HomeMy WebLinkAboutA2. The Springs at Bozeman 15369 Staff Report for the The Springs at Bozeman Site Plan, Conditional Use Permit and Cash in Lieu of Parkland Dedication Request Date: City Commission Public Hearing September 28, 2015 Project Description: A preliminary Site Plan and Conditional Use Permit (CUP) with cash in lieu of parkland dedication request application to allow the construction of a 195,163 square foot Community Residential Facility that includes 80 independent senior living dwelling units, 68 assisted living units, 24 memory care units and associated parking and site improvements. The conditional uses proposed include: community residential facility, sales and on-premise consumption of alcohol and a proposed building height increase of 15% above the base maximum building height in the B-2 zoning district. Project Location: 2632 Catron Street, located at the southeast corner of the intersection of Catron Street and North 27th Avenue. The property is zoned B-2 (Community Business) and is legally described as Lots 1 and 2, Block 4, Cattail Creek Subdivision Phase 1, City of Bozeman, Gallatin County, Montana. Recommendation: Approval of CUP with conditions and code provisions. Recommended Motions: Cash in Lieu of Parkland: Having considered the information provided by staff, considered public comment, and considered all of the information presented, I hereby adopt the findings included in the staff report for application 15369 and accept the provision of cash in lieu parkland dedication as meeting the required parkland dedication. Site Plan and Conditional Use: Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 15369 and move to approve the Springs at Bozeman Site Plan and Conditional Use Permit to allow for a community residential facility, to allow the sales and on-premise consumption of alcohol and to allow a proposed building height increase to a maximum of 50 feet with recommended conditions and subject to all applicable code provisions. Report Date: Friday, September 18, 2015 Staff Contact: Brian Krueger, Development Review Manager Agenda Item Type: Action (Quasi Judicial) EXECUTIVE SUMMARY Unresolved Issues There are no unresolved issues. Project Summary A Conditional Use Permit (CUP) application was submitted to the Community Development Department for a proposed building located at 2632 Catron Street, which is located within the Community Business (B-2) zoning district. The CUP application is requesting approval 146 15369 The Springs CUP Page 2 of 18 for the following conditional uses: community residential facility, sales and on-premise consumption of alcohol and a proposed building height increase of 15% above the base maximum building height in the B-2 zoning district (base maximum is 44 feet, 50 feet is proposed). The code allows an increase of up to 30% of the maximum height allowance in B-2 through a conditional use permit. At their September 9, 2015 meeting, the Development Review Committee meeting voted unanimously to recommend conditional approval of the CUP application with the recommended conditions and code provisions identified in this report. The application requests cash in lieu of parkland dedication to satisfy the required parkland for the 80 independent senior living dwelling units. The lots proposed for this development were platted with the Cattail Creek Subdivision Phase 1 as commercial use lots. No parkland was dedicated with the subdivision for commercial lots, as parkland is only required for residential uses and lots. It is the expressed preference of the developer to provide cash in- lieu of parkland dedication. The required parkland dedication for the project is equal to 1.87 acres of parkland based upon the 80 independent senior living dwelling units. No parkland is required for the assisted living and memory care units. Pursuant to Section 38.27.030.C, BMC, the applicant plans to defer the required appraisal documentation to establish the fair market value for the equivalent land dedication to final plan application. The basis for the appraisal will be fair market value which is “the value of the unsubdivided, unimproved land after it has been annexed and given an urban zoning designation.” Based upon similar recent appraisals staff estimates the equivalent land cost at $0.80 per square foot which for this application would result in a required cash in lieu payment of approximately $65,165.76. The ability to provide parkland within the site is quite limited and would substantially alter the project. It would be difficult to design a park location that would comply with the City’s requirements for frontage and provide for an efficient building and/or parking area for the type of building and uses proposed in this application. The applicant discussed offering to make physical improvements to the existing parkland in the Cattail Creek Subdivision with the value of the improvements constructed equaling or exceeding the required cash in lieu payment. While these lots are zoned commercial, the lot owners are members of the Cattail Creek Property Owners’ Association and pay assessments for the overall management and maintenance of the subdivision, including parkland. At their September 18, 2015 meeting the Recreation and Parks Advisory Board Subdivision Committee reviewed the cash in lieu of parkland request and recommended approval. They endorsed the idea of physical parkland improvements as cash in lieu of parkland, finding that physical parkland improvements on the ground benefit the community more than a cash balance to be expended on future improvements. Alternatives 1. Approve the application with the recommended conditions; 2. Approve the application with modifications to the recommended conditions; 3. Deny the application based on the Commission’s findings of non-compliance with the applicable criteria contained within the staff report; 4. Open and continue the public hearing on the application, with specific direction to Staff or the applicant to supply additional information or to address specific items. 147 15369 The Springs CUP Page 3 of 18 TABLE OF CONTENTS EXECUTIVE SUMMARY ...................................................................................................... 1 Unresolved Issues ............................................................................................................... 1 Project Summary ................................................................................................................. 1 Alternatives ......................................................................................................................... 2 SECTION 1 - MAP SERIES .................................................................................................... 4 SECTION 2 - RECOMMENDED CONDITIONS OF APPROVAL ...................................... 7 SECTION 3 - CODE REQUIREMENTS REQUIRING PLAN CORRECTIONS ................. 8 SECTION 4 - RECOMMENDATION AND FUTURE ACTIONS ...................................... 10 SECTION 5 - STAFF ANALYSIS......................................................................................... 11 Applicable Plan Review Criteria, Section 38.19.100, BMC. ............................................ 11 Applicable Conditional Use Permit Review Criteria, Section 38.19.110, BMC .............. 13 APPENDIX A – PROJECT SITE ZONING AND GROWTH POLICY............................... 17 APPENDIX B – DETAILED PROJECT DESCRIPTION AND BACKGROUND.............. 17 APPENDIX C – NOTICING AND PUBLIC COMMENT ................................................... 18 APPENDIX E – OWNER INFORMATION AND REVIEWING STAFF ........................... 18 FISCAL EFFECTS ................................................................................................................. 18 ATTACHMENTS ................................................................................................................... 18 148 SECTION 1 - MAP SERIES 149 150 15369 The Springs CUP Page 6 of 18 151 15369 The Springs CUP Page 7 of 18 SECTION 2 - RECOMMENDED CONDITIONS OF APPROVAL Community Development Conditions: 1. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. 2. A copy of the State Revenue Department alcohol license for the establishment shall be submitted to the Department Community Development prior to the sale of alcoholic beverages. 3. The right to serve alcohol to patrons is revocable based on complaints from the public or from the Police Department regarding violations of the City of Bozeman’s open alcohol container, minor in possession of alcohol, or any other applicable law regarding consumption and/or procession of alcohol. 4. Any expansion of the uses or facility is not permitted unless reviewed and approved as required under the applicable regulations of the Bozeman Municipal Code. 5. Lots 1-2, Block 4 of the Cattail Creek Subdivision Phase I shall be aggregated and/or the common boundaries of said lots shall be reconfigured through the applicable subdivision review process to accommodate the project prior to final plan approval. 6. Engineering Conditions: 7. Sidewalks along Catron Street and North 27th Avenue must be constructed in accordance with the City of Bozeman (COB) Design Standards and Specifications Policy and the City Modifications to the State Public Works Standard Specifications. 8. The drive approaches shall be constructed in accordance with the City's standard approaches per COB Standard Drawings 02529-12 and 02529-13 as applicable. A City curb cut and sidewalk permit must be obtained prior to installation. For clarity, the island proposed in the driveway off Catron Street is acceptable. 9. Plans and specifications for any fire service line must be prepared in accordance with the City’s Fire Service Line Policy by a Professional Engineer and be provided to and approved by the City Engineer prior to initiation of construction of the fire service or fire protection system. The applicant shall also provide Professional Engineering services for construction inspection, post-construction certification and preparation of mylar record drawings. Fire service plans, and domestic services 4” or larger, shall be a standalone submittal, separate from the FSP. Fire services, in addition to domestic services, shall be shown, with sizes labeled, on the FSP from main to building and approved by the Water/Sewer Superintendent. City of Bozeman applications for service shall be completed by the applicant. 10. The Preliminary Design Report indicates connection of a 6-inch water service to an existing 4-inch stub onto the property. All water service connections shall be uniform size from the 152 15369 The Springs CUP Page 8 of 18 service line tap at the main to the building. The service lines must be sized at a minimum to not cause the velocity in the line to exceed ten feet-per-second when calculated by the fixture unit method (COB Design Standards and Specifications Policy). The domestic water meter is indicated as a 4-inch meter, while the service is indicated as a 6-inch service. Provide calculations for appropriate service line and meter sizing. 11. The Geotechnical Investigation Report indicates a footing drain is not required for the project (Figure 4). However, the report narrative on Page 7 indicates a 4-inch perimeter footing drain must be installed. If the footing drain is installed, it may not discharge to the storm drainage system unless that system is designed with capacity for water from the footing drain. The footing drain may not be discharged to the sanitary sewer system. 12. The proposed sewer service does not have cleanouts. Provide cleanouts at appropriate spacing as necessary. It is recommended but not required that the service be located within the parking drive lane and not under the proposed sidewalk. 13. The Storm Drainage Calculations indicate a 12-inch storm drain on the south side of the building, while the plan indicates a 10-inch drain. Correct the storm drain sizing on the plan. 14. A stormwater drainage system maintenance plans shall be submitted with the final plan application. 15. All trees must be at least 10 feet from any public utilities or service lines. All utility lines must be shown on the final landscape plan. SECTION 3 - CODE REQUIREMENTS REQUIRING PLAN CORRECTIONS Code Provisions, Bozeman Municipal Code (BMC): a. Section 38.21.050.F BMC requires all mechanical equipment to be screened. Rooftop equipment shall be incorporated into the roof form or screened in an enclosure and ground mounted equipment shall be screened with walls, fencing or plant materials. The final plan shall contain a notation that “No ground mounted mechanical equipment, including, but not limited to utilities, air exchange/conditioning units, transformers, or meters shall encroach into the required yard setbacks and will be properly screened with an opaque solid screen and/or adequate landscape features. All rooftop mechanical equipment shall be incorporated into the roof form or screened in an approved rooftop enclosure.” Additionally, a roof plan showing rooftop equipment with proposed screening shall be submitted with the final plan. b. Section 38.25.020 BMC requires adequate provision for snow storage in parking areas. Snow may not be deposited on public right-of-way or cause unsafe ingress/egress to the parking area. The snow storage area appears inadequate for the proposed parking area and conflicts with proposed landscaping. Sufficient storage area shall be shown on the final plan. c. Section 38.25.040.A.5 BMC requires bicycle parking facilities for residents and employees. Bicycle parking spaces shall be at least ten percent of automobile parking stalls and are to be in an accessible and visible location. 