Loading...
HomeMy WebLinkAboutA1. Phase II DevPage 1 of 13 15368, Staff Report for Poplar Terrace, Phase 2 Date: City Commission meeting is on October 19, 2015 Project Description: A second phase of development to add 2 two-household dwellings to an already developed site. The site currently has 8 dwellings in two buildings on the site. A single detached home has been removed from the site as part of the project. Project Location: 3050 and 3056 York Street Recommendation: Approval with conditions Recommended Motion One: Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 15368 and move to approve the use of cash-in-lieu of parkland for this project and accept the submitted appraisal to establish the value. Recommended Motion Two: Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 15368 and move to approve the site plan and with conditions and subject to all applicable code provisions. Report Date: October 8, 2015 Staff Contact: Chris Saunders, Policy and Planning Manager Shawn Kohtz, Development Review Engineer Agenda Item Type: Action (Quasi-judicial) EXECUTIVE SUMMARY Unresolved Issues None Project Summary The Poplar Terrace project currently has eight dwellings in two buildings. The application is for a second phase which removes an existing single detached dwelling and replaces it with two duplexes. A total of 12 dwellings will be on the site upon completion. The site is a small infill project. As a site plan it is evaluated for park land impacts. After crediting for removal of the existing home, three additional homes are proposed which must provide a total mitigation of .09 acres or its equivalent. Due to the small amount and location, both staff and RPAB recommend the Commission approve cash-in-lieu of parkland. The 107 15368, Staff Report for Poplar Terrace, Phase 2 Page 2 of 13 required appraisal is provided. Normally the decision to approve this application would be made by the Director of Community Development. However, due to the request for Cash-in- lieu of parkland the City Commission must act instead. Alternatives 1) Approve the project as recommended by staff. 2) Require an alternate means of providing for the parkland. 3) Make alternate findings and deny the project. TABLE OF CONTENTS EXECUTIVE SUMMARY ...................................................................................................... 1 Unresolved Issues ............................................................................................................... 1 Project Summary ................................................................................................................. 1 Alternatives ......................................................................................................................... 2 SECTION 1 - MAP SERIES .................................................................................................... 3 SECTION 2 –REQUESTED RELAXATION/DEVIATIONS/VARIANCES ........................ 6 SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL ...................................... 6 SECTION 4 - CODE REQUIREMENTS REQUIRING PLAN CORRECTIONS ................. 7 SECTION 5 - RECOMMENDATIONS AND FUTURE ACTIONS ...................................... 7 SECTION 6 - STAFF ANALYSIS AND FINDINGS ............................................................. 7 Applicable Plan Review Criteria, Section 38.19.100, BMC. .............................................. 8 APPENDIX A – PROJECT SITE ZONING AND GROWTH POLICY............................... 11 APPENDIX B – DETAILED PROJECT DESCRIPTION AND BACKGROUND.............. 12 APPENDIX C – NOTICING AND PUBLIC COMMENT ................................................... 