Loading...
HomeMy WebLinkAbout05- Durston Development; N. 14th Ave - Revised Payback Agreement ..""'\': ~'~,...,..' AGREEMENT FOR REIMBURSEMENT THIS AGREEMENT, made and entered into this 21st day of March ,2005: "'by. and between the CITY OF BOZEMAN, a municipal corporation, organized under the laws of the State of Montana, ("City"), and Kevin Cook of Durston Development Corp., a Montana Corporation, ("Developer"). WHEREAS, Developer presently owns land located in Gallatin County, Montana, more particularly described as follows: Walton Homestead Subdivision P.D.D, according to the map or plat thereof on file and of record in the office of the Clerk and Recorder of Gallatin County, Montana, WHEREAS, the City owns and operates a water system, sanitary sewer system, storm drainage system, and City streets within and adjacent to its corporate limits; and WHEREAS, Developer has constructed certain extensions to said systems more particularly described on Exhibit "A" attached hereto and incorporated herein by this reference, which extensions are capable .of serving the tract herein above described; and WHEREAS, the extensions to said systems described in Exhibit "A" are located within the area served by the City; and WHEREAS, the area capable of being served by the extensions to said systems described in Exhibit "A", are herein referred to as "the benefitted properties", and is particularly described in Exhibit "A" attached hereto, and by this reference incorporated herein; and WHEREAS, the benefitted properties did not participate in the original cost of construction of the extension described in Exhibit "A", the total of which amounts to $172,175.50; and WHEREAS, the City and the Developer desire to and intend by this agreement to provide terms and conditions by which Exhibit "A" properties may connect to, and utilize the extensions; and WHEREAS, the parties hereto agree that the City will charge and collect a fair pro rata share from each of the described benefitted properties as they connect to said extensions; NOW, THEREFORE, in consideration of the conveyance to the City of the extensions described in Exhibit "A", and the mutual covenants contained herein, it is agreed by and between the City and Developer as follows: 1. The parties agree that the water, sanitary sewer, and storm drainage line extensions and street extension have been constructed and installed in accordance with the requirements of the City and the City Engineer. The Developer has conveyed his interest in the extensions and has secured or granted any necessary easements for said extensions to the City. The City has accepted said extensions and easements for maintenance as part of its water, sewer, storm drainage, and street systems. 2. The Developer has submitted to the City the contractor's unit costs for construction, and engineering costs directly attributable to the installation of the water, sanitary sewer, and storm drainage lines, and street extension, which costs are attached and incorporated by reference as Exhibit "B". The Developer does hereby certify that the costs listed in Exhibit "B" are solely related to the extension of the water, sanitary sewer, storm drainage lines and street extension to his property described above, approximate the original amount bid for said extensions, and do not reflect costs related to the water, sanitary sewer, storm drainage lines, and streets installed on said property. 3. The Developer has submitted an as-built set of plans together with the engineer's certification that the project was completed in accordance with the applicable laws, rules and regulations and cost of the extensions. 