HomeMy WebLinkAbout15- The Lakes at Valley West Subdivision Final Plat Parks and Recreation Facilities PlanTHE FAKES
AT VALLEY WEST
Alp
f��roved 105/15
The Lakes at Valley West Subdivision
Final Plat Application — Phase 1
Sec. 38.41.060 — Additional Subdivision Preliminary Plat Supplements
Parks & Recreation Facilities
July 2015
This parks and recreational facilities plan was prepared by:
Peaks to Plains Design('
LANDSCAPE ARCHITECTURE / PLANNING / CIVIL ENGINEERING
Inornsai JIMORMON
VA LTC I -I" c<ru n[ NE MAIERLE,Lw-
Y.nvlrnnmenW Se�vic�s _.... r< ...
THE LAKES
AT VALLEY WEST
Final Plat Application
See. 38.41.060 — Additional Subdivision Preliminary Plat Supplements
Parks & Recreation Facilities
38.41.060(a)
- Park Plan
A-1.
Site Master Plan
A-2.
Drainage Areas
A-3.
Utilities
A-4.
Zoning & Adjacent Property Ownership
A-5.
Location and Description of Critical Lands
A-6.
Park Landscape Plan
A-7.
General Description of Land
A-8.
Trail Layout & Construction — see A-6
A-9.
Park Plan Requirements
A-10.
Park Plan Requirements
A-11.
Park Plan Requirements
A-12.
Cost Estimate & Installation Responsibilities
A-13.
Playground Equipment Information
A-14.
Soil Information & Analysis
3 8.41.060(b)
— Park Maintenance
B-1.
Park Maintenance Information
B-2.
Weed Control Plan
B-3.
Collection Services — see B-1
38.41.060(c) —Irrigation Information
C-1. Park Irrigation Plan — see A-6
C-2. Well Information
38.41.060(d) —Phasing
D-1. Phasing
This parks and recreational facilities plan was prepared by:
Peaks to Plains Designs
LANDSCAPE ARCHITECTURE / PLANNING / CIVIL ENGINEERING
Intir nss ,'MORRIsod
vnuc�tiN A�Clllf[C1 E EMMAIERLE,w.
OPINION OF PROBABLE COST
Project: The Lakes At Malley West
Phase: Park Space: Phase 1
Date: July 28, 2015
Prepared By: Peaks to Plains Design, PC
ITEM DESCRIPTION QTY UNIT UNIT COST TOTAL RESPONSIBILITY
Deciduous Trees
1-1/2" CAL. Large Shade Trees
16
EA
$
220.00
$
3,520
Developer
Ornamental Trees
1-1/2" Caliper Small Shade Trees
3
EA
$
185.00
$
555
Developer
Coniferous Trees
5'-6' Hei ht
8
EA
$
200.00
$
1,600
Developer
Deciduous Shrubs
#5 Ctn.
25
EA
$
50.00
$
1,250
Developer
Perennials
#1 Ctn.
37
EA
$
15.00
$
555
Developer
Mulch & Fabric
Bark Mulch @ 3" w/fabric for planting beds
1101
SF
$
0.88
$
969
Developer
Edging
Aluminum
50
LF
$
4.50
$
225
Developer
Boulders
Locally Available
11
EA
$
250.00
1 $
2,750
Developer
Seed Mix 1
Turf Lawn Mix
52587
SF
$
0.10
$
5,259
Developer
Seed Mix 2
Upland Native Mix
19423
SF
$
0.31
$
6,021
Developer
Gravel Trails
6' wide
1408
LF
$
10.00
$
14,080
Developer
Earthwork
72010
SF
$
0.08
$
5,761
Developer
Playground Equipment
Com osite set and Swings
1
LS
$
85,000.00
$
85,000
Developer
Playground Surfacing
Engineered Wood Fiber 1' Depth
3755
SF
$
3.25
$
12,204
Developer
Playground Edging
Concrete 6" wide x12" depth
261
LF
$
12.00
$
3,132
Developer
Site Furniture: Picnic Tables
4x4' S uare Expanded Metal
6
EA
$
1,200.00
$
7,200
Others
Site Furniture: Benches
6' benches
2
EA
$
1,285.00
$
2,570
Others
Wells
35 GPM Wells
1
EA
$
6,500.00
$
6,500
Develo er
Irrigation
Sprays for boulevard & pocket parks
8170
SF
$
1.00
$
8,170
Developer
Irri ation
Rotors & MPRs
44419
SF
$
0.55
$
24,430
Developer
Irri ation
Planting beds, island, & boxes drip
910
SF
$
1.00
$
910
Develo er
SUBTOTAL
LIZATION & INSURANCE
TOTAL
775
7/27/2015 PS Phase 1
The Lakes at Valley West Subdivision — Phases 1 and 2
Final Plat
Com-
SEC. 38.41.060 THE
Additional Subdivision Preliminary Plat Supplements LA
A*1 VALLEY \Vll_�T
A(13)
1. Manufacturer:
Landscape Structures
2. Installation Data & Specifications:
Installation data and specifications are provided by the manufacturer upon purchase of
equipment, prior to any equipment installation.
3. Installer:
Dakota Fence - Williston, ND
4. Type of Fall Zone Surfacing:
Engineer wood fiber (3,755 square feet at 1 -foot depth)
5. Intended Age -Group:
Ages 5-12
5
Z
/
Mme"
\�
g
\\
ro m
v�ro
v
o
I
o
m
p�[YM-
O.D
�v-
-M
OCNri
\
O(�nmm
m
m�
/
oN
Rl �
I
�
Zy�
Cv Fiv
��
CW
�
md� I
Sow
I
m
m
w
70
\v
CIZ
oZ
ur
z00
\
\m
�
r
(ilk
N
J
41
m
00
00
I
�
N
l
�o�
A O
M
AM
N -rC
Or
/
r �
g m
�Z�m
o
N
m
�umvi
m
r
z�
row
_
m
-'
o
v
mm
4
�
I
C3 g"Ow
I
moW
m�n�
I
I
I
�
�
I\\
mho
\
_��-
e5o��
�/
• • ,1�� 2 rT� S',LL
PROPOSED BOZEMAN PARK #1
- BOZEMAN,MT January24 2015
LII
45' 41' 11' N
45' 40> N
3 Soil Map—Gallatin County Area, Montana 3:
(VALLEY WEST: PHASE 1 & 2 SOILS) ,�
03M 4905M 490600 49030 490901 490900 491000 491100 491210 491300 491400 491500 491600 491707 4918M
3 3
Map Sde:1:7,080 iprintod w A landsope (11" x 85") shat m
Meters
N 0 100 200 400 600
A 00
0 300 600 1200 1800
Map projection: Web Memhx Cmer a mdhat s: WGS84 Edge tM UTM Zane 12N WGS84
USDA Natural Resources Web Soil Survey 12/5/2014
Conservation Service National Cooperative Soil Survey Page 1 of 3
4S 4 WN
MAPLEGEND
Area of Interest (AOI)
F—
Area of Interest (AOI)
Soils
Very Stony Spot
Soil Map Unit Polygons
Wet Spot
Soil Map Unit Lines
®
Soil Map Unit Points
Special
Point Features
(o
Blowout
W
Borrow Pit
Clay Spot
0
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
J.
Lava Flow
Marsh or swamp
to
Mine or Quarry
Miscellaneous Water
Perennial Water
d
Rock Outcrop
+
Saline Spot
e
Sandy Spot
Severely Eroded Spot
Sinkhole
�.y
Slide or Slip
Sodic Spot
Soil Map—Gallatin County Area, Montana
(VALLEY WEST: PHASE 1 & 2 SOILS)
Water Features
Streams and Canals
Transportation
}µ Rails
~ Interstate Highways
~ US Routes
-. Major Roads
Local Roads
Background
No Aerial Photography
1"y "21011 UT,M- 111
The soil surveys that comprise your AOI were mapped at 1:24,000
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil line
placement. The maps do not show the small areas of contrasting
soils that could have been shown at a more detailed scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: http:/twebsoilsurvey.nrGs.usda.gov
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more accurate
calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as of
the version date(s) listed below.
Soil Survey Area: Gallatin County Area, Montana
Survey Area Data: Version 18, Sep 3, 2014
Soil map units are labeled (as space allows) for map scales 1:50,000
or larger.
Date(s) aerial images were photographed: Jul 28, 2011—Aug 10,
2011
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor shifting
of map unit boundaries may be evident.
USDA Natural Resources Web Soil Survey 12/5/2014
2" Conservation Service National Cooperative Soil Survey Page 2 of 3
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
A
Other
w
Special Line Features
Water Features
Streams and Canals
Transportation
}µ Rails
~ Interstate Highways
~ US Routes
-. Major Roads
Local Roads
Background
No Aerial Photography
1"y "21011 UT,M- 111
The soil surveys that comprise your AOI were mapped at 1:24,000
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil line
placement. The maps do not show the small areas of contrasting
soils that could have been shown at a more detailed scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: http:/twebsoilsurvey.nrGs.usda.gov
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more accurate
calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as of
the version date(s) listed below.
