IMPROVEMENTS AGREEMENT
FOR
PARTRIDGE DOWNS PHASE 1 MAJOR SUBDIVISION
(SIDEWALK IMPROVEMENTS)
This AGREEMENT is made and entered into this "'day of `
2015, by and between VISION DEVELOPMENT, hereinafter called the "Subdivider", and the
CITY OF BOZEMAN, a municipal corporation and political subdivision of the State of Montana,
with offices at City Hall, 121 North Rouse Avenue, P.O. Box 1230, Bozeman, MT 59771-1230,
hereinafter called the "City".
WHEREAS, it is the intent and purpose of the Subdivider to meet the conditions of
preliminary plat approval, Planning Application No. P14015, for the Final Plat application of
Partridge Downs Phase I Major Subdivision (PI5013), to subdivide 6.21± acres together and
create thirty(30) single-household residential lots, one Open Space parcel, and the remaining area
as public streets; and
WHEREAS,it is the intent and purpose of the Subdivider to obtain Final Plat approval for
Partridge Downs Subdivision,Phase 1; and
i
Partridge Downs Major Subdivision-Sidewalk Improvements Agreement 1
WHEREAS,the Final Plat for the Partridge Downs Subdivision,Phase 1, was filed prior
to the installation of all required subdivision improvements for Phase 1 and an improvements
agreement with financial security was provided; and
WHEREAS,it is the intent and purpose of both the Subdivider and the City to hereby enter
into an Agreement which will guarantee the full and satisfactory completion of the required
improvements related with the property hereinafter described; and it is the intent of this
Agreement, and of the parties hereto, to satisfy the improvements guarantee requirements for the
Final Plat approval of Partridge Downs Subdivision,Phase 1.
NOW, THEREFORE, in consideration of the mutual covenants and conditions contained
herein, it is hereby agreed as follows:
1. Property Description
This Agreement pertains to, and includes, those properties which are designated and
identified as being:
LEGAL DESCRIPTION—PARTRIDGE DOWNS PHASE 1
(SIDEWALK IMPROVEMENTS ON LOT FRONTAGE)
The property is legally described as Tract 2A of COS 501,together with a strip of land described
in Document No. 2268861, on file and of record in the office of the Clerk and Recorder, Gallatin
County, Montana, and located in the Southeast One-Quarter(SE '/4) of Section 3, Township Two
South(T2S),Range Five East(R5E),P.M.M., Gallatin County,Montana.
SUBJECT to all easements of record or apparent from a visual inspection of the property.
2. Improvements
This Agreement specifically includes the following improvements for Phase 1: lot sidewalk
improvements. The Estimated Cost of said improvements for Lot Sidewalk improvements has
been estimated by Northwest Concrete Services, 830 Painted Canyon Drive, Bozeman, MT
Partridge Downs Major Subdivision—Sidewalk Improvements Agreement 2
59718, at Thirty One Thousand Eight Hundred Fifteen Dollars and No Cents($31,815.00). The
estimate is attached and made a part of this Agreement, as Exhibit"A".
3. Financial Guarantee,Time for Completion of Improvements,Additional restrictions
It is the Subdivider's intent with this Agreement to file the Final Plat prior to completion
of all required subdivision improvements. Therefore, this Agreement shall be secured by
irrevocable standby Letter of Credit No. 7400003990 for an amount not to exceed$47,722.50
at Bank of Bozeman, 875 Harmon Stream Blvd., Bozeman, Montana 59718, acceptable to the
City of Bozeman, which is one hundred and fifty (150) percent of the Estimated Cost of said
improvements.
The Subdivider hereby agrees that the following subdivision related improvements
shall be installed and completed not later than three (3) years of the filing of the final
subdivision plat for Partridge Downs Major Subdivision, Phase 1: lot sidewalk
improvements in order to avoid default on the method of security.
The Subdivider agrees that no delegation of performance required by this agreement shall
relieve the Subdivider of any duty to perform or any liability for the breach of that duty to complete
said subdivision improvements required for the Partridge Downs Major Subdivision,Phase 1.
Upon submission of fully documented invoices for the work performed, said work to be
inspected and certified for payment by Subdivider's professional engineers and the City of
Bozeman and or its agents as necessary,the City of Bozeman may release a portion of the letter of
credit for the work completed by the referenced invoices.