12 APPENDIX D - OWNER INFORMATION AND REVIEWING STAFF............................ 13 FISCAL EFFECTS ................................................................................................................. 13 ATTACHMENTS ................................................................................................................... 13 108 15368, Staff Report for Poplar Terrace, Phase 2 Page 3 of 13 SECTION 1 - MAP SERIES 109 15368, Staff Report for Poplar Terrace, Phase 2 Page 4 of 13 110 15368, Staff Report for Poplar Terrace, Phase 2 Page 5 of 13 111 15368, Staff Report for Poplar Terrace, Phase 2 Page 6 of 13 SECTION 2 –REQUESTED RELAXATION/DEVIATIONS/VARIANCES None have been requested. SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL Please note that these conditions are in addition to any required code provisions identified in this report. Recommended Conditions of Approval: 1. The pedestrian walk between the two new buildings shall be extended to connect to the sidewalk in the West Babcock Street right of way. The private walk may be gated per Section 38.23.130, BMC if the owner wishes. 2. The fire turnaround hammerhead shall have red curb painted and no parking signs placed. 3. Unless otherwise allowed by the Water and Sewer Superintendent, the water service connections must be uniform size from the service line tap to the building structures per the City of Bozeman Design Standards and Specifications Policy. At least one of the existing water services to the proposed buildings is a ¾” service, while the extension of new service connections to the buildings are indicated on the plans as 1” services. 4. The driveway access off West Babcock Street to the existing building on the site must be demolished and reconstructed with new curb and gutter. Additionally, the boulevard must be reconstructed where the concrete drive access currently exists. 5. All construction activities shall comply with section 38.39.020.A.2 of the BMC. This shall include routine cleaning/sweeping of material that is dragged to adjacent streets. The City may require a guarantee as allowed for under this section at any time during the construction to ensure any damages or cleaning that are required are complete. The developer shall be responsible to reimburse the City for all costs associated with the work if it becomes necessary for the City to correct any problems that are identified. 112 15368, Staff Report for Poplar Terrace, Phase 2 Page 7 of 13 SECTION 4 - CODE REQUIREMENTS REQUIRING PLAN CORRECTIONS A. The location of the mail service shall be indicated on the final plan. B. Per Section 38.08.030 the allowed lot coverage is limited to 40% for this use. The plan shall be altered to comply with this requirement. C. The City Commission must approve the requested use of Cash-in-lieu of parkland prior to final site plan approval. D. The applicant shall submit a construction route map dictating how materials and heavy equipment will travel to and from the site in accordance with Section 38.39.020.A.1 of the Bozeman Municipal Code (BMC). This shall be submitted as part of the final site plan for site developments. It shall be the responsibility of the applicant to ensure that the construction traffic follows the approved routes. SECTION 5 - RECOMMENDATIONS AND FUTURE ACTIONS Project Name: Poplar Terrace Phase 2 preliminary plan File: 15368 Having considered the criteria established for residential planned unit developments approval with conditions is recommended by the Development Review Committee (DRC). The DRC considered the application on September 16 and 23, 2015 and