Loading...
HomeMy WebLinkAbout15370.15371.DRB.sr.finalPage 1 of 21 15370 & 15371, Design Review Board Staff Report for the Lewis and Clark Commerce Center Master Site Plan and Calvary Chapel Church Phase II Site Plan and Certificate of Appropriateness Date: Design Review Board meeting is on September 9, 2015 Project Description: To replace the previously approved Lewis and Clark Master Site Plan; the revisions will allow for the construction of a church (classified as “community center” in the M-1 Zoning District) in Phase II and an office building and three shop buildings in Phase III. Phase I is currently under construction as a storage unit development. Project Location: 2270, 2246 Boot Hill Court and is legally described as Lots 2A and 3, Block 2, Lewis & Clark Commercial Subdivision, Section 36, T1S, R5E, City of Bozeman, Gallatin County, Montana. The subject property is approximately 8.249 acres and is zoned M-1 (Light Manufacturing District) within the I-90 Entryway Corridor. Recommendation: Administrative Design Review Staff does not recommend approval of the design presented in the application. Recommended Motion: Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 15370 & 15371 and move to recommend approval of the Lewis and Clark Commerce Center Master Site Plan, Calvary Church Phase 2 Site Plan and Certificate of Appropriateness with conditions and subject to all applicable code provisions. Report Date: September 1, 2015 Staff Contact: Heather Davis, Associate Planner Shawn Kohtz, Development Review Engineer Agenda Item Type: Action (Quasi-judicial) EXECUTIVE SUMMARY Project Summary The Lewis and Clark Commerce Center Master Site Plan application proposes the construction of a church (classified as “community center” in the M-1 Zoning District), office and shop buildings with shared parking in two phases. Phase II preliminary site plan proposes the construction of a 14,800 square foot “community center” with associate parking and site improvements. Currently, the Calvary Chapel Church is planning to lease the proposed community center to operate their church. In the future, the building has been designed as a multi-purpose building as allowed within the M-1 zoning. Phase III is planned for an office building and two shop buildings with associated 15370 & 15371, Staff Report for the Lewis & Clark MSP & Phase II SP Page 2 of 21 parking and site improvements. The office and shop buildings in Phase III are conceptual, a subsequent site plan will need to be submitted in the future, providing a more detailed review. In November 2014, the Lewis and Clark Storage and Warehouse Master Site Plan Z14282 was approved for construction of a storage unit development and future office and shop buildings. A new application is required to replace Z14282 due to the reconfiguration and expanded scope of the proposed project. Phase I is currently under construction and was previously approved as the Lewis and Clark Storage Units Site Plan Application, Z15329. Alternatives 1. Recommend Approval of the application with the recommended conditions; 2. Recommend Approval of the application with modifications to the recommended conditions; 3. Recommend Denial the application based on the Design Review Board’s findings of non-compliance with the applicable criteria contained within the staff report; or 4. Open and continue the review on the application, with specific direction to staff or the applicant to supply additional information or to address specific items. Phase I Storage Units *Currently under construction Phase II- Calvary Church Site Plan Phase III Requires further site plan review 15370 & 15371, Staff Report for the Lewis & Clark MSP & Phase II SP Page 3 of 21 TABLE OF CONTENTS EXECUTIVE SUMMARY ...................................................................................................... 1 Project Summary ................................................................................................................. 1 Alternatives ......................................................................................................................... 2 SECTION 2 –REQUESTED RELAXATION/DEVIATIONS/VARIANCES ...................... 11 SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL .................................... 11 SECTION 4 - CODE REQUIREMENTS REQUIRING PLAN CORRECTIONS ............... 11 SECTION 5 - RECOMMENDATION AND FUTURE ACTIONS ...................................... 11 SECTION 6 - STAFF ANALYSIS AND FINDINGS ........................................................... 11 Applicable Plan Review Criteria, Section 38.19.100, BMC. ............................................ 12 Entryway Overlay District Review Criteria ...................................................................... 15 APPENDIX B – PROJECT SITE ZONING AND GROWTH POLICY ............................... 20 APPENDIX C – DETAILED PROJECT DESCRIPTION AND BACKGROUND.............. 20 APPENDIX D – NOTICING AND PUBLIC COMMENT ................................................... 21 APPENDIX E - OWNER INFORMATION AND REVIEWING STAFF ............................ 21 FISCAL EFFECTS ................................................................................................................. 21 ATTACHMENTS ................................................................................................................... 