HomeMy WebLinkAbout15- Stormwater Permit Less Than One AcreStorm Water Management Regulations
For Land Disturbance Sites
LESS Than One Acre
Storm Water Management is increasingly important for the purpose of maintaining clean water and
preserving waterbodies such as streams, rivers, and lakes. The City of Bozeman’s Storm Water
Management Ordinance #1763 went into effect April 22, 2010, as mandated under the Federal Clean W
Act (CWA) and the Montana Pollution Discharge Elimination (MPDES) regulation. These regulati
designed to improve water quality in waterbodies by reducing the amount of pollutants that storm water
collects and carries into storm conveyance systems.
ater
ons are
ment
ecklist;
o
l
ions
iolation and Enforcement
ill be issued to the Responsible Party. The notice will state the nature of
1763
0.
Permit and Fee
Owners/operators of construction sites considered a Sketch Plan or higher are required to apply for a City of
Bozeman Storm Water Management Permit (SMP). The SMP requires submittals of an application form
and a Storm Water Management Plan in compliance with the City of Bozeman’s Storm Water Manage
Ordinance #1763.
The Storm Water Management Plan shall contain the following items:
1. A completed Storm Water Management Plan checklist which outlines the project site’s Best
Management Practices (BMPs);
2. A short narrative explaining how the permittee(s) will implement BMPs described on the ch
and
3. A map of the construction site showing the locations of the BMPs.
Inspection and Review
Site plan review and inspection programs aid in compliance and enforcement and provide an opportunity
for guidance and education. The City will perform a site plan review of potential water quality impacts at
the time the SMP is submitted and will conduct regular inspections of the construction site.
The permittee(s) will be required to perform site inspections every 14 days and after major storm events t
ensure all BMPs have been constructed and are functioning properly. The purpose of such inspections wil
be to determine the overall effectiveness of the control plan and the possible need for BMPs. All inspect
shall be documented in written form, kept on the project site, and made available for review by the City.
V
If any violation is found, a notice w
the alleged violation(s), the action required to fix the violation(s), and a time limit to remedy the
violation(s). Any person, firm, or corporation violating any of the provisions or terms of Ordinance #
of the City of Bozeman may be subject to penalties as a municipal infraction pursuant to Title 14 of the
Bozeman Municipal Code. If you have any questions contact the City Engineering Office at 406-528-228
City of Bozeman, Montana
Storm Water Management
Permit Application
Permit Number______________
Date Submitted _____________
Final Stabilization Date _______
Engineering Department
P.O. Box 1230
Bozeman, Montana 59771
406‐582‐2280
Note: This permit is separate from any permits required by the Montana Department of Environmental
Quality. A State Storm water Construction Permit is required for all land disturbance activities equal to or
greater than one (1) acre or for land disturbance less than one (1) acre that is part of a larger common plan
of development or sale that would disturb one (1) acre or more.
(1) Contact Information:
Project Owner
Contact Person: Company:
Mailing Address: State: Zip:
Phone: Email:
Fax: Cell Phone:
Contractor
Contact Person: Company:
Mailing Address: State: Zip:
Phone: Email:
Fax: Cell Phone:
Engineer
Contact Person: Company:
Mailing Address: State: Zip:
Phone: Email:
Fax: Cell Phone:
(2) Project Information
Project Address:
Lot Number:
Subdivision (if applicable):
Project Size:
(Land Disturbance)
Project type:
(Planning Application)
(3) Project Information
Check the appropriate box(es) or provide a brief description that indicates the general nature of the
construction activities: Single Family Residential Multi-Family Residential Utility
Commercial/Industrial Highway/Road Other (describe): _____________________________
Description of proposed work:
City of Bozeman, Montana
Storm Water Management
Permit Application
Permit Number______________
Date Submitted _____________
Final Stabilization Date _______
(4) Project Schedule
Start Date: Completion Date: Final Stabilization Date:
(5) Waterbodies and Storm Conveyance Systems
List Waterbodies within 200’ of project
Streams: Lakes:
Wetlands: Rivers:
Sloughs: Other:
List Storm Conveyance Systems within 100’ of project
Ditches: Swales:
Detention Facilities: Storm Drain Inlets:
Pipe Inlets/Outlets: Gutter:
(6) Acknowledgement Certificate:
I certify that I am the Owner or Owner’s authorized agent. If acting as an authorized agent, I further certify that I am
authorized to act as the Owner’s agent regarding the property at the above-referenced address for the purpose of
filing applications for decisions, permits or review under the City of Bozeman Ordinance ---- and have full power and
authority to perform on behalf of the Owner all acts required to enable the City to process and review such
applications.