16 spaces bicycle parking spaces are required. Location of bicycle parking within storage area of decks for residential uses do not meet the 153 15369 The Springs CUP Page 9 of 18 requirement of this standard. The application has requested a reduction to provide eight spaces, yet only three are noted on the site plan. d. Section 38.27.020 BMC specifies the requirements for required park area dedication. A final calculation shall be provided to confirm required land dedication area. e. Section 38.27.030 BMC outlines the requirements for cash donation in-lieu of land dedication. These requirements shall be satisfied prior to final plan approval. f. Section 38.28.060.A BMC provides standards for the area, size, location and setbacks required for signs. The proposed site plan and sign specifications need to clearly demonstrate compliance with these standards on the final plan application. g. Section 38.41.080.A.2 BMC requires submittal of architectural floor plans that clearly depict proposes uses and activities within the building. Full floor plans clearly indicating the extent of the area for on-premise consumption of alcohol and interior floor layouts for each room shall be provided with the final plan. h. Section 38.23.170 BMC requires that the site plan shall have designated an area for temporary trash collection during construction. This area needs to be designated and added to the site plan prior to final plan approval. i. Section 28.26.040 BMC requires landscape plan review. Deciduous shrubs Spirea X Bumalda and Spirea X Cinerea are identified as the same initials on the plan. These need to be differentiated. Quaking Aspen spelling should be corrected. Details need to be provided on water feature and seat wall. j. Section 28.26.050.I BMC provides requirements for irrigation standards. The proposed irrigation schedule on Sheet L2.1 does not provide enough detail to review potential conflict areas. A final irrigation plan shall be submitted with the final plan application. k. Section 38.41.080 BMC requires that the site plan show the existing and proposed locations of utilities. The site plan lacks information on telephone, cable tv and/or internet connections. l. Section 38.19.110.F BMC states that the right to a conditional use permit shall be contingent upon the fulfillment of all general and special conditions imposed by the Conditional Use Permit procedure. All special conditions and code provisions shall constitute restrictions running with the land, shall be binding upon the owner of the land, his successors or assigns, shall be consented to in writing by the applicant prior to commencement of the use and shall be recorded as such with the Gallatin County Clerk and Recorder’s Office by the property owner prior to the final site plan approval or commencement of the use. All of the conditions and code provisions specifically stated under any conditional use listed in this title shall apply and be adhered to by the owner of the land, successor or assigns. m. Section 38.19.110.I BMC Termination/ Revocation of Conditional Use Permit approval: 1. Conditional use permits are approved based on an analysis of current local circumstances and regulatory requirements. Over time these things may change and the use may no longer be appropriate to a location. A conditional use permit will be considered as terminated and of no further effect if: a. After having been commenced, the approved use is not actively conducted on the site 154 15369 The Springs CUP Page 10 of 18 for a period of two continuous calendar years; b. Final zoning approval to reuse the property for another principal or conditional use is granted; c. The use or development of the site is not begun within the time limits of the final site plan approval in Section 38.19.130 BMC. 2. A conditional use which has terminated may be reestablished on a site by either, the review and approval of a new conditional use permit application, or a determination by the Planning Director that the local circumstances and regulatory requirements are essentially the same as at the time of the original approval. A denial of renewal by the Planning Director may not be appealed. If the Planning Director determines that the conditional use permit may be renewed on a site then any conditions of approval of the original conditional use permit are also renewed. 3. If activity begins for which a conditional use permit has been given final approval, all activities must comply with any conditions of approval or code requirements. Should there be a failure to maintain compliance the City may revoke the approval through the procedures outlined in Section 38.34.160, BMC. n. The transfer of water rights or the payment of cash-in-lieu of water rights shall be provided in accordance with Section 38.23.180 BMC prior to final site plan (FSP) approval. o. Section 38.23.070 BMC requires that the cutting of any city street be done in compliance with the City’s Street Cut Policy. The required form and information can be found on the City’s website at www.bozeman.net. p. The Gallatin County Conservation District, Montana Department of Environmental Quality, and U.S. Army Corps of Engineers shall be contacted regarding the proposed project and any required permits (i.e., 310, 404, Turbidity exemption, etc.) shall be obtained and provided prior to FSP approval. q. An erosion and sediment control plan shall be prepared for the project and approved by the City’s Stormwater Program Coordinator prior to FSP approval. r. Prior to building permit approval, an erosion and sediment control permit shall be obtained from the City’s Stormwater Program Coordinator. The erosion and sediment control plan approved with the final site plan shall be utilized to obtain the erosion and sediment control permit. SECTION 4 - RECOMMENDATION AND FUTURE ACTIONS Project Name: The Springs at Bozeman Conditional Use Permit, Application 15369 The Development Review Committee (DRC) considered the Conditional Use Permit application to allow for on-premises consumption of alcohol in the proposed dining area and a proposed building height increase for a Community Residential Facility, located at 2632 Catron Street. The DRC recommended conditional approval at the September 9, 2015 meeting. At their September 18, 2015 meeting the Recreation and Parks Advisory Board Subdivision Committee reviewed the cash in lieu of parkland request and recommended approval. They endorsed the idea of physical parkland improvements as cash in lieu of parkland, finding that 155 15369 The Springs CUP Page 11 of 18 physical parkland improvements on the ground benefit the community more than a cash balance to be expended on future improvements. The City Commission is scheduled to hold a public hearing and review the application at their September 28, 2015 meeting. SECTION 5 - STAFF ANALYSIS Analysis and resulting recommendations are based on the entirety of the application materials, municipal codes, standards, and plans, public comment, and all other materials available during the review period. Collectively this information is the record of the review. The analysis in this report is a summary of the completed review. Applicable Plan Review Criteria, Section 38.19.100, BMC. In considering applications for plan approval under this chapter, the review authority and advisory bodies shall consider the following criteria. 1. Conformance to and consistency with the City’s adopted growth policy The proposed application as conditioned is in compliance with this criterion. The Future Land Use designation is “Community Commercial Mixed Use” in the Bozeman Community Plan. The property is within the City’s municipal service area and otherwise complies with the goals and objectives of the growth policy. No conflicts between the proposed zoning, proposed uses and the growth policy have been identified. For more detailed information on the growth policy designation please see Appendix A. 2. Conformance to this chapter, including the cessation of any current violations There are no current violations existing on the subject property. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. 3. Conformance with all other applicable laws, ordinances, and regulations No conflicts have been identified. Some additional steps are required such as application for final site plan and building permit which will be addressed as appropriate in the future. The plans will be further evaluated against the requirements of the International Building Code at the time application is made for a building permit. Condition 1 requires full compliance with all applicable code requirements. Code provisions address coordination with other regulating agencies if necessary. 4. Relationship of site plan elements to conditions both on and off the property The proposed site plan application is consistent with the conditions on and off the property. The building configuration, building architecture, building presentation to the streets, open space layout, landscape design, pedestrian and vehicle circulation and parking comply with code requirements. The development is compatible with and sensitive to the immediate environment of the site and the adjacent neighborhoods and other approved development relative to architectural design, building mass and height, neighborhood identity, landscaping, orientation of buildings on the site and visual integration. 156 15369 The Springs CUP Page 12 of 18 5. The impact of the proposal on the existing and anticipated traffic and parking conditions Parking is provided per code requirements. The Traffic Impact Study indicates that there will be no impacts that will exceed the capacity or the functionality of intersections in the vicinity or the overall street network. 6. Pedestrian and vehicular ingress and egress Two accesses are proposed from the adjacent streets to provide vehicular ingress and egress, which are connected via the internal parking area. Pedestrian access is via boulevard sidewalks adjacent to Catron Street and N. 27th Avenue. Internal sidewalks connect the proposed building to the sidewalks and also to the adjacent shared use pathway, located east of the property along Catron Creek. 7. Landscaping, including the enhancement of buildings, the appearance of vehicular use, open space, and pedestrian areas, and the preservation or replacement of natural vegetation The landscape plan meets minimum mandatory requirements and fulfills performance point requirements. Open space areas are landscaped per requirements. The landscape plan per the required code provisions, irrigation plan corrections are required with the final plan application. 8. Open space Per the required code provisions, the requirements for cash donation in-lieu of dedication shall be satisfied prior to final plan approval if approved by the Commission. This will include a final land appraisal and cash in lieu payment. Private open space requirements for the residential units are met. 9. Building location and height The building is sited at the minimum setbacks and includes direct building frontage on Catron Street and North 27th Avenue. The parking is located to the side and rear of the building. A request to increase the building height by 15 percent to allow for the structure to have a maximum height of 50 feet is considered as part of the conditional use review. The requested height increase is to screen rooftop mechanical equipment and is found to meet the conditional use permit criteria. 10. Setbacks The proposed improvements meet the requirements for all yard setbacks. 11. Lighting The proposed site lighting meets the standards of Bozeman’s Unified Development Code for lighting. 12. Provisions for utilities, including efficient public services and facilities Adequate water and sewer capacity exists to serve this development. Per the required code provisions, plan corrections are required to show the locations of all existing and proposed utilities on the final plan. Water and Sewer mains are located in the adjacent streets. Engineering conditions require minor corrections to the proposed services to meet City standards. 157 15369 The Springs CUP Page 13 of 18 14. Loading and unloading areas There is a proposed loading area adjacent to the primary building entry within the parking lot. There is also a second loading area on the south side of the building for the use of delivery vehicles and trash collection. 15. Grading The site is relatively flat. Grading is proposed on the site to construct the parking accesses and infrastructure and to assure the proper functioning of the storm water system 16. Signage Per the required code provisions, the site plan and sign specifications need to demonstrate compliance with Section 38.28.060.A at the time of the final plan application. 17. Screening The primary mechanical units for the building are proposed to be in the roof structure. Any mechanical equipment not shown on the preliminary plan materials that may be proposed later must be screened per the municipal code. This is cited in the required code provisions. 18. Overlay district provisions The property is not located within and overlay district. 19. Other related matters, including relevant comment from affected parties No public comment was received in regards to this project. If public comment is received prior to the City Commission public hearing, it will be forwarded to the City Commission members. 20. If the development includes multiple lots that are interdependent for circulation or other means of addressing requirement of this title, whether the lots are either: Configured so that the sale of individual lots will not alter the approved configuration or use of the property or cause the development to become nonconforming or The subject of reciprocal and perpetual easements or other agreements to which the City is a party so that the sale of individual lots will not cause one or more elements of the development to become nonconforming. Per the recommended conditions of approval, the two underlying lots shall be aggregated and/or the common boundaries of said lots shall be reconfigured through the applicable subdivision review process to accommodate the project prior to final plan approval. 21. Compliance with article 8 of chapter 10 of the Bozeman Municipal Code. Not applicable. 22. Phasing of development No phasing is proposed. Applicable Conditional Use Permit Review Criteria, Section 38.19.110, BMC E. In addition to the review criteria of Section 38.19.100, the review authority shall, in approving a conditional use permit, determine favorably as follows: 158 15369 The Springs CUP Page 14 of 18 1. That the site for the proposed use is adequate in size and topography to accommodate such use, and all yards, spaces, walls and fences, parking, loading and landscaping are adequate to properly relate such use with the land and uses in the vicinity; The application proposes a community residential facility use. The site as design is adequate is size and topography to accommodate the use and the project properly relates to the uses and future land uses in the vicinity. Staff incorporates the plan review findings presented above in Section 38.19.100 as supporting evidence. The applicant is requesting to sell beer and wine within the dining area to residents and guest only. The dining area is located within a proposed community residential facility. The dining area is located in the interior of the building. Because the service will be limited to residents and their guests, it is not anticipated that there would be increased traffic or other off-site impacts related to the use. Staff recommends conditions of approval related to the addition of sales and on premises consumption of alcohol to limit the expansion of the use and a revocation provision related to open containers. Staff finds the site adequate in size and topography to accommodate on-premises sales and consumption of alcohol and that the project properly relates to the uses and future land uses in the vicinity. The request to allow for an increase in building height of 15 percent, or up to 50 feet is to allow for the screening of the rooftop mechanical area. The plans submitted by the applicant show the proposed screening within a mechanical well, located on the roof of the structure. Incorporating mechanical equipment into the roof form is the preferred method for mechanical screening. Per the required code provisions, a final roof plan showing the rooftop equipment with the proposed screening be submitted with the final plan. Staff finds the site adequate in size and topography to accommodate and increase in building height to up to 50 feet and that the project properly relates to the uses and future land uses in the vicinity. . 