TASK ORDER NUMBER 06
Issuer] under the authority of Professional Services Master, Taslc Ordef Agreement betiyeen :the City of
Bozema. n a.nd. DOWL for: Professional and teclniical services for the acquisition of right of y,aL
easements and real property to allow for the construction of various street and utilities
improvements withinthe City of Bozeman
Task Order Title: Street and Utilities Land Agent Services — Trail to the M
This Task Order is dated a I, I 20Lbehveen City of Bozeman (City)
and DOWL (Contractor).
The following representatives have been designated for the work performed under this Task Order:
City: Carolyn Poissant
Contractor: Tony Becken-Gaddo, P.E.
SCOPE OF wolkm
The scope of work for Task Order No. 6 is detailed in the attached Exhibit A-6 Project Scope of Seivices.
COMPENSATION:
Contractor shall be reimbursed on a time and materials basis with a total cost not to exceed $35,474.00. The
total cost for Task Order No. 6 is detailed in the attached Project Cost Estimate. Contractor shall invoice no
Blore often than mootlily foi, services provided in the prior month.
The provisions of the Professional Seivices Master Task Order Agreement and any Special Terms and
Conditions and/or Exhibits or Attachments to this Task Order shall govern the Work.
IN WITNESS WHEREOF, the parties Agthorized to commit resources of the companies have executed this
Task Order:
City of Bozeman
�P
7-7
By:
Title:,. i
Contractor
By. r� !
Title: SS lz P A
Date:•
Fed. ID. No. 92-0166301
EXHIBIT A-6 July 7, 2015
PROJECT SCOPE OF SERVICES
Professional Services Agreement for Streets and Utilities Land Agent Services
Project Scope of Services
Task Order No. 6
The scope of services for this City of Bozeman Right -of -Way Acquisition Project is to Appraise,
Acquire and successfully conduct and prepare the necessary meetings, agreements, and legal
documents to transfer property titles fiom private land owners to the City of Bozeman (City).
The Federal Highway Administration (FHWA) and City will be constructing new trail
improvements in the near future and the City intends to acquire the necessary right-of-way
(R/W) prior to construction. This project will serve as the R/W acquisition process for the Trail
to the M TOP Project which will install a new shared use path to the M Trailhead near Bozeman,
Montana. The Feasibility Memorandum for the Bozeman to Bridger Mountains Trail, MD DOT
86(1) (January, 2015), trail alternative 2, is the basis for areas necessitating R/W acquisition.
The intent of this scope of services and corresponding cost estimate is to provide acquisition
services on a time and materials, not to exceed basis. Additional costs related to the actual land
purchase price, relocation costs paid to property owners, and any costs associated with eminent
domain proceedings are not included in this scope of services or cost estimate.
All work will be performed in accordance with the guidelines and procedures contained 49 CFR,
"Uniform Relocation Assistance and Real Property Acquisition Regulations for Federally -
Assisted Programs" as amended. The standard R/W process for Montana Department of
Transportation projects will be followed for this project.
The following activities will be conducted as outlined below.
1_0 PROJECT RESEARCH
• Obtain and review available preliminary design plans.
• Obtain and review available project documentation.
• Coordination meeting with the project team members.
• Obtain current deeds and ownership information.
2_0 INITIAL PROPERTY OWNER CONTACT
• Compile contact information.
• Initiate contact with owners to inform them of this project and the process.
3_0 SURVEY
Control or topographic field surveys are not included in this scope.
4_0 R/W MAPPING & EXHIBITS
Determine proposed R/W acquisition areas for six parcels located on the north side of
Bridger Canyon Road. Based on preliminary design efforts between FHWA, the City
BOWL Page 1 of 3
July 7, 2015
and the design engineer, it's anticipated the six parcels affected by future trail
improvements will require partial parcel acquisitions.
• Prepare preliminary deed exhibits.
• The final deed exhibits will be filed with the clerk and recorder upon finalization of
acquisition agreements.
• QA/QC of deliverables
Deliverables:
• Preliminary deed exhibits
5_0 TITLE COMMITMENTS
• Title commitments will be secured for each parcel requiring property acquisition.
• Team coordination
'6.0 APPRAISALS AND REVIEW APPRAISALS
• Appraisals will be conducted for parcels 97B and 106 as shown on the attached Figure 1.
• Review appraisals will be conducted for each of the parcel appraisals by a second
appraisal subconsultant.
• Waiver evaluations will be conducted for parcels 97A, 98, 100, and 107 as shown on the
attached Figure 1.
• Team coordination
• QA./QC of appraisal reports and waiver evaluations
7_0 PREPARE CONTRACTS
• Prepare preliminary acquisition documents.
