Loading...
HomeMy WebLinkAboutC3. Amend 1 Robert Peccia Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer SUBJECT: 5.3 Million Gallon (MG) Water Storage Reservoir Project - Amendment No. 1. MEETING DATE: September 28th, 2015 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve and authorize City Manager to sign Amendment No. 1 with Robert Peccia and Associates. BACKGROUND: Attached is a copy of the partially executed Amendment No. 1 with Robert Peccia and Associates for the 5.3 Million Gallon (MG) Water Storage Reservoir Project. The document is in the City’s standard format. The original professional services agreement for the project only included the predesign task. That task compared the various options for the type of reservoir to be constructed. The predesign report determined that the preferred alternative is a Type I Prestressed Concrete Reservoir. This amendment is to add the design phase services for the reservoir to the project. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission FISCAL EFFECTS: $255,036 from the Water Impact Fee Fund. Attachments: Amendment No. 1 Report compiled on: 9/21/15 15 16 17 18 19 20 21 22 23