings:
1. Exterior architectural lighting is encouraged
but should be judiciously used in select
locations. Exterior architectural lighting
should be primarily used for the following
functions:
• Lighting should accent building entries
• Lighting should illuminate the overall
form of significant buildings.
a. Building Lighting
Building
Lighting
2. Where used to illuminate overall building
form of significant buildings, Building
lighting should accentuate rhythms ,
textures and patterns established by the
building design.
3. Light fixtures should be simple, functional
and industrial in character. Recessed linear
or can fixtures are encouraged. Decorative
light fixtures should be used selectively in
limited locations such as building entrances.
Example building
lighting illuminating
overall form of a building
Northside Granary
Building - Comma-Q
4.04 Building Lighting
Example building lighting
illuminating a building entry
Bozeman Food Coop - Comma-Q
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 76
Comma-QArchitecture, Inc.
4. The following lighting types are permitted
with approximate 4000k color temperature:
• Halogen
• Metal Halide which has appropriate color
rendering characteristics
• Compact Fluorescent which
has appropriate color rendering
characteristics.
• LED
5. The following lighting types are not permitted:
• Incandescent
• Colored Lamps
• Mercury vapor or High Pressure Sodium
Lamps
• Any type of moving or flashing lighting
6. Exposed neon tube or LED string lighting
must be approved by the Cannery District
Design Review Board. Neon tube or LED string
lighting may not be used as intense visual
element for advertising or other purposes.
Neon tube or LED string lighting may be used
as subtle recessed or concealed light elements
for wall washing or back lighting.
7. Light spread from fixtures illuminating a
building facade may not significantly spill over
onto facades of neighboring buildings.
8. All building lighting shall conform to City
of Bozeman Unified Development Code
standards and shall meet the cut-off shield
requirements outlined therein.
9. All exterior facade and sign lighting should be
programmed to automatically turn off at 11:00
pm or one-half hour after closing, whichever
is later.
Example of simple,
functional facade lighting
scheme.
Mar y Tierra - Doyle
Collection Co. LTD
Architects.
Building
Lighting
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 77
Comma-QArchitecture, Inc.
Site signage guidelines governing wayfinding
signage, and signs identifying the Cannery District
Development as a whole are described in Section
2.01 Site Signage.
General building signage types and sizes are
described in a Comprehensive Sign Plan included
in the PUD documents. Following are general
design criteria for building signage:
1. The design of all signs should be compatible
with development’s over-arching design
guidelines. Sign form, material, texture, and
size should be compatible and integrated with
building design.
2. Prior to fabrication of any sign, a sign permit
must be obtained by the City of Bozeman.
All signs and sign lighting much comply
with City of Bozeman Unified Development
Code requirements and with the Project’s
Comprehensive Sign Plan.
3. The following sign materials are encouraged:
• Wood
• Metal
• Frosted Glass
• Acrylic Sheet in appropriate colors and
limited quantity
4. Signage must be of quality construction.
Concealed attachment mechanisms are
encouraged.
a. General Signage Guidelines
Building
Signage
4.05 Building Signage
Signs add vibrancy and color to the Cannery
District at both pedestrian and vehicular scales.
The following guidelines encourage a variety of
sign styles to engage all of the Development’s
users. Sign quantities are described in the Cannery
District’s Comprehensive Sign Plan included in
PUD documents.
1. Each tenant is allowed one primary sign per
exterior facade with frontage on a public way.
This sign should be located to accent the main
store entry where applicable.
2. Secondary signage such as blade signs, signage
on awnings, signs painted directly on building
materials, and window signage is encouraged.
3. Tenants and building owners are encouraged
to maximize signage with respect to
the allowed quantities outlined in the
Comprehensive Sign Plan. Signage should,
however, be proportional to the scale of the
overall building facade. The Cannery District
Design Review Committee (CDRC) will closely
review all signage to confirm proper facade
design-to-signage relationship.
b. Sign Size and Quantity
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 78
Comma-QArchitecture, Inc.
All exterior signs or window signs visible from the
building exterior shall be required to be specifically
approved in writing by the CDRC.
1. Tenants applying for signage approvals shall
submit complete signage design drawings.
Drawings shall provide sufficient information
for the CDRC to clearly understand signage
location(s), size, assembly, materials, and lighting.
