Loading...
HomeMy WebLinkAbout2015-02-18 CDi Cannery Prelim PUD Book Part I ReducedPreliminary Planned Unit Development Application Cannery District Partners, llc Comma-QArchitecture, Inc. The Cannery District - Preliminary PUD Application Cannery District Partners Page 1 Comma-QArchitecture, Inc. Table Of Contents Part 1 - PUD Information Chapter 1 - Project Introduction 1 1.01 Introductory Statement 3 1.03 Statement of Compliance 5 1.02 Owners and Applicants 7 1.04 Certification of Ownership 9 Figure 1.1 - Vicinity Map 15 Figure 1.2 - Site Illustration 17 Chapter 2 - Application Forms and Checklists 19 2.01 Development Review Application 21 2.02 Planned Unit Development Checklist 23 2.03 Site Plan Checklist 27 2.04 Certificate of Adjoining Property Owners List 31 2.05 Adjoiners List 33 2.06 Neighborhood Recognition Ordinance Compliance Certificate 35 2.07 Application Checklist “Not Applicable” Narrative 37 Chapter 3 - Background and Overview 41 3.01 Legal Description and Location 43 3.02 Zoning and Land Use 45 3.03 Development Schedule 47 Figure 3.1 Existing Land Use Map 49 Figure 3.2 Community Plan Land Use Designation Map 51 Figure 3.3 City Zoning Map 53 Figure 3.4 Neighborhood and Entryway Corridor Map 55 Figure 3.5 Phasing Map 57 Table 3.1 Land Use Data 59 Table 3.2 Proposed Building Uses 61 4.01. Implementation of Bozeman Growth Policy 65 4.02 PUD Information 67 4.03 PUD Objectives and Criteria Narrative 69 Figure 4.1 - Open Space Diagram 79 Chapter 5 - Physiographic Data 81 5.01. Physiographic Data 83 Chapter 6 - Access and Utilities 87 6.01 Access 89 6.02 Utilities 91 The Cannery District - Preliminary PUD Application Cannery District Partners Page 2 Comma-QArchitecture, Inc. Table Of Contents (continued) Part 2 - Design Guidelines Team Contact Information 1 Section 1 - Project Overview 3 1.00 Project Overview 5 1.01 Improvements Schedule 9 1.02 Project Uses 11 Section 2 - Site Guidelines 13 2.00 Site Design Overview 15 2.01 Site Signage 17 2.02 Access Circulation and Parking 19 2.03 Pedestrian Access and Open Space 21 2.04 Site Grading and Drainage 23 2.05 Utilities, Communications and Refuse 25 2.06 Site Lighting 27 Section 3 - Landscape Design Guidelines 31 3.00 Landscape Design Overview 33 3.01 Vegetation 35 3.02 Hardscape 47 3.03 Maintenance 53 Section 4 - Building Design 55 4.00 Building Design Overview 57 4.01 Dimensional Considerations 61 4.02 Programmatic Considerations 65 4.03 Building Exterior 69 4.04 Building Lighting 75 4.05 Building Signage 77 Section 5 - Submittal Review Requirements and Procedures 83 5.00 Design Review Process and Requirements 85 Figure 5.01 - Viewsheds 91 Appendices Appendix 1 - Plans Set Appendix 2 - Common Open Space Lighting Information Appendix 3 - Storm Water Plan Appendix 4 - Geotechnical Report Appendix 5 - Traffic Impact Study Appendix 6 - Water Main Extension Engineer’s Report Appendix 7 - Sewer Main Extension Engineer’s Report Appendix 8 - Draft Declaration Appendix 9 - Noxious Weed Management Plan Appendix 10 - Comprehensive Sign Plan Design Guideline Attachments Attachment 1 - Cannery District Master Plan Attachment 2 - Shared Parking description & Worksheet Cannery District Planned Unit Development Preliminary PUD Application Cannery District Partners, llc Chapter 1 Project Introduction The Cannery District - Preliminary PUD Application Cannery District Partners Page 3 Comma-QArchitecture, Inc. The Cannery District is a proposed multi-phase Planned Unit Development (PUD) on 12.24 acres along the north side of East Oak Street and Rouse Avenue. The existing property, at one time the site of a bustling canning factory that employed more than 250 residents of Gallatin County, is currently an under-utilized property located in three of Bozeman’s primary entryway corridors. The Cannery District PUD revitalizes this site through the adaptive re-use of existing buildings, infill with compatible structures, and infrastructure that re-connects the site to the adjacent urban fabric, improving the area’s overall image and livability. By revitalizing an under-utilized but historically significant property within Bozeman’s core, the Cannery District PUD will have authentic character and sense of place, recalling our community’s industrial/agricultural past. This project will be delivered by the same team that successfully developed the Northside PUD project, which won two Bozeman Beautification awards: one for Industrial Revitalization in 2009 and one for Adaptive Urban Revitalization in 2012. Our approach to the Cannery District PUD expands on the lessons and experience of Northside and will further enhance Bozeman’s Northeast Neighborhood. This project strives to provide significant economic development opportunities by serving as an attractive option to high tech and other entrepreneurial companies. These companies are hungry for professional, compatible working environments that complement Bozeman’s lifestyle. 1.01 Introductory Statement Introductory Statement The Cannery District - Preliminary PUD Application Cannery District Partners Page 5 Comma-QArchitecture, Inc. It is our intent, as managers for Cannery District Partners, LLC, owner of the proposed Cannery Disttrict Planned Unit Development, to comply with the requirements of the Bozeman Municipal Code and any conditions considered necessary by the approval body. In addition we are in acceptance of the conditions and restrictions as set forth on the site plan submitted with the PUD final plan. Cannery District Partners, LLC by: CDP Managment, LLC by: Scott Dehlendorf, Manager Date 1.03 Statement of Compliance Statement of Compliance The Cannery District - Preliminary PUD Application Cannery District Partners Page 7 Comma-QArchitecture, Inc. Owner / Developer: Cannery District Partners, llc | Scott Dehlendorf, Barry Brown | (406) 522-7449 | scott@ dehlendorfgrp.com | Bozeman, Montana Architect: Comma-Q Architecture | Ben Lloyd, AIA, LEED AP | (406) 585-1112 | ben@commaq.com | Bozeman, Montana Civil Engineer: Stahly Engineering & Associates, Inc| Cordell Pool, P.E. | (406) 522-9526 | cpool@seaeng.com | Bozeman, Montana Landscape Architect: Design.5 Landscape Architecture | Troy Scherer, RLA, ASLA | (406) 600-0342| troy@design5la.com | Bozeman, Montana Landscape Designer: Linda Iverson Landscape Design| Linda Iverson| (406) 932-5840 | lilandscape@mtinthouch.net | Big Timber, Montana Electrical Engineer: Consulting Design Solutions, Inc.|Scott Elders| (406) 382-7082| selders@cdsiengineering.com| Manhattan, Montana 1.02 Owners and Applicants Owners and Applicants The Cannery District - Preliminary PUD Application Cannery District Partners Page 9 1.04 Certification of Ownership The Cannery District - Preliminary PUD Application Cannery District Partners Page 10 The Cannery District - Preliminary PUD Application Cannery District Partners Page 11 The Cannery District - Preliminary PUD Application Cannery District Partners Page 12 The Cannery District - Preliminary PUD Application Cannery District Partners Page 13 Figure 1.1 Vicinity Map Figure 1.2 Site Illustration Cannery District Planned Unit Development Preliminary PUD Application Cannery District Partners, llc Chapter 2 Application Forms and Checklists The Cannery District - Preliminary PUD Application Cannery District Partners Page 21 Page 1 Appropriate Review Fee Submitted CITY OF BOZEMAN FEE APPLIES- $ DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT Alfred M. Stiff Professional Building 20 East Olive Street P.O. Box 1230 Bozeman, Montana 59771-1230 phone 406-582-2260 fax 406-582-2263 planning@bozeman.net www.bozeman.net DEVELOPMENT REVIEW APPLICATION 1. Name of Project/Development: 2. Property Owner Information: Name: E-mail Address: Mailing Address: Phone: FAX: 3. Applicant Information: Name: E-mail Address: Mailing Address: Phone: FAX: 4. Representative Information: Name: E-mail Address: Mailing Address: Phone: FAX: 5. Legal Description: 6. Street Address: 7. Project Description: 8. Zoning Designation(s): 9. Current Land Use(s): 10. Bozeman Community Plan Designation: 11. Gross Area: Acres: Square Feet: 12. Net Area:Acres: Square Feet: Cannery District Planned Unit Development Cannery District Partners, llc 1006 West Main Street, Bozeman, MT 59715 scott@cannerydistrict.com (406) 522-7449 Same as Property Owner Comma-Q Architecture, inc 107 N. Rouse, Ste 1, Bozeman, MT 59715 ben@commaq.com laura@commaq.com (406) 585-1112 Tracts 1, 2, and 3A of COS 2128B, Tract on COS 2548, and Portions of Block 2 of Imes Addition (Plat C-41) north of Oak Street 101 East Oak Street By renovating and re-purposing existing structures, infilling with new compatible construction, and installing pedestrian scaled common open space,the Cannery District project revitalizes an existing under-utilized site, located within three prominent Bozeman entryway corridors. B-2 Commercial & Vacant Regional Commercial and Services 12.24 533,146 2.96 128,938 The Cannery District - Preliminary PUD Application Cannery District Partners Page 22 Page 2 (Development Review Application – Prepared 11/25/03; Amended 9/17/04, 5/1/06; 9/18/07, revised 11/14/11) 13. Is the subject site within an urban renewal district? Yes, answer question 13a No, go to question 14 13a. Which urban renewal district? Downtown Northeast (NURD) North 7th Avenue 14. Is the subject site within an overlay district? Yes, answer question 14a No, go to question 15 14a. Which Overlay District? Casino Neighborhood Conservation Entryway Corridor 15. Will this application require a deviation(s)? Yes, list UDC section(s): No 16. Application Type (please check all that apply): O. Planned Unit Development – Concept Plan A. Sketch Plan for Regulated Activities in Regulated Wetlands P. Planned Unit Development – Preliminary Plan B. Reuse, Change in Use, Further Development Pre-9/3/91 Site Q. Planned Unit Development – Final Plan C. Amendment/Modification of Plan Approved On/After 9/3/91 R. Planned Unit Development – Master Plan D. Reuse, Change in Use, Further Development, Amendment /COA S. Subdivision Pre-application E. Special Temporary Use Permit T. Subdivision Preliminary Plat F. Sketch Plan/COA U. Subdivision Final Plat G. Sketch Plan/COA with an Intensification of Use V. Subdivision Exemption H. Preliminary Site Plan/COA W. Annexation I. Preliminary Site Plan X. Zoning Map Amendment J. Preliminary Master Site Plan Y. Unified Development Ordinance Text Amendment K. Conditional Use Permit Z. Zoning Variance L. Conditional Use Permit/COA AA. Growth Policy Map Amendment M. Administrative Project Decision Appeal BB. Growth Policy Text Amendment N. Administrative Interpretation Appeal Other: This application must be accompanied by the appropriate checklist(s), number of plans or plats, adjoiner information and materials, and fee (see Development Review Application Requirements and Fees). The plans or plats must be drawn to scale on paper not smaller than 8½- by 11-inches or larger than 24- by 36-inches folded into individual sets no larger than 8½- by 14-inches. The name of the project must be shown on the cover sheet of the plans. If 3-ring binders will be used, they must include a table of contents and tabbed dividers between sections. Application deadlines are Wednesdays at 5:00 pm. This application must be signed by both the applicant(s) and the property owner(s) (if different) before the submittal will be accepted. As indicated by the signature(s) below, the applicant(s) and property owner(s) submit this application for review under the terms and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and any special conditions established by the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may be assessed for my project. Further, I agree to grant City personnel and other review agency representatives access to the subject site during the course of the review process (Section 38.34.050, BMC). I (We) hereby certify that the above information is true and correct to the best of my (our) knowledge. Applicant’s Signature: Date: Applicant’s Signature: Date: Property Owner’s Signature: Date: Property Owner’s Signature: Date: X X X X X The Cannery District - Preliminary PUD Application Cannery District Partners Page 23 PLANNED UNIT DEVELOPMENT CHECKLIST The appropriate checklist shall be completed and returned as part of the submittal. Any item checked “No” or “N/A” (not applicable) must be explained in a narrative attached to the checklist. Incomplete submittals will be returned to the applicant. A. Planned Unit Development – Concept Plan. The following information and data shall be submitted: PUD Concept Plan Information Yes No N/A 1. Data regarding site conditions, land characteristics, available community facilities and