Loading...
HomeMy WebLinkAboutA2. Amendment 1 PSA DHMAmendment #1 - Professional Services Agreement for Bozeman Pond Park Expansion TOP Bond Project Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Carolyn Poissant – Trails, Open Space, and Park Development Manger Mitch Overton – Director of Parks and Recreation SUBJECT: Amendment #1 - Professional Services Agreement for Bozeman Pond Park Expansion TOP Bond Project MEETING DATE: July 27, 2015 AGENDA ITEM TYPE: Action RECOMMENDATION: Authorize the City Manager to sign Amendment #1 of the Professional Services Agreement with DHM Design (with Allied Engineering Services, Inc. subcontractor), hereinafter referred to as, “Consultant” for design, engineering, and construction administration services for the Bozeman Pond Park Expansion TOP Bond Project (“Project”) RECOMMENDED MOTION: Having considered public all input and reviewed materials submitted by staff, I hereby authorize the City Manager to sign Amendment #1 of the Professional Services Agreement with DHM Design for design, engineering, and construction administration services for the Bozeman Pond Park Expansion TOP Bond Project, for an additional amount of $14,335 ($97,575 total contract amount). BACKGROUND: Resolution No. 4494 approved the allocation of Trails, Open Space and Parks (TOP) bond funding in an amount not to exceed $1,045,000 for the acquisition of park land and development of the Bozeman Pond Park Expansion Project. The land purchase was completed in 2014 for $607,100 leaving $437,900 for construction of park improvements. An RFQ was advertised and proposals were received and evaluated in accordance with city and state requirements late last fall. A selection committee comprised of representatives of Bozeman Parks, GVLT, and Run Dog Run, who are partners in the project. The highest ranking team as rated by the selection committee was DHM Design, teamed with Allied Engineering. A Professional Services Agreement was approved by Commission on Feb. 8, 2015 in the amount of $83,240. The process for approving a park master plan and site plan produced by the city is not clearly defined in the code. The Consultant’s original scope of work included refinement of the conceptual master plan into a final site plan, which was to be submitted for review by DRC and Commission. In the course of reviewing the master plan and site plan (including 60% complete construction drawings), which were submitted together as recommended by staff, it was determined that a master plan first needed to be approved by Commission in order to address Pond Row and Fowler Road infrastructure issues, followed by site plan review by the DRC. (The original PSA Commission memo stated, “Construction of Pond Row street and utility 115 Amendment #1 - Professional Services Agreement for Bozeman Pond Park Expansion TOP Bond Project improvements is not scheduled to take place at this time as planning and design of the Haven development is still in its early stages.”) On June 8, 2015 Commission passed a motion to add $105,000 to the Project budget for Phase I construction to include a paved “stub” entry and gravel parking lot. In order to meet as many code requirements as possible within current budget constraints, the site plan drawings and submittal package will need to be modified prior to DRC review. The cost of additional services is $14,335, for a contract total of $97,575, which is 18% of the new total Project construction budget of $542,900. A complete breakdown of added services is attached in Amendment No. 1 of the Professional Services Agreement (Attachment A). Bidding and contract award are scheduled to take place in September with site construction occurring in October-November. Some final landscaping and work by partners on the fines trails and playground may need to be completed next spring, depending on fall weather conditions. City engineering, community development, and parks department staff will continue to hold project status meetings to ensure that road and infrastructure design and construction in the rights-of-way surrounding the park, as well as improvements on adjacent properties being developed, are well coordinated. UNRESOLVED ISSUES: Negotiations