recommends favorably with conditions and code corrections. The Recreation and Parks Advisory Board subdivision review committee considered the proposed cash-in-lieu of park dedication on September 18, 2015. They recommend City Commission approval of the use of cash-n-lieu of parks for this project. The City Commission will consider the proposal on October 19, 2015. The City Commission public meeting will occur at 121 North Rouse Avenue, Bozeman MT, in the City Commission room at 6 pm. SECTION 6 - STAFF ANALYSIS AND FINDINGS Analysis and resulting recommendations are based on the entirety of the application materials, municipal codes, standards, and plans, public comment, and all other materials available during the review period. Collectively this information is the record of the review. The analysis in this report is a summary of the completed review. 113 15368, Staff Report for Poplar Terrace, Phase 2 Page 8 of 13 Applicable Plan Review Criteria, Section 38.19.100, BMC. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or State law. In considering applications for plan approval under this title, the advisory boards and City Commission shall consider the following: 1. Conformance to and consistency with the City’s adopted growth policy This is a residential project located within an area planned and zoned for residential uses. It conforms with Figure 3-1 of the growth policy. A review of the goals and policies has shown no conflicts. The infill development in a scale and density consistent with surrounding areas is supportive of Objective LU-1.4, Objective C-1.3, and Housing Objective 3.3 of the Bozeman Community Plan. 2. Conformance to this chapter, including the cessation of any current violations The site has no known violations on site. The project has five conditions and 4 code requirements identified. When those have been satisfied the project will conform to this chapter. 3. Conformance with all other applicable laws, ordinances, and regulations Construction of the site will require building code review and permits and utility inspections. With the identified conditions and code corrections the proposed project will comply. See Conditions 3 & 5. 4. Relationship of site plan elements to conditions both on and off the property The site is generally level and no substantial grading is proposed with this project. Storm water controls will be required to prevent nuisance to adjacent properties from runoff. The buildings are two stories which is the same or of similar scale to adjacent development. 5. The impact of the proposal on the existing and anticipated traffic and parking conditions There are 4 two-bedroom dwellings proposed which requires a total of 8 parking spaces. The required parking is provided by a combination of internal garages and open parking spaces. The additional traffic impacts are minor and appear well within the capacity of adjacent streets. To prevent parking in the required emergency services hammerhead it is required by Condition 2 that the curbs be painted red and appropriate signs installed. 6. Pedestrian and vehicular ingress and egress Condition 1 requires a sidewalk connection between the existing sidewalk along Babcock Street and the interior of the property. Currently, the residents of the 8 existing dwellings need to take an indirect route to Babcock Street that is 645 feet in length. With the sidewalk 114 15368, Staff Report for Poplar Terrace, Phase 2 Page 9 of 13 in place, they will access in less than 105 feet. Babcock Street has the nearest designated bicycle lanes and is a direct route to a variety of services and retail options. The owner has expressed concerns