2. That the proposed use will have no material adverse effect upon the abutting property. Persons objecting to the recommendations of review bodies carry the burden of proof; With the recommended conditions of approval and required code provisions on page 8, the site design will comply with the Unified Development Code. The large lot area, proposed there story building and unified site design can accommodate the large community residential facility use. Staff finds that the proposed community residential facility use will have no material adverse effect upon the abutting properties. The sales and on premise consumption of alcohol is limited to residents and guests, there will be minimal off-site impacts. Staff recommends condition of approval 3 allowing the City of Bozeman to revoke the right to serve alcohol to patrons based on substantial complaints from the public or from the Police Department regarding violations of the City of Bozeman’s open alcohol container, minor in possession of alcohol, or any other applicable law regarding consumption and/or procession of alcohol. Staff finds the proposed beer and wine service for residents and guests will have no material adverse effect upon abutting properties. The request to allow for an increase in building height of 15 percent, or up to 50 feet is to allow for the screening of the rooftop mechanical area. The plans submitted by the applicant 159 15369 The Springs CUP Page 15 of 18 show the proposed screening within a mechanical well, located on the roof of the structure. Incorporating mechanical equipment into the roof form is the preferred method for mechanical screening. Placing the mechanical equipment on the roof will further remove any noise that the units emit from the adjacent property. With the units located in the roof and screened by the roof form, there is no need for ground mounted equipment. The abutting residentially zoned properties: R-4, High Density Residential and RO, Residential Office allow a maximum height of 44 feet. The additional six foot allowance proposed in this application will have no material adverse effect upon the abutting properties. Staff has not identified any hazards to the public health and safety and finds that the application generally complies with the Unified Development Code as conditioned. Staff has not received any public comment as of the writing of this report. Any public comment received after the completion of the Commission packets will be distributed to the Commission members at the public hearing. Following review of the proposed application with the inclusion of the recommended conditions and correction of the identified code provisions, staff finds that the proposed uses will have no material adverse effect upon abutting properties unless evidence presented at the public hearing proves otherwise. 160 15369 The Springs CUP Page 16 of 18 3. That any additional conditions stated in the approval are deemed necessary to protect the public health, safety and general welfare. Such conditions may include, but are not limited to: a. Regulation of use; b. Special yards, spaces and buffers; c. Special fences, solid fences and walls; d. Surfacing of parking areas; e. Requiring street, service road or alley dedications and improvements or appropriate bonds; f. Regulation of points of vehicular ingress and egress; g. Regulation of signs; h. Requiring maintenance of the grounds; i. Regulation of noise, vibrations and odors; j. Regulation of hours for certain activities; k. Time period within which the proposed use shall be developed; l. Duration of use; m. Requiring the dedication of access rights; and n. Other such conditions as will make possible the development of the city in an orderly and efficient manner. Staff has identified, through the review process, recommended project conditions that are included to protect the public health, safety, and general welfare. Please see the recommended conditions of approval and findings within this report. Several of these are standard conditions of approval that the City has consistently applied to alcohol serving establishments and conditional use permits. Please see the recommended conditions of approval and findings within this report. F. In addition to all other conditions, the following general requirements apply to every conditional use permit granted: 1. That the right to a use and occupancy permit shall be contingent upon the fulfillment of all general and special conditions imposed by the conditional use permit procedure; and 2. That all of the conditions shall constitute restrictions running with the land use, shall apply and be adhered to by the owner of the land, successors or assigns, shall be binding upon the owner of the land, his successors or assigns, shall be consented to in writing, and shall be recorded as such with the county clerk and recorder's office by the property owner prior to the issuance of any building permits, final plan approval or commencement of the conditional use. The necessary recording of documents will be addressed as part of the final plan process and will be required prior to approval of the final plan. Community Development cited code 161 15369 The Springs CUP Page 17 of 18 provision m applies to this issue. A document to be recorded will be provided by the City following preliminary approval. APPENDIX A – PROJECT SITE ZONING AND GROWTH POLICY Zoning Designation and Land Uses: The lots addressed as 2632 Catron Street are zoned as “B-2” (Community Business District). The intent of the B-2 community business district is to provide for a broad range of mutually supportive retail and service functions located in clustered areas bordered on one or more sides by limited access arterial streets. Adopted Growth Policy Designation: The lots addressed as 2632 Catron Street are designated as Community Commercial Mixed Use in the Bozeman Community Plan. The intent of the community commercial designation is to provide for activities that include basic employment and services necessary for the community. Uses includes a broad range of uses including retail, education, professional and personal services, residences and other general services. It is the intent of this district to encourage higher density than seen in other commercial areas, and include multi-story buildings. There should be equal emphasis on vehicle, pedestrian, bicycle, and transit circulation. APPENDIX B – DETAILED PROJECT DESCRIPTION AND BACKGROUND The property under consideration for this application was rezoned in August 2014. The same ownership group was granted approval by the City Commission to rezone 5.9 acres from B-1 Neighborhood Business to B-2 Community Business. This Conditional Use Permit (CUP) application is for a proposed building to be located at 2632 Catron Street. The CUP application requests approval for the following conditional uses: community residential facility, sales and on-premise consumption of alcohol and a proposed building height increase of 15% above the base maximum building height in the B-2 zoning district (base maximum is 44 feet, 50 feet is proposed). The code allows an increase of up to 30% of the maximum height allowance in B-2 through a conditional use permit. At their September 9, 2015 meeting, the Development Review Committee meeting voted unanimously to recommend conditional approval of the CUP application with the recommended conditions and code provisions identified in this report. The application requests cash in lieu of parkland dedication to satisfy the required parkland for the 80 independent senior living dwelling units. The lots proposed for this development were platted with the Cattail Creek Subdivision Phase 1 as commercial use lots. No parkland was dedicated with the subdivision for commercial lots, as parkland is only required for residential uses and lots. It is the expressed preference of the developer to provide cash in-lieu of parkland dedication. The required parkland dedication for the project is equal to 1.87 acres of parkland based upon the 80 independent senior living dwelling units. No parkland is required for the assisted living and memory care units. Pursuant to Section 38.27.030.C, BMC, the applicant plans to defer the required appraisal documentation to establish the fair market value for the equivalent land dedication to final plan application. The basis for the appraisal will be fair market value which is “the value of 162 15369 The Springs CUP Page 18 of 18 the unsubdivided, unimproved land after it has been annexed and given an urban zoning designation.” Based upon similar recent appraisals staff estimates the equivalent land cost at $0.80 per square foot which for this application would result in a required cash in lieu payment of approximately $65,165.76. The ability to provide parkland within the site is quite limited and would substantially alter the project. It would be difficult to design a park location that would comply with the City’s requirements for frontage and provide for an efficient building and/or parking area for the type of building and uses proposed in this application. The applicant discussed offering to make physical improvements to the existing parkland in the Cattail Creek Subdivision with the value of the improvements constructed equaling or exceeding the required cash in lieu payment. While these lots are zoned commercial, the lot owners are members of the Cattail Creek Property Owners’ Association and pay assessments for the overall management and maintenance of the subdivision, including parkland. At their September 18, 2015 meeting the Recreation and Parks Advisory Board Subdivision Committee reviewed the cash in lieu of parkland request and recommended approval. They endorsed the idea of physical parkland improvements as cash in lieu of parkland, finding that physical parkland improvements on the ground benefit the community more than a cash balance to be expended on future improvements. APPENDIX C – NOTICING AND PUBLIC COMMENT Noticing was provided pursuant to Section 38.40.030, BMC. Notice was sent to property owners within 200 feet of the exterior boundaries of the property via USPS first class mail at least 15 and not more than 45 days prior to the expected decision by the City Commission. Notice was published in the Bozeman Daily Chronicle on September 6 and September 13, 2015. No public comment was received in regards to this project. If public comment is received prior to the City Commission public hearing, it will be forwarded to the City Commission members. APPENDIX E – OWNER INFORMATION AND REVIEWING STAFF Owners/Applicants: The Springs at Bozeman, LLC, Chuck Archer, 401 NE Evans, McMinnville, OR 97128 Representative: TD&H Engineering, 234 E. Babcock, Bozeman, MT 59715 Report By: Brian Krueger, Development Review Manager FISCAL EFFECTS No unusual fiscal effects have been identified. No presently budgeted funds will be changed by this application. ATTACHMENTS The full application and file of record can be viewed at the Bozeman Community Development Department at 20 E. Olive Street, Bozeman, MT 59715. Recreation and Parks Advisory Board Subdivision Committee Memorandum Applicant’s submittal materials 163 Bozeman Recreation & Parks Advisory Board P.O. Box 1230 · Bozeman, MT · 59771 Park Master Plan Review SUBJECT: Springs Living PLANNER: Brian KruegerKrueger FROM: Subdivision Review Committee DATE OF REVIEW: 9/18/2015 OVERVIEW: • This subdivision phase, zoned commercial, is now proposing an 80-unit group living development in the Cattail Creek subdivision. Applying the density cap at 12 units per acre, their dedication requirement has been calculated at 1.87 acres. The developer is requesting cash-in-lieu. • Due to its previous commercial designation a parkland requirement was never anticipated and there is no land within the development available for additional parks. COMMENTS: • The Cattail Creek HOA is actively trying to improve their existing parkland. If cash-in-lieu were approved, an infusion of cash into this project would be appropriate. The committee discussed improvements-in-lieu as an effective way to accomplish this. • As a retirement living project we discussed the different impacts on parkland that this would generate. This is a strong argument in favor of cash-in-lieu but the argument could also be made that this is analogous to childless citizens wanting to opt out of school taxes. We see the importance of this project contributing to parkland development and maintenance within the subdivision. • Trails o Connectivity and walkability of paths/sidewalks on site could be improved by making more direct routes out of the building entrances toward the primary neighborhood destinations. This will also help encourage carless travel and healthy, active lifestyles. Specifically: o Include a path or sidewalk that cuts more directly from the main entrance to the NE corner of the property, so that the Target/Costco shopping destinations can be more easily reached. As currently planned, the two walking routes from the main entrance will force residents to backtrack (to the south or to the west), before connecting into the northeast. For the most direct route, residents will 164 likely end up walking through the parking lot – an unsafe situation – if a more direct path or sidewalk option is not provided. o Create more direct routes from the entrances at Catron and North 27th Street toward the intersection with 27th and Catron. This will be the most direct path that residents will take to get to the existing parkland. As currently planned, residents will have to go east out of the Catron entrance before going west toward the parkland, and south out of the 27th St. entrance before going north toward the parkland. RECOMMENDATION: • This being an infill project in a built out subdivision and given the change from commercial to residential, neither the committee nor staff could identify a viable alternative to cash-in-lieu and recommends that this request be approved. • The possibility of improvements-in-lieu should be encouraged. Otherwise utilizing some portion of the cash-in-lieu to improve the existing parks is recommended. FISCAL EFFECTS: • The cash-in-lieu equivalent to 1.87 acres is estimated at approximately $65K. ALTERNATIVES: • No appropriate alternatives could be identified. Respectfully submitted, Subdivision Review Committee of the Recreation and Parks Advisory Board The full Recreation & Parks Advisory Board has not reviewed these findings and recommendations. 