2. The following information shall be included in all
signage approval submittals:
• Elevation drawings: clearly indicate proposed
signage on the building facade on which it
will be located. Provide dimensions indicating
the size and location of the proposed signage.
Drawings to include identification of materials,
color schemes, and illumination.
• Detail drawings: indicate sign fabrication
technique, materials, illumination, and
mounting system.
• Material samples to be provided upon request
of CDRC.
c. Sign Approvals
The following sign types are permitted at the Cannery
District Development:
Back-lit Illuminated Signs
• Signs to be constructed of individual reverse
channel letters and/or graphic components
and/or panels with cut-out letter and/or
graphic components mounted directly to the
building and/or a non-reflective background
surface with concealed stand-off brackets.
• All illumination must be fully concealed within
the letter or logo component and not directly
visible.
• On large letters or graphic components, clear
Lexan backing must be used on the back side of
channel letters to prevent bird nesting.
d. Permitted Sign Types
Building
Signage
Examples of back-lit
illuminated signage
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 79
Comma-QArchitecture, Inc.
Externally Illuminated Signs
• Signs to be constructed of individual
letters and/or graphic components
and/or panels with cut-out or applied
letter and/or graphic components
mounted directly to the building or a
non-reflective background surface with
concealed brackets.
• External illumination must be integrated
into the facade design and may be by
concealed fixture or a sign light type
fixture
• Gooseneck sign light or linear sign
light fixtures may be used. Sign light
fixtures should be simple, functional
and industrial in character. Decorative
fixtures are discouraged.
Internally Illuminated, Fully Integrated Signs
• Signs to be fully integrated into the
building facade such that the face of
the sign is flush with the surrounding
exterior building finish material.
• Letters or logos shall be the only
components on the sign face through
which light is visible. All other materials
shall be opaque. Letters should be push-
through dimensional translucent letters
which extend through the routed opaque
sign face.
• Internal illumination must be fully
concealed such that no lamps are visible.
Building
Signage
Examples of externally
illuminated signage
Example of internally
illuminated signage
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 80
Comma-QArchitecture, Inc.
Painted Signs
• Signs painted directly onto the building surface are allowed
with CDRC approval.
• External illumination of painted signs is optional.
Blade Signs
• Projecting blade signs that address pedestrian users are
highly encouraged.
• Blade signs shall be integrated into the building facade
design.
• Blade sign dimensions are governed by the Comprehensive
Sign Plan.
• Internally lit blade signs are not permitted.
Building
Signage
Example of painted
signage
Examples of blade
signage
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 81
Comma-QArchitecture, Inc.
In addition to signs not approved by the City of
Bozeman’s Unified Development Code, the following
sign types are not permitted at the Cannery District
Development:
• Exposed or surface mounted box or
cabinet style signs.
• Signs which are not professional in
appearance as determined by the CDRC.
e. Signs Not Permitted
Window Signs and Graphics
• Any sign or graphics placed closer than 4’-0”
of a window surface is considered a window
sign and is subject to approval by the CDRC.
• Appropriate temporary poster type signage,
open/closed and hours of operation signs
less that two square feet in size may be
placed in windows without CDRC approval.
Freestanding Temporary Signage
• Temporary signage may be placed outside
of the lease line during tenant hours of
operation and is encouraged. Temporary
signs are subject to CDRC approval.
• Freestanding temporary signage must be
placed as to not impede pedestrian traffic.
Building
Signage
Example of window and
graphic signage
Example of temporary
signage
Cannery District Planned Unit Development
Design Guidelines
Cannery District Partners, llc
Section 5
Submittal Review
Requirements and
Procedures
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 85
Comma-QArchitecture, Inc.
a. Intent
5.00 Design Review Process
and Requirements
Design Review
Process &
Requirements
The preceding Design Guidelines establish
a framework that acts to structure site,
landscape, and building design such that the
resulting development maintains it’s unique
historic character while becoming a vibrant
progressive place within the fabric of Bozeman’s
neighborhoods.
b. Cannery District Design Review Committee
The Design Guidelines are established and
enforced by the Cannery District Review
Committee (the CDRC) which is established
per the Declaration of Covenants Conditions
and Restrictions for Cannery District Planned
Unit Development (the Covenants). The Design
Guidelines are intended as a guide to assist the
CDRC in reviewing plans and specifications.