about cut through pedestrian by non-residents trespassing on his site. Prevention of trespass is a reasonable concern. Section 38.23.130, BMC addresses options for fencing, including gates, which can be used to restrict access to unauthorized persons. There is no restriction on the property owner from installing a fence compliant with Section 38.23.130, BMC to lessen trespass. A construction route map must be submitted with the final site plan. Given the project location, West Babcock Street will be the primary access with site access from York St. There is an existing curb cut for the driveway which served the demolished home. The driveway is being abandoned with this project. The project needs to restore the boulevard area and remove the old curb cut in order to comply with drive access spacing standards of Section 38.24.090 and Condition 4. 7. Landscaping, including the enhancement of buildings, the appearance of vehicular use, open space, and pedestrian areas, and the preservation or replacement of natural vegetation The proposed landscaping complies with required standards. The placement of plants provides screening of parking areas. Landscaping will break up the profile of buildings and provide visual interest along the street. 8. Open space and Parks The required private open space has been provided. There is a net increase of three dwellings with this project. Per Section 38.27.020, BMC review as a site plan with additional dwellings requires provision of parkland or its equivalent to mitigate impacts to the City’s recreational system. The mitigation required is equal to .03 acres (1,307 sq. ft.) of land per dwelling. The total mitigation required is therefore .09 acres (3,921 sq. ft.) If cash-in-lieu (CIL) of dedication of land is proposed, per Section 38.27.030, BMC an appraisal must be provided by the applicant to establish the value of the land. The applicant has requested approval for CIL. The City uses the unsubdivided, unimproved land value as the basis for the appraisal. The required appraisal has been submitted which sets a value per sq. ft. of $0.80. The total amount due is $3,136.80. The City prefers a dedication of land over cash-in-lieu due to disparity of value. This policy is established in the Parks Recreation Open Space and Trails plan. However, the plan also recognizes that in some circumstances CIL is appropriate. For this project, due to the small size of the dedication, inability to combine the dedication with other park areas, and is an infill project; both staff and the Recreation and Parks Subdivision Review Committee recommend acceptance of CIL. Further, there are several nearby parks which can provide 115 15368, Staff Report for Poplar Terrace, Phase 2 Page 10 of 13 neighborhood and community scale services and which could benefit from additional improvements funded with CIL dedicated by this development. 9. Building location and height The buildings are located reasonably on the site and are placed harmoniously with the existing buildings. At 24.75 feet in height the buildings are within the 38 foot maximum height allowed for R-3 zone for a 5:12 roof pitch. 10. Setbacks The application meets all setbacks. 11. Lighting No new non-building lighting is proposed. There are parking lot lights already in place which appear to conform to City requirements. Should additional lighting be installed it must comply with Section 38.23.150, BMC. The proposed building mounted lights comply. 