HomeMy WebLinkAboutC9. PSA R&R Taylor
Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Chuck Winn, Assistant City Manager
SUBJECT: Concrete Work on the West and South sides at City Hall
MEETING DATE: September 21, 2015
AGENDA ITEM TYPE: Consent
RECOMMENDATION: Authorize the City Manager to sign the Construction Agreement
for the concrete installation in the west parking lot and the old alley area on the south side of the
building. The dollar amount for the materials and labor is $20,000.00. BACKGROUND: Concrete will be installed in areas of the West Side Parking Lot in order to
improve water flow direction and reduce ice area build up in the parking lot in order to improve
vehicle travel and pedestrian crossing in the parking lot. Also, because the former alley was
grassed over on the south side of the building, an access sidewalk from the emergency exit door in the City Commission Meeting Room will be installed from the exit porch west to the Parking Lot on the west side of the building. The sidewalk will be 5 feet wide with an accessible ramp
installed from the exit to the accessible means of egress. Concrete will also be installed in the
west side parking lot in the area around the dumpster enclosure in the lot. A concrete valley
gutter will be placed along the west side of the building to move water from the roof drain to the old alley area and the turf area will be regarded to allow water to flow to the retention pond prior to the creek. The existing concrete barriers along the edge of the west parking lot and the alley
will be removed and a wooden fence installed for reduced access.
FISCAL EFFECTS: The funding for this planned project is contained in the Facilities Division’s budget.
ALTERNATIVES: As suggested by the City Commission.
Attachments: Proposal from R&R Taylor.
Construction Agreement Site Drawing With Details Attached
Report compiled on: September 16, 2015
87
Professional Services Agreement for Concrete Installation At City Hall FY 2015 - 2016
Page 1 of 11
PROFESSIONAL SERVICES AGREEMENT
THIS AGREEMENT is made and entered into this 21st day of September, 2015, by and between
the CITY OF BOZEMAN, MONTANA, a municipal corporation organized and existing under the
laws of the State of Montana, 121 North Rouse Ave., Bozeman, Montana 59771, hereinafter referred to as “City,” and, R & R Taylor Construction Inc., a Corporation, of 1775 Love Lane,
Bozeman, Montana 59715, “Contractor”.
In consideration of the mutual covenants and agreements herein contained, the receipt and
sufficiency whereof being hereby acknowledged, the parties hereto agree as follows:
1. Purpose: City agrees to enter this Agreement with Contractor to perform for City
services of concrete installation work at City Hall with details shown on the attached site sheet and
by this reference made a part hereof.
2. Term/Effective Date: This Agreement is effective upon the date of its execution
and will terminate on the 30th day of , 2015.
3. Scope of Work: Contractor will perform the work and provide the services in
accordance with the attached site sheet and the details outlined in this category. For conflicts
between this Agreement and the Scope of Services, unless specifically provided otherwise, the
Agreement governs.
Because the former alley was grassed over on the south side of the building, an access sidewalk
from the emergency exit door in the City Commission Meeting Room will be installed from the exit
porch, west to the Parking Lot on the west side of the building. The sidewalk is 5 feet wide and
there will be an accessible ramp installed from the exit porch for ADA accessibility requirements.
Concrete will also be installed in the west side parking lot in the area around the dumpster enclosure
in the lot. A concrete valley gutter will be placed along the west side of the building to move water
from the roof drain to the old alley area and the turf area will be regarded to allow water to flow to
the retention pond prior to the creek. The existing concrete barriers along the edge of the west
parking lot and the alley will be removed and a wooden fence installed for reduced access.
88
Professional Services Agreement for Concrete Installation At City Hall FY 2015 - 2016
Page 2 of 11
4. Payment: City agrees to pay Contractor the amount specified in the Scope of
Services for the construction work involved in the Concrete Installation Work. Any alteration or
deviation from the described services that involves additional costs above the Agreement amount
will be performed by Contractor after written request by the City, and will become an additional
charge over and above the amount listed in the Scope of Services. The City must agree in writing
upon any additional charges.
5. Contractor’s Representations: To induce City to enter into this Agreement,
Contractor makes the following representations:
a. Contractor has familiarized itself with the nature and extent of this Agreement, the
Scope of Services, and with all local conditions and federal, state and local laws, ordinances, rules,
and regulations that in any manner may affect cost, progress or performance of the Scope of
Services.
b. Contractor represents and warrants to City that it has the experience and ability to
perform the services required by this Agreement; that it will perform said services in a professional,
competent and timely manner and with diligence and skill; that it has the power to enter into and
perform this Agreement and grant the rights granted in it; and that its performance of this
Agreement shall not infringe upon or violate the rights of any third party, whether rights of
copyright, trademark, privacy, publicity, libel, slander or any other rights of any nature whatsoever,
or violate any federal, state and municipal laws. The City will not determine or exercise control as
to general procedures or formats necessary to have these services meet this warranty.