Except for those Design Guidelines required as
a condition of PUD plat approval, the Design
Guidelines shall not be binding upon the CDRC
and shall not constitute in every event the
basis for a recommendation of approval or
disapproval of plans, specifications, or other
materials submitted to the CDRC for review.
The CDRC will be the interpreter of the Design
Guidelines and their decisions in matters relating
to the Design Guidelines shall be final.
The Design Guidelines may be amended from
time to time by the Cannery District Property
Owners Association. However, if a guideline
proposed for amendment was required as
a condition of PUD plat approval the City of
Bozeman must approve the amendment before
it is effective. No improvements constructed
in accordance with plans and specifications
approved by the CDRC and Association shall be
required to be changed because such standards
are thereafter amended.
No exterior construction, alteration, addition,
or renovation of any building, structure,
parking lot, sign, or landscape feature, or other
Improvement of any kind or nature shall be
commenced within the Cannery District PUD,
except such as is reviewed by the CDRC and
approved by the Board in accordance with this
Section 9, or otherwise expressly permitted in
the Covenants.
c. Work Requiring Design Review
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 86
Comma-QArchitecture, Inc.
All development plans shall be reviewed and
approved according to the following phased
process.
1. Sketch Plan Review (optional)
2. Preliminary Plan Review
3. Final Plan Review
4. Construction Compliance
The applicant, at its expense, shall submit (1)
complete set of printed documents and one (1)
set of documents in electronic format to the
CDRC at review stages 1-3. The following details
document format.
d. Design Review Process
Sketch Plan Review is an optional but
recommended submittal phase. The intent
of the sketch plan review is to provide
general feedback to the applicant regarding
development plans. The follow items should
be submitted by the applicant for Sketch Plan
Review:
1. Site Plan (if applicable) with the following
information:
• project name, date, architect and civil
engineer, applicant, north arrow, scale
(minimum 1”-30’);
• approximate building area;
• general layout of site showing
building location;
• location of sidewalks within the
property and parking areas in
accordance with the master plan;
• location of building setbacks,
property lines, easements and other
restrictions on the property.
2. Building Plans (if applicable) with the
following information:
• project name, date, architect,
applicant, north arrow, scale
(minimum 1”-30’);
• preliminary floor plan;
• building data: uses and areas
associated with each use including
seating areas if applicable;
• elevations of all sides of the building
with preliminary material selections
designated;
• building signage information
including locations and areas of signs.
e. Sketch Plan Review
Design Review
Process &
Requirements
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 87
Comma-QArchitecture, Inc.
Preliminary Plan Review is a required review
phase in which information pertaining the use,
size, location, and character of the proposed
development is “approved”, “conditionally
approved”, or “disapproved”.
The follow items shall be submitted by the
applicant for Preliminary Plan Review unless the
item is not applicable to the project. If an item
is not included, a narrative must accompany
the submittal describing why the item is not
applicable to the project.
1. Site Plan with the following information:
• project name, date, architect and civil
engineer, applicant, north arrow, scale
(minimum 1”-30’);
• existing features to remain;
• location of view corridors; building
setbacks, property lines, easements
and other restrictions on the
property;
• building footprint area;
• parking data: number and ratio
required by Code and number
required, size of stalls and aisles,
accessible spaces provided;
• layout of site showing building
locations; lighting and other site
amenities;
• proposed light fixture cut sheets;
• location of sidewalks within the
property and parking areas and drives
in accordance with the masterplan;
• location of existing and proposed
utilities;
• grading plans indicating grades for
the entire property; building floor
elevations;
• proposed site signs;
• location of dumpster enclosure and
utility screening.
f. Preliminary Plan Review
Design Review
Process &
RequirementsThe CDRC shall review the Sketch Plan
Application and return it to the applicant
with the Committee’s informal feedback.
Applications are not approved or disapproved
at the sketch plan phases. CDRC comment
at this phase is to be considered informal and
non-binding and is subject to change in future
applications
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 88
Comma-QArchitecture, Inc.