are underway to determine the need for a boundary line adjustment or easement with The Help Center, Inc. for the “Hearts and Homes” property adjacent to the park. This issue does not affect the park design or construction. ALTERNATIVES: Per Commission. FISCAL EFFECTS: The Agreement will allow the project to proceed as previously approved. Attachment: Amendment No. 1 to Professional Services Agreement for Bozeman Pond Park Expansion Project Report compiled on: July 17, 2015 116 1 ATTACHMENT A Amendment No. 1 to Professional Services Agreement for Bozeman Pond Park Expansion Trails, Open Space, and Parks Bond Project THIS AGREEMENT is made as of this ____ day of __________________, 2015, between THE CITY OF BOZEMAN, a Municipal Corporation, P.O. Box 1230 Bozeman, Montana, 59771-1230 (CITY) and DHM Design, whose address is 201 S. Wallace, Suite A-3, Bozeman, Montana, 59715 (CONSULTANT). WHEREAS, the parties have entered into a Professional Services Agreement dated February 8, 2015, for design and engineering services for the Bozeman Pond Expansion Project; and WHEREAS, revisions to the scope of services are necessary to complete the Project in accordance with the Master Plan approved by Commission; and WHEREAS, the parties desire to amend the provisions of this Agreement. NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL COVENANTS CONTAINED HEREIN, the parties agree as follows: The conditions and provisions set forth in the attached Amendment No. 1 to Scope of Services for Bozeman Pond Expansion Project (“Exhibit A”) are hereby incorporated in and made part of this agreement. Section 4 – Payment: Section 4 of the original agreement is modified to include $83,240 plus $14,335, for a contract total of $97,575. Except as specifically amended herein, the original agreement shall remain in full force and effect and the Parties shall be bound by all terms and conditions therein. 117 2 IN WITNESS WHEREOF, the parties hereto do make and execute this Agreement. CITY OF BOZEMAN DHM DESIGN BY: __________________________________BY:___________________________________ (City Manager) (Authorized Signatory) DATE:________________________________DATE:_________________________________ ATTEST: BY:____________________________________ (City Clerk) 118 Exhibit A Scope of Services And Cost Schedules 119     Bozeman Pond Park Expansion Project         Amendment to Bozeman Pond Park Professional Services Agreement for Design and Engineering       Prepared by: DHM Design and Allied Engineering Services, Inc.               16 July 2015    PSA Amendment #1 Scope of Services:  DHM Design and Allied Engineering are requesting an amendment to the PSA agreement in order to to redesign  and resubmit the 60% Construction Document Submittal.  The following represents the change in scope based  on the outcomes of the Master Planning approval process noted above:  Design Changes:   Re‐design and layout of the parking lot in order to reduce the parking lot to 18 spaces and regrade to  include curb and gutter.   Redesign the landscape plan to include all of the required parking lot landscaping and curb and gutter.   Redesign the stormwater system.  Alter storm water conveyance infrastructure to accommodate the  new storm water pond location and parking lot changes.   Update plans and details to include a smaller restroom building.   Complete grading changes associated with parking lot, stormwater system and restroom building.    Redesign path layout to eliminate 1 of the picnic shelters.   Redesign dog park path layout with separate path around the perimeter.   Redesign the entry drive, reducing the cross section from 35’ to 31’ per Engineering Department’s  request.    Preliminary Site Plan Submittal:  DHM Design and Allied Engineering will revise the Preliminary Site Plan Submittal with the design changes as  noted above and re‐submit to the City for DRC review and approval.  We recommend starting the re‐submittal  process with a team meeting including City Staff from Community Development, Engineering and Parks  departments.  The goal for this meeting will be to review the scope of services memo provided on July 6th 2015  and identify any outstanding items that need to be addressed prior to commencing work.  