21 15370 & 15371, Staff Report for the Lewis & Clark MSP & Phase II SP Page 4 of 21 section 1 - MAP SERIES 15370 & 15371, Staff Report for the Lewis & Clark MSP & Phase II SP Page 5 of 21 Page 6 of 21 Master Site Plan 15370 & 15371, Staff Report for the Lewis & Clark MSP & Phase II SP Page 7 of 21 Calvary Chapel Church Phase II Site Plan 15370 & 15371, Staff Report for the Lewis & Clark MSP & Phase II SP Page 8 of 21 Calvary Chapel Church Elevations 15370 & 15371, Staff Report for the Lewis & Clark MSP & Phase II SP Page 9 of 21 15370 & 15371, Staff Report for the Lewis & Clark MSP & Phase II SP Page 10 of 21 Page 11 of 21 SECTION 2 –REQUESTED RELAXATION/DEVIATIONS/VARIANCES No relaxations, deviations or variances have been requested. SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL Administrative Design Review Staff does not recommend approval of the requested Site Plan/COA applications 15370 & 15371 to the Director of Community Development. The applicant must comply with all applicable conditions of approval as recommended by the DRB and Development Review Committee (DRC) and approved by the Director. Prior to receiving Final Site Plan or Building Permit approval, the applicant must comply with all other provisions of the Bozeman Unified Development Code, which are applicable to this project. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. Conditions related to the DRC review are in development at this time. The recommendations of the DRB and DRC will be forwarded to the Director of Community Development who will make the final decision regarding this project. Recommended Design Review Board Conditions of Approval: 1. None at this time. SECTION 4 - CODE REQUIREMENTS REQUIRING PLAN CORRECTIONS A. None at this time SECTION 5 - RECOMMENDATION AND FUTURE ACTIONS Having considered the criteria established for site plans approval with conditions as recommended to the Design Review Board (DRB), the DRB shall forward its recommendation to the Director of Community Development for consideration and action. The tentative final date for Director consideration and action is October 5, 2015. This date has not yet been finalized. The Development Review Committee (DRC) will consider the Master Site Plan, Site Plan, and Certificate of Appropriateness on September 16th. If the DRC finds that the application is sufficient for review they will make a recommendation to the Director of Community Development. SECTION 6 - STAFF ANALYSIS AND FINDINGS Analysis and resulting recommendations are based on the entirety of the application materials, municipal codes, standards, and plans, public comment, and all other materials available during 15370 & 15371, Staff Report for the Lewis & Clark MSP & Phase II SP Page 12 of 21 the review period. Collectively this information is the record of the review. The analysis in this report is a summary of the completed review. The site is located within the Class I, I-90 Entryway Corridor Overlay District. ADR staff has reviewed the proposal for conformance with the Bozeman Design Guidelines for Entryway Corridors. Staff finds the proposal to not be in general conformance with the 2005 Bozeman Design Guidelines for Entryway Corridors as reviewed under the Entryway Overlay District Review Criteria. Applicable Plan Review Criteria, Section 38.19.100, BMC. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or State law. In considering applications for plan approval under this title, the advisory boards and City Commission shall consider the following: 1. Conformance to and consistency with the City’s adopted growth policy This property is designated as Industrial on Figure 3-1 (Future Land Use Map) of the Bozeman Community Plan. The construction of a community center (church), storage, office and manufacturing uses comply with the description of this land use designation, M-1 and the future land use map. 2. Conformance to this chapter, including the cessation of any current violations There are no known violations of the chapter on the site. When the site plan process has been completed compliance with standards of the chapter will be demonstrated. Code corrections have been identified in Section 2 of this report. 3. Conformance with all other applicable laws, ordinances, and regulations No violations are known at this time. Conformance with building codes, stormwater regulations, and similar requirements will be demonstrated with subsequent submittal material. 4. Relationship of site plan elements to conditions both on and off the property In relation to the existing blend of industrial, storage and commercial structures, general development pattern, and lot configurations along Simmental Way and Boot Hill Court, the Lewis and Clark project depicted on the submitted plans appear to be reasonably related to adjacent and on-site conditions. See Entryway Overlay District Review Criteria below for more detailed discussion. 5. The impact of the proposal on the existing and anticipated traffic and parking conditions The plan provides adequate off-street parking to meet minimum parking requirements of the Bozeman Municipal Code. The office and shop building layout provides sufficient parking 15370 & 15371, Staff Report for the Lewis & Clark MSP & Phase II SP Page 13 of 21 with the square footage and proposed uses. However, a subsequent site plan will be required to provide more information on specific uses and their compliance with the parking requirements. A traffic study was not required by the Engineering Department for this project due to its location and the adequacy of the existing street network to accommodate the traffic generation from the proposed use. 6. Pedestrian and vehicular ingress and egress The site development includes sidewalks on perimeters and crossing the site. The network of pedestrian and vehicular ways appears adequate to circulate safely with condition of approval 4, which requires treatment of points of conflict where the interior sidewalk that parallels the public sidewalk on Boot Hill crosses both driveways, such as colored stamped pavement. 