4. Inspection
Partridge Downs Major Subdivision—Sidewalk Improvements Agreement 3
Representatives of the City shall have the right to enter upon the property at any reasonable
time in order to inspect it and to determine if the Subdivider is in compliance with this Agreement,
and the Subdivider shall permit the City and its representatives to enter upon and inspect the
property at any reasonable time.
5. Default
Time is of the essence of this Agreement. If the Subdivider shall default in or fail to fully
perform any of its obligations in conformance with the time schedule under this Agreement, and
such default or failure shall continue for a period of thirty(30)days after written notice specifying
the default is deposited in the United States mail addressed to the Subdivider at Vision
Development,P.O.Box 1858,Bozeman,MT 59771-1858,or such other address as the Subdivider
shall provide to the City from time to time, without being completely remedied, satisfied, and
discharged,the City may elect to enforce any of the following specified remedies:
A) The City may,at its option,declare the financial guarantee to be forfeited and secure
the complete construction and inspection of the improvements described herein.
The City's representative, contractors, and engineers shall have the right to enter
upon the property and perform such work and inspection, and the Developer shall
permit and secure any additional permission required to enable them to do so. In
the event that any funds remain from the financial guarantee upon completion of
all improvements, such funds shall be promptly returned to the Subdivider.
B) The City may enforce any other remedy provided by law.
6. Indemnification
The Subdivider hereby expressly agrees to indemnify and hold the City harmless for and
against all claims, costs and liability of every kind and nature, for injury or damage received or
sustained by any person or entity in connection with, or on account of the performance of work at
the development site and elsewhere pursuant to this Agreement. Subdivider further agrees to aid
and defend the City in the event that it is named as a defendant in an action concerning the
Partridge Downs Major Subdivision—Sidewalk Improvements Agreement 4
performance of work pursuant to this Agreement except where such suit is brought by the
Subdivider. The Subdivider is not an agent or employee of the City.
7. Attorney Fees
In the event it becomes necessary for either party to this Agreement to retain an attorney
to enforce any of the terms or conditions of this Agreement, then the prevailing party shall be
entitled to reasonable attorney's fees and costs,including fees,salary,and costs of in-house counsel
including City Attorney.
8. Warranty
The Subdivider shall warrant against defects of all improvements and that these
improvements are made in a good and workman-like manner for a period of two (2) years from
the date of their written acceptance by the governing body.
9. Governing Law
This Agreement shall be construed according to the laws of the State of Montana. In the
event of litigation concerning this Agreement, venue is in the Eighteenth Judicial District Court,
Gallatin County, State of Montana.
10. Modification or Alterations
No modifications or amendment of this Agreement shall be valid, unless evidenced by a
writing signed by the parties hereto.
11. Invalid Provision
The invalidity or unenforceability of any provision of this Agreement shall not affect the
other provisions hereof, and this Agreement shall be construed in all respects as if such invalid or
unenforceable provision were omitted.
12. No Assignment
Partridge Downs Major Subdivision—Sidewalk Improvements Agreement 5
It is expressly agreed that the Subdivider shall not assign this Agreement in whole, or in
part,without prior written consent to City.
13. Successors
Except as provided in paragraph twelve(12),this Agreement shall be binding upon,ensure
to the benefit of,and be enforceable by the parties hereto and their respective heirs, successors and
assigns.
14. Filing
The Subdivider shall have this Agreement recorded in the Office of the Gallatin County
Clerk and Recorder at the within 10 business days of the signature of the Community Development
Director.
Partridge Downs Major Subdivision—Sidewalk Improvements Agreement 6
SUBDIVIDER
BY: DENNIS BALIAN, PRESIDENT
VISION DEVELOPMENT
STATE OF MONTANA )
:ss
County of Gallatin )
On this I(o day of t , 2015, before me a Notary Public of the State of
Montana, personally appeared Dennis Balian, known to me to be the person that executed the
foregoing Improvements Agreement, and acknowledged to me that they executed the same for and
on behalf of said Subdivider.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my Notarial Seal the day
and year first above written.