The DHM team will  provide meeting minutes following the meeting, documenting the outcome and direction given during the  meeting.  Following the team meeting DHM and Allied Engineering will update the Preliminary Site Plans and re‐ submit to the City for approval.  DHM assumes that all variances required as part of the Site Plan Submittal will  be handled by City Staff and no additional work will be required by DHM or Allied Engineering.  DHM and Allied  Engineering will provide (1) additional opinion of probable cost as part of this additional services request.  We  will provide the cost estimate prior to the team meeting to provide City Staff with an estimate of how the  proposed scope fits within the approved budget.  If value engineering is necessary, we will discuss the options  120       for reduced scope as part of the team meeting in order to gain consensus among City Staff prior to developing  any Site Plans for DRC Review.      Summary of Deliverables:  The following deliverables will be submitted to the City in completion of this scope of work:    Revised DRC submittal including:   o DRC application, checklist, checklist narrative and Site Plan Submittal Exhibits digital copy (.pdf)  and any necessary hard copies  o Drawing set digital copy (.pdf) and any necessary hard copies   Attendance at 2 DRC meetings   (2) team coordination meetings   Additional project management (assume 3 week duration for updated drawings to be completed)   Jurisdictional determination and coordination with Army Corp of Engineers (completed July 6, 2015)    Following the completion of the Preliminary Site Plan Submittal, DHM and Allied will proceed within the  previous scope of work to complete 90% and 100% Construction Documents based on the revised design.    Professional fees: Requested Budget Increase (PSA Amendment #1)  The budget to undertake the work scope as described is estimated at $13,635.  This is based on an estimated  134 hours of professional and technical time plus $700  in expenses.  Expenses are in addition to the  professional fees and include reproduction costs, postage, and mileage within Bozeman.  The following is a  breakdown of fees per task and per consultant:  PSA Amendment #1 Scope of Services:      _______________     DHM Design:         $5,240  AESI:          $8,395     Reimbursable Expenses              DHM Design:         $300  AESI          $400  Total Design:     $13,635  Total Cost: $14,335  Refer to budget summary for an hour estimate.    121 AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT FOR DESIGN & ENGINEERING TASK NO.TASK DESCRIPTION COST 1 PROJECT MANAGEMENT $1,230 2 PROJECT RE-DESIGN $1,320 2 REVISIONS TO SITE PLAN SUBMITTAL $2,690 3 REIMBURSABLE EXPENSES $300 TOTAL COST $5,540 Prepared July 16,2015 Bozeman Ponds Expansion Project - Landscape Architectural Services - DHM Design SUMMARIZED COST (FROM ITEMIZED COST) 122 TASK NO.Stephen EllspermanDirector of Ecological PlanningCharlie KeesAssociate Principal Matthew WhippleAssociate PrincipalShara KeesAssociateStaffDesignerStaffAdminTOTAL HOURSTOTAL FEESTOTAL COSTTravel Other 1.0 PROJECT MANAGEMENT General 3 3 6 $630 $630 Meetings (Preparation and Attendance)0$0 $0 2 2 4 $420 $420 2 2 $180 $180 Subtotal Hours 050 70012 Subtotal Costs $1,230 $0 $0 $1,230 2.0 PROJECT RE-DESIGN 2 12 14 $1,320 $1,320 Subtotal Hours 020 120014 Subtotal Costs $1,320 $0 $0 $1,320 3.0 REVISIONS TO SITE PLAN SUBMITTAL 2 2 $240 $240 - Cover sheet - revisions to cover sheet 0.5 1 $40 $40 - Construction Management Plan - revisions to construction management plan with new parking lot, stormwater system, path layout, dog park path and entry drive revisions 0.5 1 $40 $40 - Landscape Plan - redesign to include parking lot landscapeing & curb & gutter 1 3 4 $390 $390 - Landscape Plan Enlargements revise with new parking lot, path layout 1 3 1 5 $470 $470 - Conceptual Irrigation Plan/Diagram revisions (Conceptual Irrigation Design including source, general areas and methods. No detailed irrigation head layout will be provided. Final irrigation to be design build). 