165 Development Review Application A1 Page 1 of 3 Revision Date 4-27-15 Required Forms: Varies by project type Recommended Forms: Presentation of submitted plans and specifications CITY OF BOZEMAN DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT REVIEW APPLICATION 1. PROJECT Development Name: Description: 2. PROPERTY OWNER Name: Full Address: Phone: Email: 3. APPLICANT Name: Full Address: Phone: Email: 4. REPRESENTATIVE Name: Full Address: Phone: Email: 5. PROPERTY Full Street Address: Full Legal Description: Current Zoning: Current Use: Community Plan Designation: A1 166 Development Review Application A1 Page 2 of 3 Revision Date 4-27-15 Required Forms: Varies by project type Recommended Forms: Presentation of submitted plans and specifications Overlay District: Neighborhood Conservation Entryway Corridor None Urban Renewal District: Downtown North 7th Avenue Northeast None 6. STATISTICS (ONLY APPLICATION TYPES 2-12, 17, 25 AND 27) Gross Area: Acres: Square Feet: Net Area: Acres: Square Feet: Dwelling Units: Nonresidential Gross Building Square Feet: 7. APPLICATION TYPES Check all that apply, use noted forms. Form Form 1. Pre-application Consultation None 17. Informal Review INF 2. Master Site Plan MSP 18. Zoning Deviation None 3. Site Plan SP 19. Zoning or Subdivision Variance Z/SVAR 4. Subdivision pre-application PA 20. Conditional Use Permit CUP 5. Subdivision preliminary plat PP 21. Special Temporary Use Permit STUP 6. Subdivision final plat FP 22 Comprehensive Sign Plan CSP 7. Subdivision exemption SE 23. Zoning Verification ZV 8. Condominium Review CR 24. Regulated Activities in Wetlands RW 9. PUD concept plan PUDC 25. Zone Map Amendment (non Annexation) ZMA 10. PUD preliminary plan PUDP 26. UDC Text Amendment ZTA 11. PUD final plan PUDFP 27. Growth Policy Amendment GPA 12. Annexation and Initial Zoning ANNX 28. Modification/Plan Amendment MOD 13. Administrative Interpretation Appeal AIA 29. Extension of Approved Plan EXT 14. Administrative Project Decision Appeal APA 30. Reasonable Accommodation RA 15. Commercial Nonresidential COA CCOA 31. Other: 1 6. Historic Neighborhood Conservation Overlay COA NCOA 8. APPLICATION FEES AND MATERIALS A. Fees are to be provided based upon the adopted fee schedule FS. Contact our office for an estimate. B. Applications received by a rolling deadline of Wednesday at 5pm will be reviewed to determine if they are acceptable within five working days of the application deadline. Applications deemed acceptable for review will begin staff review immediately or be scheduled for Development Review Committee review in ten working days from the application deadline. 167 168 DEVELOPMENT REVIEW APPLICATION SITE PLAN REVIEW NARRATIVE & CONDITIONAL USE PERMIT NARRATIVE THE SPRINGS LIVING BOZEMAN, MONTANA July 2015 Prepared by: TD&H ENGINEERING 234 E. BABCOCK, SUITE 3 BOZEMAN, MT 59715 Project No. B15-035 169 Page 2 of 13 Project Description Legal Description: Lots 1 & 2, Block 4, Cattail Creek Subdivision, Phase 1, Section 35, Township 01 South, Range 05 East. Parcel Size: ±5.9 Acres (two parcels) Proposed Use: Community Residential Facility Existing Zoning: B-2 Community Business Proposed Zoning: B-2 Community Business with Conditional Use Permit to allow a Community Residential Facility and the sale of alcohol on the site Project Description: The proposed project is to establish a Community Residential Facility on the subject property. The project consists a three story building that will include 80 independent living units, 68 assisted living units and 24 memory care units, the project also includes a variety of amenities such as group living, dining and activity rooms, pool/spa and exercise facilities and outdoor courtyards. Response to 38.19.100 Plan Review Criteria 1. Conformance to and consistency with the city's adopted growth policy. Response: The subject property is designates as Community Commercial Mixed Use by the City of Bozeman Community Plan (BCP). The proposed project is consistent with the BCP in the following ways: A. The proposed project is well connected to the community with a variety of transportation options. There is accessible, easy access via public transit to nearby commercial goods and services for the residents of the community. The blue bus line route runs along N 27th Ave and Catron Street with a bus stop at the corner of these streets. This line also runs to the broader community including downtown and Montana State University. Additionally, there is a shared use path that runs along the east side of the property for residents to utilize, this path is connected to the broader community by existing sidewalks to the east. As a part of the project sidewalks along the frontage of Catron Street and N 27th Ave will be installed, which will further the pedestrian network in the area. Although some of the residents will be unable to utilize personal vehicles there will be adequate parking provided on site with two point of ingress/egress to the site. There is easy access to interstate, downtown and the community at large from the subject property. B. The project is proposing a higher density than is typically expected. The proposed project has a density of about 29 units per acre, which if zoned residentially would be considered residential high density. The project is 170 Page 3 of 13 proposed to be a three story building that is designed to integrate into the surrounding community. It will provide a good transition between the heavier commercial uses, such as Target to the east and the lower intensity uses such as single family residences to the west. The project is located in the City limits and would be considered an infill development that will utilize existing infrastructure in the area. C. This project is part of a large area designated as Community Commercial Mixed Use by the BCP and there are a variety of existing uses and the potential for more within this district. To the northwest there is established office building, to the southwest there is an existing townhome/condo development. There is vacant land to the north, south and west. Catron Creek is located directly to the east, beyond that is a Target retail store. The development of the community residential facility in this location provides a different use that will add variety and character to the neighborhood without having a negative impact to the surrounding residential neighborhood. 2. Conformance to this chapter, including the cessation of any current violations; Response: The proposed development of the subject property is consistent with this chapter. There are no outstanding violations on the property that the Owner is aware of. 3. Conformance with all other applicable laws, ordinances and regulations; Response: The intent of the proposed development is to be in conformance with all other applicable laws, ordinances and regulations with the exception of the following: A. A request for modification to the City guidelines on the separation distance between driveways, see traffic report (page 22) for summary of request. B. A request to increase the building height with this CUP process to allow up to 50 feet in height to the peak of the roof to hide the mechanical equipment within a mechanical well. This would be a 15% increase as allowed by section 38.10.060(A)2d. C. A request in reduction of auto parking requirements for the Memory Care (Alzheimer residents) as they will not be allowed to drive. This puts the 1 stall per unit requirement as follows: 171 Page 4 of 13 a. Independent living = 80 stalls b. Assisted Living = 68 stalls c. Memory Care Living = 0 stalls d. Total =148 stalls e. Total Parking Provided =163 stalls D. A request for reduction in bike parking requirements. As a retirement facility, the Assisted Living and Memory Care residents are physically limited and biking is difficult for them. The other facility’s managed by The Springs Living throughout several state support the lack of bike use for this resident type. This facility would like to propose only providing the 10% required for the Independent residents only. This would amount to eight bike stalls. 4. Relationship of plan elements to conditions both on and off the property, including: A. Compatibility with, and sensitivity to, the immediate environment of the site and the adjacent neighborhoods and other approved development relative to architectural design, building mass and height, neighborhood identity, landscaping, historical character, orientation of buildings on the site and visual integration; B. Design and arrangement of the elements of the plan (e.g., buildings, circulation, open space and landscaping, etc.) so that activities are integrated with the organizational scheme of the community, neighborhood, and other approved development and produce an efficient, functionally organized and cohesive development; C. Design and arrangement of elements of the plan (e.g., buildings circulation, open space and landscaping, etc.) in harmony with the existing natural topography, natural water bodies and water courses, existing vegetation, and to contribute to the overall aesthetic quality of the site configuration; and D. If the proposed project is located within a locally designated historical district, or includes a locally designated landmark structure, the project is in conformance with the provisions of article 16 of this chapter; Response: The proposed arrangement of the site is integrated with the surrounding neighborhood and community context. The design is sensitive to the neighborhood, with enhanced architectural features. No new roadways are planned, the proposed building is located toward the two street frontages to provide an urban design character, with the parking lot located mainly out of 172 Page 5 of 13 public view. Overall the design of the new Community Residential Facility is functional, organized and cohesive with the surrounding community. The propose arrangement of the site is also in harmony with the existing natural topography and other natural features. The site is relatively flat and the proposed grading and drainage for the site is consistent with the requirements of the City. The property is adjacent to a West Catron Creek to the east; per the requirements of the City the development includes a 50 foot buffer. The landscaping proposed for the buffer is sensitive to the adjacent natural feature. Trees, shrubs and mounds are proposed to buffer the community trail and the proposed parking lot. There is no existing significant vegetation proposed to be removed as a part of this project. The overall aesthetic quality of the project is high and will be influenced by the natural Bozeman context. The project site is not located in a historical district. 5. The impact of the proposal on the existing and anticipated traffic and parking conditions; Response: The proposed development includes adequate parking for the project. Additionally, the surrounding roadways are existing and were designed with anticipated capacity for future development in the area. The proposed project is not anticipated to cause traffic or parking issues in the area. 6. Pedestrian and vehicular ingress, egress and circulation, including: A. Design of the pedestrian and vehicular circulation systems to assure that pedestrians and vehicles can move safely and easily both within the site and between properties and activities within the neighborhood area; B. Non-automotive transportation and circulation systems design features to enhance convenience and safety across parking lots and streets, including, but not limited to, paving patterns, grade differences, landscaping and lighting; C. Adequate connection and integration of the pedestrian and vehicular transportation systems to the systems in adjacent developments and general community; and D. Dedication of right-of-way or easements necessary for streets and similar transportation facilities; Response: There are two point of vehicular ingress/egress proposed for the project, one on the north side of the site to Catron Street and one to the west to North 27th Avenue. New vehicular ingress/egress points are being provided from Catron Street and North 27th Avenue. The design of the circulation will support the safe and 173 Page 6 of 13 functional access to and from the site. A request for modification to the City’s guideline on the distance requirements for the egress curb cuts are outlined in the traffic report on page 22. Additionally, sidewalks along the streets and through the community and a connection to the community trail are being added to ensure safe pedestrian travel both internally and to the general community. The roads adjacent to the subject property are existing, it is not anticipated that additional right-of-way is necessary. 