12. Provisions for utilities, including efficient public services and facilities No main lines must be extended for this project. Installation of service lines to the two new buildings is required. Per the Conditions and code requirements in this report, the service extensions must meet City specifications. Trash service is provided by individual totes for each unit rather than a centralized trash location. 13. Site surface drainage The required stormwater control plan has been submitted. No deficiencies have been identified. 14. Loading and unloading areas Not applicable. 15. Grading The grading proposed appears consistent with stormwater management requirement and does not appear to create a problem for adjacent uses. The site will be filled slightly to connect the elevation of the Babcock right of way and the internal parking area. 16. Signage No signs are included with the application. 17. Screening All required screening has been provided. 18. Overlay district provisions Not applicable 116 15368, Staff Report for Poplar Terrace, Phase 2 Page 11 of 13 19. Other related matters, including relevant comment from affected parties No public comment has been received as of the writing of this report. Any comments received will be provided to the City Commission prior to or at their meeting. 20. If the development includes multiple lots that are interdependent for circulation or other means of addressing requirement of this title, whether the lots are either: Configured so that the sale of individual lots will not alter the approved configuration or use of the property or cause the development to become nonconforming or The subject of reciprocal and perpetual easements or other agreements to which the City is a party so that the sale of individual lots will not cause one or more elements of the development to become nonconforming. Not applicable. 21. Compliance with article 8 of chapter 10 of the Bozeman Municipal Code. Not applicable. 22. Phasing of development No phasing is proposed. APPENDIX A – PROJECT SITE ZONING AND GROWTH POLICY Zoning Designation and Land Uses: The subject property is zoned “R-3” (Residential Medium Density District). The intent of the R-3 residential medium density district is to provide for the development of one- to five- household residential structures near service facilities within the city. It should provide for a variety of housing types to serve the varied needs of households of different size, age and character, while reducing the adverse effect of nonresidential uses. Adopted Growth Policy Designation: The property is designated as “Residential” in the Bozeman Community Plan. The Plan indicates that “This category designates places where the primary activity is urban density dwellings. Other uses which complement residences are also acceptable such as parks, low intensity home based occupations, fire stations, churches, and schools. High density residential areas should be established in close proximity to commercial centers to facilitate the provision of services and employment opportunities to persons without requiring the use of an automobile. Implementation of this category by residential zoning should provide for and coordinate intensive residential uses in proximity to commercial centers. The residential 117 15368, Staff Report for Poplar Terrace, Phase 2 Page 12 of 13 designation indicates that it is expected that development will occur within municipal boundaries, which may require annexation prior to development. The dwelling unit density expected within this classification varies between 6 and 32 dwellings per net acre. A higher density may be considered in some locations and circumstances. A variety of housing types can be blended to achieve the desired density. Large areas of single type housing are discouraged. In limited instances the strong