2 2 $160 $160 - Planting Details 0.5 1 $40 $40 - Site Details (including signage, site furnishing, picnic shelters, restroom etc.) - revisions to 4 site detail sheets 2 2 4 $340 $340 2 2 $180 $180 Itemized Preliminary Cost Estimate 2 2 $240 $240 Maintenance and management design review 1 1 0.5 3 $295 $295 Quality Control Review 1 1 2 $255 $255 Subtotal Hours 280 107027 Subtotal Costs $2,690 $0 $0 $2,690 4.0 REIMBURSABLE EXPENSES 0 $0 $300 $300 Subtotal Costs $0 $300 $300 TOTAL HOURS 53 TOTAL COSTS $5,240 $0 $300 $5,540 Prepared July 16,2015 General coordination and daily project management (assumes 3 week duration for updated drawings to be completed) includes coordination with Stakeholders $270 2 Revised Site Submittal Drawings Revisions to Site Plan Submittal Checklist and Checklist Narrative $0 $0 $0 $0$0 Bozeman Ponds Expansion Project - Landscape Architectural Services - DHM Design HOURS AND FEES TASK DESCRIPTION INDIRECT COSTSITEMIZED DESIGN COST ESTIMATE - AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT FOR DESIGN & ENGINEERING $0 $80 $0 $60$120 $90$120 $600 $630$0 $0 $1,800 $0 $2,610 $560 $0 15 0 29 7 0 $135 $0 Informal Team Meetings (Includes 2 team coordination meetings) Attendance at (2) DRC meetings Tabulation of points earned by Site plan per Landscape Performance Standards Re-design project as outlined in the Amendment to Bozeman Pond Park Professional Services Agreement for Design and Engineering $0 $240 $0 $1,080 $0 $0 Printing expenses - includes printing required quantities of revised DRC submittal appplication, shecklist, site plan submittal exhibits and drawing sets. $270 $960 $0 $900 $560 $0 123 AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT FOR DESIGN & ENGINEERING TASK NO.TASK DESCRIPTION COST 1 PROJECT MANAGEMENT $1,290 2 PROJECT RE-DESIGN $4,865 2 REVISIONS TO SITE PLAN SUBMITTAL $2,240 3 REIMBURSABLE EXPENSES $400 TOTAL COST $8,795 Prepared July 16,2015 Bozeman Ponds Expansion Project - Civil Engineering Services - Allied Engineering SUMMARIZED COST (FROM ITEMIZED COST) 124 TASK NO.Paul Sanford, PEEngineering Project ManagerDoug Chandler, PhD, PEEngineering Principal Geotechnical EngineerProject EngineerStaff EngineerEnvironmental SpecialistTOTAL HOURSTOTAL FEESTOTAL COSTTravel Other 1.0 PROJECT MANAGEMENT General 4 4 $540 $540 Meetings (Preparation and Attendance)0$0 $0 2 2 4 $480 $480 2 2 $270 $270 Subtotal Hours 80020010 Subtotal Costs $1,290 $0 $0 $1,290 2.0 PROJECT RE-DESIGN 1 12 13 $1,155 $1,155 6 2 14 14 36 $3,710 $3,710 Subtotal Hours 70214141249 Subtotal Costs $4,865 $0 $0 $4,865 3.0 REVISIONS TO SITE PLAN SUBMITTAL 1 1 2 $220 $220 - Cover sheet - revisions to cover sheet 0$0 $0 - Construction Management Plan - revisions to construction management plan with new parking lot, stormwater system, path layout, dog park path and entry drive revisions 1 1 $85 $85 - Civil Design Plan 2 2 $170 $170 - Grading Plan 4 4 $420 $420 - Entry Drive (Pond Row Street)2 2 $170 $170 - Drainage Plan & Profile 3 3 $255 $255 - Civil Details 2 2 $170 $170 Itemized Preliminary Cost Estimate 2 2 4 $440 $440 Quality Control Review 1 1 2 $310 $310 Subtotal Hours 410413022 Subtotal Costs $2,240 $0 $0 $2,240 4.0 REIMBURSABLE EXPENSES 0 $0 $400 $400 Subtotal Costs $0 $400 $400 TOTAL HOURS 81 TOTAL COSTS $8,395 $0 $400 $8,795 Prepared July 16,2015 USACE Jurisdictional Determination Printing and office expenses; 318 Permit Fee Reimbursement; $540 $175 $0 $420 $1,105 $0 $0 $240 $1,470 $1,190 $1,020 $135 $0 Informal Team Meetings (Includes 2 team coordination meetings) Attendance at (2) DRC meetings Re-design project as outlined in the Amendment to Bozeman Pond Park Professional Services Agreement for Design and Engineering $945 27 121220 $175 $240 $2,100 $2,295 $1,020 $85$120 $105$175 $0 $210$0 $0 Bozeman Ponds Expansion Project - Civil Engineering Services - Allied Engineering HOURS AND FEES TASK DESCRIPTION INDIRECT COSTSITEMIZED DESIGN COST ESTIMATE - AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT FOR DESIGN & ENGINEERING $0 $85 $1,080 $0 $0 $0 $0$0 General coordination and daily project management (assumes 3 week duration for updated drawings to be completed) includes coordination with Stakeholders $2,565 19 Revised Site Submittal Drawings Revisions to Site Plan Submittal Checklist & Narrative 125