Soil Survey Area: Gallatin County Area, Montana
Survey Area Data: Version 18, Sep 3, 2014
Soil map units are labeled (as space allows) for map scales 1:50,000
or larger.
Date(s) aerial images were photographed: Jul 28, 2011—Aug 10,
2011
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor shifting
of map unit boundaries may be evident.
USDA Natural Resources Web Soil Survey 12/5/2014
2" Conservation Service National Cooperative Soil Survey Page 2 of 3
Soil Map—Gallatin County Area, Montana
Map Unit Legend
VALLEY WEST: PHASE 1 & 2 SOILS
Gallatin County Area, Montana (MT622)
Map Unit Symbol
Map Unit Name
Acres in AOI
Percent of AOI
448A
Hyalite -Beaverton complex,
9.5
5.2%
moderately wet, 0 to 2
percent slopes
509B
Enbar loam, 0 to 4 percent
41.5
22.6%
slopes
5108
Meadowcreek loam, 0 to 4
46.3
25.2%
percent slopes
511A
Fairway silt loam, 0 to 2 percent
1.1
0.6%
slopes
537A
Lamoose silt loam, 0 to 2
28.8
15.7%
percent slopes
748A
Hyalite -Beaverton complex, 0 to
56.6
30.8%
4 percent slopes
Totals for Area of Interest
183.8
100.0%
USDA Natural Resources Web Soil Survey 12/5/2014
Conservation Service National Cooperative Soil Survey Page 3 of 3
W
awl—
•
IRS�iHO
�-�___ d�
� `� ■� (
,�,
—=1► :�"" ��
it
IIII
1 ����
�,�
The Lakes at Valley West Subdivision — Phases 1 and 2
Final Plat
Utilities
ac-.
THE LAKES
AT VALLEY WEST
All affected publicly and privately owned utilities have been notified and provided copies of the
Preliminary Plat for The Lakes at Valley West Subdivision — Phases 1 and 2. These include:
• Northwestern Energy (gas and electric)
• CenturyLink
• Charter Communications
Copies of the letters to each of these utilities requesting design input are included in Section 38,
along with any other correspondence.
Northwewstem Energy will provide natural gas and electric service to the development. These
facilities will be located in public utility easements along the roadways within the subdivision.
New electric and natural gas lines will be placed underground.
Century Link and/or Charter Communications will provide cable, telephone and fiber service to
the development. These facilities will be located in public utility easements along the roadways
within the subdivision. New lines will be placed underground.
Attached is a utility exhibit (Exhibit A) that illustrates the existing water, sewer, storm and dry
utilities present on the site and adjacent to the site. Future utilities are shown on the exhibit as
well, with public utility easements noted where utilities will cross lots or open space.
� R
-
��u11 !!a! .�'���`ICid
\�9r�`+�
it
Al $I �ME � �� �_■,a,v�„�11,1���
�WHO_Ii � �NMMMIo V tJ 'J11 ��! �r JIM
Wall
;lift
ro
t _ _
1.
'�'
k \
FOURp
Mh-iiieli
�I � I � I I I I VALLEY NEst sUC
I
L_ J�
I
CELTIC CONDO
UNR PAD
AN LYNNE
I� I A I
EDERTRUST
J I I I �/ PATRICK TAND
CHRISTINAM
VADEY iy�s� �I /II '
PHASE 1
PHASE 2
I I' lI
NOTTOSCALE
M012RISOIQ TSATVAUMYWEST
_J eozEnwN MONTANA x
JJ�MAIERLE Inc. r+E - AOJACENiCNTERS:—H EIAND2 EXE
'
PRELIMINARY PLAT
THE LAKES AT VALLEY WEST - PHASE 1 & PHASE 2
A PORTION OF TRACT I OF CERTIFICATE OF SURVEY NO. 1005B AND A PORTION OF
TRACT 2A OF CERTIFICATE OF SURVEY NO. 1005C, SITUATED IN THE NW I/4 OF THE NEI/4,
AND THE NEI/4 OF THE NW I/4 OF SECTION 9, TOWNSHIP 2 SOUTH, RANGE 5 EAST,
PRINCIPAL MERIDIAN, CITY OF BOZEMAN, GALLATIN COUNTY, MONTANA
ARP.ASUNNARY-PR IR2
�L
T rygn�„v, ���� icxo.w nsctca<wieea a:r.u9.�-�st'�
nee�aA nm �� i.axi�n,sp�
xnamnsg, ��
THE LAKES ;
Proposal The Lakes at Valley West Subdivision — PUD
Property Owners
Adjacent to proposal site and across watercourses, roads, etc.
Within 200 feet of the proposal site.
NA5352\0020esign Docs\Platting\Adjoiners UsMB Adjoiner Lisl_PUD.docx
Legal Description of Property
Property Owner's Name
Mailing Address of Property Owner
from County Tax Records
LAUREL GLEN SUB PH 1, SO4, T02 S, R05 E,
MELISSA L MORELLI
3300 VICKERS DR
1
BLOCK 11, Lot 5, ACRES 0.28, PLAT J-374
KEVIN FOSTER
GLENDALE, CA 91208-1606
GOLDENHILLS CONDO, SO4, T02 S, R05 E,
GOLDENHILLS CONDO
GENERAL DELIVERY
2
LAUREL GLEN SUB PH 1 LOT 4 BLK 11 PLAT J-
MASTER
BOZEMAN, MT 59718-9999
374 CONDO MASTER
GOLDENHILLS CONDO, SO4, T02 S, R05 E,
JANE PAGE BARTLEY &
623 WESTGATE AVE APT C
2a
LAUREL GLEN SUB PH 1 LOT 4 BLK 11 PLAT J-
TIMOTHY BIXLER HOZIER
BOZEMAN, MT 59718-6591
374 UNIT C
GOLDENHILLS CONDO, SO4, T02 S, R05 E,
NIKOLAI & KAREN
427 GREENWAY AVE
2b
LAUREL GLEN SUB PH 1 LOT 4 BLK 11 PLAT J-
BASHKIREW
BOZEMAN, MT 59718-1821
374 UNIT
GOLDENHILLS CONDO, SO4, T02 S, R05 E,
CODY CORNWELL
103 NEWTON AVE
2c
LAUREL GLEN SUB PH 1 LOT 4 BLK 11 PLAT J-
JULI CORNWELL
GLASGOW, MT 59230
374 UNIT D
GOLDENHILLS CONDO, SO4, T02 S, R05 E,
623 WESTGATE AVE APT B
2d
LAUREL GLEN SUB PH 1 LOT 4 BLK 11 PLAT J-
HALEY VICCHIO
BOZEMAN, MT 59718-6591
374 UNIT C
LAUREL GLEN SUB PH 1, SO4, T02 S, R05 E,
68 N FAWN PL
3
BLOCK 14, Lot 1, ACRES 0.358, PLAT J-374
JASON SCHWARTZ
BELGRADE, MT 59714
LAUREL GLEN SUB PH 1, SO4, T02 S, R05 E,
LAUREL GLEN SUBDIVISION
GENERAL DELIVERY
4
BLOCK 14, ACRES 0.43, PUBLIC PARK 3, PLAT J-
PH 1
BOZEMAN, MT 59718-9999
374
SHADOW GLEN CONDO, SO4, T02 S, R05 E,
SHADOW GLEN CONDO
GENERAL DELIVERY
5
LAUREL GLEN SUB PH 1 LOT 2 BLK 4 PLAT J-374
MASTER
BOZEMAN, MT 59718-9999
CONDO MASTER
SHADOW GLEN CONDO, SO4, T02 S, R05 E,
WILSON GONZALEZ
4716 SHADOWGLEN DR
5a
LAUREL GLEN SUB PH 1 LOT 2 BLK 4 PLAT J-374
LINDSAY DYER
BOZEMAN, MT 59718
UNIT C
SHADOW GLEN CONDO, SO4, T02 S, R05 E,
5458134 TH AVE NW
5b
LAUREL GLEN SUB PH 1 LOT 2 BILK 4 PLAT J-374
JERRYSHAE
WILLISTON, ND 58801-8998
NA5352\0020esign Docs\Platting\Adjoiners UsMB Adjoiner Lisl_PUD.docx
Proposal The Lakes at Valley West Subdivision — PUD
Property Owners
Adjacent to proposal site and across watercourses, roads, etc.
Within 200 feet of the proposal site.