presence of constraints and natural features such as floodplains may cause an area to be designated for development at a lower density than normally expected within this category. All residential housing should be arranged with consideration of compatibility with adjacent development, natural constraints such as watercourses or steep slopes, and in a fashion which advances the overall goals of the Bozeman growth policy. The residential designation is intended to provide the primary locations for additional housing within the planning area. APPENDIX B – DETAILED PROJECT DESCRIPTION AND BACKGROUND Project Description The project site is 1.097 acres in size. There are two existing four dwelling buildings on the site. A single detached home was recently removed to make room for the addition of two duplex structures. Each of the new dwellings is a two bedroom home with ground floor garage and primary living space on the second floor. The project has requested approval for cash-in-lieu of parkland to mitigate recreational impacts. Project Background The property has not been previously subdivided and is Tract 2 of Certificate of Survey 2276. The original approval for the first phase was as application Z-07039 in 2007. The project received approval for the first two buildings. Due to the passage of time it was necessary to resubmit for formal review of Phase 2. APPENDIX C – NOTICING AND PUBLIC COMMENT Notice was provided on September 25, 2015 and meets the requirement for notice to be provided at least 15 and not more than 45 days prior to the City Commission public meeting. No comments have been received to date. The public comment period remains open through the City Commission meeting. 118 15368, Staff Report for Poplar Terrace, Phase 2 Page 13 of 13 APPENDIX D - OWNER INFORMATION AND REVIEWING STAFF Owner/Applicant: Morgan Investments LLC, 76 Sako Court, Bozeman MT 59718 Representative: Madison Engineering Inc., 895 Technology Blve, Ste 203, Bozeman, MT 59718 Report By: Chris Saunders, Policy and Planning Manager FISCAL EFFECTS No unusual fiscal effects have been identified. No presently budgeted funds will be changed by this site plan. ATTACHMENTS The full application and file of record can be viewed at the Community Development Department at 20 E. Olive Street, Bozeman, MT 59715. Application materials Recreation and Parks Advisory Board recommendation 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 UPWH WHUPDNREF.DWDNW/DREF.DWW/DAR&S2341 CAR GARAGEINDICATES INTERIOR SHEAR WALL − SEESTRUCTURAL PANEL DESIGN NOTE #2BC2’ − 0"20’ − 6"15’ − 6"38’ − 0"4’ − 0"2’ − 1"2’ − 10"1’ − 1"3’ − 8 1/2"2’ − 6"3’ − 0"2’ − 6"2’ − 4"BEDROOMCEILING − 8’−1 1/8"2’ − 8"3’ − 6 1/2"4’ − 1"8’ − 0 1/2"2’ − 0"6’ − 7"2’ − 5"2’ − 6"2’ − 6"24’ − 0"5’ − 0"22’ − 6"6’ − 3"9’ − 3"3’ − 0"2’ − 10"2’ − 4 1/2"2’ − 4 1/2"3’ − 1 1/2"5’ − 3"FOYERCEILING −8’−1 1/8"BATHCEILING −8’−1 1/8"8’ − 0"9’ − 10"6’ − 1 1/2"GARBAGESTORAGE2’ − 7 1/2"5’ − 5"1CONC.PORCHCONC.PORCHUNIT AR&S1 CAR GARAGE38’ − 0"2’ − 1"2’ − 10"1’ − 1"3’ − 8 1/2"2’ − 6"3’ − 0"3’ − 0"2’ − 6"2’ − 4"BEDROOMCEILING − 8’−1 1/8"2’ − 8"3’ − 6 1/2"4’ − 1"8’ − 0 1/2"2’ − 0"4’ − 0"6’ − 7"2’ − 5"2’ − 6"2’ − 6"24’ − 0"5’ − 0"22’ − 6"6’ − 3"9’ − 3"3’ − 0"2’ − 10"2’ − 4 1/2"2’ − 4 1/2"3’ − 1 1/2"5’ − 3"0’ − 1"FOYERCEILING −8’−1 1/8"BATHCEILING −8’−1 1/8"9’ − 10"6’ − 1 1/2"0’ − 1"GARBAGESTORAGE2’ − 7 1/2"5’ − 5"2UNIT B4’ − 0"32’ − 0"16’ − 0"16’ − 0"4’ − 0"32’ − 0"W/ PAN& STRAPW/ PAN& STRAP3’ − 0"x 7’−0" 8’ − 0" x 7’−0"CONC.PORCH4x4 POST,TYP.1CONC.PORCH4x4 POST,TYP.4x4POST,TYP.4x4 POST4x4 POST4’ SW4’ SW4’ SW4’ SW4’ SW4’ SW4’ SW4’ SW4’ SW6’ SW6’ SWA234BEDROOMCEILING − 8’−1 1/8"UNIT