04'{)6-200S 1 4. The City agrees to collect from the owners of property benefitted by said extensions who did not contribute to the cost of construction of said extensions, and who subsequently connect to or use the same, a fair I>Jo rata share of the cost of such construction based upon the sum of $8,870.90 per gross acre, which unit charge shall be conclusively presumed to be a fair pro rata charge against the benefitted property (50% of the construction cost for water, sanitary sewer and storm drainage lines, plus 100% of the cost of street construction east of centerline). The reimbursement charges are in addition to the usual and normal charges that will be made by the City for service connections, monthly service charges and impact fees. The Developer hereby releases the City from any and all claims that may arise out of the collection of said charges, including but not limited to error in calculation of proportionate cost, failure to collect fees set forth herein and in making a determination that the property or portion thereof is or is not benefitted by said services. 5. The City shall account for funds received and remit said funds to Durston Development Corp., designated by writing as- the agent to receive said proceeds by the Developer, approximately thirty (30) days following receipt of said funds, less an administrative fee of seven percent (7%) of the amount received. No extensions or connections shall be made to the water, sanitary sewer, storm drainage lines, or street extension without first paying the required amount and with the full knowledge of the City. However, if the City, for whatever reason, fails to collect the required fee hereunder, no liability shall arise nor any claim be made by the Developer against the City. 6. It is agreed that this agreement shall continue until Developer has recovered fifty percent (50%) of his total "as-built" construction costs associated with water, sanitary sewer, and storm drainage lines, and has recovered sixty five and one-half percent (65.5%) of his total "as- built" construction costs associated with street extension, or upon the expiration of ten (10) years, whichever shall occur first, whereby this agreement shall be deemed terminated and of no further force and effect. Failure of the City to recover the maximum reimbursement shall neither create a liability on the part of the City nor extend the Agreement beyond the period specified herein. Provided, however, that should this agreement not provide Developer with reimbursement as described above within said ten (10) year period, this agreement may be extended by way of a mutual agreement between the parties, unless such an extension would work a hardship to the City. 7. Construction and installation of the water, sanitary sewer, storm drainage lines and street extension is limited specifically to the terms and area covered by this agreement. Nothing in this agreement is to be construed as an obligation on the part of Developer to extend the water, sanitary sewer, storm drainage lines or street extension to any points beyond those contemplated in this agreement and described in Exhibit "A.". 8. This Agreement has no effect on City charges for utility connections or impact fees. The City may connect to the above described extensions other main extensions or side lateral extensions, as appropriate. Such connections shall not constitute grounds for reimbursement. Any connections to such extensions of the above described extensions shall not constitute grounds for reimbursement. The City shall be the sole judge of what constitutes a main, side lateral extension, or sewer service. 