6. Independent Contractor Status/Labor Relations: The parties agree that
Contractor is an independent contractor for purposes of this Agreement and is not to be considered
an employee of the City for any purpose. Contractor is not subject to the terms and provisions of
the City’s personnel policies handbook and may not be considered a City employee for workers’
compensation or any other purpose. Contractor is not authorized to represent the City or otherwise
bind the City in any dealings between Contractor and any third parties.
Contractor shall comply with the applicable requirements of the Workers’ Compensation
Act, Title 39, Chapter 71, MCA, and the Occupational Disease Act of Montana, Title 39, Chapter
71, MCA. Contractor shall maintain workers’ compensation coverage for all members and
employees of Contractor’s business, except for those members who are exempted by law.
Contractor shall furnish the City with copies showing one of the following: (1) a binder for
workers’ compensation coverage by an insurer licensed and authorized to provide workers’
89
Professional Services Agreement for Concrete Installation At City Hall FY 2015 - 2016
Page 3 of 11
compensation insurance in the State of Montana; or (2) proof of exemption from workers’
compensation granted by law for independent contractors.
Contractor shall indemnify, defend, and hold the City harmless from any and all claims,
demands, costs, expenses, damages, and liabilities arising out of, resulting from, or occurring in
connection with any labor problems or disputes or any delays or stoppages of work associated with
such problems or disputes.
Contractor shall post a legible statement of all wages and fringe benefits to be paid to the
Contractor’s employees and the frequency of such payments (i.e., hourly wage employees shall be
paid weekly). Such posting shall be made in a prominent and accessible location at the Contractor’s
normal place of business and shall be made no later than the first day of services provided under
this Agreement. Such posting shall be removed only upon expiration or termination of this
Agreement.
In performing the services under this Agreement, Contractor shall give preference to the
employment of bona fide residents of Montana, as required by §18-2-403, MCA, and as such, term
is defined by §18-2-401(1), MCA. When making assignments of work, Contractor shall use
workers both skilled in their trade and specialized in their field of work for all work to which they
are assigned.
In the event that, during the term of this Agreement, any labor problems or disputes of any
type arise or materialize which in turn cause any services to cease for any period of time, Contractor
specifically agrees to take immediate steps, at its own expense and without expectation of
reimbursement from City, to alleviate or resolve all such labor problems or disputes. The specific
steps Contractor shall take to services shall be left to the discretion of Contractor; provided,
however, that Contractor shall bear all costs of any related legal action. Contractor shall provide
immediate relief to the City so as to permit the services to continue at no additional cost to City.
Contractor shall indemnify, defend, and hold the City harmless from any and all claims,
demands, costs, expenses, damages, and liabilities arising out of, resulting from, or occurring in
connection with any labor problems or disputes or any delays or stoppages of work associated with
such problems or disputes.
7. Indemnity/Waiver of Claims/Insurance: For other than professional services
rendered, to the fullest extent permitted by law, Contractor agrees to release, defend, indemnify, and
hold harmless the City, its agents, representatives, employees, and officers (collectively referred to
for purposes of this Section as the City) from and against any and all claims, demands, actions, fees
90
Professional Services Agreement for Concrete Installation At City Hall FY 2015 - 2016
Page 4 of 11
and costs (including attorney’s fees and the costs and fees of and expert witness and consultants),
losses, expenses, liabilities (including liability where activity is inherently or intrinsically
dangerous) or damages of whatever kind or nature connected therewith and without limit and
without regard to the cause or causes thereof or the negligence of any party or parties that may be
asserted against, recovered from or suffered by the City occasioned by, growing or arising out of or
resulting from or in any way related to: (i) the negligent, reckless, or intentional misconduct of the
Contractor; (ii) any negligent, reckless, or intentional misconduct of any of the Contractor’s agents;
or (iii) the negligent, reckless, or intentional misconduct of any other third party.
For the professional services rendered, to the fullest extent permitted by law, Contractor
agrees to indemnify and hold the City harmless against claims, demands, suits, damages, losses, and
expenses, including reasonable defense attorney fees, to the extent caused by the negligence or
willful misconduct of the Contractor or Contractor’s agents or employees.
Such obligations shall not be construed to negate, abridge, or reduce other rights or
obligations of indemnity that would otherwise exist. The indemnification obligations of this Section
must not be construed to negate, abridge, or reduce any common-law or statutory rights of the
indemnitee(s) which would otherwise exist as to such indemnitee(s).
