Loading...
HomeMy WebLinkAbout15- Amendment No. 4 Morrison-Maierle, Inc for Capital Improvement Projects Field SurveyAMENDMENT NO. 4 TO PROFESSIONAL SERVICES AGREEMENT FOR CAPITAL IMPROVEMENT PROJECTS FIELD SURVEY MMI. No. 0417.075 THIS IS AN AGREEMENT made as of Njober, 2015, between THE CITY OF BOZEMAN, a Municipal Corporation, P.O. Box 1230, Bozeman, Montana, 59771-1230 (OWNER) and Morrison-Maierle, Inc., P.O. Box 1113, Bozeman, Montana, 59771- 1113 (ENGINEER). WHEREAS the parties previously entered into a Professional Services Agreement dated October 13, 2014, herein referred to as the Original Agreement, for professional engineering services for the Capital Improvement Projects Field Sul vey Project; and WHEREAS, the scope of the Original Agreement included preliminary design services only; and WHEREAS, the scope of Amendment No. 1, No.2 and No.3 to the Original Agreement included additional preliminary design services; and WHEREAS, the parties desire to amend provisions of the Original Agreement to include additional preliminary design engineering services for the project. NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL COVENANTS CONTAINED HEREIN, the parties agree as follows: The conditions and provisions set forth in the attached EXHIBIT C-4 — SCOPE OF SERVICES FOR CAPITAL IMPROVEMENT PROJECTS FIELD SURVEY AND EXHIBIT D-4 - FEE ESTIMATE are hereby incorporated in and made part of this Agreement. ARTICLE 4 - Basic Engineering Services Section 4.2 is included as part of this amendment and is modified as follows: The last sentence of Section 4.2 of the Original Agreement is replaced with the following: The Preliminary Design Phase will be completed and submitted by December 2015. Task 800 shall be completed and delivered to OWNER by December, 2015. 1 Article 6 - Compensation For Engineering Service Article 6.1 of the original agreement is modified as follows: 6.1 LUMP SUM AGREEMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER 6.1.1 Payment. The OWNER shall for design phase services performed as Basic Engineering Services under sections 4.1 through 4.3 of this agreement pay a total sum in the amount of $199,005.80 for such services. 6.1.2 Payment Schedule. Total cumulative payments for the design phase engineering services (sections 4.1 through 4.3) shall not exceed the following ceilings: $11,061.40 (6 % of design fee) until the Task 100 has been completed and submitted to the OWNER and review authorities. $199,005.80 (100 % of design fee) until the Tasks 100, 200,300A, 400A, 500, 600,700 and 800 have been completed and submitted to the OWNER and review authorities. Except as specifically amended herein, the Original Agreement shall remain in full force and effect and the parties shall be bound by all terms and conditions therein. 2 In witness whereof, the Parties hereto do make and execute this Agreement. CITY OF BOZEMAN, MONTANA BY: (City Manager) DATE I C) - �'— / .� ATTEST: 0 _7L BY. (City le jp MORRISON-MAIERLE, INC. BY: (Vice -President) DATE: 3 O iL cg:� O CL am `} C0 W W > U Q O vi O ®+I II Q � ,LLI W LL Q ❑ Q O O } w W � N F_ � W >> W w Z I— xh ;f # Mj 0 11 °a w OQw L` w J Cn J aw U vj —f W � � O O w ma LL w U o `- m `} C0 W W > U Q O vi O ®+I II Q � ,LLI W LL Q ❑ Q O LO N F_ W LL Z 0 MORRISON MAIERLE, INc. M fmpAW".0wn d C—W ny Exhibit C-4 - Scope of Services for Capital Improvement Projects Field Survey September, 2015 Preliminary Design Phase The preliminary design phase will proceed following written authorization to proceed from the owner. The topographic survey shall occur during this phase. This phase includes specific tasks and sub -tasks that will be provided for the Capital Improvement Projects Field Survey. Each task encompasses a specific survey area within the City of Bozeman and the sub -tasks define the work elements for each task. The tasks defined for this project include the following and are illustrated on the attached figure within Exhibit C-4: Task 800 - Bridger Dr., Story Mill Rd., E. Griffin Dr. • Task 800 to be completed and delivered to the City of Bozeman by December 2015. The following sections describe each sub -task as well as identifying the deliverable for each sub - task. Sub -task 001 Office Research and Computations Task Description — Complete research and computations as well as preparation of survey equipment and files required for field survey. Task deliverable — N/A Sub -task 002 Horizontal and Vertical Field Control Task Description — Establish vertical / horizontal control and provide horizontal control points and vertical benchmarks at each intersection or at intervals not to exceed 1,000 feet. Task deliverable — N/A MOMUSON MAIERLE,INC. M finptuyrr-OwnM C-1—W Sub -task 003 Topographic Field Survey Task Description — Complete a topographic design survey of the right of way including areas beyond right of way as necessary to locate curb boxes. Include areas outside of right of way