HomeMy WebLinkAbout15- Amendment No. 3 Morrison-Maierle, Inc for Capital Improvement Projects Field SurveyAMENDMENT NO. 3 TO
PROFESSIONAL SERVICES AGREEMENT
FOR
CAPITAL IMPROVEMENT PROJECTS FIELD SURVEY
NM. No. 0417.075
THIS IS AN AGREEMENT made as of� , 2015, between
THE CITY OF BOZE MAN, a Municipal Corporatio , P.O. ox 1230, Bozeman, Montana,
59771-1230 (OWNER) and Morrison-Maierle, Inc., P.O. Box 1113, Bozeman, Montana, 59771-
1113 (ENGINEER).
WHEREAS the parties previously entered into a Professional Services Agreement dated
October 13, 2014, herein referred to as the Original Agreement, for professional engineering
services for the Capital Improvement Projects Field Survey Project; and
WHEREAS, the scope of the Original Agreement included preliminary design services only;
and
WHEREAS, the scope of Amendment No. l and No.2 to the Original Agreement included
additional preliminary design services; and
WHEREAS, the parties desire to amend provisions of the Original Agreement to include
additional preliminary design engineering services for the project.
NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL COVENANTS
CONTAINED HEREIN, the parties agree as follows:
The conditions and provisions set forth in the attached EXHIBIT C-3 — SCOPE OF SERVICES
FOR CAPITAL IMPROVEMENT PROJECTS FIELD SURVEY AND EXHIBIT D-3 - FEE
ESTIMATE are hereby incorporated in and made part of this Agreement.
ARTICLE 4 - Basic Engineering Services
Section 4.2 is included as part of this amendment and is modified as follows:
The last sentence of Section 4.2 of the Original Agreement is replaced with the following:
The Preliminary Design Phase will be completed and submitted by the end of September 2015. Task 700 shall
be completed and delivered to OWNER by October, 2015.
1
Article 6 - Compensation For Engineering Service
Article 6.1 of the original agreement is modified as follows:
6.1 LUMP SUM AGREEMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER
6.1.1 Paent. The OWNER shall for design phase services performed as Basic Engineering
Services under sections 4.1 through 4.3 of this agreement pay a total sum in the amount of
$169,078.05 for such services.
6.1.2 Payment Schedule. Total cumulative payments for the design phase engineering services
(sections 4.1 through 4.3) shall not exceed the following ceilings:
$11,061.40 (7 % of design fee) until the Task 100 has been completed and submitted to the OWNER
and review authorities.
$169,078.05 (100 % of design fee) until the Tasks 100, 200,300A, 400A, 500,600 and 700 have been
completed and submitted to the OWNER and review authorities.
Except as specifically amended herein, the Original Agreement shall remain in full force and effect
and the parties shall be bound by all terms and conditions therein.
2
In witness whereof, the Parties hereto do make and execute this Agreement.
CITY OF BOZEMAN, MONTANA MORRISON-MAIERLE, INC.
BY. BY:
(City Manager) (Vice -President)
DATE: _ 2 t` _ DATE: l C t
0'
ATTEST:
BY.
(City 1
PIN co'��o
3
MORRISON
MAIERLE, Ne,
M t,"&Yee.0--' CanpunY
Exhibit C-3 - Scope of Services for Capital Improvement Projects Field Survey
July, 2015
Preliminary Design Phase
The preliminary design phase will proceed following written authorization to proceed from the
owner. The topographic survey shall occur during this phase.
This phase includes specific tasks and sub -tasks that will be provided for the Capital
Improvement Projects Field Survey. Each task encompasses a specific survey area within the
City of Bozeman and the sub -tasks define the work elements for each task.
The tasks defined for this project include the following and are illustrated on the attached figure
within Exhibit C-3:
Task 700 - N. Wallace Avenue
• Task 700 to be completed and delivered to the City of Bozeman by October 2015.
The following sections describe each sub -task as well as identifying the deliverable for each sub -
task.
Sub -task 001
Office Research and Computations
Task Description — Complete research and computations as well as preparation of survey
equipment and files required for field survey.
Task deliverable — N/A
Sub -task 002
Horizontal and Vertical Field Control
Task Description — Establish vertical / horizontal control and provide horizontal control
points and vertical benchmarks at each intersection or at intervals not to exceed 1,000
feet.
Task deliverable — N/A
AAM MORRISON
MERLE, inc.
ML.&yee-0- dCo ".y
Sub -task 003
Topographic Field Survey
Task Description — Complete a topographic design survey of the right of way including
areas beyond right of way as necessary to locate curb boxes. Extend survey to fifty feet
down each intersecting roadway and survey next manhole, water valve, etc., along
intersection. Survey includes surface features and subsurface utilities, including depth
information on water, sewer, and storm utilities. Manholes shall have center of lid and
center of manhole located. Horizontal locations of underground utilities provided by
utility locate personnel using pin flags and paint markings. Underground utility materials
and sizes to be noted based on locates and City of Bozeman provided service cards and
record drawings. Advise city staff of any discrepancies between survey and service
cards/record drawings. City of Bozeman to provide vacuum excavation services as
needed for valve boxes and sewer and storm manholes/inlets.