Contractor’s indemnity under this Section shall be without regard to and without any right to
contribution from any insurance maintained by City.
Should any indemnitee described herein be required to bring an action against the Contractor
to assert its right to defense or indemnification under this Agreement or under the Contractor’s
applicable insurance policies required below the indemnitee shall be entitled to recover reasonable
costs and attorney fees incurred in asserting its right to indemnification or defense but only if a
court of competent jurisdiction determines the Contractor was obligated to defend the claim(s) or
was obligated to indemnify the indemnitee for a claim(s) or any portion(s) thereof.
In the event of an action filed against City resulting from the City’s performance under this
Agreement, the City may elect to represent itself and incur all costs and expenses of suit.
Contractor also waives any and all claims and recourse against the City or its officers, agents
or employees, including the right of contribution for loss or damage to person or property arising
from, growing out of, or in any way connected with or incident to the performance of this
Agreement except “responsibility for his own fraud, for willful injury to the person or property of
another, or for violation of law, whether willful or negligent” as per 28-2-702, MCA.
91
Professional Services Agreement for Concrete Installation At City Hall FY 2015 - 2016
Page 5 of 11
These obligations shall survive termination of this Agreement and the services performed
hereunder.
In addition to and independent from the above, Contractor shall at Contractor’s expense
secure insurance coverage through an insurance company or companies duly licensed and
authorized to conduct insurance business in Montana which insures the liabilities and obligations
specifically assumed by the Contractor in this Section. The insurance coverage shall not contain any
exclusion for liabilities specifically assumed by the Contractor in subsection (a) of this Section.
The insurance shall cover and apply to all claims, demands, suits, damages, losses, and
expenses that may be asserted or claimed against, recovered from, or suffered by the City without
limit and without regard to the cause therefore and which is acceptable to the City and Contractor
shall furnish to the City an accompanying certificate of insurance and accompanying endorsements
in amounts not less than as follows:
• Workers’ Compensation – statutory;
• Employers’ Liability - $1,000,000 per occurrence; $2,000,000 annual aggregate;
• Commercial General Liability - $1,000,000 per occurrence; $2,000,000 annual
aggregate;
• Automobile Liability - $1,000,000 property damage/bodily injury; $2,000,000
annual aggregate.
The City of Bozeman, its officers, agents, and employees, shall be endorsed as an additional
or named insured on a primary non-contributory basis on both the Commercial General and
Automobile Liability policies. The insurance and required endorsements must be in a form suitable
to City and shall include no less than a sixty (60) day notice of cancellation or non-renewal. The
City must approve all insurance coverage and endorsements prior to the Contractor commencing
work. Contractor shall notify City within two (2) business days of Contractor’s receipt of notice that
any required insurance coverage will be terminated or Contractor’s decision to terminate any
required insurance coverage for any reason.
The City must approve all insurance coverage and endorsements prior to the
Contractor commencing work.
92
Professional Services Agreement for Concrete Installation At City Hall FY 2015 - 2016
Page 6 of 11
8. Termination for Contractor’s Fault:
a. If Contractor refuses or fails to timely do the work, or any part thereof, or
fails to perform any of its obligations under this Agreement, or otherwise breaches any terms
or conditions of this Agreement, the City may, by written notice, terminate this Agreement
and the Contractor’s right to proceed with all or any part of the work (“Termination Notice
Due to Contractor’s Fault”). The City may then take over the work and complete it, either
with its own resources or by re-letting the contract to any other third party.
b. In the event of a termination pursuant to this Section 8, Contractor shall be
entitled to payment only for those services Contractor actually rendered.
c. Any termination provided for by this Section 8 shall be in addition to any
other remedies to which the City may be entitled under the law or at equity.
d. In the event of termination under this Section 8, Contractor shall, under no
circumstances, be entitled to claim or recover consequential, special, punitive, lost business
opportunity, lost productivity, field office overhead, general conditions costs, or lost profits
damages of any nature arising, or claimed to have arisen, as a result of the termination.
9. Termination for City’s Convenience:
a. Should conditions arise which, in the sole opinion and discretion of the City,
make it advisable to the City to cease work on the services provided, City may terminate this
Agreement by written notice to Contractor (“Notice of Termination for City’s
Convenience”). The termination shall be effective in the manner specified in the Notice of
Termination for City’s Convenience and shall be without prejudice to any claims that the
City may otherwise have against Contractor.
b. Upon receipt of the Notice of Termination for City’s Convenience, unless
otherwise directed in the Notice, the Contractor shall discontinue services and shall do only
such work as may be necessary to preserve, protect, and maintain work already completed,
in progress.
c. In the event of a termination pursuant to this Section 13, Contractor is
entitled to payment only for those services Contractor actually rendered and materials
actually purchased or which Contractor has made obligations to purchase on or before the
receipt of the Notice of Termination for City’s Convenience, and reasonably incurred costs.
