Loading...
HomeMy WebLinkAbout15- Task Order Tetra Tech for June 2015 Document Compilation and General Support Bozeman Landfill• L ■ ■, JUNE 2015 DOCUMENT COMPILATION AND GENERAL SUPPORT BOZEMAN LANDFILL d June 25, 2015 L 0 6 2,C,' CLIENT: CONSULTANT: --------------------- The --------------WThe City of Bozeman Tetra Tech, Inc. P.O. Box 1230 851 Bridger Drive, Ste 6 Bozeman, Montana 59711-1230 Helena MT 59715 Attention: Mr. Rick Hixson and Craig Woolard Attention: Mr. Kirk A Miller INTRODUCTION The City's outside counsel, Gough, Shanahan, Johnson and Waterman have requested that Tetra Tech provide copies of all hard copy documents and papers, electronic files and emails pertaining to the Bozeman Landfill since the start of Tetra Tech's work on the site. This covers over 20 years of documents, including records from predecessor companies (Maxim Technologies, Northern Engineering etc.) that are stored in multiple Tetra Tech offices and servers. The majority of home mitigation systems have been through periodic inspections for at least one year. They will now be inspected on an annual basis, unless the homeowner identifies a problem that needs to be addressed. However, the mitigation systems in six homes underwent significant modifications last winter and spring (e.g., new fans or additional extraction points) and will require quarterly inspection for at least one more year per DEQ guidance. This task order includes the following work activities; • Compile documents, electronic files, emails maps, CAD files and other information relative to Tetra Tech and its predecessor company's work on the landfill and provide information to the City's outside counsel. • Continue to respond to homeowner requests for information, system monitoring, modifications and other issues. Triple R mitigation just submitted costs for system modifications made over the last 4 months. • Conduct quarterly inspection of the six homes that had significant mitigation system modifications in early 2015 for up to one year. • Respond to City requests for information or assistance, and attend meetings, as needed. The mitigation system inspections and reporting will occur as needed through between May 2015 and April 2016. The responses to homeowner requests and City requests are likely to be ongoing, so a specific timeline cannot be projected. The compilation of project records was initiated in April and is ongoing and is anticipated to be completed in July 2015. Task Order For Document Compilation and General Support Bozeman Landfill June 25, 2015 Page 2of2 COSTS Estimated costs to complete the foregoing scope of services are $49,048, as detailed in Table 1. The services will be conducted on a time and materials basis. SPECIAL CONDITIONS: Execution of this Task Order constitutes acceptance of all terms and conditions contained in Tetra Tech's Professional Services Agreement with the City of Bozeman, dated January 3, 1994 and Amendment Nos. 1, 2, 3, and 4 of the Professional Services Agreement dated July 31, 1995; January 1, 1996; March 17, 1997; and December 10, 2001, respectively. CLIENT: CONSULTANT: Tetra Tech By: Its: Senior Project Manager Date: June 25, 2015 NOTICE OF CONFIDENTIALITY This Task Order (including attachments) contains information confidential to Tetra Tech, Inc., its subsidiaries, and subcontractors. It is intended only for City of Bozeman to consider Tetra Tech providing professional services at the Bozeman Landfill. Argy other Lrse is prohibited, without the prier written consent of Tetra Tech. Page 2of2 TABLE 1 - ESTIMATED BUDGET JUNE 2015 DOCUMENT COMPILATION AND GENERAL SUPPORT BOZEMAN LANDFILL BOZEMAN, MONTANA Date Submitted: 6/25/2015 Document Compilation Field Work Units Rate Cost Project Manager/Senior Hydrogeologist, per hour 24 $180.00 $4,320.00 Assistant Project Manager/Hydrogeologist, per hour 50 $90.00 $4,500.00 Environmental Scientist, per hour 20 $80.00 $1,600.00 Administrative Personnel, per hour 60 $60.00 $3,600.00 Labor Subtotal $14,020.00 DIRECT COSTS Tetra Tech Vehicle Mileage, per mile 50 $0.56 $28.00 Per Diem and Lodging, per person per day 1 $140.00 $140.00 Direct Costs Subtotal $168.00 Document Compilation Subtotal $14,188.00 Mitigation System Inspections and Homeowner Questions Project Manager/Senior Hydrogeologist, per hour 8 $180.00 $1,440.00 Assistant Project Manager/Hydrogeologist, per hour 24 $90.00 $2,160.00 Principal Engineer, per hour 4 $275.00 $1,100.00 Field Technician, per hour 90 $75.00 $6,750.00 Administrative Personnel, per hour 4 $60.00 $240.00 Labor Subtotal $11,690.00 Subcontractors Triple R Mitigation 0 $7,500.00 Festa Radon Technologies high flow fans 2.00 $450.00 $900.00 TetraTech Subcontractor Markup (10%) $840.00 Direct Costs Subtotal $9,240.00 Mitigation System Inspections Subtotal F $20,930.00 Response to City Requests For Information Project Manager/Senior Hydrogeologist, per hour 60 $180.00 $10,800.00 Assistant Project Manager/Hydrogeologist, per hour 20 $90.00 $1,800.00 Environmental Scientist, per hour 0 $80.00 $0.00 Administrative Personnel, per hour 16 $60.00 $960.00 Labor Subtotal $13,560.00 DIRECT COSTS Tetra Tech Vehicle Mileage, per mile 600.00 $0.60 $360.00 Photocopies, estimate 100 $0.10 $10.00 Direct Costs Subtotal $370.00 Response to City Requests Subtotal $13,930.00 TOTAL OFALL TASKS $49,048.00 Tetra Tech