• Prepare preliminary acquisition costs.
• QA/QC of deliverables
Deliverables:
• Preliminary acquisition documents including appraisals, review appraisals, and waiver
evaluations
8_0 ACQUISITIONS
• Conduct pre-acquisition meeting.
• Conduct meetings with property owners.
• Prepare final acquisition documents.
• Prepare final acquisition costs.
• Prepare summary of non -monetary considerations when applicable
• QA./QC of deliverables
%if L70WL Page 2 of 3
July 7, 2015
Deliverables:
• Final acquisition documents including appraisals and waiver evaluations
• Prepare summary of non -monetary considerations when applicable
9_0 R/W AND DESIGN PLAN UPDATES
• Based on acquisitions and agreements, updates to the preliminary deed exhibits will be
completed, if required.
• Modification of trail design plans is not included in this scope.
10.0 RELOCATION SERVICES
• Relocation services are not included in this scope.
11.0 CLOSING
• Prepare final title transfer documents, and schedule closing dates and meetings.
• Attend closing meetings.
12.0 PROJECT MANAGEMENT
• Team Coordination
• Progress meetings and updates
Deliverables:
• Bi -weekly Progress Report
13.0 FINAL SUBMITTAL AND CLOSEOUT
• Deliver completed title transfer documents
• Complete R/W certification documents
• Project closeout
• QA/QC of deliverables
Deliverables:
• Final signed and recorded title transfer documents (2 copies)
• Final R/W certification documents
CONTINGENCY
Due to the nature of property acquisition work, the time required to work with individual
property owners varies significantly. The scope of services as detailed in this document includes
all the necessary steps to acquire property from private owners, but much of that work relies on
good cooperation and timely responses from all parties. The contingency item serves to capture
the possible additional costs incurred during the acquisition process due to challenging situations
with property owners.
It
Page 3 of 3
BOWL
NOIldO IMI Z 3AI1VN2i311V n
M p Q NOIIISI(1DOV I302iVd ,l2iVNIWll32id m- W
�mm C�9
* VNVINOW 'Nb'W3Z08
A1NnOO NIIVIIV0'39H'SLl'££ N01103S 6 LL
S1N3W3AMWINI 103fONd d01 W 3H101IN81 g° F
u�
s g r< 0F
Y� kffigm Vii$
r ,x
AM
3 Z d
OF
a.
W W
CL 03
12 s
rr t
1 rf
i
cl
y
Fz
a
4
r
r-
lGity of Bozeman WIN Acquisition: Task Order No. 6 Project Cost Estimate
DATE: 7/7/15
PROJECT NO: 4524.11402.06
EST. PREPARED BY: DOWL
PAY SCH.: Time and Materials --NTE
Activity
Tasks
Total Hours
Project
Real Estate Manager/
Manager Coordinator
Right of
Way/Relocati
on Agent
Design
Engineer
Assistant
Coordinator
Professional
Surveyor
Survey Crew
Clerical
WORK TO BE COMPLETED
1.0 PROJECT RESEARCH
Obtain and review preliminary design plans
1
1
Obtain and review project documentation
1
1
Coordination meeting with the project team members
2
2
Obtain current deeds
2
2
SUBTOTAL (HOURS)
6
0 6
0
0
0
0
0
0
2.0 INITIAL PROPERTY OWNER CONTACT
Compile Contact Information
2
2
Initiate Contact
2
2
SUBTOTAL (HOURS)
4
0 4
0
0
0
0
0
0
3.0 SURVEY
Control Survey
0
Topographical Survey
RAN Survey
0
0
Not Applicable
Set New RAN Pins
0
QA/QC
0
SUBTOTAL(HOURS)
0
0 0
0
0
0
0
0 1
0
4.0 RIW MAPPING & EXHIBITS
Determine proposed RIW acquisition areas.