NA5352\0020esign Docs0atting\Adjoiners List\6B Adjoiner List_PUD.docx
Legal Description of Property
Property Owner's Name
Mailing Address of Property Owner
from County Tax Records
UNIT B
SHADOW GLEN CONDO, SO4, T02 S, R05 E,
4716 SHADOWGLEN DR APT A
5c
LAUREL GLEN SUB PH 1 LOT 2 BLK 4 PLAT J-374
JAMES M WARFIELD
BOZEMAN, MT 59718-6594
UNITA
SHAMROCK CONDO, SO4, T02 S, R05 E, LAUREL
SHAMROCK CONDO
GENERAL DELIVERY
6
GLEN SUB PH 1 LOT 3 BLK 14 PLAT J-374
MASTER
BOZEMAN, MT 59718-9999
CONDO MASTER
SHAMROCK CONDO, SO4, T02 S, R05 E, LAUREL
JEFFREY M & KAMIE R
6901 W 84TH ST APT 206
6a
GLEN SUB PH 1 LOT 3 BLK 14 PLAT J-374 UNIT A
GARNER
BLOOMINGTON, MN 55438-1188
SHAMROCK CONDO, SO4, T02 S, R05 E, LAUREL
JOHN KELLY & DICKIE FOX
4521 NE 201ST PL
6b
GLEN SUB PH 1 LOT 3 BLK 14 PLAT J-374 UNIT C
KELLY
LK FOREST PK, WA 98155-1704
SHAMROCK CONDO, SO4, T02 S, R05 E, LAUREL
1794 SPYGLASS CIR
6c
GLEN SUB PH 1 LOT 3 BLK 14 PLAT J-374 UNIT D
MAKOS FAMILY TRUST
VISTA, CA 92081-8950
SHAMROCK CONDO, SO4, T02 S, R05 E, LAUREL
4684 SHADOWGLED DR APT B
6d
GLEN SUB PH 1 LOT 3 BLK 14 PLAT J-374 UNIT B
DOUGLAS C MORIARTY
BOZEMAN, MT 59718-6595
CELTIC CONDO, SO4, T02 S, R05 E, LAUREL
GENERAL DELIVERY
7
GLEN SUB PH 1 LOT 4 BLK 14 PLAT J374 CONDO
CELTIC CONDO MASTER
BOZEMAN, MT 59718-9999
MASTER
PAUL & LYNNE ELDER
7a
CELTIC CONDO, SO4, T02 S, R05 E, LAUREL
TRUST DTD 1/17/97
115 NEZ PERCE DR
GLEN SUB PH 1 LOT 4 BLK 14 PLAT J374 UNIT A
PAUL W & LYNNE B ELDER
BOZEMAN, MT 59715-8304
TRUSTEES
7b
CELTIC CONDO, SO4, T02 S, R05 E, LAUREL
PATRICK T HAGGERTY
4662 SHADOWGLEN DR APT B
GLEN SUB PH 1 LOT 4 BLK 14 PLAT J374 UNIT B
CHRISTINA M HAGGERTY
BOZEMAN, MT 59718
8
LAUREL GLEN SUB PH 1, SO4, T02 S, R05 E,
JEFFREY D SADIK
4648 SHADOWGLEN DR APT A
BLOCK 14, Lot 5, ACRES 0.213, PLAT J-374
BOZEMAN, MT 59718-6597
NA5352\0020esign Docs0atting\Adjoiners List\6B Adjoiner List_PUD.docx
Proposal The Lakes at Valley West Subdivision - PUD
Property Owners
Adjacent to proposal site and across watercourses, roads, etc.
Within 200 feet ofthe proposal site.
NA\5352=20esign Docs\Platting\Adjoiners Li MB Adjoiner List_PUD.docx
Legal Description of Property
Property Owner's Name
Mailing Address of Property Owner
from County Tax Records
9
LAUREL GLEN SUB PH 1, SO4, T02 S, R05 E,
ROBERT J & VONNIE K
82 W SHORE DR
BLOCK 14, Lot 6, ACRES 0.225, PLAT J-374
ROLLER
BELGRADE, MT 59714-9537
10
LAUREL GLEN SUB PH 1, SO4, T02 S, R05 E,
ANGELA M MACKAY
4608 SHADOWGLEN DR
BLOCK 14, Lot 7, ACRES 0.235, PLAT J-374
BOZEMAN, MT 59718-6554
11
LAUREL GLEN SUB PH 1, SO4, T02 S, R05 E,
HABITAT FOR HUMANITY OF
230 ARDEN DR
BLOCK 14, Lot 8, ACRES 0.231, PLAT J-374
GALLATIN VALLEY INC
BELGRADE, MT 59714-8917
12
LAUREL GLEN SUB PH 1, SO4, T02 S, R05 E,
TONY KABER
4568 SHADOWGLEN DR
BLOCK 14, Lot 9, ACRES 0.226, PLAT J-374
BOZEMAN, MT 59718-6555
13
LAUREL GLEN SUB PH 1, SO4, T02 S, R05 E,
MICHELLE DEVES
1627 W MAIN ST STE 183
BLOCK 14, Lot 10, ACRES 0.222, PLAT J-374
BOZEMAN, MT 59715-4011
14
LAUREL GLEN SUB PH 1, SO4, T02 S, R05 E,
DANIEL & LORALYN A
41 HART AVE
BLOCK 14, Lot 11, ACRES 0.298, PLAT J-374
SAPORITO
HOPEWELL, NJ 08525-1411
15
MINOR SUB 201A, SO4, T02 S, R05 E, Lot 2A,
FOUR CORNERS
125 CENTRAL AVE STE 1A
ACRES 33.5683
CONSTRUCTION LLC
BOZEMAN, MT 59718-9616
16
VALLEY WEST SUB, S09, T02 S, R05 E, Lot PARK,
VALLEY WEST SUB
GENERAL DELIVERY
ACRES 39.06, PLAT J-320
BOZEMAN, MT 59718-9999
S09, T02 S, R05 E, ACRES 210.117, SE4NW4,
SW4NE4, NE4SW4, SE4SW4, NW4SE4, SW4SE4
NORTON PROPERTIES LLC
63026 NE LOWER MEADOW DR #200
17
& 41'X 1320' WS OF SE4SE4 LESS HWRW & LESS
KEVIN SPENCER
BEND, OR 97701-5877
PLAT 503 & 509
18
S09 T02 S, R05 E, ACRES 39.25, SW4NW4 LESS
AAJKER CREEK
4700 GOOCH HILL RD
25' RD ON NS
PROPERTIES LLC
BOZEMAN, MT 59718-9027
19
S09 T02 S, R05 E, C.O.S. 1581, PARCEL 2,
ALAN D FULTON
958 RIALTO WAY
ACRES 20.526
BUTTE, MT 59701-7113
20
S09 T02 S, R05 E, C.O.S. 1581, PARCEL 1,
ALAN D FULTON
958 RIALTO WAY
ACRES 20.519
BUTTE, MT 59701-7113
21
SO4, T02 S, R05 E, ACRES 40, SW4SW4
BONITA L NOLLMEYER
i
PO BOX 1503
I BELGRADE, MT 59714-1503
NA\5352=20esign Docs\Platting\Adjoiners Li MB Adjoiner List_PUD.docx
The Lakes at Valley West Subdivision — Phases 1 and 2
Final Plat
Surface Water
THE LAKES
AT VALLEY WEST
Exhibit A shows a plat overlay of surface waters and wetlands that exist within the Lakes at
Valley West property boundaries. Surface water resources include Baxter Creek, located along
the northeast property boundary, the West Lake and East Lake, and a large palustrine wetland
complex located southeast of the East Lake. Aajker Creek is located outside the west property
boundary although the 50 -foot watercourse setback extends across the west boundary into the
Lakes parcel. There is no designated floodplain for Baxter Creek. The resource conditions
associated with Baxter Creek, the Lakes, and the wetland complex are detailed in the following
sections.
Baxter Creek and Aajker Creek and the adjacent wetland fringes will be protected from
development by 50 -foot watercourse setbacks in accordance with Section 38.23.100 Watercourse
setback (A) of the City of Bozeman Unified Development Code (UDC). The Lakes and the
palustine, emergent wetland complex will be protected in most areas by a 50 -foot upland buffer
between the edge of the lacustrine fringe and residential lot boundaries.
Baxter Creek
The Gallatin County Conservation District (GCD) classifies Baxter Creek as a perennial stream.
The creek channel within the property is approximately 7 to 10 feet wide and 1,373 feet long,
flowing from south to north between the Baxter Natural Area city park and the Lakes at Valley
West. Baxter Creek is diverted from the Farmer's Canal approximately 1.2 miles south of the
Lakes property. The boundaries of the open water channel and adjacent riverine fringe were
originally delineated in 1994 in anticipation of the original Valley West Subdivision plat
submittal. Fifty -foot watercourse setbacks were established from the edge of the riverine
wetland fringe in the October 2003 Preliminary Plat Application (Figure A). The watercourse
setbacks have been maintained to the present in accordance with Section 38.23.100 Watercourse
setback (A) of the City of Bozeman UDC.