utilities and other related general information about adjacent land uses and the uses of land within one-half mile of the subject parcel of land 2. Conceptual (sketch) drawing showing the proposed location of the uses of land, major streets and other significant features on the site and within one-half mile of the site 3. A computation table showing the site’s proposed land use allocations by location and as a percent of total site area 4. Stormwater Management Permit Application required B. Planned Unit Development – Preliminary Plan. The following information and data shall be submitted: PUD Preliminary Plan Information Yes No N/A 1. The following information shall be presented in an 8½- by 11-inch vertically bound document. The document shall be bound so that it will open and lie flat for reviewing and organized in the following order: a. Application forms b. A list of names of all general and limited partners and/or officers and directors of the corporation involved as either applicants or owners of the planned unit development c. Statement of applicable City land use policies and objectives achieved by the proposed plan and how it furthers the implementation of the Bozeman growth policy d. Statement of the proposed ownership of open space areas e. Statement of the applicant’s intentions with regard to future ownership of all or portions of the planned unit development f. Estimate of number of employees for business, commercial and industrial uses g. Description of rationale behind the assumptions and choices made by the applicant h. Where deviations from the requirements of this title are proposed, the applicant shall submit evidence of successful completion of the applicable community design objectives and criteria of Section 38.20.090 (PUD Design Objectives and Criteria), BMC. The applicant shall submit written explanation for each of the applicable objectives or criteria as to how the plan does or does not address the objective or criterion. The Planning Director may require, or the applicant may choose to submit, evidence that is beyond what is required in that section. Any element of the proposal that varies from the criterion shall be described i. Detailed description of how conflicts between land uses of different character are being avoided or mitigated j. Statement of design methods to reduce energy consumption, (e.g., home/business utilities, transportation fuel, waste recycling) Page 3 (PUD Checklist – Prepared 12/2/03; revised 9/21/04, revised 11/14/11) X X X X X X X X X X X The Cannery District - Preliminary PUD Application Cannery District Partners Page 24 Page 4 PUD Preliminary Plan Information, continued Yes No N/A 1. The following information shall be presented in an 8½- by 11-inch vertically bound document. The document shall be bound so that it will open and lie flat for reviewing and organized in the following order: k. A development schedule indicating the approximate date when construction of the planned unit development, or stages of the same, can be expected to begin and be completed, including the proposed phasing of construction of public improvements and recreational and common space areas j. One reduced version of all preliminary plan and supplemental plan maps and graphic illustrations at 8½- by 11-inches or 11- by 17-inches size 2. In addition to all of the information listed on the Site Plan Checklist, the following information shall be included on the site plan: a. Notations of proposed ownership, public or private, should be included where appropriate b. The proposed treatment of the perimeter of the planned unit development, including materials and techniques used, such as screening, fences, walls and other landscaping c. Attorney’s or owner’s certification of ownership 3. Viewsheds: a. Looking onto and across the site from areas around the site, describe and map the views and vistas from adjacent properties that may be blocked or impaired by development of the site b. Describe and map areas of high visibility on the site as seen from adjacent off-site locations 4. Street cross-section schematics shall be submitted for each general category of street, including: a. The proposed width b. Treatment of curbs and gutters, or other storm water control system if other than curb and gutter is proposed c. Sidewalk systems d. Bikeway systems, where alternatives to the design criteria and standards of the City are proposed 5. Physiographic data, including the following: a. A description of the hydrologic conditions of the site with analysis of water table fluctuation and a statement of site suitability for intended construction and proposed landscaping, in compliance with Section 38.41.120.B.3.c, BMC b. Locate and identify the ownership of existing wells or well sites within 400 feet of the site 6. If the project involves or requires platting, a preliminary subdivision plat, subject to the requirements of this title relative to subdivisions, shall be submitted 7. Not withstanding the waiver provisions of Section 38.41.080.B.9, BMC, at the discretion of the City Engineer, a traffic impact analysis shall be prepared based upon the proposed development. The analysis shall include provisions of the approved development guidelines, and shall address impacts upon surrounding land uses. The Director of Public Service may require the traffic impact analysis to include the information in Section 38.41.050.L, BMC. If a traffic impact analysis has been submitted as part of a concurrent subdivision review, that analysis shall meet this requirement 8. If the development’s compliance with the community design objectives and criteria is under question, the City Commission may require additional impact studies or other plans as deemed necessary for providing thorough consideration of the proposed planned unit development 9. A proposed draft of a legal instrument containing the creation of a property owner’s association sufficient to meet the requirements of Section 38.38.020 (Property Owners Association), BMC shall be submitted with the preliminary plan application 10. Stormwater Management Permit Application required X X X X X X X X X X X X X X X X X X The Cannery District - Preliminary PUD Application Cannery District Partners Page 25 Page 5 C. Planned Unit Development – Final Plan. The following information and data shall be submitted: PUD Final Plan Information Yes No N/A 1. A list of names of all general and limited partners and/or officers and directors of the corporation involved as either applicants or owners of the planned unit development 2. A final plan site plan shall be submitted on a 24- by 36-inch sheet(s) at the same scale as the approved preliminary plan. If a different scale is requested or required, a copy of the approved preliminary plan shall be submitted that has been enlarged or reduced to equal the scale of the final plan. However, only the scales permitted for the preliminary plans shall be permitted for final plans. The final plan site plan shall show the following information: a. Land use data (same information as required on the preliminary site plan) b. Lot lines, easements, public rights-of-way as per subdivision plat c. Attorney’s or owner’s certification of ownership d. Planning Director certification of approval of the site plan and its conformance with the preliminary plan e. Owner’s certification of acceptance of conditions and restrictions as set forth on the site plan 3. A final landscape plan consistent with the conditions and restrictions of the approved preliminary plan shall be submitted. It shall also be consistent with the Chapter 38.26 (Landscaping), BMC, except that any stated conditions and restrictions of the preliminary plan approval shall supersede the provisions of Chapter 38.26 (Landscaping), BMC 4. An official final subdivision plat of the site must accompany the final planned unit development plan when applicable. City approval of the final subdivision plat shall be required before issuance of building permits 5. Prior to submission of the final plan to the DRC and ADR staff, engineering plans and specifications for sewer, water, street improvements and other public improvements, and an executed improvements agreement in proper form providing for the installation of such improvements, must be submitted to and approved by the City 6. A plan for the maintenance of open space, meeting the requirements of Section 38.38.030 (Common Area and Facility Maintenance Plan and Guarantee), BMC, shall be submitted with an application for final plan approval. Open space shown on the approved final plan shall not be used for the construction of any structures not shown on the final plan 7. Stormwater Management Permit Application required X The Cannery District - Preliminary PUD Application Cannery District Partners Page 27 SITE PLAN CHECKLIST These checklists shall be completed and returned as part of the submittal. Any item checked “No” or “N/A” (not applicable) must be explained in a narrative attached to the checklist. Incomplete submittals will be returned to the applicant. A. Design Review Board (DRB) Site Plan Review Thresholds. Does the proposal include one or more of the following: Design Review Board (DRB) Site Plan Review Thresholds Yes No 1. 20 or more dwelling units in a multiple household structure or structures 2. 30,000 or more square feet of office space, retail commercial space, service commercial space or industrial space 3. 20,000 or more square feet of exterior storage of materials or goods 4. Parking for more than 90 vehicles B. General Information. The following information shall be provided for site plan review: General Information Yes No N/A 1. Location map, including area within one-half mile of the site 2. List of names and addresses of property owners according to Chapter 38.40, BMC (Noticing) 3. A construction route map shall be provided showing how materials and heavy equipment will travel to and from the site. The route shall avoid, where possible, local or minor collector streets or streets where construction traffic would disrupt neighborhood residential character or pose a threat to public health and safety 4. Boundary line of property with dimensions 5. Date of plan preparation and changes 6. North point indicator 7. Suggested scale of 1 inch to 20 feet, but not less than 1 inch to 100 feet 8. Parcel size(s) in gross acres and square feet 9. Estimated total floor area and estimated ratio of floor area to lot size (floor area ratio, FAR), with a breakdown by land use 10. Location, percentage of parcel(s) and total site, and square footage for the following: a. Existing and proposed buildings and structures b. Driveway and parking c. Open space and/or landscaped area, recreational use areas, public and semipublic land, parks, school sites, etc. d. Public street right-of-way 11. Total number, type and density per type of dwelling units, and total net and gross residential density and density per residential parcel 12. Detailed plan of all parking facilities, including circulation aisles, access drives, covered and uncovered bicycle parking, compact spaces, handicapped spaces and motorcycle parking, on-street parking, number of employee and non-employee parking spaces, existing and proposed, and total square footage of each Page 3 (Site Plan Checklist – Prepared 12/05/03; revised 9/22/04; revised 7/24/07, revised 11/14/11) X X X X X X X X X X X X X X X X X X X The Cannery District - Preliminary PUD Application Cannery District Partners Page 28 Page 4 General Information, continued Yes No N/A 13. The information required by Section 38.41.060.L, BMC (Streets, Roads and Alleys), unless such information was previously provided through a subdivision review process, or the provision of such information was waived in writing by the City during subdivision review of the land to be developed, or the provision of such information is waived in writing by the City prior to submittal of a preliminary site plan application 14. Description and mapping of soils existing on the site, accompanied by analysis as to the suitability of such soils for the intended construction and proposed landscaping 15. Building design information (on-site): a. Building heights and elevations of all exterior walls of the building(s) or structure(s) b. Height above mean sea level of the elevation of the lowest floor and location of lot outfall when the structure is proposed to be located in a floodway or floodplain area c. Floor plans depicting location and dimensions of all proposed uses and activities 16. Temporary facilities plan showing the location of all temporary model homes, sales offices and/or construction facilities, including temporary signs and