7. Landscaping, including the enhancement of buildings, the appearance of vehicular use, open space, and pedestrian areas, and the preservation or replacement of natural vegetation The proposed landscaping does not currently meet the Design Review Criteria. See Entryway Overlay District Review Criteria for additional discussion. 8. Open space This is a commercial development, so open space is not a requirement; however, open space is further discussed with the Entryway Overlay District Review Criteria. 9. Building location and height The proposed building heights comply with maximum height limits. 10. Setbacks Section 38.12.050, BMC, states required setbacks. All proposed structures appear to be within the required front, side and read yard setbacks. 11. Lighting New lighting is proposed within the site. All LED lighting is proposed for parking lot lights. Lighting levels appear within code limits. 12. Provisions for utilities, including efficient public services and facilities The water and sewer lines for the proposed development are shown within the vehicular circulation and parking area. The utilities were reviewed by the City Engineering Department. All final utility locations will be reviewed with the Final Site Plan application. 13. Site surface drainage The proposed site surface drainage appears to meet standards and is currently being reviewed by the Engineering Division. 15370 & 15371, Staff Report for the Lewis & Clark MSP & Phase II SP Page 14 of 21 14. Loading and unloading areas Loading and unloading for the anticipated storage and shop uses for these proposed buildings can be accommodated within the adjacent service drive and parking lot drive aisles. 15. Grading Minimal grading is required with the proposed development. The parking area and buildings generally follows the lay of the land with the construction of a stormwater retention area in the northeast corner of the property. 16. Signage No signage is proposed at this time. If any new signage is proposed, it must be in compliance with the Bozeman Unified Development Code and will require a sign permit prior to construction. 17. Screening All required screening appears to be met. No ground mechanical equipment is proposed. Code provision correction A requires any mechanical equipment to be screened and shall be shown on the final site plan. 18. Overlay district provisions The site is located within the I-90 Entryway Corridor. Over 90 parking spaces are proposed triggering review by the Design Review Board (DRB) pursuant to Section 38.19.040.C, BMC. The detailed findings can be found further below under Entryway Overlay District Review Criteria section. 19. Other related matters, including relevant comment from affected parties As of the writing of this report, no public comment has been received in response to the noticing of the project. Any comments received prior to the public hearing will be forwarded to the Director. 20. If the development includes multiple lots that are interdependent for circulation or other means of addressing requirement of this title, whether the lots are either: Configured so that the sale of individual lots will not alter the approved configuration or use of the property or cause the development to become nonconforming or The subject of reciprocal and perpetual easements or other agreements to which the City is a party so that the sale of individual lots will not cause one or more elements of the development to become nonconforming. The site does include multiple lots. Necessary easements such as shared access are proposed and will be completed prior to the final plan approval. 15370 & 15371, Staff Report for the Lewis & Clark MSP & Phase II SP Page 15 of 21 21. Compliance with article 8 of chapter 10 of the Bozeman Municipal Code. Not applicable. 22. Phasing of development The project is proposed for construction in two phases. At this time, no specific conditions are required to facilitate the phasing of this development. Entryway Overlay District Review Criteria The site is located within the Class I, I-90 Entryway Corridor Overlay District. ADR staff has reviewed the proposal for conformance with the Bozeman Design Guidelines for Entryway Corridors. Staff finds the proposal to not be in general conformance with the 2005 Bozeman Design Guidelines for Entryway Corridors. Chapter 1. Neighborhood Design Guidelines A. Green Space This could to be developed. As of right now there is nothing showing a public green space. B. Auto Connections It is proposed to share access with adjacent commercial lots. C. Pedestrian and Bicycle Connections Pedestrian and bicycle facilities are provided. They appear adequate to safe circulation and enhance the internal and external character of the development. D. Street Character “The use of a coordinated landscape design shall be used along the street edge to establish a single identity for the area and to buffer the view of cars in parking areas.” No buffer to the parking area is provided. Street furnishings are not proposed due to the industrial character of the development area. Trees line the street and although may act as a buffer to the vehicles. Additional landscaping is recommended for screening the parking lot from the street. Chapter 2. Site Design Guidelines F. Building Placement Like most developments of this