AATTICACCESS30"x22"MIN.BCKITCHENCEILING − 8’−1 1/8"2’ − 5 1/2"3’ − 3 1/2"3’ − 2"2’ − 4"2’ − 6"33’ − 6"2’ − 4"9’ − 9"2’ − 10 1/2"2’ − 9 1/2"10’ − 10"3’ − 3"6’ − 6"LIVING11’ − 0"8’ − 0"CEILING − 8’−1 1/8"BATHCEILING −8’−1 1/8"2’ − 11 1/2"3’ − 9 1/2"2’ − 0"3’ − 0"DININGR&SLINEN2’ − 6"5436’ − 0"5’ − 9"4’ − 11 1/2"5’ − 3"11’ − 2"4’ − 9 1/2"HALFWALLRAILINGUNIT BATTICACCESS30"x22"MIN.KITCHENCEILING − 8’−1 1/8"2’ − 5 1/2"3’ − 3 1/2"2’ − 4"2’ − 6"83’ − 6"9’ − 9"2’ − 10 1/2"2’ − 9 1/2"10’ − 10"3’ − 3"6’ − 6"LIVING11’ − 0"8’ − 0"BATHCEILING −8’−1 1/8"2’ − 0"DININGLINEN6736’ − 0"5’ − 9"4’ − 11 1/2"5’ − 3"0’ − 1"11’ − 2"4’ − 9 1/2"0’ − 1"HALFWALLRAILING32’ − 0"16’ − 0"16’ − 0"2’ − 0"20’ − 6"32’ − 0"INDICATES INTERIOR SHEAR WALL − SEESTRUCTURAL PANEL DESIGN NOTE #22’ − 6"2’ − 4"2’ − 11 1/2"3’ − 9 1/2"R&S2’ − 6"CEILING − 8’−1 1/8"BEDROOMCEILING − 8’−1 1/8"PLUMBING WALLPLUMBING WALL3’ − 0"2’ − 0"20’ − 6"15’ − 6"(ROOF BELOW)(ROOF BELOW)(ROOF BELOW)(ROOF BELOW)(ROOF BELOW)14’ SW4’ SW4’ SW4’ SW4’ SW4’ SW4’ SW4’ SW4’ SW4’ SW4’ SW4’ SWINDICATES EXTERIOR BRACED WALL PANEL7/16" SHEATHING W/8d @ 6" O.C. AT EDGES 12"O.C. AT FIELD.dzyn2architectscopyright 2015 dzyn2 architects,pllc drawings shallnot be modified,copied, or used forpurposes other thantheir intended use,without prior writtenconsent from dzyn2architects, pllc verifyscale noted ondrawings, as sizereduction will affectscale of drawings.scale: drawingsplotted on 24"x36"scale as shown, ifplotted on 11"x17"drawings are half(50%) of scale notedREV:PROJECT NAME:Michael E. Pentecost,AIAP.O. Box 10866Bozeman, mt. 59719Phone − 406−586−5896Fax − 406−566−5782ADDRESS:OWNER:LEGAL:A1.01LEVELPLANST.B.D.MORGAN HOMES DUPLEXPERMITSMORGAN INVESTMENTS LLC.T.B.D.8−18−15WINDOW SCHEDULEMARK WIDTH HEIGHT HEAD HEIGHT DESCRIPTION COMMENTS1 3’ − 0" 5’ − 0" 6’ − 11 1/8" SINGLE HUNG2 3’ − 0" 5’ − 0" 6’ − 11 1/8" SINGLE HUNG3 4’ − 0" 4’ − 0" 6’ − 11 1/8" SLIDER EGRESS4 4’ − 0" 5’ − 0" 6’ − 11 1/8"5 5’ − 0" 3’ − 6" 6’ − 11 1/8"6 5’ − 0" 3’ − 6" 6’ − 11 1/8"7 4’ − 0" 5’ − 0" 6’ − 11 1/8"8 4’ − 0" 4’ − 0" 6’ − 11 1/8" SLIDER EGRESSGENERAL PLAN NOTES:1. ALL WALLS AT THE MAIN LEVEL ARE 8’−1 1/8". ALL WALLS AT THE UPPER LEVEL ARE 8’−1 1/8".2. ALL DIMENSIONS SHOWN ARE TO FACE OF FRAMING.3. ALL WINDOWS TO BE TAPE SEALED AND FOAM FILLED SPACE BETWEEN WINDOW AND FRAMING.4. PROVIDE 1−1/2" GRIPPABLE HANDRAIL 34" ABOVE NOSING AT ALL STAIRS WITH MORE THAN ONE RISER5. ALL INTERIOR DOORS ARE TO BE CENTERED IN OPENINGS OR LOCATED AS DIMENSIONED.6. PROVIDE 1/2" TYPE X GYP BOARD AT COMMON WALLS (CONTINUOUS TO UNDERSIDE OF UPPER LEVELFLOOR SHEATHING) AND 5/8" TYPE X GYP AT CEILING AND UNDER STAIR.7. ALL WINDOW HEAD HEIGHTS ARE AS NOTED, REFER TO WINDOW SCHEDULE.8. PROVIDE EXHAUST VENT FOR WATER HEATER OF CPVC OR OTHER HIGH TEMPERATURE MATERIAL ASREQ. BY MANUFACTURER.9. STRUCTURE MUST COMPLY WITH 2012 INTERNATIONAL ENERGY CONSERVATION CODE AND IRC 2012BUILDING CODE.STRUCTURAL PANEL DESIGN NOTES:1. ALL WALLS FOR THIS PROJECT HAVE BEEN DESIGNED USING 2012 IRC (CS−WSP) CONTINUOUSSHEATHED − WOOD STRUCTURAL PANELS PER TABLE R602.10.1.2(2) AND R602.10.4.1 CONTINUOUSSHEATHING BRACED WALL PANELS, USING SEISMIC DESIGN CATEGORY SDC DO OR DI. ALL WALLS TO BEBUILT USING 2X6 STUDS STACKED UNDER FLOOR TRUSSES AND ROOF TRUSSES AT 24" O.C. WITH SINGLEBOTTOM PLATE AND DOUBLE TOP PLATES WITH CONTINUOUS 1/2" OSB FULL HEIGHT 8’ PANELS,VERTICALLY INSTALLED W/ 6D COMMON NAILS AT 6" O.C. PANEL EDGES AND 12" AT FIELD, OR 16 GAUGE1−3/4" STAPLES AT 3" SPACING AT PANEL EDGES AND 6" SPACING AT FIELD, PER TABLE R602.10.4.1.2. INTERIOR WALLS TO HAVE SHEETROCK SCREWS AT 7" SPACING AT EDGES AND FIELD SIZE PER IRCR702.3.5.AREA SCHEDULEUNIT UNIT AREAUNIT A − GARAGE 360 SFUNIT A − MAIN LEVEL 248 SFUNIT A − UPPER LEVEL 543 SFUNIT B − GARAGE 360 SFUNIT B − MAIN LEVEL 248 SFUNIT B − UPPER LEVEL 543 SF 1/4" = 1'-0"1MAIN LEVEL PLAN 1/4" = 1'-0"2UPPER LEVEL PLAN171 MAIN LEVEL0' - 0"MAIN T.O.W.8' - 1 1/8"T.O. FTG.