04'{)6-200S 2 IN WITNESS WHEREOF the .Parties hereto have executed this instrument the day and year first above written. ?/~ Durston Development .: By: Kevin Cook, Vice President ~i~ TY OF BOZEMAN By: Chris A Kukulski, City Manager STATE OF MONTANA ) ) SS. ATTEST: . County of Gallatin ) Robin L u ivan, C erk of Comm On this I~~ay of . . /}i)Y>'"1 . , 2005, before me, the undersigned, a Notary Public for the State ofMon'tana, personally appeared Chris A Kukulski and ROBIN L. SULLIVAN, known to me to be the City Manager and Clerk of Commission, respectively, of the City of Bozeman and the persons whose names are subscribed to the within instrument, and acknowledged to me that they executed the same for and on behalf of the City of Bozeman. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my Notarial Seal the day and year first above written. (SEAL) NO~~~thet~~ .It ~ LiVIL (;{(Lvtl ~ (Printed Name) Residing at Bozeman My Commission Expires: v3 I 2.5 120M (SEAL) ~~~ Not c for the State of Montana Suoy metS (Printed Name) Residing at p':,,:,-zs,,^F\../J. /VI. T My Commission Expires: r I .~:>-. 120c(., 04-06-2005 3 WtII'f Oak EXHIBIT "A" - PAYBACK BOUNDARY EXHIBIT WAL TON HOMESTEAD SUBD/VlS/ON PLANNED UNIT DEVELOPMENT LOCATED IN IHE swi4 OF' SECTION 1, TOWNSHIP 2 SOUIH, RANGE 5 EAST, P.M.M, Cll'YOF' BOZEMAN, GALLATIN COUNTY, MONTANA I _____~R~._~M____.~.._~.~~.~.~~M__~ ~ 330' . ~ Btortn Drain P'p. OUUt)' Conduit ero,~lnKa. Wa.ter MaJn Extension 51,...t ----~~~---\----., ,....1__ ____~~_~=___.J '\ ~> 1;8 ~ (1'- tP ". ..., I I , I I.. " I 1<<~"1. ...,.,..t. Ig I ' I .~: I tb.", I "'- 1 , 1 I __M~~.!.':"'__'!!r.J:_---~-+~-t------!....r:.II'--/jJ.u.'-- .J ,~ : -- _...~~+ .: ..-~ -+-, - :-"'-~-7 4&""\lI,'I""1:;"IKI? --- --Tt--- r-~--- -.., H'~;"-'.'7'i;r.--- -1 Ii ~!, : ~~\\\\n\\\'; i 1/IIIl11ll~J!s :il I l.~ !r: ". ~i Ii i, ,-~" ~~ -l i :~:~_: i:! :i ~".. :-.~111 ,.~=. ,I I " ~ . IN ~......J 46,' I ~ ~,: l~ . :11'I9~~r'w N'jI, ~'.,. .....M' 1M I I ~n' " . 1 ,t9MI 11011.,. 9't'M'ft<>,.........., ~- &III*,"~ I ~1;:::,&::"j1~C~:~: I I ~\:: I ! 1I1~: II I I: _J:~ 1,',1 , ""...Af. : I ~ I I to "_."_ h." ..kt~.lll' "'tt. ",""\l1li",,, ~. I I ~- ~ ~~~;>' I~-----~'-:l. , I 'll__ - ::;;1' l!!S:-:;n, , . I ,...... .......,......, Sllnltw:y Sewer MaIn Exten4lo[l Slnf;tt CulistTuetion I PD.\lemtnt and Slsnos.e '1 ~( ( I I I I :$; 10.15 Ac. pa. ybackArea, r a Portion of Tract A ~ . 5 Certificate of Survey No. 2439, ~ . 1\1 Benefited Property .~ J"/ ~f, ,."..~ /~. oti~,~c__. "'"~ 'E;,"'''.'.'.iJ 1~;f~::~~:0';; '" '" ~ '" ~ \i;!i~ . .. . . . . . I . '. iiliill'lhii 111111111111 111111111111 111111111111 111111111111 II111Ulnl1 1lIlllllltll 111111111111 111111111111 \ \ , I \ i I ;>rJ(' 1---= I.~"".l\ i ~til : :"';Jii.:\;, I ;0 ~ ij '< l'll~til.: 1';II'~ \ I ~==::::'=~l.:=~"---_.J (oj '---f? _I. -~- rl~Yj,\ \.. i Oq:. I \ I I ... '11' ':' II I . . . . . . . . . . . ~ I ... __ .._______ _ ___ _3:~,__6___ _ _5~__:.~~~__ __r--;#----- ..~ Scale: 1"= 100' e"/ .~\.~ cI' ~- P'.por04 ijy. Rocky Mouritain Engineers. P.L.L.C. ClvR EngIn.er1nll I. Lend surveying 1700 w..t KoQh. str'oet, :sulte 7 Bozomorl, MOntClnG 59715 (408)588-....8591 0,...1n0 FIi. Nom., \\9o..aB2.d..g 12/22/2004 ~ :'. Exhibit "B" North 14th Avenue Cost Estimate for Utility and Street Payback Walton Homestead Subd., Durston Development, Inc. 04/06/0S Page 1 of 3 All auantities are finished. in-olace. comoacted. etc. Unit Total Item No. Description Quantity Units Price Price 10 Sanitary Sewer Manhole (Basic S') 4 EA. $1,6S0.00 $6,600.00 Manhole Add'l Oepth 7.0 L.F. $200.00 $1,400.00 8" Sanitary Sewer Main 1,131 L.F. $18.00 $20,358.00 Traffic Rated Cover for Existing SS MH 1 EA. $2,000.00 $2,000.00 Sub-Total $30,358.00 11 Water Line Excav.lOispose Existing Blow-off Hyd 1 L.S. $2.000.00 $2,000.00 and approx. 