2. Landscape Plans with the following
information:
• project name, date, landscape architect,
applicant, north arrow, scale (minimum
1”-30’);
• existing features to remain;
• location of view corridors; building
setbacks, property lines, easements and
other restrictions on the property;
• location of building, parking and drives;
pedestrian, and service areas.
• location of existing and proposed
utilities;
• locations and types of hardscape
materials, furniture, lighting and other
site amenities;
• planted areas, plants, and ground cover
materials: show type, size and location
of materials.
3. Building Plans with the following
information:
• project name, date, architect, applicant,
north arrow, scale (minimum 1”-30’);
• floor plans at 1/8” = 1’-0” scale minimum;
• building data: uses and areas associated
with each use including seating areas, if
applicable;
• elevations of all sides of the building
with material selections designated;
note locations of exterior mechanical
equipment and utility meters;
• provide information describing proposed
exterior lighting including fixture cut
sheets;
• elevations of dumpster enclosure and
mechanical screening;
• building signage drawings showing
locations and areas of signs, style, copy,
illumination, colors, construction and
mounting; include samples of actual
materials to be used;
• samples of actual materials to be used
corresponding to material designations
on the elevations.
4. Other materials as requested by the CDRC
The CDRC shall review the Preliminary Plan
Application and return it to the applicant
marked “Approved”, “Conditionally Approved”, or
“Disapproved” with the Committee’s applicable
comment and conditions.
Design Review
Process &
Requirements
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 89
Comma-QArchitecture, Inc.
Final Plan Review is a required review phase in
which information is reviewed for conformance
with the comments made in the preliminary
review.
Final Plan applications shall include the
following:
1. All items submitted in the Preliminary
Plan Application, revised according to the
comments and conditions made in the
preliminary review:
2. Any additional items requested by the
CDRC;
3. A narrative explaining how all the
comments and conditions made in
the Preliminary Review have been
incorporated in the to Final Plan
Application.
The CDRC shall review the Final Plan Application
and return it to the applicant marked ‘Approved’,
or ‘Disapproved’ with the Committee’s
applicable comment.
Upon approval, one (1) complete set of final
plans and one (1) complete electronic set of final
plans shall be re-submitted and retained by the
CDRC for their records and use.
g. Final Plan Review
In addition to CDRC review and approval, all
proposed development is required to undergo
City of Bozeman Department of Planning and
Community Development (CoB Planning) review
per the City of Bozeman UDC. At the discretion
of CoB Planning, their review may occur
concurrently with CDRC review, with CDRC
review being a condition of final approval. An
approval letter from the CDRC shall be included
in the CoB Planning application as required.
h. City of Bozeman Site Plan Review
At completion of construction and prior to
occupancy, improvements as submitted and
approved by the CRDC shall be physically
verified by a representative of the CDRC for
conformance with the approved Final Site Plan.
If found non-compliant, the Cannery District
Home Owners Association may require any
Owner to restore such Owner’s improvements
to the condition existing prior to the
construction thereof per the covenants
i. Construction Compliance
Design Review
Process &
Requirements
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 90
Comma-QArchitecture, Inc.
Design Review
Process &
Requirements
At completion of construction and prior to
occupancy, improvements shall be physically
verified by a representative of the CDRC for
conformance with the Final Site Plan.
If found non-compliant, the Cannery District
Home Owners Association may require any
Owner to restore such Owner’s improvements
to the condition existing prior to the
construction thereof per the covenants
i. Construction Compliance
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 91
Comma-QArchitecture, Inc.
views to highly visible structures on site
highly visible structures on site
east oak street
interstate 90
north rouse avenue
north rouse avenueFigure 5.01 - Viewsheds
Viewsheds
Cannery District Planned Unit Development
Design Guidelines
Cannery District Partners, llc
Attachment 1
Cannery District Master
Plan
Cannery District Planned Unit Development
Design Guidelines
Cannery District Partners, llc
Attachment 2
Shared Parking Tracking
Sheets
The Cannery District - Preliminary
PUD Application
Cannery District Partners
Page 98
Comma-QArchitecture, Inc.
Shared Parking Tracking
Sheets
The Cannery District utilizes shared joint-use parking
for its tenants. It is anticipated that the type of
uses and use areas will change from planned uses in
the future. In order to ensure adequate parking is
provided to all future tenants, the Cannery District
parking requirements should be tracked when uses
change. The following worksheet serves as a starting
point to track changes in parking needs.