7. Landscaping, including the enhancement of buildings, the appearance of vehicular use, open space and pedestrian areas, and the preservation or replacement of natural vegetation; Response: The landscaping for the proposed project will exceed the standards of Bozeman’s Unified Development Code. In addition, as required, there will be a 50 foot buffer along the existing creek which is located on the easterly portion of the site. This buffer will be designed with trees, shrubs and native grasses in a natural design theme. It will include mounds within the 20-feet closest to the parking lot that will help screen the parking lot from the existing community trail. There will also be a connection from the community to the trail to provide access to the trail for residents. The project also includes enhanced landscaping around the perimeter of the building and at the entrances with water features and patio’s for the residents use. Additionally, there are four internal courtyards provided to enhance the experience of residents and provide additional amenities. The parking lot is located behind the building with minimal views from surrounding properties, trees and shrubs will also be provided in the parking lot to enhance the character of the site. 8. Open space, including: A. The enhancement of the natural environment; B. Precautions being taken to preserve existing wildlife habitats or natural wildlife feeding areas; C. If the development is adjacent to an existing or approved public park or public open space area, have provisions been made in the plan to avoid interfering with public access to and use of that area; D. Is any provided recreational area suitably located and accessible to the residential units it is intended to serve and is adequate screening provided to ensure privacy and quiet for neighboring residential uses; E. Open space shall be provided in accordance with article 27 of this chapter; F. Park land shall be provided in accordance with article 27 of this chapter; 174 Page 7 of 13 Response: The proposed development includes a high level landscape design, which includes a buffer to the adjacent Catron Creek that includes additional landscaping and buffering from the development. The subject property is in a developing area of the City; the owner is not aware of any significant wildlife habitat or wildlife feeding areas. The development adjacent to Catron Creek, there is an existing community trail along the creek, the development will provide additional connections to the community by installing sidewalks along Catron Street and North 27th Avenue as well as providing an access to this trail from the community. There is a proposed putting green for residence, this amenity will be located within the courtyard and have ample screening from neighboring properties. Open space and park land shall be provided per the Unified Development Code. 9. Building location and height; Response: The proposed development meets the requirements of Bozeman’s Unified Development Code for building location. An increase in allowable building height to 50 feet is requested to allow the roof peak to screen the roof top equipment. 10. Setbacks; Response: The proposed development meets the requirements of Bozeman’s Unified Development Code for setbacks. 11. Lighting; Response: The proposed development will meet the standards of Bozeman’s Unified Development Code for lighting. A lighting plan has been provided for the City’s Review. 12. Provisions for utilities, including efficient public services and facilities; Response: There are utilities located in the vicinity of the project that will provide efficient public services and necessary facilities. 175 Page 8 of 13 13. Site surface drainage and stormwater control; Response: A grading, drainage and stormwater report and drawings have been submitted as a part of the application for the City’s review. 14. Loading and unloading areas; Response: Adequate loading and unloading areas are provided. See site plan for additional information. 15. Grading; Response: A grading plan has been submitted as a part of the application for the City’s review. There are no significant grading issues associated with the project. 16. Signage; Response: The proposed development intends to meet the standards of Bozeman’s Unified Development Code for signage. Typical signage examples for the project have been provided as a part of the application package. A custom monument sign will be developed for the project and submitted to the City for review as necessary. 17. Screening; Response: Any on site mechanical equipment shall be screen by the roof at the mechanical wells, fencing or landscaper to meet the requirements of the code, see the plans for more detail. The parking lot does not have residential adjacent therefore screening is not required, however it is proposed to screen the parking lot to the east with vegetation and mounds to provide a buffer to the adjacent community trail. Additionally, screening will be provided where the parking lot abuts North 27th Avenue and Catron Streets. 18. Overlay district provisions; Response: Not applicable. The project site is not located in an overlay district. 176 Page 9 of 13 19. Other related matters, including relevant comment from affected parties; Response: The Developer is not aware of any public comment from affected parties at this time. 20. If the development includes multiple lots that are interdependent for circulation or other means of addressing requirements of this chapter, whether the lots are either: A. Configured so that the sale of individual lots will not alter the approved configuration or use of the property or cause the development to become nonconforming; or B. The subject of reciprocal and perpetual easements or other agreements to which the city is a party so that the sale of individual lots will not cause one or more elements of the development to become nonconforming. Response: This proposed development is located on two lots. The developer is proposing to aggregate the lots through the applicable subdivision review process to meet the requirements of the Unified Development Code. 21. Compliance with article 8 of chapter 10 of this Code; Response: Not applicable. 22. Phasing of development. Response: The propose project will not be phased. 177 Page 10 of 13 Section 38.19.110. Conditional Use Permit. Narrative Response. In addition to the review criteria of section 38.19.100, the review authority shall, in approving a conditional use permit, determine favorably as follows: Community Residential Facility, Alcohol Sales for On-premise Consumption, Building Height Increase and Reduction in Vehicular and Bicycle parking Requirements. 1. That the site for the proposed use is adequate in size and topography to accommodate such use, and all yards, spaces, walls and fences, parking, loading and landscaping are adequate to properly relate such use with the land and uses in the vicinity; Response: The proposed project is to establish a Community Residential Facility on the subject property. The project consists a three story building that will include 80 independent living units, 68 assisted living units and 24 memory care units, the project also includes accessory spaces such as group living, dining and activity rooms, pool/spa and exercise facilities and outdoor courtyards with a variety of amenities. The property is zoned B-2 Community Business and per the Unified Development Code Community Residential Facility is a conditional use. Additionally, the applicant is requesting to sell alcoholic beverages (beer and wine) on site as a part of the dining experience, which is also considered a conditional use in the B-2 zoning district. Finally, a request to increase the building height with this CUP process to allow up to 50 feet in height to the peak of the roof in order to screen the mechanical equipment within a mechanical well. The project site is approximately 5.9 acres and as designed has adequate size to accommodate the proposed facility. The building meets the required yard setbacks for the district. The proposed use requires 1 parking spaces per unit. The total capacity for the building is 172, however 24 of the residence will be prohibited from driving. The memory care area of the project is a secure facility with limited accesses both in and out, the residents in this area would be prohibited from driving due to physical or mental health conditions. Therefore the applicant is requesting a reduction in the parking by 24 spaces. The total number of parking provided on site is 163 stalls. There are an additional 11 off- site spaces for a total of 174 stalls, the combination of the two parking meets the intent of the code. The site design includes an enhanced entry with a porte-cochere for loading and unloading residence. There is also a service loading/unloading area designated on the south side of the building with an enclosed trash/recycling area, which will be screened with landscaping. 178 Page 11 of 13 The proposed landscaping for the site is consistent with Bozeman’s Unified Development Code including boulevard, parking and yard landscaping to meet the code. Additionally, the applicant is proposing to provide courtyards within the building to support additional activities for the residence. Some of the proposed amenities include a putting green, water features, fire pits, outdoor seating and dining areas, walking paths, and a sensory garden for the memory care units. The site also includes a 50-foot buffer from the adjacent Catron Creek, the design for this buffer would include access from the facility to the community path and be designed with natural vegetation and mounds, which will provide a buffer between the parking lot on site and the community trail. As an accessory use to the Community Residential facility, the owners are proposing to serve and sell alcoholic beverages in the dining areas within the facility. This use, as stated, is accessory and would be limited to beer and wine and only be available to residents and their guests, not open to the general public. Additionally, there would be no gaming associated with the project on site. The sale of alcoholic beverages would not have an effect on the layout and configuration of the development. 2. That the proposed use will have no material adverse effect upon the abutting property. Persons objecting to the recommendations of review bodies carry the burden of proof; Response: The proposed use will not have an adverse effect on the abutting property. The proposed Community Residential Facility, as mentioned previously, has an upscale design with most of the amenities contained within the facility. The development will exceed the landscape standards and provide amenities to the residence beyond what is required in the code. Property to the north, south and west are undeveloped at this time, so potential future development would have the benefit of knowing the established use of the property prior to development. The proposed use provides a transition and buffer between the higher density commercial uses to the east and the lower density residential community to the west. Finally, the project fill in portions of the missing sidewalk infrastructure, which will provide great connection for the neighborhood to the community. The sale of alcohol on the premises should not have an adverse effect on abutting properties because as previously state there will be limited hours of operation and the facility will not be open to the general public. Additionally, no gaming will included as a part of the development. 179 Page 12 of 13 The request for an increase to the building height will not adversely affect the abutting properties, as mentioned the properties, directly to the north, south and west are vacant and undeveloped, and the property to the east is a larger commercial retailer, that does not have windows or views to the west. 3. That any additional conditions stated in the approval are deemed necessary to protect the public health, safety and general welfare. Such conditions may include, but are not limited to: a. Regulation of use; b. Special yards, spaces and buffers; c. Special fences, solid fences and walls; d. Surfacing of parking areas; e. Requiring street, service road or alley dedications and improvements or appropriate bonds; f. Regulation of points of vehicular ingress and egress; g. Regulation of signs; h. Requiring maintenance of the grounds; i. Regulation of noise, vibrations and odors; j. Regulation of hours for certain activities; k. Time period within which the proposed use shall be developed; l. Duration of use; m. Requiring the dedication of access rights; and n. Other such conditions as will make possible the development of the city in an orderly and efficient manner. The Owner does not believe that the requested Conditional Use Permit requires any additional conditions of approval as they have carefully considered public health, safety and general welfare in planning for the proposed Community Residential Facility. The overall site design integrates the facility into the area with ample landscaping and providing parking off of the main streets. Additionally there is a large buffer between the adjacent creek and retail development (Target) to the east that will be enhanced with mounding and landscaping. The site will be maintained by a professional company that will be responsible for snow removal in the winter and landscaping in the summer. This provides safety in the parking lots and walkways and continuous site maintenance throughout the year. Additionally, the use of the courtyards will not cause excess noise, vibrations or orders. The proposed on-site alcohol consumption will be limited to the interior of the building and internal courtyard areas and will service only residence and visitors; 180 Page 13 of 13 it is not a restaurant that is open to the general public. Therefore there should not be an increase in traffic in the neighborhood due to the proposed use. The proposed signage will conform to the City of Bozeman’s signage regulations and will not advertise the sale of alcoholic beverages. Although the City does not require parking lot lighting for the aging residents served by the development, the development is adding soft lighting at the parking and exterior walkways, which will contribute to the public’s safety. These lights will be in conformity with the City of Bozeman’s exterior lighting regulations. The project will also request a reduction to the required bike parking stalls, the project will provide bike parking to meet the requirements for the Independent Living residents only and employees who wish to commute or recreate by bicycle. The bike storage will be provided by the resident’s decks and/or patios storage closets with the exception of three stalls located by one of the main entries. Overall the proposed development will meet a need for the community in a well- designed, attractive manner. The location of the project is ideal for this type of use and impacts to the surrounding neighborhood are minimal. 181 182 183 184 1 Brian Krueger From:Ray Yancey [RayY@myhregroup.com] Sent:Friday, September 11, 2015 10:14 AMTo:Brian KruegerCc:Chuck Archer; Ahren Hastings; Jeff ReynoldsonSubject:TSL - Bozeman Parkland Calculation Good Morning Brian    We are proposing the following calculation for the Parkland – can you please review and let us know if this is correct.    As per Sec 38.27.020 A.1.e(3) the maximum density calculation of 12 units per acre applies therefore –    5.202 acres x 12 units/acre = 62.42 units x .03 acres of Parkland per dwelling unit = 1.87 acres of Parkland    Thanks,    Ray    Raymond Yancey, AIA, NCARB  Principal          620 SW 5th Avenue, Suite 500  Portland, Oregon 97204  t 503.236.6000  f 503.236.7500    rayy@myhregroup.com . www.myhregroup.com    185 234 East Babcock, Suite 3  Bozeman, MT 59715  (406) 586-0277  tdhengineering.com August 26, 2015 Brian Krueger, Development Review Manager City of Bozeman Department of Community Development 20 East Olive Street PO Box 1230 Bozeman, MT 59715 RE: The Springs at Bozeman Site Plan and Conditional Use Permit Application 15369 TD&H Engineering Job# B15-035 Dear Mr. Krueger: Per your review of the applications referenced above, the following items have been addressed and remedied for further review. 