parking facilities 17. Unless already provided through a previous subdivision review, a noxious weed control plan complying with Section 38.41.050.H, BMC (Noxious Weed Management and Revegetation Plan) 18. Drafts of applicable supplementary documents as set forth in Chapter 38.38, BMC (Supplementary Documents) 19. Stormwater Management Permit Application required C. Site Plan Information. The location, identification and dimension of the following existing and proposed data, onsite and to a distance of 100 feet (200 feet for PUDs) outside the site plan boundary, exclusive of public rights-of-way, unless otherwise stated: Site Plan Information Yes No N/A 1. Topographic contours at a minimum interval of 2 feet, or as determined by the Planning Director 2. Adjacent streets and street rights-of-way to a distance of 150 feet, except for sites adjacent to major arterial streets where the distances shall be 200 feet 3. On-site streets and rights-of-way 4. Ingress and egress points 5. Traffic flow on-site 6. Traffic flow off-site 7. Utilities and utility rights-of-way or easements: a. Electric b. Natural gas c. Telephone, cable television and similar utilities d. Water e. Sewer (sanitary, treated effluent and storm) 8. Surface water, including: a. Holding ponds, streams and irrigation ditches b. Watercourses, water bodies and wetlands c. Floodplains as designated on the Federal Insurance Rate Map or that may otherwise be identified as lying within a 100-year floodplain through additional floodplain delineation, engineering analysis, topographic survey or other objective and factual basis d. A floodplain analysis report in compliance with Chapter 38.31, BMC (Bozeman Floodplain Regulations) if not previously provided with subdivision review X X X X X X X X X X X X X X X X X X X X X X X X The Cannery District - Preliminary PUD Application Cannery District Partners Page 29 Page 5 Site Plan Information, continued Yes No N/A 9. Grading and drainage plan, including provisions for on-site retention/detention and water quality improvement facilities as required by the Engineering Department, or in compliance with B.M.C. Chapter 40 Article 4 storm drainage ordinance and best management practices manual adopted by the City 10. All drainageways, streets, arroyos, dry gullies, diversion ditches, spillways, reservoirs, etc. which may be incorporated into the storm drainage system for the property shall be designated: a. The name of the drainageway (where appropriate) b. The downstream conditions (developed, available drainageways, etc.) c. Any downstream restrictions 11. Significant rock outcroppings, slopes of greater than 15 percent or other significant topographic features 12. Sidewalks, walkways, driveways, loading areas and docks, bikeways, including typical details and interrelationships with vehicular circulation system, indicating proposed treatment of points of conflict 13. Provision for handicapped accessibility, including but not limited to, wheelchair ramps, parking spaces, handrails and curb cuts, including construction details and the applicant’s certification of ADA compliance 14. Fences and walls, including typical details 15. Exterior signs. Note – The review of signs in conjunction with this application is only review for compliance with Chapter 38.28, BMC (Signs). A sign permit must be obtained from the Department of Planning and Community Development prior to erection of any and all signs. 16. Permanent and construction period exterior refuse collection areas, including typical details 17. A site plan, complete with all structures, parking spaces, building entrances, traffic areas (both vehicular and pedestrian), vegetation that might interfere with lighting, and adjacent uses, containing a layout of all proposed fixtures by location and type. The materials required in Section 38.41.060.18, BMC (Lighting Plan), if not previously provided 18. Curb, asphalt section and drive approach construction details 19. Landscaping - detailed plan showing plantings, equipment, and other appropriate information as required in Section 38.41.100, BMC (Submittal Requirements for Landscaping Plans). If required, complete section C below 20. Unique natural features, significant wildlife areas and vegetative cover, including existing trees and shrubs having a diameter greater than 2.5 inches, by species 21. Snow storage areas 22. Location of City limit boundaries, and boundaries of Gallatin County’s Bozeman Area Zoning Jurisdiction, within or near the development 23. Existing zoning within 200 feet of the site 24. Historic, cultural and archeological resources, describe and map any designated historic structures or districts, and archeological or cultural sites 25. Major public facilities, including schools, parks, trails, etc. 26. The information necessary to complete the determination of density change and parkland provision required by Chapter 38.27, BMC, unless such information was previously determined by the City to be inapplicable and written confirmation is provided to the applicant prior to submittal of a preliminary site plan application. If a new park will be created by the development, the park plan materials of Section 38.41.060.16, BMC shall be provided. 27. Describe how the site plan will satisfy any requirements of Article 8 Section 10, BMC (Affordable Housing) which have either been established for that lot(s) through the subdivision process or if no subdivision has previously occurred are applicable to a site plan. The description shall be of adequate detail to clearly identify those lots and dwellings designated as subject to Article 8 Section 10, BMC compliance requirements and to make the obligations placed on the affected lots and dwellings readily understandable. X X X X X X X X X X X X X X X X X X X X The Cannery District - Preliminary PUD Application Cannery District Partners Page 30 Page 6 D. Landscape Plans. If a landscape plan is required, the following information shall be provided on the landscape plan: Landscape Plan Information Yes No N/A 1. Date, scale, north arrow, and the names, addresses, and telephone numbers of both the property owner and the person preparing the plan 2. Location of existing boundary lines and dimensions of the lot 3. Approximate centerlines of existing watercourses, required watercourse setbacks, and the location of any 100-year floodplain; the approximate location of significant drainage features; and the location and size of existing and proposed streets and alleys, utility easements, utility lines, driveways and sidewalks on the lot and/or adjacent to the lot 4. Project name, street address, and lot and block description 5. Location, height and material of proposed screening and fencing (with berms to be delineated by one foot contours) 6. Locations and dimensions of proposed landscape buffer strips, including watercourse buffer strips 7. Complete landscape legend providing a description of plant materials shown on the plan, including typical symbols, names (common and botanical name), locations, quantities, container or caliper sizes at installation, heights, spread and spacing. The location and type of all existing trees on the lot over 6 inches in caliper must be specifically indicated 8. Complete illustration of landscaping and screening to be provided in or near off-street parking and loading areas, including information as to the amount (in square feet) of landscape area to be provided internal to parking areas and the number and location of required off-street parking and loading spaces 9. An indication of how existing healthy trees (if any) are to be retained and protected from damage during construction 10. Size, height, location and material of proposed seating, lighting, planters, sculptures, and water features 11. A description of proposed watering methods 12. Location of street vision triangles on the lot (if applicable) 13. Tabulation of points earned by the plan – see Section 38.26.060, BMC (Landscape Performance Standards) 14. Designated snow removal storage areas 15. Location of pavement, curbs, sidewalks and gutters 16. Show location of existing and/or proposed drainage facilities which are to be used for drainage control 17. Existing and proposed grade 18. Size of plantings at the time of installation and at maturity 19. Areas to be irrigated 20. Planting plan for watercourse buffers, per Section 38.23.100, BMC (Watercourse Setbacks), if not previously provided through subdivision review 21. Front and side elevations of buildings, fences and walls with height dimensions if not otherwise provided by the application. Show open stairways and other projections from exterior building walls X X X X X X X X X X X X X X X X X X X X X The Cannery District - Preliminary PUD Application Cannery District Partners Page 31 CERTIFICATE OF ADJOINING PROPERTY OWNERS LIST I, , hereby certify that, to the best of my knowledge, the attached name and address list of all adjoining property owners (including all individual condominium owners) within 200 feet of the property located at , is a true and accurate list from the last declared Gallatin County tax records. I further understand that an inaccurate list may delay review of the project. Signature (Certificate of Adjoining Property Owners List – Prepared 11/20/03; Revised 9/22/06) CERTIFICATE OF ADJOINING PROPERTY OWNERS LIST I, , hereby certify that, to the best of my knowledge, the attached name and address list of all adjoining property owners (including all individual condominium owners) within 200 feet of the property located at , is a true and accurate list from the last declared Gallatin County tax records. I further understand that an inaccurate list may delay review of the project. Signature (Certificate of Adjoining Property Owners List – Prepared 11/20/03; Revised 9/22/06) 101 East Oak Street, Bozeman, MT The Cannery District - Preliminary PUD Application Cannery District Partners Page 33 Adjoiners List Property Owners within 200’ George E. Westlake and DK Martinen LLC 15008 SE Graham Rd. Vancouver, WA. 98683-8541 City of Bozeman P.O. Box 1230 Bozeman, MT. 59771-1230 Gallatin County Fairgrounds 311 W. Main St. Bozeman, MT. 59715 Big Sky Montana Properties LLC P.O. Box 835 Bozeman, MT. 59771-0835 Montana Rail Link Inc. P.O. Box 16390 101 International Dr. Missoula, MT. 59808 BNSF Railway 2650 Lou Menk Dr. Fort Worth TX. 76131-2830 Northern Pacific Railway Co. P.O. Box 961089 Fort Worth, TX 76161-0089 Montana Avenue Partners LLC C/O Scott Dehlendorf 1006 W. Main St. Bozeman, MT. 59715 State of Montana P.O. Box 201601 Helena, MT. 59620 Northside Property Owners Assoc. 1006 W. Main St. Bozeman, MT. 59715-3219 Green Thumb LLC 1612 Gold Ave. Bozeman, MT. 59715-2488 Turczyn Jump LLC 1712 Daisy Dr. Bozeman, MT. 59718-6024 The Cannery District - Preliminary PUD Application Cannery District Partners Page 35 NEIGHBORHOOD RECOGNITION ORDINANCE COMPLIANCE CERTIFICATE On December 10, 2007 the Bozeman City Commission adopted the Neighborhood Recognition Ordinance as part of the Bozeman Municipal Code. This new ordinance contains the following requirement: Section 2.05.1230, Responsibilities of Individuals or Entities Submitting an Application to the Department of Planning and Community Development. A. In order for the City Liaison to effectively perform their duties executing the intent and purpose of this chapter, as defined in 2.05.1230, the following shall be performed: 1. As part of any application to the Department of Planning and Community Development, the applicant shall provide written notice via certified mail, e-mail, facsimile transmission, and/or personal delivery to the City Liaison if notification guidelines (BMC 38.40) require that notice be posted “on-site”, published in the local newspaper or mailed first class. 