HomeMy WebLinkAbout15- Task Order No. 6 Dowl for Acquisition of Right of Way, Easements, and Real PropertyExhibit A to Master Task Order Agreement fof Professional Services TASK ORDER NUMBER 06 Issuer] under the authority of Professional Services Master, Taslc Ordef Agreement betiyeen :the City of Bozema. n a.nd. DOWL for: Professional and teclniical services for the acquisition of right of y,aL easements and real property to allow for the construction of various street and utilities improvements withinthe City of Bozeman Task Order Title: Street and Utilities Land Agent Services — Trail to the M This Task Order is dated a I, I 20Lbehveen City of Bozeman (City) and DOWL (Contractor). The following representatives have been designated for the work performed under this Task Order: City: Carolyn Poissant Contractor: Tony Becken-Gaddo, P.E. SCOPE OF wolkm The scope of work for Task Order No. 6 is detailed in the attached Exhibit A-6 Project Scope of Seivices. COMPENSATION: Contractor shall be reimbursed on a time and materials basis with a total cost not to exceed $35,474.00. The total cost for Task Order No. 6 is detailed in the attached Project Cost Estimate. Contractor shall invoice no Blore often than mootlily foi, services provided in the prior month. The provisions of the Professional Seivices Master Task Order Agreement and any Special Terms and Conditions and/or Exhibits or Attachments to this Task Order shall govern the Work. IN WITNESS WHEREOF, the parties Agthorized to commit resources of the companies have executed this Task Order: City of Bozeman �P 7-7 By: Title:,. i Contractor By. r� ! Title: SS lz P A Date:• Fed. ID. No. 92-0166301 EXHIBIT A-6 July 7, 2015 PROJECT SCOPE OF SERVICES Professional Services Agreement for Streets and Utilities Land Agent Services Project Scope of Services Task Order No. 6 The scope of services for this City of Bozeman Right -of -Way Acquisition Project is to Appraise, Acquire and successfully conduct and prepare the necessary meetings, agreements, and legal documents to transfer property titles fiom private land owners to the City of Bozeman (City). The Federal Highway Administration (FHWA) and City will be constructing new trail improvements in the near future and the City intends to acquire the necessary right-of-way (R/W) prior to construction. This project will serve as the R/W acquisition process for the Trail to the M TOP Project which will install a new shared use path to the M Trailhead near Bozeman, Montana. The Feasibility Memorandum for the Bozeman to Bridger Mountains Trail, MD DOT 86(1) (January, 2015), trail alternative 2, is the basis for areas necessitating R/W acquisition. The intent of this scope of services and corresponding cost estimate is to provide acquisition services on a time and materials, not to exceed basis. Additional costs related to the actual land purchase price, relocation costs paid to property owners, and any costs associated with eminent domain proceedings are not included in this scope of services or cost estimate. All work will be performed in accordance with the guidelines and procedures contained 49 CFR, "Uniform Relocation Assistance and Real Property Acquisition Regulations for Federally - Assisted Programs" as amended. The standard R/W process for Montana Department of Transportation projects will be followed for this project. The following activities will be conducted as outlined below. 1_0 PROJECT RESEARCH • Obtain and review available preliminary design plans. • Obtain and review available project documentation. • Coordination meeting with the project team members. • Obtain current deeds and ownership information. 2_0 INITIAL PROPERTY OWNER CONTACT • Compile contact information. • Initiate contact with owners to inform them of this project and the process. 3_0 SURVEY Control or topographic field surveys are not included in this scope. 