Base flows fed by high groundwater and irrigation water originating in the Farmer's Canal in
summer provide the main sources of hydrology for Baxter Creek. High flow events are typically
related to stormwater runoff events and melting valley snowpack. The reach of Baxter Creek
within the project boundaries had been negatively impacted by livestock grazing and agricultural
practices resulting in an overly wide stream channel, bank erosion, lack of pool habitat, and lack
of woody riparian vegetation. Restoration of a segment of Baxter Creek extending 1,800 feet
south of Durston Road was completed in 2006. The work included narrowing the channel,
The Lakes at Valley West Subdivision — Phases 1 and 2
Final Plat
stabilizing eroding banks, and enhancing fish habitat by constructing pools throughout the stream
reach located on the Lakes property. The restored banks were revegetated with salvaged sod
mats and custom seed mixes. The east side of Baxter Creek was planted with trees and shrubs as
part of the Baxter Natural Area construction in 2007. Approximately 692 containerized woody
plant materials were installed within the riparian corridor of Baxter Creek and the Baxter Creek
Natural area. The west side of the corridor was planted with trees and shrubs in fall 2008
coincident with construction of The Lakes. Planting details are included in the Vegetation
Section. The Baxter Creek corridor, adjacent riverine wetland fringe, and 50 -foot watercourse
setback will be protected from development. A gravel fines trail was constructed in 2008 at the
outer edge of the watercourse setback in accordance with Section 38.23.100 of the UDC.
Aajker Creek
The GCD classifies Aajker Creek as a perennial stream, diverted from the Farmer's Canal
approximately 1.48 miles south of the project boundaries. The creek channel north of Farmer's
Canal has been straightened historically for agricultural purposes. The creek flows south to
north outside the Lakes property boundary. The 50 -foot watercourse setback for the east side of
Aajker Creek extends across the west boundary of the Lakes parcel (Exhibit A). The
watercourse setback will be maintained within the strip of open space located at the west
subdivision boundary. A piped outlet from the bottom of the West Lake conveys overflow to
the borrow ditch located on the south side of Durston Road east of Westgate Avenue. Surface
water in the borrow ditch and the pipe outflow are diverted through a culvert across Durston
Road to a restored tributary of Aajker Creek within the Laurel Glen Subdivision. A short
segment of the borrow ditch on the south side of Durston Road is classified as a jurisdictional
water of the US based on the downgradient connection to Aajker Creek. The tributary to Aajker
Creek and Aajker Creek converge approximately 1,400 feet north of Durston Road.
Wetlands: The Lakes and Palustrine Wetland Complex
The US Army Corps of Engineers (USACE) authorized an Individual 404 permit (Permit
No.1998-90014) for the 360 Ranch Corporation to implement Phase I of the Valley West
Subdivision project on May 4, 1998, and Phase II on July 23, 1998. Proposed mitigation for the
entire project required as a condition of permit approval included relocation of the Baxter Ditch
channel, restoration and enhancement of Baxter Creek and Maynard -Border Ditch, and creation
of a 5 -acre lake, a 12 -acre lake, and a series of spring -fed waterfowl ponds.
Bozeman Lakes, LLC, the subsequent owners of Valley West Subdivision, applied for an
amendment to the original 404 permit in May 2001. Primary design changes included a
reduction in the number of impacted wetland acres and a change in the location of the
constructed wetland complex from an upland area west of Baxter Creek to an upland area east of
Baxter Creek. The permit amendment was approved by the USACE in a letter dated November
The Lakes at Valley West Subdivision — Phases 1 and 2
Final Plat
21, 2002. The USACE 404 amended permit required the construction of 49.5 acres of mitigation
wetlands across the entire Valley West site.
The wetland complex located east of Baxter Creek, currently called the Baxter Natural Area, was
constructed between January and October 2007. Eight shallow water ponds were vegetated with
salvaged wetland sod mats in spring 2007. The remainder of the wetland complex and the east
side of the riparian corridor of Baxter Creek were seeded with herbaceous species and planted
with approximately 692 containerized woody plant materials in November 2007.
Mitigation wetlands located within the current Lakes at Valley West property boundaries include
10.47 acres of open water in the West and East Lakes and an additional 9.0 acres of lacustrine
fringe and palustrine, emergent wetlands constructed adjacent to the lakes and Baxter Creek
(Exhibit A). The lakes were constructed with west and east lobes separated by the future Laurel
Glen Parkway. The shoreline was contoured to maximize safety and the extent of the lacustrine
fringe. The lake depth was excavated to a minimum of 25 feet to ensure adequate turnover,
maximize oxygen levels, and to provide a refuge for fish. The lake will be stocked under
management of Montana Fish, Wildlife, and Parks once the area is open to the public.
Anticipated uses of the public space are recreational including fishing, bird watching, and hiking.
The lacustrine fringe of the east and west lobes of Wing Lake was planted with wetland sod mats
salvaged from an onsite, non jurisdictional wetland. The mats were placed on approximately
half of the perimeter of both lakes and around the fishing access points in June 2008. Over five
thousand wetland tubelings were planted within the lacustrine fringe of both lobes on August 27,
2008. The water levels were raised with the control structure after planting to ensure sufficient
inundation levels. Approximately 458 containerized trees and shrubs and customized seed mixes
were planted around The Lakes and the west side of the Baxter Creek riparian corridor in
September and October 2008. The clusters of trees and shrubs were staked and caged to prevent
browsing. The woody plants were manually watered during the first growing season following
installation.
The USACE wrote a letter on August 12, 2013, closing the Valley West 404 permit file based on
the successful completion of the mitigation wetlands constructed site wide including the Lakes at
Valley West and the adjacent lacustrine and palustrine wetlands. Success of the mitigation
wetlands was based on establishing an optimal percent cover of wetland and upland vegetation
and on survival of a majority (96 percent in 2012) of the woody species. The August 2013
closure letter from the USACE was included with the City Pre -application submittal. Copies of
the original and amended permit approval letters were also included with the City Pre -
Application submittal.
� ice`=� ➢��h-�€��',� �' �R��I � ��� (������ � � �/�
=_ •JMORRISON
==Elm
PARK AREA: PRASE 1 & 2
THE LAKES AT VALLEY WEST
BOZEMAN, MONTANA
DRAWING INDEX
Tl -1
TITLE SHEET
Tl -2
PHASE 1 & 2 MASTER PLAN
SD2-1
TRAIL LAYOUT PLAN: PARK PHASE 1
IRRIGATION DETAILS
ALIGNMENT C
SD2-2
TRAIL LAYOUT PLAN: PARK PHASE 1
ALIGNMENT D, E & F
L2-1
PLANTING PLAN: PARK PHASE 1
i
I112-1
IRRIGATION PLAN: PARK PHASE 1
L3-1
DETAILS
L3-2
DETAILS
L3-3
IRRIGATION DETAILS
DESIGN TEAM
OWNER LANDSCAPE ARCHITECT
THE LAKES AT VALLEY WEST LLC PEAKS TO PLAINS DESIGN, P.C.
2880 TECHNOLOGY BLVD. W. 404 NORTH 31ST STREET, STE. 405
BOZEMAN, MT 59718 BILLINGS, MT 59101
1 PROJECT LOCATIO NMAP
row
T1-1
I 90
rti
- -------- - -
E > --o
�<o
0 1
owe
P4
�l PHASE 1 AND 2 MASTER PLAN T1-2
kl I I
XJT PLAN (PARK): AIJGNNERTT C - SrAnON 0+00 TO 6+25
im
o
P,
0
|f//
P.
au
= I\ � ¥�< ^ §)R
� ` [�//
zo
LAY6iii-PLAN (PARY,): ALIGNMFNTC -STATION 6+25 TC 3+87.42
TRAIL Gmu#Gw(PA RK:ALIGNMENTS D, E & F
�� �,
_A�
sae■�
NO
GM FURI,=»
Li
---I-----------------c--
v
��� �
OW
—
---------
.
e
� ?
PARK SPACE IRRIGATION LEGEND
T
=
T
Ld
IRRIGATION NOTES
T
=
- -------------- - ------
- — — — — — — — — — — — —
IRRIGATION PLAN (PARK)4^k'7ij I "R2-1
-
�I' — — CONIFEROUS TREE -RASSES
i
41
GROUND COVER SPACING EDGING MULCH & FABRIC BOULDER PLACEMENT PLAYGROUND EDGE
tbtTo�nlE 7 �ro�� 8 �TTo
9 ENTRY SIGN - PLAN V IEW ENTRY SIGN REBAR -ELEVATION & SECTION
GRAVEL'I•RALL —T.— II'—
W
�m
-�-
Illi--llRll1E �llR lll _._...