2. Such notice shall contain a complete set of application materials as submitted to the Department of Planning and Community Development. B. Failure to provide proof of such mailing via certified mail, e-mail and/or facsimile transmission report to the most recent City Liaison address, e-mail address and/or fax number of record, or an affidavit attesting hand delivery, shall result in an incomplete application. I, , hereby certify that I have delivered via certified mail, e-mail, facsimile transmission or hand delivery written notice and a complete set of application materials for the project known as in compliance with Section 2.05.1230 of the Bozeman Municipal Code. I further understand that failure to comply will result in this application being deemed incomplete and may result in a delay in the review of this project. Signature Date (Neighborhood Recognition Ordinance Compliance Certificate – Prepared 1/7/08, revised 11/14/11) NEIGHBORHOOD RECOGNITION ORDINANCE COMPLIANCE CERTIFICATE On December 10, 2007 the Bozeman City Commission adopted the Neighborhood Recognition Ordinance as part of the Bozeman Municipal Code. This new ordinance contains the following requirement: Section 2.05.1230, Responsibilities of Individuals or Entities Submitting an Application to the Department of Planning and Community Development. A. In order for the City Liaison to effectively perform their duties executing the intent and purpose of this chapter, as defined in 2.05.1230, the following shall be performed: 1. As part of any application to the Department of Planning and Community Development, the applicant shall provide written notice via certified mail, e-mail, facsimile transmission, and/or personal delivery to the City Liaison if notification guidelines (BMC 38.40) require that notice be posted “on-site”, published in the local newspaper or mailed first class. 2. Such notice shall contain a complete set of application materials as submitted to the Department of Planning and Community Development. B. Failure to provide proof of such mailing via certified mail, e-mail and/or facsimile transmission report to the most recent City Liaison address, e-mail address and/or fax number of record, or an affidavit attesting hand delivery, shall result in an incomplete application. I, , hereby certify that I have delivered via certified mail, e- mail, facsimile transmission or hand delivery written notice and a complete set of application materials for the project known as in compliance with Section 2.05.1230 of the Bozeman Municipal Code. I further understand that failure to comply will result in this application being deemed incomplete and may result in a delay in the review of this project. Signature Date (Neighborhood Recognition Ordinance Compliance Certificate – Prepared 1/7/08, revised 11/14/11) Cannery District PUD The Cannery District - Preliminary PUD Application Cannery District Partners Page 37 Comma-QArchitecture, Inc. PUD Checklist • (B.6) If the project involves or requires platting, a preliminary subdivision plat, subject to the requirements of this title relative to subdivisions, shall be submitted. Portions of the project that require platting will undergo subdivision review in the future. See Appendix 1, C1.5, Survey Summary Map for preliminary lot layout. • (B.10) Stormwater Management Permit Application required Stormwater Management Permit Application will be submitted prior to construction. Site Plan Checklist • (B.3) A construction route map shall be provided showing how materials and heavy equipment will travel to and from the site. The route shall avoid, where, possible, local or minor collector streets or streets where construction traffic would disrupt neighborhood residential character or pose a threat to public health and safety. Given the location of the site adjacent to two major arterial streets (Oak and Rouse), construction traffic will have adequate room for site access. • (B.11) Total number, type and density per type of dwelling units, and total net and gross residential density and density per residential parcel. The proposed development does not include dwelling units or residential parcels within its scope. If a residential use is added in the future, this information will be provided. • (B.15.a,b,c) Building Design Information; Building heights and elevations of all exterior walls of the building(s) or structure(s);Height above mean sea level of the elevation of the lowest floor and location of lot outfall when the structure is proposed to be located in a floodway or floodplain area; Floor plans depicting location and dimensions of all proposed uses and activities The design of structures will not occur until after P.U.D. approval. Anticipated uses and approximate building square footages are defined in the P.U.D. submittal. The Cannery District Design Guidelines describe the character of all structures. The actual design of structures will undergo site plan review following PUD approval. • (B.16) Temporary facilities plan showing the location of all temporary model homes, sales offices and/or construction facilities, including temporary signs and parking facilities No temporary facilites are planned at this time. Any temporary facilites designed in the future will undergo review with a site plan submittal Application Checklist “Not Applicable” Narrative “Not Applicable” Narrative The Cannery District - Preliminary PUD Application Cannery District Partners Page 38 Comma-QArchitecture, Inc. • (B.19) Stormwater Management Permit Application required Stormwater Management Permit Application will be submitted prior to construction. • (C.8.a,b,c,d) Surface water, including: watercourses, water bodies, and wetlands...floodplain analysis report in compliance with Chapter 18.58, BMC if not previously provided with subdivision review. The proposed development does not exist adjacent to watercourses, water bodies, or wetlands, nor does it exist within a 100-year floodplain. • (C.10.a,b,c) All drainageways, streets, arroyos, dry gullies, diversion ditches, spillways, reservoirs, etc. which may be incorporated into the storm drainage system for the property shall be designated: a. The name of the drainageway (where appropriate) b. The downstream conditions (developed, available drainageways, etc.) c. Any downstream restrictions No drainageways, streets, arroyos, dry gullies, diversion ditches, spillways, reservoirs, etc. will be incorporated into the storm drainage system for the property. • (C.11) Significant rock outcroppings, slopes of greater than 15% or other significant topographic features. The proposed development site is visually flat with no significant topographic or natural features. • (C.14) Fences and walls, including typical details. The design of any fences or walls will not occur until after P.U.D. approval. The Cannery District Design Guidelines describe the character of any fences or walls. The actual design of fences or walls will undergo review with a site plan submittal following PUD approval. • (C.20)Unique natural features, significant wildlife areas and vegetative cover, including existing trees and shrubs having a diameter greater than 2.5 inches, by species No unique natural features, significant wildlife areas, or vegetative cover existing on the site. • (C.24) Historic, cultural and archeological resources, describe and map any designated historic structures or districts, and archeological or cultural sites. The proposed development does not include any of the above structures or features. • (C.26) The information necessary to complete the determination of density change and parkland provision required by Chapter 38.27, BMC, unless such information was previously determined by the City to be inapplicable and written confirmation is provided to the applicant prior to submittal of a preliminary site plan application. If a new park will be created by the development, the park plan materials of Section Application Checklist “Not Applicable” Narrative (continued) “Not Applicable” Narrative The Cannery District - Preliminary PUD Application Cannery District Partners Page 39 Comma-QArchitecture, Inc. 38.42.060.16, BMC shall be provided. The proposed development does not include dwelling units or residential parcels within its scope. If a residential use is added in the future, this information will be provided. • (C.27) Describe how the site plan will satisfy any requirements of Article 8 Section 10, BMC (Affordable Housing) which have either been established for that lot(s) through the subdivision process or if no subdivision has previously occurred are applicable to a site plan. The description shall be of adequate detail to clearly identify those lots and dwellings designated as subject to Article 8 Section 10, BMC compliance requirements and to make the obligations placed on the affected lots and dwellings readily understandable. The proposed development does not include dwelling units or residential parcels within its scope. If a residential use is added in the future, this information will be provided. • (D.7) Complete landscape legend providing a description of plant materials shown on the plan, including typical symbols, names (common and botanical name), locations, quantities, container or caliper sizes at installation, heights, spread and spacing. The location and type of all existing trees on the lot over 6 inches in caliper must be specifically indicated The complete design of landscape will not occur until after P.U.D. approval. Preliminary landscape design is included in the P.U.D. submittal. The Cannery District Design Guidelines describe the character and requirements of future landscape design. Complete landscape design will undergo review with a site plan submittal following PUD approval • (D.8) Complete illustration of landscaping and screening to be provided in or near off-street parking and loading areas, including information as to the amount (in square feet) of landscape area to be provided internal to parking areas and the number and location of required off-street parking and loading spaces The complete design of landscape will not occur until after P.U.D. approval. Preliminary landscape design is included in the P.U.D. submittal. The Cannery District Design Guidelines describe the character and requirements of future landscape design. Complete landscape design will undergo review with a site plan submittal following PUD approval • (D.9) An indication of how existing healthy trees (if any) are to be retained and protected from damage during construction No trees are to be retained. Application Checklist “Not Applicable” Narrative (continued) “Not Applicable” Narrative The Cannery District - Preliminary PUD Application Cannery District Partners Page 40 Comma-QArchitecture, Inc. • (D.10) Size, height, location and material of proposed seating, lighting, planters, sculptures, and water features The complete design of landscape will not occur until after P.U.D. approval. Preliminary landscape design is included in the P.U.D. submittal. The Cannery District Design Guidelines describe the character and requirements of future landscape design. Complete landscape design will undergo review with a site plan submittal following PUD approval • (D.13) Tabulation of points earned by the plan – see Section 38.26.060, BMC (Landscape Performance Standards) The complete design of landscape will not occur until after P.U.D. approval. Preliminary landscape design is included in the P.U.D. submittal. The Cannery District Design Guidelines describe the character and requirements of future landscape design. Complete landscape design will undergo review with a site plan submittal following PUD approval • (D.20) Planting plan for watercourse buffers, per Section 18.42.100, BMC, if not previously provided through subdivision review. The proposed development is not adjacent to any watercourse buffers. • (D.21) Front and side elevations of buildings, fences and walls with height dimensions if not otherwise provided by the application. Show open stairways and other projections from exterior building walls The design of structures will not occur until after P.U.D. approval. Anticipated uses and approximate building square footages are defined in the P.U.D. submittal. The Cannery District Design Guidelines describe the character of all structures. The actual design of structures will undergo site plan review following PUD approval. “Not Applicable” Narrative Cannery District Planned Unit Development Preliminary PUD Application Cannery District Partners, llc Chapter 3 Background and Overview The Cannery District - Preliminary PUD Application Cannery District Partners Page 43 Comma-QArchitecture, Inc. The Cannery District PUD Project’s real estate consists of the following parcels of land and the improvements thereon: Parcel I: All of Block 2 of the Imes Addition to the City of Bozeman located north of Tract A of Certificate of Survey C-41-D and south of Oak Street established by Ordinance 575, Misc. Bk. 10, page 617 less any established streets, rights of way and alleys. (Deed Reference in Document No. 2206846, records of Gallatin County, Montana) Parcel II: Tracts 1, 2 and 3A of Correction Certificate of Survey No. 2128B, to the City of Bozeman, Gallatin County, Montana, according to the official survey on file and of record in the office of the County Clerk and Recorder of Gallatin County, Montana. Parcel III: That certain 3.082 acre tract of land shown and described on Certificate of Survey No. 2548, recorded in the records of Gallatin County, Montana as Document No. 2220362. Said