Loading...
HomeMy WebLinkAbout15- Task Order Tetra Tech for Environmental Assessment and Addendum to Voluntary Cleanup PlanTask Order August 2015 Task Order for Environmental Assessment and Addendum to Voluntary Cleanup Plan CMC Bozeman Facility Bozeman, Montana August 11, 2015 CLIENT: CONSULTANT: The Citv of Bozeman Tetra Tech Inc. P.O. Box 1230 851 Bridger Drive, Ste 6 Bozeman Montana 59711-1230 Bozeman MT 59715 Attention: Mr. Kellen Gamradt Attention: Mr. Kirk A. Miller INTRODUCTION Our proposal and cost estimate are based on DEQ's request for Addendums to the 2013 Environmental Assessment and 2013 Voluntary Cleanup Plan for the remaining unremediated properties within the subject Facility. SCOPE OF WORK This Modification is for the following work, which is outside the scope of our previously approved September 2014 Task Order. Tetra Tech will conduct the following work tasks to close out the Heebs East Sidewalk contaminated soil removal project. Complete the Addendum to the 2013 Environmental Assessment Component of the 2013 CMC Voluntary Clean-up Plan (VCP) to address all remaining unremediated areas within the CMC Bozeman Facility. A portion of this document was completed under the previous task order, however, DEQ's request to include additional properties and to secure new landowner access agreements have increased our costs. Prepare an Amendment to the 2013 CMC Voluntary Clean-up Plan (VCP) to address all remaining unremediated areas within the CMC Bozeman Facility. We anticipate that this document will identify the location of the Heebs Sidewalk excavation area as well as outlining an approach to any future soil removal projects. A draft of this document was produced last year, however, DEQ has changed the scope of this document, so considerable new text will be necessary. Reporting Tetra Tech will submit the following documents for City review prior to DEQ submittal. • Final Addendum to Environmental Assessment • Draft and Final VCP Amendment August 2015 Task Order for Addendum to EA and VCP August 11, 2015 COST ESTIMATE Tetra Tech estimates that our costs to perform the scope of work outlined above on a time and materials basis is $17,710. Special Conditions Execution of this Task Order constitutes acceptance of all terms and conditions contained in Tetra Tech's Professional Services Agreement with the City of Bozeman, dated May 29th, 2014. CLIENT: CONSULTANT: City of Bozeman Tetra Tech By: CQ�l4 By: ;4"- a, . NA Its: '�T4 _6L4�QQF Its: Sr. Project Manager Date: Date: _August 11, 2015 Page 2 of 2 Tetra Tech Page 1 of 1 Cost Estimate 2015 Environmental Assesment and Voluntary Cleanup Plan Task Order South Wallace Avenue, Bozeman, Montana August 11, 2015 VCP Addendum RATE QUANTITY COST Labor Project Manager $170.00 12.0 $2,040.00 Asbestos Manager $120.00 16.0 $1,920.00 Staff Scientist $95.00 24.0 $2,280.00 CADD $65.00 12.0 $780.00 Clerical $55.00 12.0 $660.00 Subtotal $7,680.00 Other Direct Costs Photocopies $0.10 300.0 $30.00 Vehicle Mileage, per mile $0.60 1500.0 $900.00 $930.00 Task Total $8,610.00 Environmental Assessment Addendum RATE QUANTITY COST Labor Project Manager $170.00 12.0 $2,040.00 Asbestos Manager $120.00 16.0 $1,920.00 Staff Scientist $95.00 32.0 $3,040.00 CADD $65.00 8.0 $520.00 Clerical $55.00 12.0 $660.00 Subtotal $8,180.00 Other Direct Costs Photocopies $0.10 200.0 $20.00 Vehicle Mileage, per mile $0.60 1500.0 $900.00 $920.00 Task Total $9,100.00 TOTAL $17,710.00 Tetra Tech Page 1 of 1