IL=ILJL=IL JL=JL=
llIllllt--: LllRllll
THE LAKES
show—
llllll! Lllllllllllllllllllll ll llll ll ll�llllJ �llllll
©1 LETTERINGQENTRY SIGN ISOMETRIC
fjNENTRY SIGN
ISOMETRIC
_ IICs]
uc'�`II�'�II'E=' ii''�`Ile'IrIIE
4 POCKET PARK SITTING AREA POCKET PARK sn-TING AREA StI1'ING AREA SECTION TYP. PICNIC TABLE
HASE 1 E"' `' ADMASE 2 ova =r-0 6 wrro r� 7 rvona E
• usr ��
Ml—
ELECTRIC CONTROL VA 1 oVE � 9 DRIP ZONE CONTROLLER Ag!Q100 100 DECODER o � W I REI SOLAR SYNC SYSTEM
0=1.
ri-,,6 INCH POP-UP SPRAY
II f, -\6 -INCH MPROTATOR HEAD
TRENCH & BEDDING -7, OUICK COUPLING VALVE
/QiROTOR HEAD Q, i NE DRIP EMITTER
r7AIR RELEASE VALVE - I- _k2to-iJISOLATION BALL VALVE
ITj�111TI-
�j-�41-
MAINLINE DRAIN -W --KALE WATER WELL SOURCE
The Lakes at Valley West Subdivision — Phases 1 and 2
Final Plat
Seed Mix Descriptions
Four separate seed mixes encompass the park and open space areas THE LAKES
throughout the development. The seed mixes correspond with activity 1 1S.
use levels appropriate for the different types of ecosystems provided AT VALLEY WEST
throughout the development. Active park lands are a combination of Kentucky Bluegrass, Perennial
Ryegrass and Creeping Red Fescue. This irrigated mix utilizes approximately 25 percent less water than
a traditional bluegrass blend, but the species respond well to heavy pedestrian traffic and provides the
average citizen with a typical expectation of a traditional park area.
The Durston Road and Laurel Parkway open spaces and boulevards consist of three types of fescue along
with a Canada Bluegrass blend. While these areas will be irrigated as well, the fescues provide about a 50
percent reduction of water requirements, creating a quality greenbelt. These areas will not receive as
much pedestrian traffic; therefore, the fescues can be mowed less often but still project a nice green space
analysis.
The upland open space and park lands consist of a four -blend wheatgrass mix, along with brome and
other species. This seed mix allows for a 100 percent reduction in water consumption, as it does not
require irrigation. This seed mix is in locations where minimal foot traffic is expected. In most cases,
these areas will not be mowed, although an annual mowing may be performed for species diversity.
The detention ponds will receive a seed mix that survives with a periodic inundation of water and
drought. Consisting of wheatgrass, hairgrass, mannagrass and bluegrass species, this seed mix will
provide for herbaceous ground cover through multiple water events. This seed mix also has a 100 percent
reduction in water consumption, as it does not require irrigation.
Active Park Lands —SEED MIX #I
60% Kentucky Bluegrass
25% Perennial Ryegrass
15% Creeping Red Fescue
Drill @ 4-5#/1000/SF
Broadcast @8-10#/1000/SF
Durston Road Open Space — SEED MIX #2
35% Durar Hard Fescue
35% Sheep Fescue
15% Turf -type Tall Fescue
15% Canada Bluegrass
Drill @ 10-15#/Acre
Broadcast @ 20-30#/Acre
Upland Open Space & Park Lands — SEED MIX #3
25% Green Needlegrass
20% Western Wheatgrass
20% Thickspike Wheatgrass
15% Slender Wheatgrass
13% Mountain Brome
5% Secar Bluebunch Wheatgrass
2% Blue Flax
The Lakes at Valley West Subdivision — Phases 1 and 2
Final Plat
Drill @ 8-10#/Acre
Broadcast @ 16-20#/Acre
Detention Ponds & Wetland Areas (only if disturbed) — SEED MIX #4
6.5#PLS/Acre
Slender Wheatgrass
5.0#PLS/Acre
Sodar Streambank Wheatgrass
3.5#PLS/Acre
Tufted Hairgrass
0.5#/PLS/Acre
Fowl Mannagrass
0.25#/PLS/Acre
Fowl Bluegrass
Seed mixes three and four do not have any permanent irrigation systems. Establishment of non -irrigated
seed will be established utilizing these proven, successful establishment methods without the use of
temporary irrigation.
1. Proper seed bed preparation. The contractor is required to place four to six inches of topsoil over
all areas to receive seed. The topsoil must be tested to meet soil texture and soil nutrient
capacities. Compaction of the topsoil layer shall not exceed 85 percent.
2. Viable seed source. The seed source will be checked through the acquisition of the tags off of the
bags of seed. Verification of the seed -tested germination, percentage of inert materials and
percentages of weed seed in the mix itself will meet industry standards.
3. Seed to soil contact. All non -irrigated seed mixes will be drill seeded to ensure proper seed to
soil contact. The equipment shall not have a spacing of more than 3-1/2 inches, and the soil
surface should be cultipacked or rolled after seeding. Areas too narrow to drill seed will be
broadcast seeded at double the rate and raked into the soil.
4. Timing of seeding. Non -irrigated seed mixes should only be seeded between October 15 and
May 15 of each year, provided that the ground is not frozen or overly muddy. This is the optimal
time for soil moisture content and the cooler spring temperatures enhance native grass seedling
development.
5. No use of fertilizer. Non -irrigated seed mixes will not receive a fertilizer treatment. Experience
and studies show that the application of fertilizer in the first two years of establishment only
benefits weeds.
6. Mulch application. Immediately after seeding, the seed bed will have a layer of straw or paper
mulch hydraulically placed over the top. This helps to retain moisture, provide increased organic
matter, suppresses weed growth and can provide nutrients to the grass.
7. Weed monitoring. Weeds will be monitored and removed according to the applicant's approved
weed management plan.
8. Successful establishment time period. The City is advised that successful establishment of non-
irrigated grasses takes two years at a minimum due to the slow germination rates of the native
grasses and slow root zone development.
This methodology has been tested by Agronomist Neal Fehringer, MDT Agronomist Phil Johnson and
successfully implemented by Peaks to Plains Design on several projects throughout Montana.
Seeding of soil stockpiles that will remain undisturbed for a period of more than four months will be
seeded with an annual grass groundcover of annual rye. Annual ryegrass germinates quickly and is a low
cost option for dust control, without long-term consequences of contamination of the soil source. This
will be completed as per the SWPPP plan requirements.
The Lakes at Valley West Subdivision — Phases 1 and 2
Final Plat
SEC. 38.41.060
A.(7) GENERAL DESCRIPTION OF LAND
THE LAKES
AT VAI I ET WP,:T
The Lakes at Valley West continues the award-winning tradition
of parks and open space present throughout the rest of Valley West Subdivision. The open space
along Durston Road provides a neighborhood buffer that reinforces a tree -lined edge from an
urban arterial road. This edge feeds into the entry to The Lakes funneling down Laurel Parkway,
setting the stage for a green belt transportation corridor. Special attention is paid to the Parkway
median regarding scale and repetition without compromising safety and efficiency.
The east lake is bordered by the Baxter Creek Natural Area on the east. Significant wetland
mitigation activities have occurred in the natural area and along the wet perimeter of the lakes.
The north -south trail corridor on the west side of Baxter Creek will facilitate connectivity to and
from all directions, maximizing the potential use of the Natural Area without compromising
environmental commitments.
The northwest corner of the east lake will encompass active use park area. Neighborhood
gatherings are accommodated through two picnic shelters and associated improvements. A large
playground will accommodate a wide variety of play activities along with a swing set, a feature
missing in the greater Valley West park system. A combination of flat, unprogrammed open
space and large berms provide for free and imaginative play. This neighborhood gathering area
will be irrigated to support such active and intense uses. Accessible trails will connect he active
use area to the natural, reclaimed wetland edge of the lake for fishing access.
The west lake is surrounded by ample open space. Irrigated unprogrammed open space takes
advantage of flat topography on the north edge of the lake. This area creates a buffer between
private properties and the natural wetland fringe of the lake. This line is marked with the
accessible trail that separates irrigated from natural grasses. By limiting the irrigated area,
principles of water conservation contribute to the overall sustainability of the development. The
remaining lake perimeter is restored to drought -tolerant upland grasses, creating greater habitat
diversity. Greater habitat diversity attracts a variety of wildlife and avian species, thus creating
opportunities for nature -related recreation.
Together, the parks, trails and open space amenities encompass a wide variety of recreational
opportunities appealing to many different age groups. The public lands within The Lakes at
Valley West appeal to many interests, and are accessible by vehicle, bicycle and pedestrian
means. This accentuates the high quality of life attributes affiliated with the Bozeman area and
the overall development consistent with the expectations found at Valley West.
The Lakes at Valley Nest Subdivision — Phases 1 and 2
Final Plat
SEc. 38.41.060
Additional Subdivision Preliminary Plat Supplements THELAKES
AT VALLEY WEST
A(8) — Trail Layout & Construction
Refer to A-6 for parks trail layout & construction.