tract being described on said survey as follows: A tract of land located in the SE¼NW¼ of Section 6, Township 2S, Range 6E, Principal Meridian Montana, Gallatin County, Montana, and more particularly described as follows: Beginning at the southwest corner of the tract herein described, being a point on the east-west mid- section line of said Section 6 and common to the southeast corner of Tract 1 of C.O.S. 2128B, from which point the West Quarter Corner of said Section 6 bears S89°35’23”W, 1875.55 feet, thence, from said Point of Beginning, along the east line of said Tract 1 N00°33’39”W, 363.98 feet to the northeast corner of said Tract 1, being a point on the southerly right-of-way line of Interstate 90; thence, along said right-of- way, S69°53’45”E, 447.45 feet to the southerly right-of-way of the BNSF Railway; thence along said right-of-way, S37°29’16”E, 182.61 feet to the west right-of-way of Rouse Avenue; thence along said right-of-way S00°54’16”W, 61.50 feet to the east-west mid-section line of said Section 6; thence along said mid-section line, S89°35’23”W, 526.80 feet to the Point of Beginning and containing an area of 3.082 acres. A. Legal Description 3.01 Legal Description and Location Legal Description and Location The Cannery District - Preliminary PUD Application Cannery District Partners Page 44 Comma-QArchitecture, Inc. As of February 2015, only portions of the proposed Cannery District PUD property are located within the city limits of Bozeman, Montana. The remainder of the property is in Gallatin County (see Figure 1.1 - Vicinity Map). Phased annexation of the properties presently located outside the City corporate limits is proposed through the formation of an Annexation District. The property is bounded on the south by Oak Street, on the east by Rouse Ave, and on the north by Interstate 90 (see Figure 1.1 - Vicinity Map). The property is located in the following Entryway Corridors (see Figure 3.4 - Neighborhood & Entryway Corridor Map): • Rouse Ave / Bridger Drive Corridor • Interstate 90 • Oak Street Portions of the property are located within the boundaries of the Northeast Neighborhood Association. B. Location Information Legal Description and Location The Cannery District - Preliminary PUD Application Cannery District Partners Page 45 Comma-QArchitecture, Inc. The Bozeman Community Plan land use designation at the Cannery District PUD property is Regional Commercial and Services (see Figure 3.2 - Community Plan Land Use Designation Map). The portion of the Cannery District PUD located within the city limits of Bozeman, MT is currently zoned B-2. As property is annexed into the city, it will be zoned B-2. (See Figure 3.3 - City Zoning Map) A. Underlying Zoning 3.02 Zoning and Land Use Zoning and Land Use Property adjoining the Cannery District PUD ls zoned as the following (see Figure 3.2 - City Zoning Map): • B-2: adjoining the property to the east • M-1 & M-2: across Rouse Ave to the west • PLI: across Oak Street to the south • M-2: across the Interstate 90 to the north As of January 2015, property adjoining the Cannery District PUD ls can be classified as having the following land uses (see Figure 3.1 - Existing Land Use Map): • Vacant Land: adjoining the property to the east • Light Manufacturing & • Commercial: across Rouse Ave to the west • Parks or Open Space & Rights of way: across Oak Street to the south C. Adjacent Zoning & Uses As of January 2015, land use at the Cannery District PUD property can be classified as Vacant Land and Commercial (see Figure 3.1 - Existing Land Use Map). Existing building uses are as follows: • Office • Retail • Light Manufacturing • Restaurant B. Existing Uses The Cannery District - Preliminary PUD Application Cannery District Partners Page 46 Comma-QArchitecture, Inc. Following development, the following land uses may be present at the Cannery District PUD: • Commercial • Light Manufacturing • Residential Overall Land Use ratios are as follows: (See Table 3.1 Land Use Data for phase by phase data and additional information. Refer to Appendix 1 - C1.5 Survey Summary Map for graphic representation of land uses.) • Existing footprint buildings & structures: 36,591 sf, 6.86% of total site • Proposed buildings & structures: 56,200 sf, 10.54% of total site • Driveway and parking: 234,559 sf, 44.00% of total site • Open space and / or landscaped area 151,864 sf, 28.48% of total site • Public street right-of-way 17,948 sf, 3.37% of total site Following development, the following building may be present at the Cannery District PUD (see Table 3.2 - Proposed Uses): • Office • Retail • Health & Exercise Establishment • Light Manufacturing • Restaurant • Residential D. Proposed UsesZoning and Land Use The Cannery District - Preliminary PUD Application Cannery District Partners Page 47 Comma-QArchitecture, Inc. The Cannery District PUD will be constructed in four phases (see Figure 3.5 - Project Phasing Diagram). Phase One includes renovation of existing buildings, site improvements and infrastructure to support these buildings. Phase One construction will begin in 2015 and is anticipated to be completed by 2016. While it is the first phase to be constructed, the Phase One area will be the final area to be annexed into the City of Bozeman per the Annexation District. Therefore, Phase One will be the final portion of the project to be reviewed by the City of Bozeman Department of Community Development (CoB Planning) for compliance with these PUD requirements. Phase Two development, consisting of two new buildings, associated site improvments and infrastructure, occurs on the portion of the Cannery District PUD property inside of Bozeman’s city limits. As such it will be the first portion of the project reviewed by CoB Planning for compliance with these PUD requirements. Phase Two construction is anticipated to begin in 2015 and to be completed in 2016 Phases Three and Four are new construction with associated site improvements. Construction of these phases is anticipated to occur in the next 2-6 years. Phases Two through Four may be broken down into sub-phases that each include a single building and those site improvements necessary to meet the PUD requirements for that building. A. Project Phasing 3.03 Development Schedule Development Schedule The Cannery District - Preliminary PUD Application Cannery District Partners Page 49 Figure 3.1 - Existing Land Use Map The Cannery District - Preliminary PUD Application Cannery District Partners Page 51 Figure 3.2 - Community Plan Land Use Designation Map The Cannery District - Preliminary PUD Application Cannery District Partners Page 53 Figure 3.3 - City Zoning Map The Cannery District - Preliminary PUD Application Cannery District Partners Page 55 Figure 3.4 - Neighborhood and Entryway Corridor Map The Cannery District - Preliminary PUD Application Cannery District Partners Page 57 Figure 3.5 - Phasing Plan The Cannery District - Preliminary PUD Application Cannery District Partners Page 59 Table 3.1 - Land Use Data Phase 1 Phase 2 Phase 3 Phase 4 Total Phase Area (ac)3.76 3.30 3.24 1.94 12.24 Phase Area (sf)163,845 143,571 141,008 84,722 533,146 Lot Area (ac)1.13 0.74 0.65 0.43 2.96 Lot Area (sf)49,279 32,419 28,319 18,758 128,775 Lot area as percentage of Phase Area 30.08%22.58%20.08%22.14% 24.15% Building Footprint (sf)36,591 19,900 21,400 14,900 92,791 Building Footprint as % of Phase Area 22.33%13.86%15.18%17.59%17.40% Building Floor Area 66,298 24,120 42,500 28,000 160,918 FAR by phase 0.40 0.19 0.30 0.34 0.31 FAR of overall development 0.13 0.18 0.26 0.31 0.31 Road Right-Of-Way (ac)0.00 0.36 0.00 0.05 0.41 Road Right-Of-Way (sf)0 15,892 0 2,056 17,948 Road Right-of-Way as % of Phase Area 0.00% 11.07% 0.00%2.43%3.37% Common Open Space (ac)2.63 2.19 2.59 1.47 8.87 Common Open Space (sf)114,566 95,260 112,689 63,908 386,423 Common Open Space as % of Phase Area 69.92% 66.35%79.92%75.43%72.48% Common Parking Area (sf)71,163 60,946 65,755 36,695 234,559 Common Parking Area as % of Phase Area 43.43% 42.45%46.63%43.31% 44.00% Common Landscape Area (sf)43,403 34,314 46,934 27,213 151,864 Common Landscape Area as % of Phase Area 26.49%23.90%33.28%32.12%28.48% PUD Open Space (sf)8,271 15,047 16,969 9,788 50,075 PUD Open Space (%)1.6%2.8%3.2%1.8%9.4% PUD Open Space Points 1.9 3.5 4.0 2.3 11.7 Parking Spaces Provided 214 104 138 62 518 Spaces Required (without reductions)267 86 145 95 593 Spaced Required (with joint use)208 61 127 87 483 Cumm Spaces Required 208 269 396 483 Cumm Spaces Provided 214 318 456 518 Cannery District - Land Use Data The Cannery District - Preliminary PUD Application Cannery District Partners Page 61 Table 3.1 - Proposed Building Uses Bldg Key Building Name Footprint Stories Gross Area Existing / Proposed Use Designation Floor Area Use Area PHASE 1 E Cannery Building 9,231 4 29,698 Existing L1 West Tenant (Retail) 1,644 1,397 13,283 L1 Restaurant 6,020 3,500 49,883 L2 Office 7,187 6,109 16,415 L3 Office 4,614 3,922 L4 Office 4,614 3,922 F Cannery Complex 12,000 1&2 16,500 Existing level 1 office 2,098 1,783 level 1 distillery 2,984 2,111 500 level 1 retail 1,836 1,561 level 1 brewery 4,647 1,200 1,350 level 2 office 3,613 3,071 G Canning Warehouse 13,760 1&2 18,500 Existing Office 18,500 15,725 H Boiler House 1,600 1 1,600 Existing Office 1,600 1,360 PHASE 2 J Lone Mountain Gymnastics Expansion 11,900 1 13,400 Proposed Health & Exercise establishment 11,900 10,115 Office 1,500 1,275 K 8,000 1 plus mezz 10,720 Proposed Retail 10,720 9,112 PHASE 3 L 12,700 2 26,500 Proposed Office 26,500 22,525 M 8,700 2 16,000 Proposed Office 16,000 13,600 PHASE 4 N 5,800 2 10,000 Proposed Office 10,000 8,500 O 9,100 2 18,000 Proposed Office 18,000 15,300 Cannery District - Anticipated Use Table TOTAL 92,791 SF 160,918 SF Cannery District Planned Unit Development Preliminary PUD Application Cannery District Partners, llc Chapter 4 Statement of Planning Objectives The Cannery District - Preliminary PUD Application Cannery District Partners Page 65 Comma-QArchitecture, Inc. From pedestrian oriented infrastructure to low-impact stormwater systems, the Cannery District PUD furthers the implementation of the Bozeman Growth Policy in almost every aspect of the development. The following describes specifically several important ways the project achieves the objectives of the growth policy not outline elsewhere in this application: A Sense of Place: Bozeman Growth Policy Goal LU-1: Create a sense of place that varies throughout the City, efficiently provides public and private basic services and facilities in close proximity to where people live and work, and minimizes sprawl. Bozeman Growth Policy Objective LU-1.4: Provide for and support infill development and redevelopment which provides additional density of use while respecting the context of the existing development which surrounds it. Respect for context does not automatically prohibit difference in scale or design. The existing Cannery District site can be considered an under-utilized site. The existing floor area ratio (FAR) on the 12.24-acre property is .127. In comparison, The FAR for the adjacent Northside PUD, not an especially dense development, is .362. Worsening the existing lack of density is the reality that more than two thirds of the existing floor area on the Cannery District property is currently unused or used for long term storage. The result is a property, highly visible from three entryway corridors, that is noticeably unoccupied and lacks vitality. The Cannery District PUD will revitalize this under-used site. Beyond the discussion of density alone (the planned FAR at the Cannery District is .310) is the goal of maintaining a sense of place that varies throughout Bozeman. By re- purposing existing buildings, and infilling with compatible new construction, and surrounding the buildings with quality landscaping and site features, the Cannery District celebrates its industrial/agricultural history. The District’s overarching design concept, inspired by the industrial/agricultural typology and carefully described in the Cannery District Design Guidelines, will result in a development that is specific to the history and character of the site and that promotes an image of place respectful of it’s context. A. PUD Checklist Item B1c: Statement of applicable City land use policies and objectives achieved by the proposed plan and how if furthers the implementation of the Bozeman Growth Policy 4.01 Implementation of Bozeman Growth Policy Bozeman Growth Policy The Cannery District - Preliminary PUD Application Cannery District Partners Page 66 Comma-QArchitecture, Inc. Commercial Centers Bozeman Growth Policy Goal LU-2: Designate centers for