SEAL
; f �;Fbb OORINNE WRIGHT
Notary (Printed Name re)
o°•NOTnRiA���n for the StAt®of of Montana
Residing at: Notary Public for the State of Montana
Bozeman, Montanat
My Commission Expires: RBSidlrig at °- oN t N
of1 ilk rno June 15, 201 s My Commission Expires:
(Use 4 digits for expiration year)
Partridge Downs Major Subdivision—Sidewalk Improvements Agreement 7
THE CITY OF BOZEMAN
BY: WENDY THOMAS,
COMMUNITY DEVELOPMENT DIRECTOR
CITY OF BOZEMAN
STATE OF MONTANA )
:ss
County of Gallatin )
On the day of o , 2015, before me, a Notary Public for the
State of Montana, personally appeared Andy Thomas, known to me to be the person described
in and who executed the foregoing instrument as Community Development Director of the City of
Bozeman, whose name is subscribed to the within instrument and acknowledged to me that she
executed the same for and on behalf of said City.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my seal on the day and
year first written above.
(SEAL) �Q S
;� 'M KATHERINE M/-,J�NE-s (P ted Name Here)
Notary Flubitc; o Public for the State of Montana
for the Stato o tviont;,na
*: -- Roei�;�r=��� <ir„ Residing at
n'.SEAL. Belgrade, tv'-�ntu.r,..,.
=;qT�o�Mo ,: My Commission Expi
My Commission Explr
,,,I,"I July 22,201 G _ (Use 4 digits for expiration yea
Partridge Downs Major Subdivision—Sidewalk Improvements Agreement 8
EXHIBIT "A"
ESTIMATED COST FOR IMPROVEMENTS
---------------------------------------------------------------------------------------------------------------------
Date:
Project: Partridge Downs Major Subdivision,Phase I
Developer: Dennis Balian,Vision Development
---------------------------------------------------------------------------------------------------------------------
Improvement Sq. Ft./Ln. Ft Estimated
Lot Sidewalk Improvements 8,484 sq/ft @$3.75 per sq/ft $ 31,815.00
$ 31,815.00
Sub Total $ 31,815.00
150% $ 47,722.50
Approved by City Engineer's Office w Date
Partridge Downs Major Subdivision—Sidewalk Improvements Agreement 9
Partridge Downs Subdivision
Sidewalk QTO for Improvements Agreement
April 14, 12015
Sidewalk Unit Price: $ 3.75 /sf
Sidewalk Width: 5 ft
Block 1
Lot Length (ft) Area (sf) Cost Notes
1 73.21 366.05 $ 1,372.69
2 53.01 265.05 $ 993.94
3 53.01 265.05 $ 993.94
4 53.01 265.05 $ 993.94
5 53.01 265.05 $ 993.94
6 53.01 265.05 $ 993.94
7 53.01 265.05 $ 993.94
8 53.01 265.05 $ 993.94
9 63.30 316.50 $ 1,186.88
10 59.93 299.65 $ 1,123.69
11 63.13 315.65 $ 1,183.69
12 61.79 308.95 $ 1,158.56
13 58.50 292.50 $ 1,096.88
14 159.64 798.20 $ 2,993.25 Corner Lot
Block 2
Lot Length (ft) Area (sf) Cost Notes
1A 77.2/1 386.20 $ 1,448.25 PI'iase 2
2 58.01 290.05 1,087.69 Phase 2
3 58.01 290.05 1,08'7.69 Please 2
4 58.01 290.05 $ 1,087.69
5 58.01 290.05 $ 1,087.69
6 58.01 290.05 $ 1,087.69
7 58.01 290.05 $ 1,087.69
8 161.03 805.15 $ 3,019.31 Corner Lot
9 161.04 805.20 $ 3,019.50 Corner Lot
10 58.03 290.15 $ 1,088.06
11 58.03 290.15 $ 1,088.06
12 58.03 290.15 $ 1,088.06
13 58.03 290.15 $ 1,088.06
14 58.03 290.15 $ 1,088.06 Phase 2
15 58.03 290.15 1,08C.06 Phase 2
16 77.04 385.20 1,444.50 1'hase 2
PH 1 TOTAL 1696.80 8484.00 $ 31,815.00
Northwest Concrete Services PROPOSAL
830 Painted Canyon Drive
Bozeman,MT 59718 Date Estimate#
4/20/2015 1340
Submitted to: Work to be Performed at:
Vision Development Partridge Downs
P.O.Box 1858 Bozeman
Bozeman,MT 59771-1858
Description Total
Public sidewalk labor and materials, 1696.8 LF equates to 8484SF 31,815.00