-2' - 8"UPPER LEVEL8' - 11 3/8"UPPER T.O.W.17' - 0 1/2"5/4x10 MIRATECSPLASH GUARD,TYP.LAP SIDING, TYP.5/4x4 MIRATECTRIM, TYP.5" 12"24’ − 8 5/16"5" 12"24’ − 8 5/16"dzyn2architectscopyright 2015 dzyn2 architects,pllc drawings shallnot be modified,copied, or used forpurposes other thantheir intended use,without prior writtenconsent from dzyn2architects, pllc verifyscale noted ondrawings, as sizereduction will affectscale of drawings.scale: drawingsplotted on 24"x36"scale as shown, ifplotted on 11"x17"drawings are half(50%) of scale notedREV:PROJECT NAME:Michael E. Pentecost,AIAP.O. Box 10866Bozeman, mt. 59719Phone − 406−586−5896Fax − 406−566−5782ADDRESS:OWNER:LEGAL:A2.01ELEVATIONST.B.D.MORGAN HOMES DUPLEXPERMITSMORGAN INVESTMENTS LLC.T.B.D.8−18−15 1/4" = 1'-0"1NORTH ELEVATION 1/4" = 1'-0"2SOUTH ELEVATION 1/4" = 1'-0"3EAST ELEVATION 1/4" = 1'-0"4WEST ELEVATION172 173 174 175 Turf Turf Turf Turf Turf Turf Turf Remove existing trees Setback Line Utility Easement 6"+ Maple to preserve 6"+ Willow to preserve Remove existing trees Snow StorageSnow Storage Remove existing tree Symbol Plant Name (Scientific)Size @ Planting Mature Size Qty Plant Table Tatarian Maple (Acer tataricum) Buffalo Juniper (Juniperus sabina) Dwarf Mugho Pine (Pinus mugho pumillo) Austrian Pine (Pinus nigra) Quaking Aspen (Populus tremuloides) Radiant Flowering Crab (Malus sp.) Dwarf Korean Lilac (Syringa meyeri palibin) Diablo Ninebark (Physocarpus opulifolius) Abbotswood Potentilla (Potenitlla fruticosa) Goldflame Spirea (Spiraea japonica) 8-10'40-50' 2 #5 3-5' 3 #5 3-5' 8 1.5-2"50-60' 3 1-1.5"35-45'10 1-1.5" 35-45' 2 12-24"5-6' 3 12-24" 4-5' 5 9-12"2-3'13 9-12" 2-3' 16 Drought Tolerant Y Y Y Y Y Y Y Poplar Terrace50 Bronco DriveBozeman, Montana 59718ph 406.539.7030e-mail:chad@customearthdesign.comL 1.0Date: 04 August 2015Revised: Landscape PlanProject for: Bozeman, MontanaChad Rempfer, Landscape DesignerScale 1/8" = 1'-0"Date: 17 August 2015176 Turf Turf Turf Turf Turf Turf Turf Remove all existing trees on site Irrigation Symbols Rainbird 5000 Rotor large space 25-30' radius Rainbird RD04 Spray MSRT Nozzle 10-18' radius Poplar Terrace50 Bronco DriveBozeman, Montana 59718ph 406.539.7030e-mail:chad@customearthdesign.comL 1.1Date: 04 August 2015Revised: Irrigation PlanProject for: Bozeman, MontanaChad Rempfer, Landscape DesignerScale 1/8" = 1'-0" 177 178 179 180 Bozeman Recreation & Parks Advisory Board P.O. Box 1230 · Bozeman, MT · 59771 Park Master Plan Review SUBJECT: Poplar Terrace PLANNER: Chris Saunders FROM: Subdivision Review Committee DATE OF REVIEW: 9/18/2015 OVERVIEW: • This development on West Babcock between Michael Grove and Meriwether Aves proposes replacing an existing dwelling with two duplexes. This would generate a dedication requirement of .09 acres. The developer is requesting cash-in-lieu. COMMENTS: • This is an infill project in a densely populated area. The impact on existing neighborhood parks will be minimal. RECOMMENDATION: • This project presents an appropriate use of cash-in-lieu. • We would like to see the proceeds of the cash-in-lieu payment go toward improvements to parks in this area. FISCAL EFFECTS: • Cash-in-lieu has been calculated at $3,136. ALTERNATIVES: • N/A Respectfully submitted, Subdivision Review Committee of the Recreation and Parks Advisory Board The full Recreation & Parks Advisory Board has not reviewed these findings and recommendations. 181