commercial development rather than corridors to encourage cohesive neighborhood development in conjunction with non-motorized transportation options. Bozeman Growth Policy Objective LU-2.3: Encourage redevelopment and intensification, especially with mixed uses, of brownfields and underutilized property within the City consistent with the City’s adopted standards. Using this approach rehabilitate corridor based commercial uses into a pattern more supportive of the principles supported by commercial centers The Cannery District, in conjunction with the recently developed Northside PUD, will establish a well defined commercial mixed- use center and will rehabilitate the low density corridor based commercial use seen along the north portion of Rouse Avenue. The variety of planned uses, including a brew pub and distillery, a restaurant, retail, office, and recreational spaces, as well as pedestrian oriented layout of the development, will create a walkable commercial district where users will visit multiple establishments per trip to the district. Public Landscaping and Architecture: Bozeman Growth Policy Goal C-5: Public Landscaping and Architecture— Enhance the urban appearance and environment through the use of architectural excellence, landscaping, trees and open space. The Cannery District Design Guidelines have been carefully written to describe a design methodology that will result in high quality public landscaping and architecture. The Guidelines emphasise the following overarching principles: • Site, landscape, and building design should be function based and compatible with the site’s existing industrial/agricultural buildings. • Site, landscape, and building design should utilize progressive development techniques and should be ‘user friendly’ for a diverse user set. • Site, landscape, and building design should be ecologically balanced. Similar design principles were successfully implemented at the Northside PUD, located to the west of the Cannery District PUD and implemented by the same design team as the Cannery District PUD. The City of Bozeman Department of Community Development awarded two beautification awards to this project. Similar results can be expected at the Cannery District. Bozeman Growth Policy The Cannery District - Preliminary PUD Application Cannery District Partners Page 67 Comma-QArchitecture, Inc. The following describes the applicant’s intentions with regard to future ownership of all or portions of the Cannery District PUD: The Cannery District Project is being developed by Cannery District Partners, LLC. It is the intent of that entity to improve the site as proposed in Cannery District PUD plans as submitted. The intent is for Buildings E, F, G, & H to be renovated by Cannery District Partners, LLC for commercial rental use. Pad sites at buildings J, K, L, M and N are intended to be developed by the Cannery District Partners, LLC or sold to owner /users who will improve those lots for their respective uses as defined in the PUD, the Cannery District Design Guidelines, and Covenants. A. PUD Checklist Item B1d & B1e: Proposed Ownership The following is an estimate of the number of employees for business, commercial, and industrial uses at the Cannery District PUD: B. PUD Checklist Item B1f: Employee Data estimates Rationale i: The Cannery District PUD property is an important site within Bozeman. The site’s importance is due, in part, to its location. It is located within three of Bozeman’s entryway corridors and is highly visible from these corridors. It is also near downtown Bozeman and its historic core. The Cannery District PUD property is also important due to its history, linked to Bozeman’s agricultural/industrial past. This history remains visible in the site’s C. PUD Checklist Item B.1.g: Description of Applicant’s rationale behind assumptions and choices made by the Applicant. Building ID Number of Commercial Employees Number of Business Employees Number of Industrial Employees Building E 28 46 Building F 10 16 6 Building G 57 Building H 5 Building J 8 Building K 16 Building L 76 Building M 46 Building N 28 Building 0 51 TOTALS 62 325 6 4.02 PUD Information PUD Information The Cannery District - Preliminary PUD Application Cannery District Partners Page 68 Comma-QArchitecture, Inc. iconic existing structures. Finally, the site is important because it is located in an area that is undergoing re-development and change. Quality development on this site could elevate the standard of development on surrounding properties. Rationale ii: Progressive development patterns result in more user-friendly and ecologically balanced developments. The development pattern that the Cannery District PUD exemplifies is an alternative to the typical building-with-parking-lot pattern. This more progressive model is based on multiple, mixed- use buildings sharing appropriately sized parking areas. Pedestrian paths and parking areas are distributed so that pedestrians are not required to navigate large expanses of parking to travel from one location to another. Rather they can visit multiple locations by moving through a well designed system of common open spaces. Because of the code relaxations required to enable this development pattern, it is only possible through the PUD process. Rationale iii: As a result of Rationale i and ii, this under-utilized site will be transformed into a successful, vibrant development. The Cannery District PUD property is a unique site and the progressive development pattern that it utilizes will result in environments that attract users, the development is expected to be a desirable and thriving location. PUD Information The Cannery District - Preliminary PUD Application Cannery District Partners Page 69 Comma-QArchitecture, Inc. The following lists 9 relaxations of the City of Bozeman UDC requirements for the underlying zoning classification at the Cannery District PUD. Relaxation 1: Lot Area and Width - to create pad lots with common open space. Sec. 38.10.040. - Lot area and width: A. All newly created lots shall have a minimum area adequate to provide for required yards and parking but in no case shall they be less than: B-2: No minimum size. B. Lot width for all newly created lots shall not be less than: B-2: 100 feet... This relaxation allows proposed pad sites to be sized, not to accommodate required yards and parking, but to accommodate the building footprint only. Required parking is provided on common open space adjacent to the pad sites. Relaxation 2 addresses yard setbacks. A. Land Use Classification-38.20.090.B 4.03 PUD Objectives and Criteria Narrative B. Proposed Relaxations: Growth Policy Designation: The project site is designated as “Regional Commercial and Services” by the Bozeman 2020 Community Plan. Uses within this designation are potentially intensive, providing services for the Bozeman community and the surrounding muilti-county area. The Bozeman Growth Policy describes development in Regional Commercial and Services areas thus: “...a mix of uses with encourages a robust and broad activity level....Any development within this category should have a well-integrated transportation and open space network which encourages pedestrian activity, and provides ready access within and to adjacent development.” Zoning Designation The property is zoned B-2 (Community Business District). The following is a list of proposed relaxations that deviate from the objectives and criteria stated in the Bozeman Unified Development Code for a property zoned B-2, as well as those applying to all developments. PUD Objectives and Criteria Narrative The Cannery District - Preliminary PUD Application Cannery District Partners Page 70 Comma-QArchitecture, Inc. Relaxation 2: Yard setbacks - to create pad lots within common parking areas and open space. Sec. 38.10.050. - Yards This relaxation allows buildings on pad site lots to be built with a zero foot setback from the lot line except where lots are adjacent to the Oak Street right-of-way. At this location, buildings will be placed with a 10’ setback from the pad site property line adjacent to the Oak Street right-of-way at accommodate a utility easement. Relaxation 3: Entryway Corridor setbacks - to place buildings closer to Oak street than the required 25’ setback and to place parking and circulation closer to I-90 than the required 50’ entryway corridor setback. Sec. 38.10.050. - Yards. A. Minimum yards required for the B-2 district is: 1. Buildings: a. Front yard: seven feet, except along arterials where minimum is 25 feet. Sec. 38.17.060. - Design criteria and development standards in entryway corridors. 2.b ...parking areas and buildings shall: (1)Be set back at least 50 feet from any Class I entryway corridor roadway right-of-way Buildings and a drive aisle adjacent to Oak Street are proposed to be built with a 10’- 0” setback from the lot line adjacent to the Oak Street right-of-way. The existing buildings located on Oak Street to the east of the Cannery District PUD site are located within 7’-0” of the Oak Street right-of-way. These existing buildings have established a pattern of buildings creating an active ‘street wall’ along the north side of Oak Street. This pattern, typical of historic industrial building placement where large buildings are located in close proximity to streets, is common in northeast Bozeman. This relaxation is intended to allow the historic pattern to continue along the portion of Oak Street, adjacent to the Cannery District property. Parking areas and drive aisles are proposed to be located with a 7’-0” setback from the lot line adjacent to the I-90 right-of-way. This relaxation is necessary given the existing constrained conditions of this infill project; the desire to add density to this currently under utilized site; and the need to efficiently use land to realize the project. In addition to responding to context and using land efficiently, granting this relaxation will also recognize that a substantial grade PUD Objectives and Criteria Narrative The Cannery District - Preliminary PUD Application Cannery District Partners Page 71 Comma-QArchitecture, Inc. separation exists between the I-90 roadway and the proposed parking area. Because eastbound drivers on I-90 look down on the property, a 50’ setback would not successfully buffer the visual impact of the parking lot (view of the entire project is effectively blocked to westbound I-90 drivers). Finally, the parking lot that is adjacent to I-90 will be well landscaped and maintained per the Cannery District Design Guidelines. It will be a pleasing foreground to the iconic industrial buildings that are the main focal point on the site. Relaxation 4: Access frontage for lots - to create pad lots with common open space. Sec. 38.23.030. - Lot, Item H: Frontage...all lots will have frontage in compliance with section 38.24.090.B to provide, among other things, adequate room for snow removal, lot access and utility easements Sec. 38.24.090. - Access, Item B: Drive access from improved public street, approved private street or alley required... Individual pad sites are proposed to be on independent lots. Lots at buildings E, F . G. J. L, M, and O do not front a public street or an alley. They do front common space with appropriate access for emergency vehicles. Relaxation 5: Access spacing Table 38-24-090.3 – Full access private accesses located on Arterial Streets to be spaced 660’ apart measured from intersection. Strict conformance with this code would result in only a single access to Oak Street serving both the Cannery District and Northside PUD. There are currently two improved accesses to Oak Street and one unimproved access. The following access modifications are proposed with the Cannery District PUD. The existing Cannery Access (west access) will be relocated to line up with a new Fairgrounds access. The right-in/right- out Montana Avenue Access (east access) will be relocated further away from the Oak and Rouse intersection. The existing unimproved access at the far west edge of the Cannery District will be abandoned. This design provides approximately 590 feet between the relocated east access and the intersection of Rouse and Oak, and approximately 275 feet between the two relocated Cannery District accesses. Due to improved spacing both accesses are proposed to provide full access. This spacing will provide safer, more effective access to the Cannery District and Northside PUD. PUD Objectives and Criteria Narrative The Cannery District - Preliminary PUD Application Cannery District Partners Page 72 Comma-QArchitecture, Inc. The new approach on Rouse Avenue is based on MDT improvement plans and has been shown by MDT as a