Table 1 shows the planned uses with gross floor
area and planned use area shown. At this time
use area is estimated at 85% of the gross floor
area. As building plans are completed this table
should be updated and estimated use area
should be replaced with actual use areas for
each building.
Table 2 shows the hourly parking demand by
each type of use and planned hours of operation.
The hourly parking demand is based on the ITE’s
(Institute of Transportation Engineers) Parking
Generation, 3rd Edition manual. As planned
uses become more defined, this table should be
updated along with Table 1. Additionally, if the
hours of operation of a particular type of use
change significantly, a new hourly distribution
may be required in order to determine joint-use
parking requirements.
TABLE 1. Cannery District Parking RequirementsCannery District Phase 1 Use by BuildingArea (gsf)Use AreaSpacesCannery Building (Bldg E)1st Floor Retail1674 1423 300of nsf floor area4.71st Floor Restaurant6020 3500 50of nsf seating area70.02nd Floor Office7187 6109 250of nsf floor area24.43rd Floor Office4614 3922 250of nsf floor area15.74th Floor Office4614 3922 250of nsf floor area15.7130.6Cannery Complex (Bldg F)1st Floor Office2098 1783 250of nsf floor area7.11st Floor Distillery Seating500 500 50of nsf seating area10.01st Floor Distillery Manufacturing248421111000of nsf floor area4.1(plus 2 spaces for 4 employees)1st Floor Retail1836 1561 300of nsf floor area5.21st Floor Brewery Seating1200 1200 50of nsf seating area24.02nd Floor Brewery Manufacturing3447 13501000of nsf floor area5.4(plus 4 spaces for 8 employees)2nd Floor Office3613 3071 250of nsf floor area12.368.1Canning Warehouse (Bldg G)Office18500 15725 250of nsf floor area62.9Boiler House (Bldg H)Office1600 1360 250of nsf floor area5.4Total of Phase 1 Individual Parking Requirements 267.0Phase 1 Cummulative Totals By UseTotal Office42226 35892 250of nsf floor area143.6Total Manufacturing5931 34611000of nsf floor area9.5(plus 6 spaces for 12 employees)Total Retail3510 2984 300of nsf floor area9.9Bldg E Restaurant6020 3500 50of nsf seating area70.0406 Brewery/Distillery Seating1700 1700 50of nsf seating area34.0Total267.0Cannery District Phase 2 Use by BuildingArea (gsf) Use AreaSpacesLone Mountain Building (Bldg J)1st Floor Gym11900 10115 200of nsf floor area50.62nd Floor Office1500 1275 250of nsf floor area5.155.7Bldg K1st Floor Retail10720 9112 300of nsf floor area30.4Total of Phase 1 Individual Parking Requirements 86.0Phase 1-2 Commulative Totals By UseTotal Office43726 37167 250of nsf floor area148.7Total Manufacturing5931 34611000of nsf floor area9.5(plus 6 spaces for 12 employees)Total Retail14230 12096 300of nsf floor area40.3Bldg E Restaurant6020 3500 50of nsf seating area70.0406 Brewery/Distillery Seating1700 1700 50of nsf seating area34.0Gym11900 10115 200of nsf floor area50.6Total353.0Cannery District Phase 3 Use by BuildingArea (gsf) Use AreaSpacesBldg L1st Floor Office13250 11263 250of nsf floor area45.12nd Floor Office13250 11263 250of nsf floor area45.190.1Bldg K1st Floor Office8700 7395 250of nsf floor area29.62nd