1. The application did not include a full legal description including Section, Township and Range. Response: Legal description added to A3 and C1.1 sheets. 2. The application identified the project including 172 dwelling units. This is incorrect. The only dwelling units identified within the application should be those with cooking facilities within each unit. Response: Dwelling summary adjusted on the A3 sheet, 80 dwelling units (residential) total with 92 sleeping units (commercial). 3. Checklist SP1 A the project is identified as being within an overlay district. This is incorrect. The project is not within an overlay district. Response: Site plan checklist has been updated to show the project not in an overlay district. 4. Checklist SP1 4 the site plan did not include a full street address and legal description. Response: Site address located on the title block of each architectural sheet and sheet C1.1, and legal description added to sheets A3 and C1.1. 5. Per checklist SPI 12 the floor area noted within the development review application does not match the area noted on sheet A3. Response: Sheet A3 has been updated to reflect the correct floor area. 186 Mr. Brian Krueger August 26, 2015 Page 2 234 East Babcock, Suite 3  Bozeman, MT 59715  (406) 586-0277  tdhengineering.com 6. Checklist SP1 13 the site plan did not provide all the required data. The checklist requires separate calculations for landscaped area and private open space. See 38.27.020.E for open space requirements and definition. Response: Landscape area and private open space calculations provided on landscape plans see sheets L1.0-L1.4. 7. Checklist SP1 15 existing and proposed topographic contours not defined. Response: Sheet C2.1 shows existing and proposed contours. Sheet C1.2 contains a legend differentiating the two line types. 8. Checklist SP1 17 existing zoning not identified correctly. Site is zoned B-2, Community Business. Response: Zoning adjusted on sheet A2. 9. Checklist SP1 23 bicycle parking or details not identified on site plan sheets. Response: Bike parking detail for unit storage on decks provided on sheet A4. Description provided in CUP narrative. 10. Checklist SP1 24 all utilities not shown on site plan sheets. Response: See Sheet C2.3 for site utilities. 11. Checklist SP1 32 details for construction and permanent trash collection area details not provided. Response: Permanent Trash located within the Compactor/Recycle room. This will have a standard roll up door on the south side. 12. Checklist SP1 34 snow storage not shown on site plan sheets. Response: See Sheet C2.2 for snow storage location. 13. Checklist SP1 35 street vision triangles not shown on site plan sheets. Response: See Sheet C2.2 for vision triangle locations. 14. Checklist SP1 39 information not provided. Response: Parkland will be accounted for with cash in lieu. The project consists of 80 dwelling units which would require 2.4 acres of parkland that will be accounted for with a cash conation in lieu. 15. Checklist SPI 40 information not provided. Response: The lots were originally zoned as B-2 in the subdivision process and there was no affordable housing requirement at that time. Since the zoning is remaining B-2 it is our understanding that there will continue to be no requirement for affordable housing. 16. Checklist SP1 no electrical site plan submitted. No wiring or electrical connections presented. 187 Mr. Brian Krueger August 26, 2015 Page 3 234 East Babcock, Suite 3  Bozeman, MT 59715  (406) 586-0277  tdhengineering.com Response: See sheet E1 for electrical site plan. See sheet C2.3 for proposed electrical main connection. 17. Checklist SP1 43 cutsheets not provided for electrical fixtures. No pole information presented including base/concrete pedestal details. Response: Cut sheets provided. 18. Checklist SP1 44 no roof pitch information presented on elevations. Response: Roof pitches called out on sheet A4 (building section), A5 and A6 (exterior elevations). 19. Checklist SP1 44 color and materials palette incomplete and not keyed to elevations. Response: Added color tags to material call outs on A5 and A6 (exterior elevations). 20. Checklist SP1 46 n detailed sign information provided. Response: Example of site signage provided. 21. Checklist SP1 47 project address not present on landscape plan. Response: Project address added to landscape plans see sheet L1.0. 22. Checklist SP1 48 property owner not identified as required on landscape plan. Response: Property owner added to landscape plans see sheet L1.0. 23. Checklist SP1 53 details and cross sections of detention ponds not submitted. See code section noted in checklist. Response: See sheet C2.3 for detailed description of detention ponds. 24. Checklist SP1 54 snow storage not shown on landscape plan. Response: Snow storage area was previously shown on sheet L1.2, see southeast corner of plan. 25. Checklists SP1 58 no mandatory parking lot landscape screening shown. Response: Parking lot screening added to landscape plan, see sheets L1.1 & L1.2. 26. Checklist SP1 60 watercourse setback buffer are planting plan not provided. Response: Watercourse setback buffer area planting was provided, located along eastern portion of property between community trail and parking lot, see sheets L1.1 & L1.2. Calculations provided on Sheet L1.0. 27. Checklist SP1 64 estimated water consumption data not provided. Response: Estimated water consumption data added, see new landscape sheets L2.0-2.2. 28. Checklist SP1 65 irrigation design plan not submitted. Response: Conceptual Irrigation Design provided, see new landscape sheets L2.0-2.2. 188 Mr. Brian Krueger August 26, 2015 Page 4 234 East Babcock, Suite 3  Bozeman, MT 59715  (406) 586-0277  tdhengineering.com 29. Checklist SP1 68 confirm a stormwater management permit and fee has been submitted to the Engineering Division. Response: Stormwater permit and fee will be submitted at final site plan submittal. We have confirmed with Engineering Division that this is acceptable. Sincerely, Ahren Hastings, PE Project Manager TD&H Engineering 189 190 191 192 193 194 195 196 B15-035 C1.1COVER SHEET AND VICINITY MAP .DWGC1.1SHEETDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:B15-035169/607/29/15THE SPRINGS LIVING BOZEMAN, MONTANA REV DATE Engineering tdhengineering.com REVISIONACHACH PRELIMINARY SITE PLAN SETNOT FOR CONSTRUCTIONKLS1 8.26.15 C.O.B. ADDITIONAL INFORMATION PRELIMINARY SITE PLAN FORSPRINGS LIVING BUILDINGCATTAIL CREEK SUB. PH 1, SEC 35, T1S, R5E, BLOCK 4 LOTS 1-2CATRON STREET AND N. 27TH AVEBOZEMAN, MONTANAJULY, 2015SHEET INDEXPROJECT LOCATIONLOCATION MAPCATRON STN. 27TH AVEVICINITY AND CONSTRUCTION ROUTEN. 19TH AVEE. VALLEY CENTER RDTARGETCOSTCO197 B15-035 C1.2NOTES, LEGEND AND ABBREVIATIONS .DWGC1.2SHEETDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:B15-035169/607/29/15THE SPRINGS LIVING BOZEMAN, MONTANA REV DATE Engineering tdhengineering.com REVISIONACHACH PRELIMINARY SITE PLAN SETNOT FOR CONSTRUCTIONKLS1 8.26.15 C.O.B. ADDITIONAL INFORMATIONA3ABBREVIATIONSEXISTINGDESCRIPTIONLEGENDNEWSCALING NOTEGENERAL NOTESSANITARY SEWER NOTESWATER NOTESSTORM SEWER NOTES198 B15-035 C2.1SITE AND GRADING PLAN .DWGC2.1SHEETDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:B15-035169/607/29/15THE SPRINGS LIVING BOZEMAN, MONTANA REV DATE Engineering tdhengineering.com REVISIONACHACH PRELIMINARY SITE PLAN SETNOT FOR CONSTRUCTIONKLS1 8.26.15 C.O.B. ADDITIONAL INFORMATION199 B15-035 C2.2STRIPING AND SIGNAGE PLAN .DWGC2.2SHEETDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:B15-035169/607/29/15THE SPRINGS LIVING BOZEMAN, MONTANA REV DATE Engineering tdhengineering.com REVISIONACHACH PRELIMINARY SITE PLAN SETNOT FOR CONSTRUCTIONKLS1 8.26.15 C.O.B. ADDITIONAL INFORMATION200 B15-035 C2.3UTILITY PLAN .DWGC2.3SHEETDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:B15-035169/607/29/15THE SPRINGS LIVING BOZEMAN, MONTANA REV DATE Engineering tdhengineering.com REVISIONACHACH PRELIMINARY SITE PLAN SETNOT FOR CONSTRUCTIONKLS1 8.26.15 C.O.B. ADDITIONAL INFORMATION201 SIDE VIEWTOP VIEWB15-035 C3.1DETAILS .DWGC3.1SHEETDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:B15-035169/607/29/15THE SPRINGS LIVING BOZEMAN, MONTANA REV DATE Engineering tdhengineering.com REVISIONACHACH PRELIMINARY SITE PLAN SETNOT FOR CONSTRUCTIONKLS1 8.26.15 C.O.B. ADDITIONAL INFORMATIONPAINT STRIPING DETAIL3CURB RAMP DETAIL2SIDEWALK DETAIL1SIGN BASE DETAIL4THICKEND-EDGE SIDEWALK DETAIL5C3.1CURB CHANNEL DETAIL6C3.1ASPHALT PAVEMENT DETAIL7C3.1OUTLET STRUCTURE DETAIL8C3.1202 LANDSCAPE SHEET MAP SHEET L1.3-ASHEETDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:B15-035-L1.0REV DATE Engineering tdhengineering.com REVISION THE SPRINGS LIVING BOZEMAN, MONTANA LANDSCAPE STANDARDS B15-03508/26/15.DWGL1.0JCCJCCWDLANDSCAPE PERFORMANCE STANDARDSGENERAL NOTESCONTACT INFOPROJECT ADDRESS & LEGAL DESCRPTIONMASTER PLANT SCHEDULE SHEET L1.1 SHEET L1.4 SHEET L1.2 SHEET L1.3-BPRELIMINARY SITE PLAN SETNOT FOR CONSTRUCTIONPROPERTY OWNEROPEN SPACE CALCULATIONS203 LEGEND 12PLANTING PLAN SHEET L1.1 MATCH LINE L1.2PLANT SCHEDULESEE SHEET L1.3-A111111111222SHEETDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:B15-035-L1.1REV DATE Engineering tdhengineering.com REVISION THE SPRINGS LIVING BOZEMAN, MONTANA PLANTING PLAN B15-03508/26/15.DWGL1.1JCCJCCWDPLANT SCHEDULEPRELIMINARY SITE PLAN SETNOT FOR CONSTRUCTION204 LEGEND 12PLANTING PLAN SHEET L1.2 MATCH LINE L1.1PLANT SCHEDULESEE SHEETL1.4122SHEETDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:B15-035-L1.2REV DATE Engineering tdhengineering.com REVISION THE SPRINGS LIVING BOZEMAN, MONTANA PLANTING PLAN B15-03508/26/15.DWGL1.2JCCJCCWDSEE SHEET L1.3-B111121111PLANT SCHEDULEPRELIMINARY SITE PLAN SETNOT FOR CONSTRUCTION205 LEGEND 123PLANTING PLAN SHEET L1.3 - A 4PLANTING PLAN SHEET L1.3 - B PLANT SCHEDULEPRELIMINARY SITE PLAN SETNOT FOR CONSTRUCTION12333444233444SHEETDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:B15-035-L1.3REV DATE Engineering tdhengineering.com REVISION THE SPRINGS LIVING BOZEMAN, MONTANA PLANTING PLAN B15-03508/26/15.DWGL1.3JCCJCCWD206 PLANTING PLAN SHEET L1.4 SHEETDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:B15-035-L1.4REV DATE Engineering tdhengineering.com REVISION THE SPRINGS LIVING BOZEMAN, MONTANA PLANTING PLAN B15-03508/26/15.DWGL1.4JCCJCCWDLEGEND 12341111233344PLANT SCHEDULEPRELIMINARY SITE PLAN SETNOT FOR CONSTRUCTION207 SHEETDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:B15-035-L1.5REV DATE Engineering tdhengineering.com REVISION THE SPRINGS LIVING BOZEMAN, MONTANA PLANTING DETAILS B15-03508/26/15.DWGL1.5JCCJCCWDPLANTING NOTESDECIDUOUS TREE1NOT TO SCALECONIFEROUS TREE2NOT TO SCALESHRUB PLANTING3NOT TO SCALEORNAMENTAL GRASS & PERENNIAL PLANTING4NOT TO SCALEBOULDER PLACEMENT6NOT TO SCALEMETAL EDGING DETAIL5NOT TO SCALEPRELIMINARY SITE PLAN SETNOT FOR CONSTRUCTION208 IRRIGATION SHEET MAP SHEETDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:B15-035-L2.0REV DATE Engineering tdhengineering.com REVISION THE SPRINGS LIVING BOZEMAN, MONTANA IRRIGATION STANDARDS B15-03508/26/15.DWGL2.0JCCJCCWDIRRIGATION NOTESIRRIGATION DRIP SCHEDULE SHEET L2.1 SHEET L2.2PRELIMINARY SITE PLAN SETNOT FOR CONSTRUCTIONPERFORMANCE STANDARDSIRRIGATION GENERAL SPECIFICATIONS IRRIGATION CALCULATIONS209 LEGEND 12IRRIGATION PLAN SHEET L2.1 MATCH LINE L2.2111111111333SHEETDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:B15-035-L2.1REV DATE Engineering tdhengineering.com REVISION THE SPRINGS LIVING BOZEMAN, MONTANA IRRIGATION PLAN B15-03508/26/15.DWGL2.1JCCJCCWDPRELIMINARY SITE PLAN SETNOT FOR CONSTRUCTION34222222222222222222222222222222222144444444444IRRIGATION SCHEDULE30d51418L5.2210 IRRIGATION PLAN SHEET L2.2 MATCH LINE L2.1133SHEETDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:B15-035-L2.2REV DATE Engineering tdhengineering.com REVISION THE SPRINGS LIVING BOZEMAN, MONTANA IRRIGATION PLAN B15-03508/26/15.DWGL2.2JCCJCCWD111131111PRELIMINARY SITE PLAN SETNOT FOR CONSTRUCTIONLEGEND 12342222222222222222222222222244444444444IRRIGATION SCHEDULE30d51418L5.2211 212 213 214 215 216 217 TRAFFIC IMPACT STUDY for The Springs Living at Bozeman Bozeman, Montana Prepared for The Springs Living Prepared by MARVIN & ASSOCIATES 1300 North Transtech Way Billings, MT 59102 March 5, 2015 218 TRAFFIC IMPACT STUDY for The Springs Living at Bozeman Bozeman, Montana Prepared for The Springs Living Prepared by MARVIN & ASSOCIATES 1300 North Transtech Way Billings, MT 59102 March 5, 2015 P.T.O.E. #259 219 i TABLE OF CONTENTS PAGE INTRODUCTION 1 SITE LOCATION & DESCRIPTION 2 EXISTING CONDITIONS 2 Streets & Intersections 2 Traffic Volumes 4 Speeds 6 Capacity 6 TRIP GENERATION 7 TRIP DISTRIBUTION 8 TRAFFIC ASSIGNMENT 10 TRAFFIC IMPACTS 12 Existing Traffic Volumes 12 Capacity 14 Safety- Auxiliary Turn Lane Warrants 15 FUTURE CONDITIONS 15 Traffic Volumes 15 Future Capacity 17 Future Safety Conditions 17 MODIFIATIONS TO CITY GUIDELINES 22 RECOMMENDATIONS 24 APPENDIX A – TRAFFIC VOLUMES APPENDIX B – SPEED STATISTICS APPENDIX C - CAPACITY CALCULATIONS APPENDIX D - LEFT TURN LANE WARRANTS 220 ii LIST OF TABLES PAGE Table 1. Existing Peak Hour Capacity Analysis Summary 6 Table 2. The Springs Living Trip Generation Summary 7 Table 3. Existing Plus Development Site Traffic Peak Hour Capacity Analysis Summary 14 Table 4. Future (2025) Peak PM Hour Capacity Analysis Summary 17 LIST OF FIGURES PAGE Figure 1. Site Location Map 3 Figure 2. Existing 2015 Traffic Volumes 5 Figure 3. Directional Distribution of Site Trips 9 Figure 4. Site Generated Traffic Assignment 11 Figure 5. Existing Plus Site Generated Traffic Volumes 13 Figure 6. Future Traffic at Site Accesses 16 Figure 7. Maximum Vehicle Queues & Available Sight Distance 18 221 The Springs Living at Bozeman Traffic Impact Study 222 The Springs Living at Bozeman TIS Page 1 INTRODUCTION Marvin & Associates was retained by “The Springs Living” to provide a Traffic Impact Study (TIS) for The Springs Living at Bozeman development. This report summarizes the findings of the TIS. The purpose of the TIS is to determine whether this development would impact the surrounding street system and related intersections. During initial discussions with the City of Bozeman Public Work Department we were informed that the potential impacts of greatest concern would be the four intersections of Cattamount Street and Catron Street with both Davis Lane and N 27th Avenue. The proposed development site access to Catron Street would not meet the minimum separation distance from the intersection and the N 27th Avenue access would not meet separation distance for adjacent driveways required by the City of Bozeman. Therefore, this study provides specific information addressing modification of the guidelines according to Ordinance #1755. Therefore, the main emphasis of this study is related to impact at the four intersections and modifications to the guidelines for access locations. Having reviewed the proposed land use development plan and existing site conditions, Marvin & Associates collected traffic data, completed an analysis of existing conditions, addressed trip generation, trip distribution and traffic assignment, evaluated capacity impacts, and provided information related to access standard modifications. The study methodology and analysis procedures used in this study employed the most contemporary of analysis techniques, referencing only nationally accepted guidelines in the areas of site development and transportation impact assessment. Recommendations made within this report are based upon those guidelines and the professional judgment of the author. 