The Lakes at Valley West Subdivision — Phases 1 and 2
Final Plat
�J
SEC. 38.41.060
Additional Subdivision Preliminary Plat Supplements THS LAKES
AT VALLEY V'ES"T
AM
The final park plan shall be approved by the review authority with recommendations from both
the city recreation and parks advisory board prior to any site work.
A-CI01
A preconstruction meeting is required prior to any site work.
AG 1
The Park Plan shall follow all appropriate design guidelines for city parks.
The Lakes at Valley West Subdivision — Phases 1 and 2
Final Plat
Parks
The park system within the The Lakes at Valley West is
diverse and requires different subsets of maintenance THE
�
considerations within this area. Because over 9 acres of
this area is dedicated for parkland, the master plan AT VALLEY WEST
allows for certain areas to remain native, natural state versus a manicured park for ease of
maintenance and to maintain species diversity.
Depending on the seasonal moisture, native grass will be mowed 2 to 3 times per year.
Generally the first time in mid-July, and the final time occurring in mid-October. The mow
height will be a minimum of 6 inches, with 12 inches being the preferable.
A noxious weed control program has been established with a local contractor. A yearly property
check with two applications a year till turf is fully established once in June and the other in
August. Once the turf is fully established then spaying will be cut down to one application per
year in the month of June. This event is coordinated with the County Weed Supervisor, the
MRCS agent and the City of Bozeman. This program can also be used to control the weeds in
gravel walkways with spot application of a weed control agent as required. The City of
Bozeman shall be notified of any and all applications of pesticides and/or herbicides on public
lands. Signs shall be posted prior to application in appropriate and noticeable locations
identifying the product applied. Signs will remain in place for a minimum of two (2) days after
treatment. Records shall be maintained in accordance with the State of Montana Pesticide Act,
Administration Rule 4.10.207 and copies submitted to the City of Bozeman Parks Division.
Active use grass areas will have a mow height of no less than 3 inches and be allowed to grow to
4 or 4-1/2 inches before being mowed again. One can expect around 26 mows a year. Fescue
blend lawn areas require roughly 9 inches of water between June 1 st and September 1 st. At peak
demand this means roughly 0.75 inch of precipitation per week in lawn areas. For mature lawn
areas, this water will be spread evenly through the week and in less frequent, deeper soakings.
Fertilizing of grass and lawn areas is to be done as necessary, but not be overdone to minimize
water needs and mowing and to protect sensitive areas. Lawns which have irrigation at head to
head coverage will have two applications of fertilizer: The first will be a blend of 17-17-17 in
May and then will have an application of 27-8-8 in mid -summer. As the lawns are establishing,
the rate of fertilization will be approximately 40 lbs per 10,000 square feet. An established lawn
will be fertilized at a rate of 60 lbs. per 10,000 square feet.
Certain park areas have ground cover which requires full or partial irrigation. In areas where a
full turf -type lawn is desired, an irrigation system will be placed with head to head coverage.
The borders next to areas desired to be left in native grass state, a single row of heads is placed to
The Lakes at Valley West Subdivision — Phases 1 and 2
Final Plat
allow for minimal watering to allow that transition. The irrigation system will need to be
monitored to watch for breaks, vandalism and overall needs of the site.
Areas which are "partially irrigated" or have only a single row of heads may be fertilized in a
similar way. Bi -annual soil test will be taken to assess soil nutrient contents and adjust fertilizer
rates accordingly.
Any seed mix that has no irrigation or areas within 50 feet of a stream or wetland will not be
fertilized and has no plan for regular application of fertilizer. This will minimize excess nutrient
run-off that will adversely affect the water ecosystem. Trees and shrubs located within this
corridor will be monitored and if deemed that they need fertilization, the use of capsule fertilizer
will be utilized.
In areas outside the corridor, the shade trees will be fertilized in April with 16-10-9 plus iron and
zinc. Once trees and shrubs are established, they will be fertilized with tree food spikes. Do not
fertilize trees and shrubs past mid to late July. Pruning of evergreens will occur in June. Shade
trees will pruned in April, except maples and birch. Maple and Birch species will be pruned in
mid to late July. During the fall once the leaves have fallen, they will be collected and removed.
General monitoring for pests and diseases will be done throughout the year. Trees and shrubs
will be deep watered right before the ground freezes. All trees on public property are subject to
the City of Bozeman permits and ordinances as outlined in City Ordinance 12.30.040.
The irrigation system will be charged in April, after the frost has left the ground and plant
material begins to grow. All of the manual drain valves will be turned to the closed position.
The power for the pump will be switched to the "on" position. Program or adjust the controller
for the current month's watering needs. Check all heads to ensure that there is no breakage and
that proper coverage is attained. Each month the heads and controller will be checked and
adjusted for the weather.
When repairing the sprinkler heads using different brands or nozzles are not recommended. This
ensures that the coverage is efficient for the working pressure and disperses at an equal
precipitation rate. Ensure that the heads seated at a level which it is not damaged from mowing
or maintenance equipment. Be sure to periodically check the drip emitters around the trees to
ensure they are functioning properly.
Winterization of the irrigation system typically occurs during the last week of October. At this
time, the power to the well pump will be turned off. All manual drain valves will be opened.
Use a high powered air pump to connect to many of the quick coupler valves around the system.
Run air through the system, opening and closing each valve zone, until all of the water is
completely out of the system. Turn off the controller and leave the water off until spring. If
The Lakes at Valley West Subdivision — Phases 1 and 2
Final Plat
winter watering is necessary, this must be done manually from a tank to avoid damage to the
system.
Areas with higher use such as picnic structures and tables will need weekly garbage service. All
residential garbage is the responsibility of the individual lot. The park system is currently
maintained through the Homeowner's Association and these types of services will be included in
that overall maintenance.
Sidewalks, Streets, Woonerfs, and Alleys
Concrete sidewalks located in the open space will have the snow removed within 24 hours of the
end of any snowfall event as per Bozeman Ordinance 1529. Gravel trails will not have a regular
snow removal schedule. The maintenance as well as the snow removal for the concrete
sidewalks located in the open spaces will be the responsibility of the Homeowner's Association.
City standard streets will be maintained by the City of Bozeman which includes snow removal
and overall street maintenance. The snow removal for the Woonerps and Alley's will be
completed for any snow event that is 2 inches or greater. The snow will be stored on-site in
areas outlined on the attached drawing, number FIG. 8. The snow removal and maintenance for
the Woonepf s and Alley's will be the responsibility of the Homeowner's Association.
A rate study will be performed to establish Homeowner's Association fees based on maintenance
requirements as well as long term replacement costs for the concrete sidewalks, Woonerps, and
Alley's.
Implementation
All park and open space areas will comply with the City of Bozeman requirements for
implementation. Each preliminary plat subdivision phase will provide detailed landscape and
irrigation plans in accordance with the overall master plan for any park land in that particular
phase. Site grading, seeding, well development and irrigation infrastructure will be installed as
required for subdivision regulations. All soils to be used on pubic park land shall be inspected
by and meet the approval of the City of Bozeman Parks Division Staff prior to installation and
shall meet the minimum depth requirement of 10 inches.
Additional amenities not required of the developer, but will be included in park improvements,
include playground equipment, surfacing and drainage; benches, and picnic tables. The quality
of the installed improvements will far exceed the minimum requirements necessary for the
development.
Date Received
NOXIOUS WEED MANAGEMENT PLAN
This plan is valid and effective upon approval by the Board or it's Representative for 3 years
from date of approval. The Landowner/Responsible Party agrees that the Board shall have the
right to revise this plan and any Memorandum of Understanding as necessary to effectuate the
purposes of the Gallatin County Weed Management Plan or Montana Noxious Weed Control
Act. If a new Landowner/Responsible Party becomes involved before expiration of this plan, the
new Landowner/Responsible Party must submit a new Weed Management Plan for approval by
the Weed District. The Landowner/Responsible Party will provide documentation that the Weed
Management Plan has been implemented.
The property owner agrees that the Weed District may inspect the property prior to granting
approval of the Weed Management Plan, and if approved, such reasonable inspections as
necessary to determine compliance with this plan.
Weed Management Plans that have expired require a submittal of a new Weed Management
Plan and documentation of completed weed control efforts. A property inspection is mandatory
for reviewing the plan. There is a Review Fee of $300 for a Major Subdivision and $150 for a
Minor Subdivision. These fees also apply to applications for Extensions of Preliminary Plat.
Landowner/Responsible Party agrees to comply with this plan.
CHECK TYPE OF WEED MANAGEMENT PLAN (check all that apply)
❑✓ Subdivision
❑ Telecommunications (cell tower)
❑ Roadside Maintenance (no spray)
❑ Landowner
❑ Organic Farm/Ranch
❑ Gravel Pit (attach MT DEQ Plan of Operation)
I have read and understand all the relevant sections of the Gallatin County Weed
Management Plan.