Task deliverable — N/A
Sub -task 004
Office Survey Data Processing
Task Description — Download survey data and prepare topographic mapping drawings
using standard Morrison-Maierle line work and symbols.
Task deliverable — N/A
Sub -task 005
Field Survey Verifications
Task Description — Review topographic survey drawings for completeness and accuracy
by walking the project area with drawings in hand. Based on field review, complete
additional survey as necessary and update survey drawings.
Task deliverable — N/A
Sub -task 006
Deliverables
Task Description — Prepare project notebook.
Task deliverable — Topographic mapping exhibits (both paper and electronic) for each
survey area. Overall control exhibits (both paper and electronic) for each survey area.
Topographic and control exhibits may be combined. Electronic AutoCad files shall
utilize a Civil 3D 2013 compatible format. Copies of all field notes.
MORRISON
AA an
MAIERLE, wc.
���royrc.ow,r a�n„n�m
Sub -task 007
Coordination — City, MDT, Utilities
Task Description — Project coordination and utility locate coordination.
Task deliverable — N/A
Sub -task 008
Quality Assurance / Quality Control
Task Description — This task includes effort associated with project coordination and
quality control/assurance.
Task deliverable — N/A
MORRISON
y
MAIERLE, INC.
An Biopl } -O..M Company
AREA OF SURVEY
ADDED = ±5.7 ACRES
Engineers 2880 Technology Blvd. W. DRAWN BY: KDJ
Bozeman MT59718
Surveyrors CHK'D. BY: KDJ
SNenVsls [BOZEMAN
Planners Phone: (406)5870721 APPR. BY:
0 250
( IN FEET )
CITY OF BOZEMAN CAPITAL IMPROVEMENT PROJECTNO.
PROJECTS FIELD SURVEY _ CITY SURVEY
Fax: (406) 9220702 DATE: 7/2015
M11 N WALLACE AVENUE -LAMME ST. TO RAILROAD TRACKS (ADD)
Na041710751ACADTxhibits\Contract Amend ExhibitslCapitol Improvement Projects Field Survey_Amend3.dwg Ploltedbykevin Jacobsen on JuV14/2015
FIGURE NUMBER
FIG. 6
Exhibit D-3 - Fee Estimate AtdA MORwsoN
City of Bozeman, MT - Capital Improvement Projects Field Survey MAIERLE,m.
Prepared For: Robert Murray Jr., P.E.
Survey / Engineerinq Services
Jul -2015
Task.TQa1- N. Wal�ace'Ave �.
$x,551;50 :
N:\0417\075\Contracts-Client\Contracts\Contract Amend #3\Exhibit D-3 - Engineering Fee Estimate.xls 7/13/2015
MEN..
700 - N. Wallace Ave.
701. Office Research and Computations
Land Surveyor III
1.00
114.00
114.00
Land Surveyor II
2.00
$102.00
$204.00
702. Horizontal and Vertical Field Control
Two Person Survey Crew
8.00
$175.00
$1,400.00
Land Surveyor III
3.00
114.00
$342.00
Two Person Survey Crew
32.00
$175.00
$5,600.00
703. Topographic Field Survey
Senior Engineer I
3.00
$128.00
384.00
Land Surveyor III
6.00
$114.00
$684.00
704. Office Survey Data Processing
Land Surve or II
6.00
$102.00
$612.00
Friniripprinn Technician II
20.00
$102.00
040.00
705. Field Survey VeriFlcations
Senior En ineer I
6.00
$128.00
---i?
$768.00
Land Surve or II
3.00
$102.00
306.00
706. Del(verables
Senior Engineer I
4.00
$128.00
$512.00
Engineering Technician II
3.00
$102.00
306.00
707. Coordination - City, MDT, Utilities
Senior En ineer I
6.00
$128.00
$768.00
Land Surve or III
4.00
$456.00
708, uallAssurance uall i Control
Sul)ervislnil En ineer III
1.00
172.00
172.00
® •
® • ®
-=No=
• ,
•
.648.00
Technology and Communications
108.00
$6.00
Vehicle ml
75.00
$0.74
155.50
GPS/Total Station (days)
5.00
225.00
$1,125.00
Survey Materials (days)
5.00
$6.00
130.00
Deliverable Package
1
$25.00
$25.00
Task.TQa1- N. Wal�ace'Ave �.
$x,551;50 :
N:\0417\075\Contracts-Client\Contracts\Contract Amend #3\Exhibit D-3 - Engineering Fee Estimate.xls 7/13/2015