223 The Springs Living at Bozeman TIS Page 2 SITE LOCATION & DESCRIPTION The Springs Living development is located in the southeast corner of N. 27th Avenue and Catron Street. The property is bordered on the south by vacant land and on the east by a Target store. Figure 1 illustrates the proposed layout of The Springs Living. The three story building would occupy the corner of Catron Street and N 27th Street with the building facing both adjacent streets and parking would be provided on the east and south sides of the building. The building would be used as a retirement community accommodating independent and assisted living rooms along with memory care units. The building would also incorporate many dining, recreation, health, and fitness facilities for it residents. According to the development plan they would be 78 independent living units, 68 assisted living units, and 24 memory care units for a total of 170 rooms. The access to North 27th Avenue would be located approximately 465 feet south of the Catron Street - N 27th Avenue intersection while the Catron Street access would be located approximately 308 feet east of that intersection. The minimum distance required by City of Bozeman Ordinance is 330 feet on collector streets. Thus, the Catron Street access would require modifications from the guidelines. In addition, there are two existing accesses on N 27th that will also require modifications to the standard driveway separation distances. EXISTING CONDITIONS Streets & Intersections Although various area streets and intersections could have the potential for impacts, this study’s primary focus is on the four intersections involving Davis Lane, N 27th Avenue, Catron Street and Cattamount Street. Impacts also include the development’s accesses to North 27th Avenue and Catron Street. 224 The Springs Living at Bozeman TIS Page 3 225 The Springs Living at Bozeman TIS Page 4 Davis Lane is a paved street with curb and gutter on both side and carries two lanes of traffic. It extends from Oak Street to Valley Center Road north of the study area. North 27th Avenue is currently improved with curb & gutter and has a paved surface from Cattail Street to Valley Center Road. It carries two traffic lanes with bikes lanes and parking on the west side. Catron Street and Cattamount Streets are both full width streets with curb & gutter and bicycle/pedestrian facilities. Cattamount Street connects N 27th Street and Davis Lane with plans for a future connection to the east at Valley Center Road. Catron Street extends between Valley Center Road and Davis Lane. Traffic Volumes Twenty-four hour automatic traffic counts were taken in October of 2014 on Catron Street and in February 2015 on N 27th Street and Davis Lane. The counts provided hourly variations, which were used to determine peak hours and provide base volumes for turning movement projections. Summaries of the counts can be found be Appendix "A" of this report. The highest hourly volumes were found to occur between 4:30 and 5:30 p.m. The peak pm hour volumes were between 10.0% and 10.7% of the average weekday traffic (AWT) on these streets. Figure 2, on the following page, presents existing (2015) pm peak hour turning movement volumes that were taken in February 2015 at the four intersections within the study area, along with AWT volumes. Some of the street segment volumes represent actual counts while others were calculated from turning movement counts. Pedestrian and bicycle activity was found to be minimal at most of the study intersections and therefore was not indicated on the turning movement diagrams. Pedestrian and bicycle traffic volumes, based on peak hour manual counts, was found to be less than 1% of all traffic. Heavy truck traffic on these local streets was also less than 1% of all traffic. The percentage of school bus traffic during the pm counting period was approximately 2% on N 27th and 2% on Davis Lane. 226 The Springs Living at Bozeman TIS Page 5 227 The Springs Living at Bozeman TIS Page 6 Speeds Appendix B contains speed statistics for Catron Street N 27th Avenue and Davis Lane based on electronic traffic counter data. It was determine that the 85th % speed on Catron Street is approximately 27 mph. On N 27th Avenue the 85th % speed is approximately 32 mph and it is approximately 41 mph on Davis Lane. Capacity PM peak hour capacity calculations were completed for each of the 4 study intersections (see Appendix C for calculations). The unsignalized intersection capacities were calculated using HCS 2010 software. Results of the calculations can be found in Table 1. Measures of effectiveness (MOEs) in Table 1 include average delay, level of service (LOS), and volume-to-capacity (v/c) ratio. Table 1. Existing Peak Hour Capacity Analysis Summary Control Delay (s/veh) LOS V/C Ratio Queue Length (95%) Control Delay (s/veh) LOS V/C Ratio Queue Length (95%) Control Delay (s/veh) LOS V/C Ratio Queue Length (95%) Control Delay (s/veh) LOS V/C Ratio Queue Length (95%) LTR 12.1 B 0.19 1 B 01 0.00 0.06 LR B Davis Lane & Cattamount Street 7.6 10.2 A Movement Group LT 0 Davis Lane & Catron Street A 0.01 0.28 LR 7.7 12.4 Movement Group LT 2 2 LR LTR 12.4 1 A 7.4 7.5 A 0.03 0 WB 9.6 0.12 0.30 B EB N. 27th Avenue & Cattamount Street Movement Group 0.04 0 LT A Movement Group LTR 7.3 Intersection MOE NB LTR SB N. 27th Avenue & Catron Street A 0.02 0 The capacity calculations revealed that all intersection approaches and individual approach movements currently operate at or above an acceptable LOS “B” under pm peak hour conditions. The westbound approach on Catron Street at N 27th Street has the highest delay at 12.8 seconds per vehicle and a v/c ratio of 0.30. However, it currently operates at LOS “B” during the peak pm hour. The maximum vehicular queue for that approach is approximately 2 vehicles. 228 The Springs Living at Bozeman TIS Page 7 TRIP GENERATION Table 2 presents trip generation estimates for The Springs Living development. Trip generation rates and resulting trips are shown for the average weekday and for the am and pm peak hours. The rates were taken from ITE’s Trip Generation Report, 9th Edition. The ITE report has a number of land uses that have certain elements of the proposed facility, but only ITE Code 255 “Continuing Care Retirement Community” has most of the characteristics that would be associated with this development. The ITE report also indicates that trip rates based on the number of beds rather than the number of living units is more aligned with rate data. Therefore, the projections contained in Table 2 were based on approximately 207 beds contained within the 170 resident units. Table 2. The Springs Living Trip Generation Summary No. of Rate Total Total Total Land Use Units Units Rate Trips Rate Trips Enter Exit Rate Trips Enter Exit 207 *Beds 1 657 2 48 31 17 3 86 34 52 *ITE Occupied Units 1 - T = 2.32(X)+176.28 2 - T = 0.13(X)+21.28 (65% enter) 3 - T = 0.13(X)+59.19 (40% enter) Peak AM HourAverage Weekday Peak PM Hour Code 255 Continuing Care Retirement Community The gross projected average weekday trips (AWT) for The Springs Living would total 657 AWT. During the p.m. peak period, total development trips would be 86, with approximately 34 entering and 52 exiting the site. In the a.m. hour, there would be 48 trips with 31 entering and 17 exiting the site. Not all of the generated trips would be vehicular, nor would all of the trips result in new traffic on the street system. A segment of new trips could be attributed to pedestrians and bicycle traffic because of the proximity to large commercial and office trip attractors, but for the purposes of this analysis, none of the trips were assigned to alternative transportation modes. 229 The Springs Living at Bozeman TIS Page 8 The number of external vehicle trips as presented in Table 2 can be further categorized as primary purpose, diverted link, or passerby purpose trips. Primary purpose trips are trips for which the development is a primary destination from any particular origin. Diverted link trips are trips made to a development as a secondary destination that must be diverted from a path between the origin and primary destination. Passerby trips are also trips made to a development as a secondary destination, but without a diversion from the primary trip path (i.e., a stop on the way home from work). The ITE Trip Generation Report provides methods for estimating passerby trips for a variety of facilities. For this development it can be assumed that there will be no passerby trips. TRIP DISTRIBUTION There are various methods available for determining the directional distribution of trips to and from site developments. For developments within a large urbanized area, the task is best accomplished through the creation of a computerized transportation model of the urban street system, which includes the proposed development changes. When the creation of a model is not feasible, reliable estimates can be made by calculating the distribution of existing traffic volumes on the surrounding street system. Figure 3, on the following page, shows a graphical summary of the directional trip distribution, which is based on composite methods of existing traffic flow and land use distribution patterns. The method used existing directional traffic distribution and adjustments were made to account for adjacent developments that would not typically be associated with trip attractions to this particular land use. Generally, 15% of the trips would be directed to the north and west, with 51% of the trips directed to the south and east. Approximately 34% of the trips would be directed to and from the south and west. 230 The Springs Living at Bozeman TIS Page 9 231 The Springs Living at Bozeman TIS Page 10 The directional distribution of trips would have multiple paths choices within the immediate area. A travel time analysis on a number of paths to and from the main arterials was completed to determine the relative distribution of trips within the area of potential impact, as shown in Figure 3. TRAFFIC ASSIGNMENT The assignment of development site traffic to the street system and site access points is dependent upon several factors. Two such factors are external directional distribution and localized operational site conditions. The combined calculation of demand and least time accessibility are then used to estimate likely movement volumes at each individual access point. Turning movements at each access point can then be calculated through the application of primary trip distributions to full development vehicular trip generation totals. In the case of The Springs Living, there are a total of two different access points, each on different streets. Individual demand at each access is dependent upon travel time and the relative location of land uses within the site. Figure 4, on the following page, illustrates the results of average weekday and pm peak hour, site-generated traffic assignment for The Springs Living. Peak pm hour traffic assignments at each of the individual approaches are also detailed in Figure 4. 232 The Springs Living at Bozeman TIS Page 11 233 The Springs Living at Bozeman TIS Page 12 TRAFFIC IMPACTS Existing Traffic Volumes Traffic volume impacts for site developments can often be quantified by determining the change in traffic volumes expected at various points within the surrounding network of streets. Site traffic assignments give an indication of what volume of traffic could potentially be added to the street system during the average weekday (AWT). The percent change in AWT can be used to identify general locations where impacts could be significant, but it is the change in traffic during peak periods that provide specific information on the type and location of impacts that could potentially occur. In almost all cases, it is very difficult to determine AWT on any section of street to within 10% accuracy. Thus, impact analyses on streets with relative percentage increases less than 10% are not normally considered critical. Figure 5, on the following page, illustrates the associated traffic volume impacts related to full development site traffic added to existing background traffic on the surrounding street system. Figure 5 also shows existing volumes plus site traffic on each street segment and the relative percentage increases over existing AWTs. The only significant increases in AWT (greater than 10%) would occur along N 27th Avenue south of the development site. 234 The Springs Living at Bozeman TIS Page 13 235 The Springs Living at Bozeman TIS Page 14 Capacity Table 3, below, summarizes capacity analysis results (see Appendix C) for existing plus site generated traffic at each of the potentially impacted intersections. The calculations indicated that there would not be any significant capacity impacts resulting from the addition of site generated traffic. The intersection of N 27th Avenue and Catron Street would still operate with a LOS “B” for the eastbound and westbound approaches, with no substantial increase in delay. The proposed Catron Street site access would operate at LOS B and the N 27th Avenue site access would operate at LOS A. The capacity impacts indicated in Table 3 provide an indication of how these intersections would operate if the development existed today so that it can be determined where mitigating measures should be applied. Table 3. Existing Plus Development SiteTraffic Peak Hour Capacity Analysis Summary Control Delay (s/veh) LOS V/C Ratio Queue Length (95%) Control Delay (s/veh) LOS V/C Ratio Queue Length (95%) Control Delay (s/veh) LOS V/C Ratio Queue Length (95%) Control Delay (s/veh) LOS V/C Ratio Queue Length (95%) Control Delay (s/veh) LOS V/C Ratio Queue Length (95%) Control Delay (s/veh) LOS V/C Ratio Queue Length (95%) LT LR LTR EB B Movement Group 0.01 0.06 A 0 0.31 2 0.01 Davis Lane & Cattamount Street 7.6 10.2 ABDavis Lane & Catron Street 7.8 Movement Group LTR LTR Intersection MOE NB SB 01 LRLT 12.8 AA N. 27th Avenue & Catron Street Movement Group N. 27th Avenue & Cattamount Street Movement Group 7.4 9.7 LR WB LTR LT 1 0.05 0.12 0 7.4 7.5 13.2 AA B 12.6 B 2 0.02 0.03 0.34 00 0.21 1 Movement Group LT LR N. 27th Avenue & Site Access 7.5 9.8 AA 0.00 0.06 01 Movement Group LR LT Catron Street & Site Access 13.1 8.1 BA 0.08 0.15 11 236 The Springs Living at Bozeman TIS Page 15 Safety – Auxiliary Turn Lane Warrants Auxiliary turn lane warrants were evaluated for existing plus site generated traffic conditions (see Appendix D). It was found that none of the intersections or site accesses would have sufficient traffic to warrant turn lane considerations. FUTURE CONDITIONS Traffic Volumes Growth in background traffic is dependent upon continued subdivision development in the area. Traffic counts were taken in 2007 on Catron Street and on N. 27th Avenue. It appears that in the past seven years, traffic has increased on N. 27th Street by 40% on N. 27th Avenue and by 50% on Catron Street. In an examination of available land remaining for development within the impact area, it was determined that areas accessed by Catron Street are approximately 60% to 70% developed, while areas that could be accessed by N 27th Avenue are approximately 20% developed. If historic growth rates were to occur in the next 10 years it is estimated that traffic on Catron Street would increase by approximately 50% and traffic on N 27th would increase by approximately 100%. It should also be noted that a future connection of Cattamount Street to Valley Center Road would provide an alternate route to N 27th from the east and north, which would essentially limit the ultimate traffic demand on Catron Street. Figure 6 indicates traffic projections on both of these streets using the above noted future growth assumptions. Peak pm hour traffic at the intersection of Catron Street and N 27th Avenue along with peak pm hour traffic at both of the site accesses are shown. The traffic volume projections at these intersections are used to determine the operational conditions that could occur within the foreseeable future. 