Signature
SubWMP - 08112 Page 1 of 5
RESPONSIBLE PARTY INFORMATION
Name: Greg Stratton
Phone: 406 599-5603
Mailing Address: 2880 Technology Boulevard West, Bozeman, MT 59718
Email Address: astratton20100hotmail.com
PROJECT LOCATION with Legal Description (Attach plat/project map)
NW 1/4 Section 9, T2S, R5E (see Attached Plat/Project Map - Appendix A)
PROJECT DESCRIPTION (Please complete all that apply)
Project Name: The Lakes at Valley West
Number of Lots: Phase 1 (25 lots); Phase 2 (32 lots)
Total Acres in Project: 65 acres (full buildout)
Total Road Miles in Project: 12,100 If inc. adjacent Durston Road
NOXIOUS WEED MANAGEMENT PLAN
Noxious Weed Species on Property (Provide plat map with weed inventory)
Figure A shows the general location of weed infestations within the entire project area. The only Priority 213
noxious weed noted is Canadian thistle (Cirsium arvense). Mexican fireweed (Kochia scoparia) and common
mullein (Verbascum thapsus) infestations are also shown on Figure A (Appendix A).
METHOD OF WEED CONTROL (Mark all that apply)
[Z]CHEMICAL ❑ MECHANICAL ❑ CULTURAL ❑ BIOLOGICAL
Describe specific control measures and timing of control for 3 years. (If using herbicides, include
type of herbicide and rates) Attach additional pages if necessary / incorporate by reference.
The berms abutting Durston Road have been sprayed for three years. NPK Turf Services, Inc. (see attached
proposal) will spray weeds (Canadian thistle) on 6 to 8 acres, spraying twice per year, once in early summer and
once in early fall. The products used will include Curtail, Milestone, 2,4-D, and a surfactant applied
label instructions.
SubWMP - 08112 Page 2 of 5
ESTIMATED COSTS OF WEED CONTROL FOR 3 YEARS (Specify cost for each year)
Indicate if work will be done by self or contracted: ❑Self ❑✓ Contracted
Year
Herbicide Cost Cultural/ Biological Cost
Mechanical Cost
1
950.00
2
950.00
3
950.00
Total
$2,850.00 1 $0.00 $0.00
REVEGETATION PLAN
Are any disturbances planned? DYes ❑ No
If Yes, complete the following re -vegetation section:
MANDATORY REVEGETATION REQUIREMENTS: Areas disturbed during subdivision
development (road construction, pond construction, service/utility/gas/electric/telephone line
installation) will have a layer of topsoil redistributed onto disturbed areas. Disturbed areas will be
seeded to an appropriate grass seed mix for the site. During the first and second years of grass
establishment, areas seeded to grass will be mowed as appropriate to prevent weed seed
development and dispersal.
PLANNED DISTURBANCES (Mark all that apply)
Utility/Service line F—] Pond Road 0✓ Park F✓ Trail ❑Central Septic
Other (list type) Lot Development
Describe in detail, the revegetation to mitigate all disturbances that will occur on this
property. (List type and amount of seed/sod, seeding methods and timing, and fertilization) Attach
additional pages if necessary / incorporate by reference.
The attached exhibits show the revegetation design for the parks, open space, and boulevards. Disturbed
areas will be drill seeded with drought -tolerant native species. Appendix B contains the seed mixes that will
be planted on Active Park Lands, Durston Road/Open Space, Upland Open Space/Park Lands, and Detention
Ponds. Non -irrigated areas will be seeded between October 15 and May 15. Irrigated areas will be seeded
when the irrigation system is functional. No fertilizer will be used in seeded, non -irrigated areas. Fertilizer
will be used as required by soil tests for the active park area seed mix. Trees will be selected as per City
guidelines. Revegetation costs include plant materials, seed mixes, mulch, fabric, edging, wells, and irrigation
system.
SubWMP - 08112 Page 3 of 5
ESTIMATED COSTS OF REVEGETATION FOR 3 YEARS (Specify cost for each year)
Indicate if work will be done by self or contracted: ❑Self 0✓ Contracted
Year
Revegetation Cost
1
105,032.00
2
66,884.00
3
59,682.00
Total
$231,598.00
PLEASE COMPLETE THE FOLLOWING SECTIONS THAT APPLY:
GRAVEL SOURCE (if using outside supply of gravel)
List source of gravel/pit run/road mix/topsoil/etc. brought on-site for disturbance mitigation and/or
construction.
Name of Gravel Pit:
Location:
Contact Person:
Does source of material have an approved Weed Management and Revegetation Plan on file
with the Weed District? ❑ Yes ❑ No
ORGANIC CERTIFICATION ORGANIZATION (for Organic Farm/Ranch only)
Organic Farm/Ranch Certification Organization:
Contact Person:
Mailing Address:
Email:
Phone Number:
LANDOWNER MAINTENANCE (only applies to Roadside Maintenance)
The LANDOWNER/RESPONSIBLE PARTY has read the relevant sections of the Gallatin
County Weed Management Plan and realizes that the WEED DISTRICT is released of liability
for any losses suffered by the LANDOWNER/RESPONSIBLE PARTY in managing noxious
weeds on the County road right-of-way. (initial)
SubWMP - 08112 Page 4 of 5
STATUS
RECOMMENDATIONS AND/OR CONDITIONS:
Additional terms and conditions apply — see attached
Compliance with laws and regulations. LANDOWNER/RESPONSIBLE PARTY has an affirmative
duty to take notice of, observe, and strictly comply with all existing laws, rules and regulations and any
laws, rules and regulations that may be adopted after the date of this agreement. Whether or not the
same are expressly stated in the agreement, the LANDOWNER/RESPONSIBLE PARTY shall strictly
comply with all applicable state, federal and local laws and regulations.
LANDOWNER/RESPONSIBLE PARTY agrees that this plan is supported by good valid consideration
and this plan constitutes a binding contract and may be enforced as such.
Signature of Weed Board Chairman/Representative
Type/print name of Chairman/Representative
Date
Signature of Landowner
Type/print name of Landowner
Date
Signature of Responsible Party
Type/print name of Responsible Party
Date
SubWMP - 08112 Page 5 of 5
The Lakes at Valley West Subdivision — Phases 1 and 2
Final Plat
SEC. 38.41.060
Additional Subdivision Preliminary Plat Supplements THE LAKESA'C VALLG\\Y /EST
�'I'
B(3) — Collection Services
Refer to B-1 for information regarding collection services.
The Lakes at Valley West Subdivision — Phases 1 and 2
Final Plat
SEc. 38.41.060
Additional Subdivision Preliminary Plat Supplements THE LAKES
AT VALLEY WEST
C(I) — Park Irrigation Plan
Refer to A-6 for Park Irrigation Plan.
DEPARTMENT OF NATURAL RESOURCES
AND CONSERVATION
January 23, 2015
Bozeman Water Resources Office
111A t: 01114 Ot A, GOVERNOR
STATE OF MONTANA
PH09E: (40615".3136
FAX 14051557-9726
Vaughn Environmental Services
Attn: Barbara Vaughn
8353 Saddle Mountain Rd.
Bozeman, MT 59715
Re: The Lakes at Valley West Water Right Review
Dear Barbara Vaughn:
2273 BOOT HELL COURT, RU1TE 110
BO_ZEMA r, MONTANA 54715.7249
Per the information provided in your email on January 15, 2015, and on January 19, 2015, the
proposed use of a groundwater permit exemption for the three wells that will provide irrigation
water is acceptable per our Current rules and laws. While the domestic water needs will be
provided by the City of Bozeman through existing water rights, proposed exempt wells will
provide the irrigation water. Also, the "lakes" have been described as old gravel mine pits, and
Barbara has assured me that due diligence in the past was completed on these. As the two
parcels totaling approximately 63 acres are both owned by The Lakes at Valley West Bozeman
LLC, one full exemption is allowed for the two parcels per combined appropriation guidance,
The proposed use of three wells for irrigation totaling 9.43 AF fits under the single allowed
exemption. No water right permitting is needed.
The Montana First Judicial District entered Judgment on November 6, 2014, in Clork Fork
Coalition et of v. ONRC et at Cause No. BDV-2010-874, striking the Department's
Admin.R.Mont. 36.12.101 definition of "combined appropriation" under Mont, Code Ann. 85-2-
306. The Court reinstated the Department's 1987 Rule defining "combined appropriation" as:
An appropriation of water from the same source aquifer by means of two or more
groundwater developments, the purpose of which, in the department's judgment, could
have been accomplished by a single appropriation. Groundwater developments need
not be physically connected nor have a common distribution system to be considered a
"combined appropriation," They can be separate developed springs or wells to separate
parts of a project or development. Such wells and springs need not be developed
simultaneously. They can be developed gradually or In increments. The amount of
water appropriated from the entire project or development from these groundwater
developments in the same source aquifer is the "combined appropriation."