I certify that the information on this application is true and correct and understand that I shall not start this project
until this application is approved. I shall comply with the laws of the State of Montana and the ordinances of the City
of Bozeman.
________________________________________________ __________________
Signature of Legally Responsible Person Date signed
________________________________________________ __________________
Printed Name Title
** For Official Use Only**
LESS than one acre Received City By Date
SMP Checklist Yes No Field Visit
SMP Plan Yes No Approval
SMP Map Yes No Comments:
Payment - $ Yes No
Greater or equal to one acre Received
MT Stormwater Discharge Permit (NOI) Yes No
SWPPP Yes No
Site showing BMPs Yes No
MT Stormwater Discharge Permit (NOT) Yes No
SMP Checklist Yes No
SMP Plan Yes No
SMP Map Yes No
Payment - $ Yes No
City of Bozeman, Montana Permit Number: ________
Date Submitted: ________
Site Name/Adress:_______________________________________________________________________
______________________________________________________________________________________
LessChecklist
Required Best Management Practice
(BMPs)
Stormwater Management Plan
Descriptive Narrative
Show
on Map
Initial
Here
E
R
O
S
I
O
N
A
N
D
S
E
D
I
M
E
N
T
C
O
N
T
O
L
1
Prevent silt, dirt, topsoil, etc. from washing
into the streets, alleys, drainage easements,
drainage conveyance systems, and storm
drains.
2 Implement and maintain erosion control B
to prevent the erosion and transport of
sediment by water/rain runoff.
MPs
3 Include spoil areas and staging areas as part of
the project/construction site.
4
Establish permanent erosion control for all
disturbed land areas related to the project
activity before final occupancy of structures
located thereon.
5 Identify all erosion and sediment control B
to be installed and maintained through
duration of the project.
MPs
out the
6 Use clearing techniques that retain natural
vegetation and retain natural drainage patterns
(where feasible).
7 Stabilize soil within 14 days of clearing or
inactivity in construction.
8 Stabilize or cover soil stockpiles at the end of
EACH workday.
9 Employ wind erosion techniques to prevent th
blowing of dust or sediment from the site.
e
10 Employ techniques that divert upland runoff
past disturbed slopes (where necessary).
11 Provide sediment controls in the form of
settling basins, sediment traps or tanks, and
perimeter controls (where necessary).
Stormwater Management
Checklist
LESS Than One Acre
Required Best Management Practice
(BMPs)
Stormwater Management Plan
Descriptive Narrative
Show Initial
on Map Here
P
O
L
12 Protect adjacent properties by the use of a
vegetated buffer strip, silt fence, fiber rolls, or
other BMP perimeter controls.
L
Keep solid waste materials in a container or an
enclosed waste collection area on site. 13 U
T
I Store chemicals, paint, petroleum, fertilizer
and pesticides in a covered enclosure. O 14 N Dispose of empty/unused chemical and
hazardous waste containers in accordance w
label instruction.
15 P ith
R
E Segregate potentially hazardous waste from
non-hazardous waste. V 16
E Perform daily cleanup of construction site to
ensure that all litter is contained in an
appropriate enclosure or container.
N 17 T
I
O 18 Recycle waste materials where feasible. N Contain concrete truck washout water on site
in a designated washout pit. Remove and
properly dispose of concrete residue at
conclusion of construction.
19 A
N
D
Ensure exposed aggregate waste wash water
does not leave the construction site and or get
into the curb and gutters, catch basins or any
other storm conveyance systems.
20
W
A
S
T E Locate sanitary waste facilities a minimum of
15 feet from storm drain inlets and receiving
waterbodies.
21 M
G
T
Delineate and stake the Flood Plain and install
perimeter BMPs. 22
W List waterbodies within 200’ of project
(stream, lake, river, wetland, slough, other). A 23 T
E
List stormwater conveyance systems within
100’ of project (ditch, swale, detention facility,
storm drain inlet, drywell, gutter, pipe
inlet/outlet).
24 R