right-in/right-out access. This new approach is approximately 190 feet from the existing Northside PUD Rouse access. Relaxation 6: Parking Space Requirements Sec. 38.25.040. - Number of parking spaces required. The site layout currently shown includes quantities of parking that meet parking space requirements per the Bozeman UDC. However, it is possible that future market conditions will make it beneficial to allow uses into the development that have higher parking demands than the uses currently anticipated and planned for. In the event that this should occur, this relaxation will allow the number of parking spaces to be up to 15% fewer than those required. Relaxation 7: Unbroken Rows of Parking Sec. 38.26.050. - Mandatory landscaping provisions, Item C.2.e(2) Internal parking lot landscaping provided shall be proportionately dispersed so as to define aisles and limit unbroken rows of parking to a maximum of 100 feet, with landscaped areas provided in an appropriate scale to the size of the parking lot This relaxation will allow for longer rows of unbroken parking spaces (148’-0”). These unbroken rows of parking will only be installed at the central parking area shown on the PUD Plans. This relaxation allows highly efficient utilization of land in a critical area, allowing the inherent inefficiencies typical of infill projects to be mitigated. Parking in this critical location, where parking will be in the highest demand, will be maximized while parking in less critical locations will be constructed strictly according to the code. Where longer rows of unbroken parking spaces are utilized, 12’-0” wide landscaped bio-swales will be installed between rows of parking. These bio-swales are wider than typical 8’-0” parking separations, mitigating the effect of the longer rows of unbroken parking. Relaxation 8: Wayfinding Signage Sec. 38.28.070. - “Wayfinding signs are allowed for parks, or for districts containing more than 30 acres of platted lots” PUD Objectives and Criteria Narrative The Cannery District - Preliminary PUD Application Cannery District Partners Page 73 Comma-QArchitecture, Inc. B. Responsibility for Impact Mitigation 38.320.090D Because the Cannery District development is consistent with the character of the existing area, it is anticipated that the development will be neither intrusive or disruptive. Any negative or adverse impacts will be mitigated according to Section 38.20.090.D. 1) Does the development comply with all City design standards, requirements and specifications for the following services: water supply, trails/walks/bike ways, sanitary supply, irrigation companies, fire protection, electricity, flood hazard areas, natural gas, telephone, storm drainage, cable television, and streets? All services and systems conform to the latest building codes adopted by the City of Bozeman Building Department. Streets, curbing and gutters are designed to meet the city engineer’s standards. Trails, walks, and bikeways, are created to create a connection between the perimeter of the site to the individual building entrances. 2) Does the project preserve or replace existing natural vegetation? Currently natural vegetation on site does not exist. Extensive new landscaping is planned. See the landscaping plan and Cannery District Design Guidelines for further information on vegetation. C. Design Objectives / PUD review Criteria for all development - 38.20.090.E.2.a The Cannery District PUD property consists of 11.83 acres of platted lots. This relaxation allows a system of wayfinding signage to be installed within the development, enhancing the navigability and identity of the development. Relaxation 9: Residential use on ground floor Table 38.10.020. - Apartments and apartment buildings are allowed only when located on the second or subsequent floor. Residential uses are not currently planned PUD Objectives and Criteria Narrative The Cannery District - Preliminary PUD Application Cannery District Partners Page 74 Comma-QArchitecture, Inc. 3) Are the elements of the site plan designed and arranged to produce an efficient, functionally organized and cohesive planned unit development? The overall site is designed using an industrial simplicity to organize vehicular and pedestrian circulation. Aside from ease of vehicular use, creating a simple parking layout allows the pedestrian spaces to become more prominent. Pedestrian paths align with each building entry, creating a range of primary spaces and secondary spaces for different types of use. 4) Does the design and arrangement of elements of the site plan contribute to the overall reduction of energy use by the project? The development is arranged to encourage pedestrians and bicycle transportation through clearly defined, safe, and appropriately lit and landscaped pathways. This layout allows users to visit multiple establishments without returning to their vehicle. The Cannery District Design Guidelines encourage the following energy reduction measures: Individual building design and renovation will encourage passive solar techniques. Site lighting is designed to create the necessary amount of lighting for safety, without the need to illuminate the overall site. Rainwater is re-used where possible to feed the landscaped areas adjacent to the buildings. Drought tolerant landscaping is designed to reduce the overall need for irrigation without sacrificing visual interest and pedestrian use. All buildings will conform to the current energy conservations codes. 5) Are the elements of the site plan designed and arranged to maximize the privacy by the residents of the project? The project does not currently include residential use. There are currently no off-site residential adjacencies. 6) Park land. Does the design and arrangement of buildings and open space areas contribute to the overall aesthetic quality of the site configuration, and has the area of park land or open space been provided for each proposed dwelling as required by section 38.27.020 The original buildings on site will be preserved in form and mass. This arrangement of buildings along with strategically located compatible new construction creates a natural backdrop surrounding proposed common space. Industrial elements of the existing buildings will be preserved to retain the site’s history. The overall layout is kept simple, giving more attention to details and materials. Because no dwellings are currently planned at the Cannery District PUD, no park land is required. If a residential component is added to the development at a future date, park land requirements will be assessed and met. PUD Objectives and Criteria Narrative The Cannery District - Preliminary PUD Application Cannery District Partners Page 75 Comma-QArchitecture, Inc. Phase 1 Phase 2 Phase 3 Phase 4 Totals Points Required by phase 6.15 5.39 5.29 3.18 20.00 (b) Additional Open Space 1.94 3.53 3.98 2.29 11.74 (d) Underutilized and brownfield sites 0.66 0.97 1.70 1.12 4.45 (f) Inclusion of a low impact development plan 1.84 1.62 1.59 0.95 6.00 (h) Integrated & coordinated way- finding measures 1.23 1.08 1.06 0.64 4.00 TOTALS 6.82 7.19 8.33 5.01 26.19 7) Performance. All PUDs must earn 20 performance points. The following table illustrates how PUD performance points are met: 8) Is the development being properly integrated into development and circulation patterns of adjacent and nearby neighborhoods so that this development will not become an isolated “pad” to adjoining development? The development creates a primary drive aisle connecting it to the development to the east, the Northside PUD. There are provisions for drive aisles to connect to a future development to the west. Drive aisles to the south are carefully placed to coordinate with surrounding vehicular and pedestrian routes. 1) If the project contains any use intended to provide adult amusement or entertainment does it meet the requirements for adult businesses? The project does not contain or allow any use intended to provide adult amusement or entertainment. 2) Is the project contiguous to an arterial street , and has adequate but controlled access been provided? Yes, the project is surrounded by three entryway corridors, two of which are defined by arterial streets both providing access into the site. D. Design Objectives / PUD review Criteria for Commercial Areas- 38.20.090.E.2.c PUD performance points by phase PUD Objectives and Criteria Narrative The Cannery District - Preliminary PUD Application Cannery District Partners Page 76 Comma-QArchitecture, Inc. 3) Is the project on al least two acres of land? Yes, the project on 12.24 acres of land. 4) If the project contains two or more significant uses, do the uses relate to each other in terms of location within the PUD, pedestrian, and vehicular circulation, architectural design, utilization of common space and facilities, etc.? The Cannery District PUD contains more than two significant uses: office, retail, restaurant, and a health and exercise facility primarily oriented toward youth. Generally, uses are not segregated but are mixed. They are located where they are best suited; for example retail uses are located in more high visibility, high traffic locations such as the rail trail. Office uses are often located above retail uses. All uses are connected with a system of pathways for pedestrian use and drives for vehicles. Parking facilities are located so that each use has access to some amount of parking in close proximity. Landscaped open space and plazas are fairly evenly distributed with some concentration of these elements along the Rail Trail (see Figure 1.02 Site Illustration). 5) Is it compatible with and does it reflect the unique character of the surrounding area? The Cannery District PUD is compatible with the surrounding area. It will be similar in character the neighboring Northside Development and will maintain an industrial character as seen in this part of Bozeman. The Cannery District Design Guidelines emphasize the need for new site, landscape, and building design to maintain the unique agricultural/industrial character of the site. 6) Is there direct vehicular and pedestrian access between on-site parking areas and adjacent existing or future off-site parking areas which contain more than ten spaces? Direct vehicular and pedestrian access is currently planned between the Cannery District PUD and adjacent Northside PUD, located on the corner of Rouse Ave and Oak Street. Vehicular and pedestrian access between the Cannery District PUD and the vacant land to the west could be established when that bordering property is developed. PUD Objectives and Criteria Narrative The Cannery District - Preliminary PUD Application Cannery District Partners Page 77 Comma-QArchitecture, Inc. 7) Does the project encourage infill, or does the project otherwise demonstrate compliance with the land use guidelines of the city growth policy? Because the project consist of renovating existing buildings, then adding new buildings on the remaining land, the project could be characterized as primarily an infill project. 