Under this Rule, the Department interprets subdivisions that are pending before the
Department of Environment Quality for approval on November 21, 2014, or filed after that date
to be a single project that can be accomplished by a single appropriation. Consequently all
wells in such a subdivision will be considered a "combined appropriation" for the purposes of
Mont. Code Ann. 85-2-306. The only exception to this interpretation is that a subdivision which
has received preliminary plat approval prior to November 21, 2014, will not be considered a
project under the "combined appropriation" 1987 Rule; individual lots will still be evaluated
under the 1987 Rule at the time of an application to the Department.
This letter does not serve as a pre -approval for a water right.
Thank you,
Kerri Strasheim
Regional Manager
cc: Jolene Rieck, PLA, via email
ge all
((8 �� o _�_ I�F V
A
. IN
A I
:It
PHASING PLAIN
all ° r In i it
IMIR
„'���a h y
€� � `�' .` � ®; ���I SII �.:•:p ,B. -
er
!I 9Yi1, 'e
°
°
1 I•l
4 � 1�) i 1��► ° a
I
o:
LOT 6
LOT 7 1 5, 24 sq.fl.
5072 sq.ft.
WESTMORLAND DRIVE' _—
��
4750
I LF�
NOTES:
LEGEND
EXISTING CONTOUR
PROPOSED CONTOUR
4752--
4750
I LF�
NOTES:
LEGEND
EXISTING CONTOUR
PROPOSED CONTOUR
Peaks to Plains Desi
LANDSCAPE ARCHITECTURE / PLANNING / CIVIL ENGINEERING
MEMORANDUM
TO: CITY OF BOZEMAN
FROM: JOLENE RIECK, PROJECT LANDSCAPE ARCHITECT
SUBJECT: PARK CONSTRUCTION PLAN COMMENTS (DATED MARCH 25, 2015)
DATE: SEPTEMBER 21, 2015
CC: GREG STRATTON, JAMES NICKELSON
[City Comment # I ] Please include the as -built topographic contours and appropriate spot
elevations (or proposed if to be altered) of the lakes to establish the conditions that are to be
maintained in perpetuity by the HOA or future maintenance district.
[Applicant Response] Sheet SD2-2 indicates the existing as -built contours from 2008. Refer
to the attached sheet by Morrison-Maierle for the park grading plan.
[City Comment #2] Please provide a construction detail for the fishing access platform for
our review, The surface needs to be stable, firm and slip resistant as per ADAAG. (see
https://www.access-board.gov/gu ide l In es-and-standards/bu i ld i ngs-and-sites/abo ut-the-ada-
standards/ada-standards/chapter-3-building-blocks ) Also, since the fishing access leads to the
water's edge, there should be a min. 2" ht. curb -like barrier near the water's edge that
prevents a wheeled device from rolling into the water. (see http://www.access-
board.gov/guidel ines-an d-standards/recreation-facilities/guides/fishing-piers-and-
platforms/accessible-fishing-piers-and-platforms )
[Applicant Response] Access to the lakes is with an ADA compliant gravel trail that meets the
City standards. The existing "fishing access pads" are currently rocks and tall grass. The gaps
in the rocks will be filled with a crushed rock and gravel fines to provide a fully accessible
surface to the water's edge. The boulders will be arranged to provide a curb -like barrier so
that a wheeled device is contained within the accessible area.
[City Comment #3] The tree planting detail needs to meet city standards. Specifically, the
planting pits must be at least twice the size of the root ball. Stakes are required and can be
metal, but must have a soft, flexible material wrapped around the trunk. Plant materials that
are root bound and all container plants must be gently scarified to stimulate new root growth
(see http://www.bozeman.net/Smarty/media/ForestryMedia/ Documents/Tree-Guide-2015-03-
Final-PDF.pdf
[Applicant Response] The attached revised detail will be utilized.
Equal Opportunity Employer
[City Comment #4] Prior to construction, a larger scale layout drawing of the active park
area (1:20), to include all of the required elements of a site plan submittal, i.e., layout
dimensions, grading plan, cut sheets or elevations of proposed park amenities with
manufacturer model numbers, surface treatments / paving, basic utility configurations, etc.
[Applicant Response] Attached is the layout drawing from Morrison-Maierle for the sidewalk
and grading improvements. The finish grading, trails, seeding, woody plant stock and irrigation
systems will be constructed as a part of this phase. The other improvements are affiliated
with future phases. When the remaining phases are implemented, the applicant will provide a
detailed site plan to the City with each plat.
[City Comment "From RPAB Sub, Div. Rev. Committee (10/ 17/14)"]
1. Developer agreed to the following:
a. Add a connecting gravel trail along west edge of Brokken Park
b. Extend trail down Babcock (near Petra) in future phase
c. Complete trails in Baxter NA, clean up debris and remove fencing; will provide
actual site plan for Baxter Natural Area with Preliminary Plat submittal
d. Provide a property boundary delineation around cul-de-sac lots
e. No fertilization inside of paths along wetlands
f. Provide ADA access to park improvements (at least on fishing deck, picnic
facilities and playground)
g. Provide dog refuse stations around park
h. Control dogs off -leash to avoid wildlife disturbance and protect wetland areas
i. A maintenance plan will be developed and submitted to the Parks Department
The lakes have a 3:1 slope for 30 feet, then drop to about 20 -ft depth for fish habitat.
A playground and small picnic shelter (approx. 10 x 20) are being planned for the
"neighborhood center."
[Applicant Response] The Applicant received the attached documentation as a part of the
RPAB review, The Applicant takes exception to items (b) and (h) listed above. Item (b) was
not agreed and is the responsibility of another developer. Item (h) was not agreed as animal
control is the function of City animal enforcement. Neither the developer nor a HOA has
law enforcement functions.
All other items listed above have been addressed in the construction plan submittal.
2
Bozeman Recreation & Parks Advisory Board
P.O. Box 1230 • Bozeman, MT • 59771
Park Plan Review
PROJECT: Lakes at Valley West — Pre Ap
PLANNER: Brian Krueger
FROM: Subdivision Review Committee
DATE OF REVIEW: 10/17/2014
OVERVIEW:
• The "Lakes" represents additional phases of the Valley West Subdivision. It is in very
close proximity to Meadowlark Elementary, Petra Academy, Heritage Christian and the
future High School. It is located west of Bronken Fields and north of the Norton
Subdivision, bounded on the north by Durston Road.
a Previous dedication of Valley West Park and Bronken Fields, credited to Valley West,
should exceed the dedication requirement for these phases.
• The subdivision is proposing a small pocket neighborhood concept with emphasis on
easy bike/ped access, a concept we fully endorse.
• Applicant is requesting a combination of dedicated parkland and open space with public
access.
• There are two ponds in the development, separated by Laurel Parkway. The eastern pond
will be in a dedicated park and the other in public open space.
COMMENTS:
• The neighborhood center will be developed on the Park Lake with features consistent
with the architecture in Valley West Park. The structures in Valley West Park are
"award winning" features and continuing this design will bring continuity and excellent
design.
• A north/south trail along the west boundary will connect the paved trail in Norton with
Durston. It may have to shift to a gravel trail if it cannot be located outside the
watercourse setback to Aajker Creek. While we would prefer a consistent paved trail,
this is a very important connection which we strongly urge be made regardless of
surface material.
• We suggested to the applicant, and they agreed to a 6 -foot gravel/fines trail along the
west end of Bronken Sports Fields. This will connect the proposed sidewalk along the
south side of Durston Road near the intersection with Rosa Way with the existing trail
system near the west end of Classical Way.
RECOMMENDATION:
• There are pros and cons to the open space vs. park question but on balance we approve
of the plan. Being open space removes the street frontage requirement. There are
many lots bordering the open space surrounding the western pond, which will open up
potential encroachment and dog conflict issues. But the public access appears very
good and the developer has experience and a good track record regarding these
conflicts. The encroachment issue will also have to be addressed in the lots on the cul-
de-sac on the south boundary of the project.
• The applicant also has an impressive track record with water quality in Meyers Lake
and we trust these skills will keep the water quality up to standard in these two new
ponds.
• Overall we are impressed with the concept and suggest the project be given the green
light as proposed.
Respectfully submitted,
Subdivision Review Committee, Sandy Dodge chair
I
i1
MI F
1LI ? zA - -
�DECIDUO a� OUSTREE SHRUB ERENNIAL GRASSES
3 4
GROUND COVER SPACING EDGING MULCH &FABRIC ULDER PLACEMENT LAYGROUND EDGE
rJ �nrin�r� 6 nnrmsrn� %BOnnrrnsrus $ nnrro. .ue
—
ENTRY SIGN -PLAN VIEW ENTRY SIGN REBAR -ELEVATION &SECTION
i
3ON
O OH
GRAVEL TRAIL I I ��
�nrrnx.,�
Q