nature, having adequate parking while maximizing the sites greenspace is always a difficulty. The proposed site plan has the buildings situated in the center of the lot. One possible solution is that the buildings could be positioned more toward 15370 & 15371, Staff Report for the Lewis & Clark MSP & Phase II SP Page 16 of 21 the Boot Hill Court with parking to the east, adjacent to I-90. This could also allow for the creation of courtyards, which could serve as attractive public spaces. G. Outdoor Public Spaces Outdoor public space should be a focal point of the design and currently nothing is shown on the plans. H. Pedestrian and Bicycle Circulation Systems Pedestrian circulation has been provided and connects to all parts of the site. I. Internal Automobile Circulation Systems Internal circulation has been defined with a hierarchy of spaces and coordinated with adjacent developments. J. Parking Lots “3. Minimize the negative visual impact of cars parked on a site. Screen Parking areas from view of public ways with landscaping (i.e. berm, low decorative walls, evergreen hedge) minimum of 4’ in height.” No screening is provided between the public ways and the areas where cars circulate and park. Landscaping has been provided within the parking areas to define circulation spaces. Because of the necessity for parking spaces, there is a large surface area of asphalt. Consider some form of ‘green parking.’ This could be used for at least a portion of the site. Basics of shading with trees and shrubs to minimize the visual impact of parking will help with this as well. Innovative parking design is encouraged and lauded. Please refer to ‘Building Placement’ section noted above. K. Site Lighting All proposed site lighting is fully shielded LED. Total output is well below maximum allowed amounts of lumens. Temperature of the light is suggested to be lowered to between 3500-4000 Kelvin to reduce glare. M. Landscape Design “3. Use a coordinated landscape palette to establish a sense of visual continuity in the design of a site. 4. A landscape design should use elements to help provide interest to pedestrians.” The design does not comply and provide buffers to address these guidelines. No large vegetation currently exists on the site. The plant palette proposed has a variety of species, plant types and sizes. The landscaping should be further developed with focus on public spaces as well as the buffer between the storage units and other uses, and also along I-90. 15370 & 15371, Staff Report for the Lewis & Clark MSP & Phase II SP Page 17 of 21 Chapter 3. Building Design Guidelines B. Building Character The building design is of standard quality and does little in the way of establishing a precedent for quality religious architecture. However, the building is designed to facilitate future uses other than a church. Therefore, the building character is less focused on the proposed church use and allows for future flexibility. C. Primary Building Entrance “The primary entrance of a structure should orient to a street, major sidewalk, pedestrian way, plaza courtyard or other outdoor public space.” The primary building entrance is oriented to a parking lot internal to the site and does not address any public way. Highlight an entrance/exit to the south fronting Boot Hill, and provide a canopy or change in roofline at the side entrance to address Simmental Way. Entrances along streets should be further oriented to those streets. The entryways are not readily visible and distinguished from other building elements. Sidewalks shall be added to connect from the street to building entrances. D. Street-Level Interest The south and particularly the west façade provide little interest to the street or pedestrian. Enhance these elevations through the use of materials, additional windows and/or doors/entrances, trim detailing at windows, end gables, covered porches, varied roof lines, multiple façade materials, varied façade plane, and decorative lighting and/or change in roof plane. This is particularly important at the classroom wing. G. Building Materials “Materials that reduce the perceived mass of a building and appear to blend with the natural setting should be used.” The material palette selected for the building is consistent with the guidelines, however, the application is inconsistent. In most instances the horizontal band of metal wraps the base of the building except in one small area of the south façade, and the hardi-panels seem to have no intentional application except to bring in church like elements. Both could benefit from additional design intent and detailing. 15370 & 15371, Staff Report for the Lewis & Clark MSP & Phase II SP Page 18 of 21 I. Service Canopies – Not applicable. J. Color Color choice for finishes will be very important in the overall appearance of the building. Consider warm, earthy tones and natural patinas, in lieu of shiny or galvanized metal, and subtle contrast in color differentiation of materials. K. Utilities and Mechanical Equipment Mechanical equipment and service meters should not be located along or adjacent to either street frontage. Intended location of services and equipment is not evident on the plans provided. Install appropriate landscape screening. Chapter 4. Sign Design Guidelines No signs are proposed at this time. Any future proposed signs will be evaluated against applicable criteria. Chapter 5. Corridor-Specific Design Guidelines P. Interstate 90 (page 100) “The I-90 entryway corridor serves as a conduit trough Bozeman with connections to North 19th Avenue, North 7th Avenue, and East