4_0 R/W MAPPING & EXHIBITS Determine proposed R/W acquisition areas for six parcels located on the north side of Bridger Canyon Road. Based on preliminary design efforts between FHWA, the City BOWL Page 1 of 3 July 7, 2015 and the design engineer, it's anticipated the six parcels affected by future trail improvements will require partial parcel acquisitions. • Prepare preliminary deed exhibits. • The final deed exhibits will be filed with the clerk and recorder upon finalization of acquisition agreements. • QA/QC of deliverables Deliverables: • Preliminary deed exhibits 5_0 TITLE COMMITMENTS • Title commitments will be secured for each parcel requiring property acquisition. • Team coordination '6.0 APPRAISALS AND REVIEW APPRAISALS • Appraisals will be conducted for parcels 97B and 106 as shown on the attached Figure 1. • Review appraisals will be conducted for each of the parcel appraisals by a second appraisal subconsultant. • Waiver evaluations will be conducted for parcels 97A, 98, 100, and 107 as shown on the attached Figure 1. • Team coordination • QA./QC of appraisal reports and waiver evaluations 7_0 PREPARE CONTRACTS • Prepare preliminary acquisition documents. • Prepare preliminary acquisition costs. • QA/QC of deliverables Deliverables: • Preliminary acquisition documents including appraisals, review appraisals, and waiver evaluations 8_0 ACQUISITIONS • Conduct pre-acquisition meeting. • Conduct meetings with property owners. • Prepare final acquisition documents. • Prepare final acquisition costs. • Prepare summary of non -monetary considerations when applicable • QA./QC of deliverables %if L70WL Page 2 of 3 July 7, 2015 Deliverables: • Final acquisition documents including appraisals and waiver evaluations • Prepare summary of non -monetary considerations when applicable 9_0 R/W AND DESIGN PLAN UPDATES • Based on acquisitions and agreements, updates to the preliminary deed exhibits will be completed, if required. • Modification of trail design plans is not included in this scope. 10.0 RELOCATION SERVICES • Relocation services are not included in this scope. 11.0 CLOSING • Prepare final title transfer documents, and schedule closing dates and meetings. • Attend closing meetings. 12.0 PROJECT MANAGEMENT • Team Coordination • Progress meetings and updates Deliverables: • Bi -weekly Progress Report 13.0 FINAL SUBMITTAL AND CLOSEOUT • Deliver completed title transfer documents • Complete R/W certification documents • Project closeout • QA/QC of deliverables Deliverables: • Final signed and recorded title transfer documents (2 copies) • Final R/W certification documents CONTINGENCY Due to the nature of property acquisition work, the time required to work with individual property owners varies significantly. The scope of services as detailed in this document includes all the necessary steps to acquire property from private owners, but much of that work relies on good cooperation and timely responses from all parties. The contingency item serves to capture the possible additional costs incurred during the acquisition process due to challenging situations with property owners. It Page 3 of 3 BOWL NOIldO IMI Z 3AI1VN2i311V n M p Q NOIIISI(1DOV I302iVd ,l2iVNIWll32id m- W �mm C�9 * VNVINOW 'Nb'W3Z08 A1NnOO NIIVIIV0'39H'SLl'££ N01103S 6 LL S1N3W3AMWINI 103fONd d01 W 3H101IN81 g° F u� s g r< 0F Y� kffigm Vii$ r ,x AM 3 Z d OF a. W W CL 03 12 s rr t 1 rf i cl y Fz a 4 r r- lGity of Bozeman WIN Acquisition: Task Order No. 6 Project Cost Estimate DATE: 7/7/15 PROJECT NO: 4524.11402.06 EST. PREPARED BY: DOWL PAY SCH.: Time and Materials --NTE Activity Tasks Total Hours Project Real Estate Manager/ Manager Coordinator Right of Way/Relocati on Agent Design Engineer Assistant Coordinator Professional Surveyor Survey Crew Clerical WORK TO BE COMPLETED 1.0 PROJECT RESEARCH Obtain and review preliminary design plans 1 1 Obtain and review project documentation 1 1 Coordination meeting with the project team members 2 2 Obtain current deeds 2 2 SUBTOTAL (HOURS) 6 0 6 0 0 0 0 0 0 2.0 INITIAL PROPERTY OWNER CONTACT Compile Contact Information 2 2 Initiate Contact 2 2 SUBTOTAL (HOURS) 4 0 4 0 0 0 0 0 0 3.0 SURVEY Control Survey 0 Topographical Survey RAN Survey 0 0 Not Applicable Set New RAN Pins 0 QA/QC 0 SUBTOTAL(HOURS) 0 0 0 0 0 0 0 0 1 0 4.0 RIW MAPPING & EXHIBITS Determine proposed RIW acquisition areas. 