as noted on the attached Exhibit D-4. Extend survey to fifty feet down each intersecting roadway and survey next manhole, water valve, etc., along intersection. Survey includes surface features and subsurface utilities, including depth information on water, sewer, and storm utilities. Manholes shall have center of lid and center of manhole located. Horizontal locations of underground utilities provided by utility locate personnel using pin flags and paint markings. Underground utility materials and sizes to be noted based on locates and City of Bozeman provided service cards and record drawings. Advise city staff of any discrepancies between survey and service cards/record drawings. City of Bozeman to provide vacuum excavation services as needed for valve boxes and sewer and storm manholes/inlets. Task deliverable — N/A Sub -task 004 Office Survey Data Processing Task Description — Download survey data and prepare topographic mapping drawings using standard Morrison-Maierle line work and symbols. Task deliverable — N/A Sub -task 005 Field Survey Verifications Task Description — Review topographic survey drawings for completeness and accuracy by walking the project area with drawings in hand. Based on field review, complete additional survey as necessary and update survey drawings. Task deliverable —N/A Sub -task 006 Tie Property Corners for ROW/Property Lines Task Description — Tie adjacent property corners to illustrate right of way/property lines along the survey corridor. Task deliverable — N/A 2 .99 MORRISON MAIERLE, INC. M fnyrRWe.0m,ed C -1—y Sub -task 007 Deliverables Task Description — Prepare project notebook. Task deliverable — Topographic mapping exhibits (both paper and electronic) for each survey area. Overall control exhibits (both paper and electronic) for each survey area. Topographic and control exhibits may be combined. Electronic AutoCad files shall utilize a Civil 3D 2013 compatible format. Copies of all field notes. Sub -task 008 Coordination — City, MDT, Utilities Task Description — Project coordination and utility locate coordination. Task deliverable — N/A Sub -task 009 Quality Assurance / Quality Control Task Description — This task includes effort associated with project coordination and quality control/assurance. Task deliverable — N/A Exhibit D-4 - Fee Estimate City of Bozeman, MT - Capital Improvement Projects Field Survey Prepared For: Robert Murray Jr., P.E. Survey / Engineering Services MORMON AA MAIERLE,isc. Sep -2015 Task Total -7 Bridger D,r,, Story -NI �Rd,, E Griffin -Dr. $29,927.75 N:\0417\075\Contracts-Client\Contracts\Contract Amend #4\Exhibit D-4 - Engineering Fee Estimatexls 9/24/2015 800 - Bridger Dr., Story Mill Rd., E. Griffin Dr. 801. Office Research and Computations Land Surve or7Crew 2.00 114.00 228.00 Land Surve o3.00 102.00 306.00 802. Horizontal and Vertical Field Control Two Person Surve14.00 $175.00 $2,450.00 Land Surveyor III 5.00 $114.00 $570.00 Two Person Survey Crew 56.00 $175.00 $9,800.00 803. Topographic Field Survey Senior Engineer I 5.00 $128.00 $640.00 Land Surveyor III 10.00 $114.00 $1,140.00 804. Office Survey Data Processing Land Surveyor II 10.00 $102.00 $1,020.00 Engineering Technician II 35.00 $102.00 $3,570.00 805. Field Survey Verifications Senior Engineer I 10.00 $128.00 1280.00 Land Surveyor II 5.00 $102.00 $510.00 806. Tie Property Corners for ROW/Property Lines Two Person Survey Crew 6.00 $175.00 $1,050.00 Land Surveyor III 2.00 $114.00 $228.00 807. Deliverables Senior Engineer I 6.00 $128.00 $768.00 Engineering Technician II 6.00 $102.00 $612.00 808. Coordination - City, MDT, Utilities Senior Engineer I 10.00 $128.00 $1,280.00 Land Surveyor III 8.00 $114.00 $912.00 809. Quality Assurance/Quality Control Supervisinq En Ineer III 1.50 $172.00 258.00 Communications 194.50 $6.00 $1,167.00 125.00 $0.74 $92.50 7ec,ologyd ion (days) 8.75 $225,00 $1,968.75 als (days) 8.75 $6.00 $52.50 ckage 1 $25.00 $25.00 Task Total -7 Bridger D,r,, Story -NI �Rd,, E Griffin -Dr. $29,927.75 N:\0417\075\Contracts-Client\Contracts\Contract Amend #4\Exhibit D-4 - Engineering Fee Estimatexls 9/24/2015 Exhibit D-4 - Fee Estimate A '1Am 'M RRISON City of Bozeman, MT - Capital Improvement Projects Field Survey Mail MAIGRLE,isc. Prepared For: Robert Murray Jr., P.E. Summary - Survey / Engineering Services Sep -2015 100 West Olive St. Included under orig. contract 3.3 $11,061.40 200 East Olive St. included under orig, contract 3.2 11061.40 300A Wilson Ave. incl. one block of Lincoln St. modified orig. scope, cost remains unchanged) 16.3 $43,012.50 400A Ka Boulevard modified orig. scope, area and cost reduced 10.3 $30,360.50 500 N.19th Avenue 3.2 $12,652.00 600 - Kaw Boulevard MDT Control Cadastral NLA 44 378.75 700 - N. Wallace Ave. 5.6 $16,551.50 800 Brid er Dr. St o Mill Rd. E. Griffin Dr. 10.0 29 927.75 N:\0417\075\Contracts-Client\Contracts\Contract Amend #4\Exhibit D-4 - Englneedng Fee Estimate.& 9/24/2015