Main Street. This corridor is Class I, entirely automobile-oriented, and prohibits pedestrian access. The I-90 entryway corridor is flanked by commercial and industrial development, though most buildings are backed up to rather than facing the corridor. The highway is elevated throughout much of the city core and provides opportunities for dramatic views to the surrounding mountains. As a result, the character of development that abuts the highway is very important. For this reason, properties along the highway should be designed with views from the road taken into consideration.” Neighborhood: “Consideration should be given to improvements that would either direct attention to the north or screen foreground views toward the south.” As noted previously, landscaping will help with buffers and screens. Site: “The various industrial/storage yards on the south side of this corridor should be buffered.” As noted previously, there is no buffer between the church building and the storage units. This should be developed. Guidelines for Interstate 90 (page 102) “Highway edge should be primarily “natural” in character with native trees and related plantings at interchanges.” Landscaping is proposed, but could be further developed. 15370 & 15371, Staff Report for the Lewis & Clark MSP & Phase II SP Page 19 of 21 “Provide site and building improvements to the side of the buildings that face the Interstate.” Additional detail to be provided as phase is further developed. “Reduce the visual impact of industrial operations.” Landscaping is proposed as a buffer, but could be further developed. Additional detail for Phase III will be provided as it is further developed. 15370 & 15371, Staff Report for the Lewis & Clark MSP & Phase II SP Page 20 of 21 APPENDIX B – PROJECT SITE ZONING AND GROWTH POLICY Zoning Designation and Land Uses: The subject property is zoned “M-1” (Light Manufacturing District). The intent of the “M-1” district is to provide for the community's needs for wholesale trade, storage and warehousing, trucking and transportation terminals, light manufacturing and similar activities. The district should be oriented to major transportation facilities yet arranged to minimize adverse effects on residential development, therefore, some type of screening may be necessary. Adopted Growth Policy Designation: The Future Land Use Map of the Bozeman Community Plan designates the subject property to develop as “Industrial”. The “Industrial” classification provides areas for the uses which support an urban environment such as manufacturing, warehousing, and transportation hubs. Development within these areas is intensive and is connected to significant transportation corridors. In order to protect the economic base and necessary services represented by industrial uses, uses which would be detrimentally impacted by industrial activities are discouraged. Although use in these areas is intensive, these areas are part of the larger community and shall meet basic standards for landscaping and other site design issues and be integrated with the larger community. In some circumstances, uses other than those typically considered industrial have been historically present in areas which were given an industrial designation in this growth policy. Careful consideration must be given to public policies to allow these mixed uses to coexist in harmony. APPENDIX C – DETAILED PROJECT DESCRIPTION AND BACKGROUND Project Description The Lewis and Clark Commerce Center Master Site Plan application proposes the construction of a church, office and shop buildings with shared parking in two phases. Phase II preliminary site plan proposes the construction of a 14,800 square foot “community center” with associate parking and site improvements. Currently, the Calvary Chapel Church is planning to lease the proposed community center to operate their church. In the future, the building has been designed for multi- purpose as allowed within the M-1 zoning. Phase III is planned for an office building and two shop buildings with associated parking and site improvements. The office and shop buildings in Phase III are conceptual, a subsequent site plan will need to be submitted in the future, providing a more detailed review. In November 2014, the Lewis and Clark Storage and Warehouse Master Site Plan Z14282 was approved for construction of a storage unit development and future office and shop buildings. A new application is required to replace Z14282 due to reconfiguration and expanded scope of the proposed project. Phase I is currently under construction and was previously approved as Site Plan Application Z15329, Lewis and Clark Storage Units. 15370 & 15371, Staff Report for the Lewis & Clark MSP & Phase II SP Page 21 of 21 APPENDIX D – NOTICING AND PUBLIC COMMENT The site has not been noticed at this time. It will be noticed September 3, 2015. No public comment has been received as of the writing of this report. APPENDIX E - OWNER INFORMATION AND REVIEWING STAFF Owner: Montana DNRC, ATTN: Real Estate Management Bureau, Property Management Section, PO Box 201601, Helena, MT 59620 Applicant: Chase Skogen, 2149 W Durston #31 Bozeman, MT 59718 Representative: Visser Architects, P.C., 163 Quiet Water Way, Manhattan, MT 59741 Report By: Heather Davis, Associate Planner FISCAL EFFECTS No unusual fiscal effects have been identified. No presently budgeted funds will be changed by this application. ATTACHMENTS The full application and file of record can be viewed at the Community Development Department at 20 E. Olive Street, Bozeman, MT 59715. Application materials