93
Professional Services Agreement for Concrete Installation At City Hall FY 2015 - 2016
Page 7 of 11
It is agreed that any materials that City is obligated to purchase for the Contractor will
remain the City’s sole property.
d. The compensation described in Section 13(c) is the sole compensation due to
Contractor for its performance of this Agreement. Contractor shall, under no circumstances,
be entitled to claim or recover consequential, special, punitive, lost business opportunity,
lost productivity, field office overhead, general conditions costs, or lost profits damages of
any nature arising, or claimed to have arisen, as a result of the termination.
10. Limitation on Contractor’s Damages; Time for Asserting Claim:
a. In the event of a claim for damages by Contractor under this Agreement,
Contractor’s damages shall be limited to contract damages and Contractor hereby expressly
waives any right to claim or recover consequential, special, punitive, lost business
opportunity, lost productivity, field office overhead, general conditions costs, or lost profits
damages of any nature or kind.
b. In the event Contractor wants to assert a claim for damages of any kind or
nature, Contractor shall provide City with written notice of its claim, the facts and
circumstances surrounding and giving rise to the claim, and the total amount of damages
sought by the claim, within ten (10) days of the facts and circumstances giving rise to the
claim. In the event Contractor fails to provide such notice, Contractor shall waive all rights
to assert such claim.
11. Representatives:
a. City’s Representative: The City’s Representative for the purpose of this
Agreement shall be Sid Bush (Facilities Staff) or such other individual as City shall
designate in writing. Whenever approval or authorization from or communication or
submission to City is required by this Agreement, such communication or submission shall
be directed to James Goehrung as the City’s Representative and approvals or authorizations
shall be issued only by such Representative; provided, however, that in exigent
circumstances when City’s Representative is not available, Contractor may direct its
communication or submission to other designated City personnel or agents as listed above
and may receive approvals or authorization from such persons.
b. Contractor’s Representative: The Contractor’s Representative for the
purpose of this Agreement shall be ___________ or such other individual as Contractor
94
Professional Services Agreement for Concrete Installation At City Hall FY 2015 - 2016
Page 8 of 11
shall designate in writing. Whenever direction to or communication with Contractor is
required by this Agreement, such direction or communication shall be directed to
Contractor’s Representative; provided, however, that in exigent circumstances when
Contractor’s Representative is not available, City may direct its direction or communication
to other designated Contractor personnel or agents.
12. Permits: Contractor shall provide all notices, comply with all applicable laws,
ordinances, rules, and regulations, obtain all necessary permits, licenses, including a City of
Bozeman business license.
13 Laws and Regulations: Contractor shall comply fully with all applicable state and
federal laws, regulations, and municipal ordinances including, but not limited to, all workers’
compensation laws, all environmental laws, the Americans with Disabilities Act, and all non-
discrimination, affirmative action, and utilization of minority and small business statutes and
regulations.
14. Nondiscrimination: The Contractor will have a policy to provide equal
employment opportunity in accordance with all applicable state and federal anti-discrimination
laws, regulations, and contracts. The Contractor will not refuse employment to a person, bar a
person from employment, or discriminate against a person in compensation or in a term, condition,
or privilege of employment because of race, color, religion, creed, political ideas, sex, age, marital
status, national origin, actual or perceived sexual orientation, gender identity, physical or mental
disability, except when the reasonable demands of the position require an age, physical or mental
disability, marital status or sex distinction. The Contractor shall be subject to and comply with Title
VI of the Civil Rights Act of 1964; Section 140, Title 2, United States Code, and all regulations
promulgated thereunder. The Contractor shall require these nondiscrimination terms of its sub-
Contractors providing services under this agreement.
15. Intoxicants; DOT Drug and Alcohol Regulations/Safety and Training:
Contractor shall not permit or suffer the introduction or use of any intoxicants, including alcohol or
illegal drugs, by any employee or agent engaged in services to the City under this Agreement.
Contractor acknowledges it is aware of and shall comply with its responsibilities and obligations
under the U.S. Department of Transportation (DOT) regulations governing anti-drug and alcohol
misuse prevention plans and related testing. City shall have the right to request proof of such
compliance and Contractor shall be obligated to furnish such proof.