Floor Office7300 6205 250of nsf floor area24.854.4Total of Phase 3 Individual Parking Requirements 144.5Phase 1-3 Commulative Totals By UseTotal Office86226 73292 250of nsf floor area293.2Total Manufacturing5931 34611000of nsf floor area9.5(plus 6 spaces for 12 employees)Total Retail14230 12096 300of nsf floor area40.3Bldg E Restaurant6020 3500 50of nsf seating area70.0406 Brewery/Distillery Seating1700 1700 50of nsf seating area34.0Gym11900 10115 200of nsf floor area50.6Total497.5Cannery District Phase 4 Use by BuildingArea (gsf)Use AreaSpacesBldg N1st Floor Office5800 4930 250of nsf floor area19.72nd Floor Office4200 3570 250of nsf floor area14.334.0Bldg K1st Floor Office9100 7735 250of nsf floor area30.92nd Floor Office8900 7565 250of nsf floor area30.361.2Total of Phase 4 Individual Parking Requirements 95.2Phase 1-4 Commulative Totals By UseTotal Office114226 97092 250of nsf floor area388.4Total Manufacturing5931 34611000of nsf floor area9.5(plus 6 spaces for 12 employees)Total Retail14230 12096 300of nsf floor area40.3Bldg E Restaurant6020 3500 50of nsf seating area70.0406 Brewery/Distillery Seating1700 1700 50of nsf seating area34.0Gym11900 10115 200of nsf floor area50.6Total592.7Parking Requirement - One Space perParking Requirement - One Space perParking Requirement - One Space perParking Requirement - One Space per
TABLE 2. Cannery District Hourly Parking Demand
Phase 1 Hourly Demand Analysis
Use Area gsf Hours Use Area Spaces Hour 8am 9am 10am 11am Noon 1pm 2pm 3pm 4pm 5pm 6pm 7pm 8pm 9pm
Office 8-5 % of Max Demand 49% 84% 100% 100% 88% 79% 86% 96% 91%
42226 gsf 35892 250 of nsf floor area 143.6 Parking Demand 70 121 144 144 126 113 123 138 131
Manufacturing 8-5 % of Max Demand 100% 100% 100% 100% 100% 100% 100% 100% 100%
5931 gsf 3461 1000 of nsf floor area + 6 spaces 9.5 Parking Demand 9 9 9 9 9 9 9 9 9
Retail 9-6 % of Max Demand 18% 38% 53% 86% 100% 98% 91% 86% 81% 57%
3510 gsf 2984 300 of nsf floor area 9.9 Parking Demand 2 4 5 9 10 10 9 9 8 6
Bldg E Restarant 11-10 % of Max Demand 21% 64% 59% 74% 31% 50% 39% 72% 100% 88% 60%
6020 gsf 3500 50 of nsf seating area 70.0 Parking Demand 15 45 41 52 22 35 27 50 70 62 42
406 Brewery/Distillery Seating 12-9 % of Max Demand 50% 35% 31% 22% 25% 73% 100% 100% 80% 58%
1700 gsf 1700 50 of nsf seating area 34.0 Parking Demand 17 12 11 7 9 25 34 34 27 20
Total 267.0 Total 82 134 158 176 208 186 204 185 192 58 84 104 89 62
Phase 2 Hourly Demand Analysis
Use Area gsf Hours Use Area Spaces Hour 8am 9am 10am 11am Noon 1pm 2pm 3pm 4pm 5pm 6pm 7pm 8pm 9pm
Office/Manufacturaing 8-5 % of Max Demand 49% 84% 100% 100% 88% 79% 86% 96% 91%
43726 gsf 37167 250 of nsf floor area 148.7 Parking Demand 73 125 149 149 131 117 128 143 135
Manufacturing 8-5 % of Max Demand 100% 100% 100% 100% 100% 100% 100% 100% 100%
5931 gsf 3461 1000 of nsf floor area + 6 spaces 9.5 Parking Demand 9 9 9 9 9 9 9 9 9
Retail 9-6 % of Max Demand 18% 38% 53% 86% 100% 98% 91% 86% 81% 57%
14230 gsf 12096 300 of nsf floor area 40.3 Parking Demand 7 15 21 35 40 40 37 35 33 23
Bldg E Restarant 11-10 % of Max Demand 21% 64% 59% 74% 31% 50% 39% 72% 100% 88% 60%