237 The Springs Living at Bozeman TIS Page 16 238 The Springs Living at Bozeman TIS Page 17 Future Capacity Table 4 summarizes the year 2025 capacity calculations associated with the projected traffic volumes. It can be seen that the minimum LOS at the intersection of Catron Street and N 27th Avenue would be reduced to “C” on the east and west approaches and the vehicle queues on the westbound approach would increase to 5 vehicles from 2 vehicles that currently exists. The N 27th Avenue site access would operate at LOS “B” while the Catron Street site access would operate at LOS C. This indicates that both site accesses would operate efficiently under future traffic loadings. Table 4. Future (2025) Peak PM Hour Capacity Analysis Summary Control Delay (s/veh) LOS V/C Ratio Queue Length (95%) Control Delay (s/veh) LOS V/C Ratio Queue Length (95%) Control Delay (s/veh) LOS V/C Ratio Queue Length (95%) Intersection MOE NB SB EB WB Movement Group LTR LTR LTR LTR N. 27th Avenue & Catron Street 7.5 7.7 17.2 23.8 AACC 0.03 0.05 0.40 0.66 012 5 Movement Group LT LR N. 27th Avenue & Site Access 7.7 10.8 AB 8.7 0.00 0.08 01 0.25 Movement Group LR LT Catron Street & Site Access 18.3 11 CA 0.13 Future Safety Conditions The primary consideration for safety is available sight distance at intersections and driveway accesses. In this case there are no permanent physical barriers that would limit the line of sight for motorists entering or exiting the site accesses. However, sight distance can also be obscured by mobile or temporary conditions such as vehicular queues that could block the line of sight for vehicles entering or exiting driveway approaches. Figure 7, on the following page was developed to illustrate the extent of maximum vehicular queues that could impact safe operations at the proposed site accesses. 239 The Springs Living at Bozeman TIS Page 18 240 The Springs Living at Bozeman TIS Page 19 The Catron Street access would have two access movements with potential for conflicts. The exit maneuver would require an adequate line of sight both east and west. The unobstructed line of sight to the east would be approximately 600’ while the line of sight to the west would be limited to 302’ if the maximum calculated number of vehicles were queued at the Catron Street and N 27th Street intersection. AASHTO guidelines provide design values for the minimum stopping and intersection sight distances. Since the 85th% speed on Catron Street was measured to be approximately 27 mph, the AASHTO minimum stopping sight distance would be approximately 200’ at 30 mph. The sight distance required for a vehicle to make a left turn from the access without impeding traffic flow would be approximately 330’ at 30 mph. The sight distance required to make a right turn from the access would be approximately 290’ at 30 mph. Figure 7 indicates that there would be approximately 302’ of available sight distance when the maximum vehicular queue is present on the westbound intersection approach. It would appear that there would be less sight distance available for the left-turn than the AASHTO intersection guidelines suggest for facilities with 30 mph design speeds. However, there are a number of elements that need to be considered. Speeds on Catron Street are actually less than 30 mph and if calculated at 27 mph the required sight distance would be close to 300’. Secondly, vehicles approaching the site access from the west would not be traveling anywhere near 30 mph at a point 302’ west of the access since any eastbound vehicle would have entered the adjacent intersection from a stop or by turning from N 27th Avenue. At that point, vehicles would be traveling at no more than 15 mph and in the processing of accelerating. Thirdly, the line of sight was measured from a point where the motorist’s eye position is located when the vehicle is as close to the street as possible. At any position 2 to 3 feet back into the site would provide unlimited sight distance to the intersection. In this case, stopping sight distance would be the controlling measurement that would ensure safe operations and thus, sufficient sight distance would be available. 241 The Springs Living at Bozeman TIS Page 20 The other site access movement on Catron Street that requires a clear line of sight would be the westbound left-turn movement into the access. Figure 7 indicates that the sight distance that would be available during peak future traffic conditions is approximately 280 feet. AASHTO guidelines indicate that the minimum sight distance for that maneuver would be 245’ at a design speed of 30 mph. Since the available sight distance is more than the minimum, it can be assumed that the left-turn movement into the site can be made safely in the future. The N 27th Avenue access would provide relatively unlimited sight distance based on the tangent roadway alignment and the absence of permanent sight obstructions. Unlike the Catron Street access, mobile and temporary sight obstructions do not involve conditions at the intersection of Catron Street and N 27th Avenue. Two accesses on the opposite side of N 27th Avenue flank the proposed site access and there is potential for vehicles turning left into those driveways to block the line of sight of oncoming traffic. The 85th% speed on N 27th Avenue was measured at 32 mph, which is in the same range as the 30 mph design speeds relative to the AASHTO guidelines. Thus, left turns from the site access should have 330’ of sight distance, right turns from the access should have 290’, and the stopping sight distance should be 200’. Sight distance for left–turns into the site access would not be impeded by vehicle movements into or out of adjacent driveways. Since the two driveways on the west side of N 27th Avenue would access apartment buildings (currently under construction) that would have 64 units, the total trip generation for those apartments would be less than 400 trips on the average weekday. During the peak pm hour each of the two accesses would have approximately 20 trips with 13 vehicle entering. With similar trip distribution 242 The Springs Living at Bozeman TIS Page 21 applied to the apartments, the maximum number of left-turn movements into each approach would be approximately 6 vehicles or 1 vehicle every 10 minutes. This is the same volume of traffic that would enter the study site in the southbound direction from N 27th Avenue. Capacity calculations for that movement resulted in 7.7 second delay and maximum vehicle queues less than 0.1 vehicles. Thus, any mobile sight obstructions would be rare, but possible. For this situation another measure of sight distance is necessary to determine if the rare and fleeting sight obstructions have the potential to create safety concerns. Figure 7 illustrates conditions where a left-turning vehicle can shadow on-coming vehicles to an extent where a driver at an adjacent approach cannot see the trailing vehicle and makes a decision to enter the roadway. Figure 7 shows the “Shadow Zones” where a trailing vehicle can be hidden. The shadow zone lengths were measured and converted into time equivalents based on the 85th% speeds. In, this case the shadow zones for both cases were determined to be 0.8 seconds in length. All of the AASHTO sight distance criteria is based upon time and speed calculations that incorporate 2.5 seconds for perception and reaction time. Since the shadow zone lengths are 0.8 seconds, they are well below the perception/reaction time and they are one half of the standard 1.5 seconds perception time. Thus, it would be extremely unlikely that the average driver would miss seeing vehicles when they pass thru the shadow zone. From this analysis it can be concluded that would be no future sight distance and safety concerns associated with the N 27th Avenue site access relative to the adjacent driveway accesses. 243 The Springs Living at Bozeman TIS Page 22 MODIFICATION TO CITY GUIDELINES City of Bozeman ordinances require specific separation distances between driveways and intersections as well as separation between adjacent driveways based on varied street classifications. Catron Street and N 27th Avenue are both Collector streets and the required separation between a driveway and street intersection is 330’ from the inside edge of the driveway to the nearest right-of- way (R/W) line for the intersecting street. The required separation distance between driveways on a Collector Street is 150’ from the inside edge of adjacent driveways. Modifications from the ordinance requirements for commercial developments can be considered by the City of Bozeman by requesting the modifications contained in Article H of Ordinance 1755 Item # 3 and submitting the following information prepared by a certified professional engineer. a. Traffic volumes b. Turning movements c. Traffic controls d. Site design e. Sight distances f. Location and alignment if other access points All of the above information is contained in the text and figures contained within this report. In addition to this information, the following narratives provide additional information with regard to the extent of modifications and logical reasoning that should be considered when deciding whether to approve the modifications. 244 The Springs Living at Bozeman TIS Page 23 The inside edge of the proposed site access on Catron Street would be located approximately 308’ (along the Catron Street alignment) from the eastern R/W line on N 27th Avenue and would required an approved modification to the guidelines since it would be 22’, short of the standard. There is also another driveway adjacent to and east of the Catron Street site access. The approximate separation distance between that access and the proposed site access is 158’ which exceeds the City of Bozeman requirements. The R/W line at the intersection of Catron Street and N 27th Avenue is approximately 465’ from the inside edge of the proposed site approach to N 27th Avenue, which exceeds the City of Bozeman standard. However, the N 27th Avenue site access is located between two driveways on the west side of the street and the separation distance from the inside edge of the north driveway is approximately 144’, which is 6’ short of the guideline. The separation between the inside edge of the southern driveway is approximately 135’, which is 15’ short of the guideline. Therefore the N 27th Avenue access would require relaxation of the guidelines. The relative variations from the guidelines for the three modifications requested range between 4% and 10% of the guideline distances. In considering relaxation of those guidelines, it should be remembered that the guidelines were actually derived from conditions incorporating average geometrics conditions, speeds, and traffic flows that are typically associated with local, collector, and arterial streets. Analysis of safety and operations at for specific circumstances, such as presented herein, are more applicable than those that were derived with the objective of covering a wide range of conditions. 245 The Springs Living at Bozeman TIS Page 24 Any alternative that would involve relocating the site access on N 27th Avenue to align with an existing driveway on the opposite side of the road would be impossible, given the development plan and function. Even if it were possible, it would not be entirely desirable from a safety standpoint. Opposite driveways would function as a four legged intersection. Four legged intersections have 32 points of conflict, whereas T-intersections only have 6 conflict points. That is why many agencies convert four legged intersections to offset T-intersections as a safety improvement measure. As long as the offset avoids overlapping, opposing left-turn movements, two offset T-intersections operate more safely than a single four legged intersection. RECOMMENDATIONS The development of The Springs Living would generate approximately 657 additional trips on the average weekday and 86 during the typical pm peak hour. Although traffic volume increases would be likely on adjacent streets and intersections, none of those streets or intersections would be impacted by the additional traffic volumes generated by this development. Therefore, the development could be constructed, as planned, without substantially impacting existing traffic operations. The two proposed site accesses do not exactly meet the City of Bozeman ordinance for separation between adjacent driveways and intersections. For the site plan to be approved, the developer is requesting a relaxation or modification to the separation guidelines. An extensive analysis of the operations and safety of the proposed access locations was completed and summarized within this report and it is recommended that the separation modifications be granted for this site development. 246