20' of 8" 01 Pipe 8" 01 Class 51 1,340 L.F. $23.50 $31,490.00 6" 01 Fire Hydrant Lead 53 L.F. $23.50 $1,245.50 Fire Hydrant Assembly 5 EA. $2,350.00 $11,7S0.00 8" Gate Valve M.J. x FL. wI Restraint 1 EA. $800.00 $800.00 8" Gate Valve M.J. x M.J. wI Restraint 5 EA. $800.00 $4,000.00 8"X 8" Tee M.J. x FL. 1 EA. $350.00 $350.00 8"X 8" Tee M.J. x M.J. 1 EA. $350.00 $350.00 8"X 6" Tee M.J. x M.J. 5 EA. $350.00 $1,750.00 8"X 4" Tee M.J. x FL. 3 EA. $350.00 $1,050.00 8" 45" Bend wI Restraint 2 EA. $300.00 $600.00 8" Solid Sleeve Coupler 1 EA. $450.00 $450.00 Sub-Total $53,836.50 12 Storm Drainage 22"x36" Class III RCP 74 L.F. $100.00 $7,400.00 Sub-Total $7,400.00 Engineering: Design, Staking, InspectionlTestlng $10,026.00 Total Construction Cost - Sanitary Sewer, Water, Storm Drainage......................................... $101,619.50 North 14th Avenue ,tl,e Cost Estimate for Utility and Street Payback Walton Homestead Subd., Durston Development, Inc. 04/06/05 Page 2 of 3 Unit Total Item No. Description Quantity Units Price Price 13 Streets Excav.lDispose Asphalt 1 C.Y. $15.00 $15.00 Topsoil Excavation 995 C.Y. $1.50 $1,492.50 Sub-Grade Excavation 634 C.Y. $2.50 $1,585.00 Select Sub-Base Course 727 C.v. $8.50 $6.179.50 Crushed Base Course 485 C.Y. $16.00 $7,760.00 3" Asphalt Surface 604 . Tol')s $36.00 $21,744.00 New Street and Stop Sign wI Post 1 EA. $250.00 $250.00 New Street Name Sign wI Post 1 EA. $250.00 $250.00 New No Parking Sign wI Post 13 EA. $250.00 $3,250.00 New Dead End Barricade wI Posts 1 L.S. $500.00 $500.00 Utility Conduits 6" and 12" (3 Crossings) 128 L.F. $15.00 $1,920.00 14 Land Cost (10'x1270) @ 2.7x10^6/20Ac. 12,700 S.F. $1.50 $19,050.00 Sub-Total $63,996.00 Engineering: Design, Staking, InspectionlTesting $6,560.00 Total Construction Cost - Street Extension.............................................................................. $70,666.00 Total Construction Cost - Sanitary Sewer, Water, Storm Drainage & Street Extension.... $172,175.50 North 14th Avenue Page 3 of 3 Cost Estimate for Utility and Street Payback Walton Homestead Subd., Durston Development, Inc. 12/22/04 Cost of Street Construction East of Centerline Unit Total Item No. Description Quantity Units Price Price 13 Streets Excav.lDispose Asphalt (1 x 10/40) 0.25 C.Y. $15.00 $3.75 Topsoil Excavation (995 x 10/40) 249 C.Y. $1.50 $373.13 Sub-Grade Excavation (634 x 10/40) 159 C.Y. $2.50 $396.25 Select Sub-Base Course (727 x 9.25/28.75) 234 C.Y. $8.50 $1,988.19 Crushed Base Course (485 x 8.75/28.25) 150 C.Y. $16.00 $2,403.54 3" Asphalt Surface (604 x 7.5/24) 189 Tons $36.00 $6,795.00 New Street and Stop Sign w/ Post (1 x 50%) 0.50 EA. $250.00 $125.00 New Street Name Sign w/ Post (1 x 50%) 0.50 EA. $250.00 $125.00 New No Parking Sign w/ Post (100%) 13 EA. $250.00 $3.250.00 New Dead End Barricade w/ Posts (1 x 50%) 0.50 L.S. $500.00 $250.00 Utility Conduits 6" and 12" (3 Crossings) (100%) 128 L.F. $15.00 $1,920.00 14 Land Cost (10'x1270) @ 2.7x10^6/20Ac. (100%) 12,700 S.F. $1.50 $19,050.00 Sub-Total $36,679.85 Engineering: Design. Staking, InspectionlTesting ($6,560.00 x 7.5/24) $2,050.00 Street Construction Cost. Total Attributable to Benefitted Property.................................. $39,229.85