The Contractor shall be responsible for instructing and training the Contractor's employees
and agents in proper and specified work methods and procedures. The Contractor shall provide
95
Professional Services Agreement for Concrete Installation At City Hall FY 2015 - 2016
Page 9 of 11
continuous inspection and supervision of the work performed. The Contractor is responsible for
instructing his employees and agents in safe work practices.
16. Modification and Assignability: This document contains the entire agreement
between the parties and no statements, promises or inducements made by either party or agents of
either party, which are not contained in this written Agreement, may be considered valid or binding.
This Agreement may not be enlarged, modified or altered except by written agreement signed by
both parties hereto. The Contractor may not subcontract or assign Contractor’s rights, including the
right to compensation or duties arising hereunder, without the prior written consent of City. Any
subcontractor or assignee will be bound by all of the terms and conditions of this Agreement.
17. Reports/Accountability/Public Information: Contractor agrees to develop and/or
provide documentation as requested by the City demonstrating Contractor’s compliance with the
requirements of this Agreement. Contractor shall allow the City, its auditors, and other persons
authorized by the City to inspect and copy its books and records for the purpose of verifying that the
reimbursement of monies distributed to Contractor pursuant to this Agreement was used in
compliance with this Agreement and all applicable provisions of federal, state, and local law. The
Contractor shall not issue any statements, releases or information for public dissemination without
prior approval of the City.
18. Non-Waiver: A waiver by either party any default or breach by the other party of
any terms or conditions of this Agreement does not limit the other party’s right to enforce such term
or conditions or to pursue any available legal or equitable rights in the event of any subsequent
default or breach.
19. Attorney’s Fees and Costs: That in the event it becomes necessary for either Party
of this Agreement to retain an attorney to enforce any of the terms or conditions of this Agreement
or to give any notice required herein, then the prevailing Party or the Party giving notice shall be
entitled to reasonable attorney's fees and costs, including fees, salary, and costs of in-house counsel
to include City Attorney.
20. Taxes: Contractor is obligated to pay all taxes of any kind or nature and make all
appropriate employee withholdings.
21. Dispute Resolution:
a. Any claim, controversy, or dispute between the parties, their agents,
employees, or representatives shall be resolved first by negotiation between senior-level
96
Professional Services Agreement for Concrete Installation At City Hall FY 2015 - 2016
Page 10 of 11
personnel from each party duly authorized to execute settlement agreements. Upon mutual
agreement of the parties, the parties may invite an independent, disinterested mediator to
assist in the negotiated settlement discussions.
b. If the parties are unable to resolve the dispute within thirty (30) days from the
date the dispute was first raised, then such dispute may only be resolved in a court of
competent jurisdiction in compliance with the Applicable Law provisions of this Agreement.
22. Survival: Contractor’s indemnification shall survive the termination or expiration of
this Agreement for the maximum period allowed under applicable law.
23. Headings: The headings used in this Agreement are for convenience only and are
not be construed as a part of the Agreement or as a limitation on the scope of the particular
paragraphs to which they refer.
24. Severability: If any portion of this Agreement is held to be void or unenforceable,
the balance thereof shall continue in effect.
25. Applicable Law: The parties agree that this Agreement is governed in all respects
by the laws of the State of Montana and the parties expressly agree that venue will be in Gallatin
County, Montana, and no other venue.
26. Binding Effect: This Agreement is binding upon and inures to the benefit of the
heirs, legal representatives, successors, and assigns of the parties.
27. No Third-Party Beneficiary: This Agreement is for the exclusive benefit of the
parties, does not constitute a third-party beneficiary agreement, and may not be relied upon or
enforced by a third party.
28. Counterparts: This Agreement may be executed in counterparts, which together
constitute one instrument.
29. Integration: This Agreement and all Exhibits attached hereto constitute the entire
agreement of the parties. Covenants or representations not contained therein or made a part thereof
by reference, are not binding upon the parties. There are no understandings between the parties
other than as set forth in this Agreement. All communications, either verbal or written, made prior
to the date of this Agreement are hereby abrogated and withdrawn unless specifically made a part of
this Agreement by reference.
97
Professional Services Agreement for Concrete Installation At City Hall FY 2015 - 2016
Page 11 of 11
**** END OF AGREEMENT EXCEPT FOR SIGNATURES ****
IN WITNESS WHEREOF, the parties hereto have executed this instrument the day and
year first above written.
CITY OF BOZEMAN, MONTANA ____________________________________
CONTRACTOR (Type Name Above)
By________________________________ By__________________________________
Chris Kukulski, City Manager
Print Name:
Print Title: ____________________________
APPROVED AS TO FORM:
By_______________________________
Greg Sullivan, Bozeman City Attorney
98
99
100
101
102
103
104
105