2
2
Prepare preliminary deed exhibits
15
1 2
12
QA/QC of Deliverables
1
1
SUBTOTAL(HOURS)
18
1 5
0
12
0
0
0
0
5.0 TITLE COMMITMENTS
Secure Title Commitments
1
1
Team Coordination
1
i
SUBTOTAL (HOURS)
2
0 2
0
0
0
0
0
0
6.0 APPRAISALS AND REVIEW APPRAISALS
Conduct Appraisal (2)
2
2
'
Conduct Review Appraisal (2)
2
- 2
Prepare Waiver Evaluations (4)
26
2 24
Team Coordination
2
2
QA/QC
0
SUBTOTAL(HOURS) 1
32 1
2 30
1 0
0
0 1
D 1
0 1
0
7.0 PREPARE CONTRACTS
Prepare Preliminary Acquisition Documents
16
2 12
2
Prepare Preliminary Acquisition Costs
8
8
QA/QC of Dellvembles
1
1
SUBTOTAL (HOURS)
25
3 20
0
0
0
0
0
2
8.0 ACQUISITIONS
Conduct pre-acquisition meeting
2
2
Conduct Owner Meetings
64
64
Prepare Final Acquisition Documents
4
2
2
Prepare Final Acquisition Costs
1
1
Prepare non-montetary documentation
2
2
QA/QC of Dellvembles
2
1 1
SUBTOTAL(HOURS)
75
1 72
0
0 1
0
0
0
2
9.0 RIW AND DESIGN PLAN UPDATES
Update Preliminary Deed Exhibits
8
8
SUBTOTAL (HOURS)
8
0 8
0
0
0
0
0
0
�- oowI Pa s e 4--J3
ICHY of Bozeman R/W Acquisition: Task Order No. 6 Project Cost Estimate
DATE: 717115
PROJECT NO: 4524.11402.06
EST. PREPARED BY: DOWL
PAY SCH.: Time and Materials --NTE
Activity Tasks
Total Hours
Real Estate
Manager
Project
Manager/
Coordinator
Righ0'
JWay�I!Relo.rrti Design
on Agent 1E.gineer
Assistant
Coordinator
Professional
Surveyor
Survey Crew Clerical
10.0 RELOCATION SERVICES
Provide Property Relocation
0
NotApplicable
SUBTOTAL(HOURS)
0
0
0
0
0
0
0
1 0
0
11.0 CLOSING
Prepare Final Title Transfer Documents
2
2
Closing Meetings
8
8
QA/QC
1
1
SUBTOTAL(HOURS)
11
1
1 10
1 0
1 0
0
0
0
0
12.0 PROJECT MANAGEMENT
Team Coordination
4
4
Progress Meetings and Updates
6
4
2
SUBTOTAL(HOURS)
10
0
8
0
0
0
0
0
2
13.0 FINAL SUBMITTAL AND CLOSEOUT
Deliver Completed Title Transfer Documents
4
2
2
RMI Certification
4
2
2
Pmject Closeout
1
1
QA/QC of Deliverables
2
1
1
SUBTOTAL(HOURS)
11
3
6
0
0
0
0
0
2
CONTINGENCY
Negotiation Challenges
26
2
16
1 1
8
Total Project Hours
228
13
187
0
12
8
0
0
8
Alk
E) O W L Page 2.of 3
]City of Bozeman R/W Acquisition: Task Order No. 6 Project Cost Estimate
DATE: 7/7/15
PROJECT NO: 4524.11402.06 EST. PREPARED BY: DOWL PAY SCH.: Time and Materials --NTE
Activity
Tasks
Total Hours
Real Estate
Manager
Project
Manager/
Coordinator
Right of
Way/Relocati
on Agent
Design
Engineer
Assistant
Coordinator
Professional
Surveyor
Survey Crew
I Clerical
COST SUMMARY
DIRECT LABOR
Hours Rate
Extension
Real Estate Manager
13 150.00
1,950.00
Project Manager/ Coordinator
187 110.00
20,570.00
Right of Way/Relocation Agent
0 140.00
0.00
Design Engineer
12 85.00
1,020.00
Assistant Coordinator
8 120.00
960.00
Professional Surveyor
0 130.00
0.00
Survey Crew
0 225.00
0.00
Clerical
8 55.00
440.00
TOTAL HOURS
228
TOTAL LABOR
1 $24,940,00
DIRECT NONLABOR
Miscerlaneous (Blueline prints, mylam, mulhTith paper, telephone,
postage, miso:equipment rental,maps,photos, surrey mds., display boards, eta) Unit Quantity - Rate
Computer Hours Per Hour
0.00
Title commitments Each 6 Per Parcel $325
1,950.00
Vehicle Rental Days Per Day $60
0.00
Mileage Miles 84 Per Mlle $1.00
84.00
Airline Trips Trips Per Trip $900
0.00
Lodging Days I IPerDay 1 $110
0.00
Meals Days 1perDay $51
0.00
TOTAL DIRECT NONLABOR
$2,034.00
OUTSIDE SERVICES AND SUBCONTRACTS LUMP SUM
R/W Appraisals Hall-Widdoss and Co.
6,500.00
RNV Review Appraisals Joki and Associates
2,000.00
TOTAL OUTSIDE SERVICES AND SUBCONTRACTS
$81500.00
RECAPITULATION
Total Direct Labor
1 24,940.00
Total Direct NonLabor
2,034.00
Total Outside Services & Subcontracts
1 8,500.00
TOTAL ESTIMATED COST(NTE)
$35,474.00