8) Does the project provide for outdoor recreational areas for the use and enjoyment of those working in or visiting the development? Working within the limits of an existing site and buildings, the site design attempts to create a range of outdoor areas for pedestrian use. These areas are located and designed to support the different building uses. The outdoor areas are also arranged to extend beyond users of the development and act as a link for future pedestrian movement along Rouse and Oak. The following describes how conflicts between different land uses of different character are being avoided or mitigated: The revitalization of industrial buildings allows the project to fit the scale and character of adjacent buildings but infuses a much needed pedestrian element in an area lacking vitality given its prominent location. Traffic flow in and out of the project is kept simple to not conflict with the more intensive traffic uses required by adjacent businesses. The project will hopefully be a positive addition to the neighborhood, benefiting surrounding land uses by increasing the amount of pedestrian activity. F. Conflict Mitigation Narrative PUD Objectives and Criteria Narrative The Cannery District - Preliminary PUD Application Cannery District Partners Page 78 Comma-QArchitecture, Inc. The following is a statement of design methods to reduce energy consumption: Existing materials on site that are being removed from non-usable areas of the site, including concrete, metal siding, and wood framing, will be re-used where possible throughout the project. Metal siding will be either re-used on site or distributed to a local building material salvage company for re-use on new structures off site. Recycling on-site materials will help create building palette that is consistent with the surroundings and history of the site. All building designs will encourage the use of daylighting in both passive and active applications to help reduce the use of artificial lighting throughout the day, and be of potential use with water heating. When possible, landscaping adjacent to buildings will use rainwater from the roofs for irrigation. Primary surface landscaping will be drought tolerant species to reduce the overall water usage of the common space. G. Energy Conservation Narrative PUD Objectives and Criteria Narrative The Cannery District - Preliminary PUD Application Cannery District Partners Page 79 Figure 4.1 Open Space Cannery District Planned Unit Development Preliminary PUD Application Cannery District Partners, llc Chapter 5 Physiographic Data The Cannery District - Preliminary PUD Application Cannery District Partners Page 83 Comma-QArchitecture, Inc. The following is included “Physiographic Data” for the Cannery District PUD addresses the following elements: • Landforms; • Geology & Soils; • Hydrology; • Vegetation; • Noxious Weeds; • Wildlife; and • Viewsheds The design of the proposed PUD is guided by and responsive to the environmental features of the site. This chapter provides a generalized description and assessment of the development implications of the various environmental features of the land included within the project boundary. Development guidelines and standards used in the formulation of the project are also summarized for each environmental factor. A. Overview The proposed Cannery District PUD is located on a relatively flat parcel of land. There are no natural water features present on the site. Geology & Soils The geologic formations present at the site consist of Quaternary aged fluvial deposits. These units were deposited in a fluvial (river or stream deposited) environment near the confluence of the Bozeman Creek and East Gallatin drainages, (Slagle 1995). In General the upper 1 1/2 to 7 feet consists of native topsoil and fine-grained sandy lean clay/ silt overlaying medium dense to very dense alluvial gravel. Tertiary deposits of still sandy lean clay and silt was found underlying the native gravels. Random fill placed at some point during the industrial past of the property is likely to exist. The site topography slopes gently to the North. Groundwater levels in this area range from 6.5 to 14 feet below the surface. B. Landforms & Geology Physiographic Data The Cannery District - Preliminary PUD Application Cannery District Partners Page 84 Comma-QArchitecture, Inc. Allied Engineering Services, Inc prepared a Geotechnical Assessment, for the project site. A partial list of the recommendations resulting from this assessment are given below. • Advise potential buyers of the depth to groundwater; • Discourage basements due to shallow groundwater; and • Mass over-excavate entire building footprints to “target”foundation bearing material. A copy of the Cannery District Geotechnical Assessment, is included in Appendix 4. Surface Water There are no natural surface water features present on the project site. The project site does not have any perennial watercourse within its boundaries. Pre-development storm and melt water drainage is provided by sheet flow and shallow concentrated flow. Currently, there is no means to collect stormwater that does not percolate into the soils. See Chapter 06, Access and Stormwater, for additional information. Flood Hazard Evaluation No flood hazards exist within the project limits. The site is not within any known published flood boundaries. Wetlands No wetland areas exist within the project limits. The site is not within any known published wetland boundaries. Groundwater Groundwater in the vicinity of the planning area is primarily found in sandy silty gravel. The depth to groundwater ranges from approximately 6.5 feet below ground surface to 14 feet below ground surface. Additional information regarding groundwater can be found in the Cannery District Geotechnical Assessment, included in Appendix 4. C. Hydrology Physiographic Data The Cannery District - Preliminary PUD Application Cannery District Partners Page 85 Comma-QArchitecture, Inc. Vegetation The property, as of the summer of 2014, was largely an abandoned commercial/industrial site with vegetative cover including grasses and annual and perennial weeds. Some of the weedy perennial species on the property are included on the Montana Noxious Weed List including spotted knapweed, Canada thistle, and common tansy. Of note, a Weed Management Plan has been submitted to the Gallatin County Weed District outlining methods, materials, and a schedule to control these noxious weeds. The property has been a commercial/industrial site for over 50 years. Accordingly, there are no critical plant communities present on the property. No stream, pond or other waterway exists on or within ½ a mile of the property, nor are there any unstable banks or highly erodible soils. Protective Measures As discussed above there are no trees or critical vegetation communities on the property. Soils on the site will be stabilized with a mixture of hardscape (buildings, roads, parking lots) and intensive landscape using grass sod and containerized trees and shrubs. Cost estimates and a species list for revegetation are described in the Weed Management Plan submitted to the Gallatin County Weed District. Noxious Weed Management and Re-Vegetation Plan A Noxious Weed Management and Revegetation Plan has been established for the Cannery District PUD property. See Appendix 9. D. Vegetation & Weed Management Physiographic Data Species Wildlife use of the area is extremely low due to the urban nature of the area and an almost complete lack of habitat. Currently, wildlife use of the area is limited to occasional, transient use by whitetail deer (Odocoileus virginianus), and occasional use by Richardson’s ground squirrels (Spermophilus richardsonii). With the development of landscaped trees and shrubs the property will likely provide habitat for resident and migratory song birds. E. Wildlife and Wildlife Habitat The Cannery District - Preliminary PUD Application Cannery District Partners Page 86 Comma-QArchitecture, Inc. F. Historical Although the project does not have a registered historical value, the industrial history of the area is preserved. This contributes to the image and strengthens the sense of place. Physiographic Data G. Viewsheds Despite its being in a highly visible location, included within three of Bozeman’s entryway corridors, the Cannery District PUD will not block or impair significant views or vistas from adjacent properties. There is a substantial grade differential between the Cannery District PUD property and the I-90 roadway. Therefore, from the I-90 roadway, views of the mountains to the South of Bozeman will remain visible above the Cannery District PUD. The original Pea Cannery structures are highly visible from the three roadways adjacent to the Cannery District PUD. As buildings emblematic of Bozeman’s industrial / agricultural past, these buildings add identity and a sense of place to this location. As such, view of these buildings from surrounding roadways are desirable. Figure 5.01 - Viewsheds, maps the views of the original Pea Cannery structures from Oak Street, Rouse Ave and I-90 as seen in 2015. Cannery District Planned Unit Development Preliminary PUD Application Cannery District Partners, llc Chapter 6 Access and Utilities The Cannery District - Preliminary PUD Application Cannery District Partners Page 89 Comma-QArchitecture, Inc. 6.01 Access Access to the Cannery District is provided by approaches on adjacent arterial streets. The Cannery District will be integrated with the Northside PUD, to allow shared access between and through these two developments. Internal access to pad site lots is provided by drive aisles within Common Open Space tracts. Access as well as parking is shared through a joint- use and access declaration that applies to all common open spaces. Internal access drives are situated to provide numerous circulation and emergency vehicle routes through the site and dead-ends are limited. Proposed phasing will allow adequate access through all phases of development. Impacts to the adjacent street network were evaluated in a Traffic Impact Study (TIS) prepared by Marvin and Associates and included in Appendix 5. This report quantifies existing and new traffic, assesses impacts, and identifies required mitigation. In summary the Cannery District will create approximately 2,344 new average weekday trips (AWT). The TIS indicated that a center turn lane will be required on Oak Street with Phase 2. The report also identified the need for a center turn lane at the existing Northside PUD approach to Rouse with Phase 3. This improvement is currently included in the MDT plans for Rouse. A. Overview Parking stall dimensions and drive aisle widths are in accordance with City requirements. Since drive aisles will support the site traffic, absolute minimum dimensions are not proposed. Typical dimensions are 26’ drive aisles with 18’-20’ parking stall lengths. Parking lots will be provided with City standard curb and gutter. Plans included in Appendix 1 show typical construction details for site access and parking. The Cannery District utilizes shared joint-use parking for its tenants. It is anticipated that the type of uses and use areas will change from planned uses in the future. In order to ensure adequate parking is provided to all future tenants, the Cannery District parking requirements should be tracked when uses change. The Cannery District Design Guidelines include a requirements for parking tracking. B. Parking Access The Cannery District - Preliminary PUD Application Cannery District Partners Page 91 Comma-QArchitecture, Inc. 6.02 Utilities Water supply for drinking and fire protection will be provided by the City of Bozeman municipal system. A Water System Engineering Report is provided in Appendix 6 outlining the proposed water system improvements. Plans have been approved for Phase 1, which will essentially replace the existing water mains installed in 1917. Future phases will require additional main extensions or new services as described in the Engineering Report. All water and sewer mains will be located within City easements on Common Open Space. Water for landscaping will be provided by one or more irrigation wells, or storm water reuse. A. Water Sewer collection will be provided by the City of Bozeman municipal system. A Sewer System Engineering Report is provided in Appendix 7 outlining the proposed sewer system improvements. Plans have been approved for Phase 1, which will essentially replace the existing sewer mains installed in 1917. Future phases will require additional main extensions or new services as described in the Engineering Report. All water and sewer mains will be located within City easements on Common Open Space. B. Sewer Storm drainage facilities are designed in accordance with City of Bozeman standards. A Storm Water Plan (Engineering Report) is provided in Appendix 3 showing storm runoff calculations. The storm water facilities consist of bioswales, storm drainage collection mains, and a large retention basin. Essentially a “belt and suspenders” system, the smaller high-frequency storms can be treated in the bioswales distributed throughout the site, while the storm drain mains and retention basin can mitigate larger less frequent storms. A Master Grading Plan and Drainage Details plan sheets are provided in the plans in Appendix 1. C. Storm Drainage Utilities The Cannery District - Preliminary PUD Application Cannery District Partners Page 92 Comma-QArchitecture, Inc. Solid waste will be collected within enclosed on-site containers, screened from view. The location of the trash enclosures accommodates access by large collection trucks. Recycling is encouraged and materials stored for pick-up can be also stored within enclosures. D. Solid Waste A Shallow Utility Master Plan is provided in the plans in Appendix 1. This plan identifies utility corridors that will allow efficient provision of services to each pad site lot, and will not conflict with other site uses. This plan also identifies where utility easements are required on pad site lots. The corridors are planned to allow above ground utility service structures such as transformers and junction boxes to be located along the side or rear of buildings. E. Shallow (Franchise) Utilities Utilities