6020 gsf 3500 50 of nsf seating area 70.0 Parking Demand 15 45 41 52 22 35 27 50 70 62 42
406 Brewery/Distillery Seating 12-9 % of Max Demand 50% 35% 31% 22% 25% 73% 100% 100% 80% 58%
1700 gsf 1700 50 of nsf seating area 34.0 Parking Demand 17 12 11 7 9 25 34 34 27 20
Gym 8-8 % of Max Demand 85% 80% 86% 71% 53% 49% 42% 49% 76% 88% 100% 77% 62%
11900 gsf 10115 200 of nsf floor area 50.6 Parking Demand 43 40 43 36 27 25 21 25 38 45 51 39 31
Total 353.0 Total 133 190 223 243 269 244 258 241 259 120 135 143 120 62
Phase 3 Hourly Demand Analysis
Use Area gsf Hours Use Area Spaces Hour 8am 9am 10am 11am Noon 1pm 2pm 3pm 4pm 5pm 6pm 7pm 8pm 9pm
Office/Manufacturaing 8-5 % of Max Demand 49% 84% 100% 100% 88% 79% 86% 96% 91%
86226 gsf 73292 250 of nsf floor area 293.2 Parking Demand 144 246 293 293 258 232 252 281 267
Manufacturing 8-5 % of Max Demand 100% 100% 100% 100% 100% 100% 100% 100% 100%
5931 gsf 3461 1000 of nsf floor area + 6 spaces 9.5 Parking Demand 9 9 9 9 9 9 9 9 9
Retail 9-6 % of Max Demand 18% 38% 53% 86% 100% 98% 91% 86% 81% 57%
14230 gsf 12096 300 of nsf floor area 40.3 Parking Demand 7 15 21 35 40 40 37 35 33 23
Bldg E Restarant 11-10 % of Max Demand 21% 64% 59% 74% 31% 50% 39% 72% 100% 88% 60%
6020 gsf 3500 50 of nsf seating area 70.0 Parking Demand 15 45 41 52 22 35 27 50 70 62 42
406 Brewery/Distillery Seating 12-9 % of Max Demand 50% 35% 31% 22% 25% 73% 100% 100% 80% 58%
1700 gsf 1700 50 of nsf seating area 34.0 Parking Demand 17 12 11 7 9 25 34 34 27 20
Gym 8-8 % of Max Demand 85% 80% 86% 71% 53% 49% 42% 49% 76% 88% 100% 77% 62%
11900 gsf 10115 200 of nsf floor area 50.6 Parking Demand 43 40 43 36 27 25 21 25 38 45 51 39 31
Total 497.5 Total 203 312 367 388 396 359 382 380 391 120 135 143 120 62
Phase 4 Hourly Demand Analysis
Use Area gsf Hours Use Area Spaces Hour 8am 9am 10am 11am Noon 1pm 2pm 3pm 4pm 5pm 6pm 7pm 8pm 9pm
Office/Manufacturaing 8-5 % of Max Demand 49% 84% 100% 100% 88% 79% 86% 96% 91%
114226 gsf 97092 250 of nsf floor area 388.4 Parking Demand 190 326 388 388 342 307 334 373 353
Manufacturing 8-5 % of Max Demand 100% 100% 100% 100% 100% 100% 100% 100% 100%
5931 gsf 3461 1000 of nsf floor area + 6 spaces 9.5 Parking Demand 9 9 9 9 9 9 9 9 9
Retail 9-6 % of Max Demand 18% 38% 53% 86% 100% 98% 91% 86% 81% 57%
14230 gsf 12096 300 of nsf floor area 40.3 Parking Demand 7 15 21 35 40 40 37 35 33 23
Bldg E Restarant 11-10 % of Max Demand 21% 64% 59% 74% 31% 50%39% 72% 100% 88% 60%
6020 gsf 3500 50 of nsf seating area 70.0 Parking Demand 15 45 41 52 22 35 27 50 70 62 42
406 Brewery/Distillery Seating 12-9 % of Max Demand 50% 35% 31% 22% 25% 73% 100% 100% 80% 58%
1700 gsf 1700 50 of nsf seating area 34.0 Parking Demand 17 12 11 7 9 25 34 34 27 20
Gym 8-8 % of Max Demand 85% 80% 86% 71% 53% 49% 42% 49% 76% 88% 100% 77% 62%
11900 gsf 10115 200 of nsf floor area 50.6 Parking Demand 43 40 43 36 27 25 21 25 38 45 51 39 31
Total 592.7 Total 250 391 463 483 480 434 464 471 477 120 135 143 120 62
Parking Requirement - One Space per
Parking Requirement - One Space per
Parking Requirement - One Space per
Parking Requirement - One Space per