2 2 Prepare preliminary deed exhibits 15 1 2 12 QA/QC of Deliverables 1 1 SUBTOTAL(HOURS) 18 1 5 0 12 0 0 0 0 5.0 TITLE COMMITMENTS Secure Title Commitments 1 1 Team Coordination 1 i SUBTOTAL (HOURS) 2 0 2 0 0 0 0 0 0 6.0 APPRAISALS AND REVIEW APPRAISALS Conduct Appraisal (2) 2 2 ' Conduct Review Appraisal (2) 2 - 2 Prepare Waiver Evaluations (4) 26 2 24 Team Coordination 2 2 QA/QC 0 SUBTOTAL(HOURS) 1 32 1 2 30 1 0 0 0 1 D 1 0 1 0 7.0 PREPARE CONTRACTS Prepare Preliminary Acquisition Documents 16 2 12 2 Prepare Preliminary Acquisition Costs 8 8 QA/QC of Dellvembles 1 1 SUBTOTAL (HOURS) 25 3 20 0 0 0 0 0 2 8.0 ACQUISITIONS Conduct pre-acquisition meeting 2 2 Conduct Owner Meetings 64 64 Prepare Final Acquisition Documents 4 2 2 Prepare Final Acquisition Costs 1 1 Prepare non-montetary documentation 2 2 QA/QC of Dellvembles 2 1 1 SUBTOTAL(HOURS) 75 1 72 0 0 1 0 0 0 2 9.0 RIW AND DESIGN PLAN UPDATES Update Preliminary Deed Exhibits 8 8 SUBTOTAL (HOURS) 8 0 8 0 0 0 0 0 0 �- oowI Pa s e 4--J3 ICHY of Bozeman R/W Acquisition: Task Order No. 6 Project Cost Estimate DATE: 717115 PROJECT NO: 4524.11402.06 EST. PREPARED BY: DOWL PAY SCH.: Time and Materials --NTE Activity Tasks Total Hours Real Estate Manager Project Manager/ Coordinator Righ0' JWay�I!Relo.rrti Design on Agent 1E.gineer Assistant Coordinator Professional Surveyor Survey Crew Clerical 10.0 RELOCATION SERVICES Provide Property Relocation 0 NotApplicable SUBTOTAL(HOURS) 0 0 0 0 0 0 0 1 0 0 11.0 CLOSING Prepare Final Title Transfer Documents 2 2 Closing Meetings 8 8 QA/QC 1 1 SUBTOTAL(HOURS) 11 1 1 10 1 0 1 0 0 0 0 0 12.0 PROJECT MANAGEMENT Team Coordination 4 4 Progress Meetings and Updates 6 4 2 SUBTOTAL(HOURS) 10 0 8 0 0 0 0 0 2 13.0 FINAL SUBMITTAL AND CLOSEOUT Deliver Completed Title Transfer Documents 4 2 2 RMI Certification 4 2 2 Pmject Closeout 1 1 QA/QC of Deliverables 2 1 1 SUBTOTAL(HOURS) 11 3 6 0 0 0 0 0 2 CONTINGENCY Negotiation Challenges 26 2 16 1 1 8 Total Project Hours 228 13 187 0 12 8 0 0 8 Alk E) O W L Page 2.of 3 ]City of Bozeman R/W Acquisition: Task Order No. 6 Project Cost Estimate DATE: 7/7/15 PROJECT NO: 4524.11402.06 EST. PREPARED BY: DOWL PAY SCH.: Time and Materials --NTE Activity Tasks Total Hours Real Estate Manager Project Manager/ Coordinator Right of Way/Relocati on Agent Design Engineer Assistant Coordinator Professional Surveyor Survey Crew I Clerical COST SUMMARY DIRECT LABOR Hours Rate Extension Real Estate Manager 13 150.00 1,950.00 Project Manager/ Coordinator 187 110.00 20,570.00 Right of Way/Relocation Agent 0 140.00 0.00 Design Engineer 12 85.00 1,020.00 Assistant Coordinator 8 120.00 960.00 Professional Surveyor 0 130.00 0.00 Survey Crew 0 225.00 0.00 Clerical 8 55.00 440.00 TOTAL HOURS 228 TOTAL LABOR 1 $24,940,00 DIRECT NONLABOR Miscerlaneous (Blueline prints, mylam, mulhTith paper, telephone, postage, miso:equipment rental,maps,photos, surrey mds., display boards, eta) Unit Quantity - Rate Computer Hours Per Hour 0.00 Title commitments Each 6 Per Parcel $325 1,950.00 Vehicle Rental Days Per Day $60 0.00 Mileage Miles 84 Per Mlle $1.00 84.00 Airline Trips Trips Per Trip $900 0.00 Lodging Days I IPerDay 1 $110 0.00 Meals Days 1perDay $51 0.00 TOTAL DIRECT NONLABOR $2,034.00 OUTSIDE SERVICES AND SUBCONTRACTS LUMP SUM R/W Appraisals Hall-Widdoss and Co. 6,500.00 RNV Review Appraisals Joki and Associates 2,000.00 TOTAL OUTSIDE SERVICES AND SUBCONTRACTS $81500.00 RECAPITULATION Total Direct Labor 1 24,940.00 Total Direct NonLabor 2,034.00 Total Outside Services & Subcontracts 1 8,500.00 TOTAL ESTIMATED COST(NTE) $35,474.00 `I pOWI Page 3af3